SITE PREPARATION AND INSTALLATION
…02……02…CAMPS
This attachment contains further specification of the
documentation/effort requested in the milestone tracking
form.
R̲E̲F̲ ̲M̲T̲F̲ ̲P̲T̲1̲ ̲S̲I̲T̲E̲ ̲S̲U̲R̲V̲E̲Y̲S̲:̲
a) Mainsites 1-13 were performed in May-June 1980.
A survey report has been issued.
b) Mainsites Athens, Sonor, NATO and 20 Remote Terminals
Sites are pending. Preferably these sites should
be accomplished in Febr. - March 1981. The surveys
are to be planned in conjunction with SHAPE.
R̲E̲F̲ ̲M̲T̲F̲,̲ ̲P̲K̲T̲ ̲P̲H̲Y̲S̲I̲C̲A̲L̲ ̲C̲H̲A̲R̲A̲C̲T̲E̲R̲I̲S̲T̲I̲C̲S̲ ̲A̲N̲D̲ ̲H̲A̲R̲D̲W̲A̲R̲E̲
̲C̲O̲N̲F̲I̲G̲U̲R̲A̲T̲I̲O̲N̲
a) ILS will need the following details from SD/HW
for the preparation of civil works requirements
and as-to-be-built drawings:
1) Envelope dimensions, including a plan view
as installed
2) Clearance dimensions needed for access, service,
maintenance, hook-up, operation, disk travel,
etc.
3) Equipment weight and center of gravity
4) Power and signal interface, interface cabling
(size, Qantity, type, connector attachment
type)
5) Signal and power cable entry/exit of racks
and pheripherals.
6) Ventilation requirements (location, flowrate)
7) Power supply requirements:
Power consumption, voltage, frequency, phase,
power factor, steady state current, maximum
transient current at turn on (or fuse size,
fuse type required)
8) Grounding of equipment
(Type of interface, grounding systems of racks
and pheripherals)
9) Special operation - environment considerations
(vibration, temperature, humidity, dust, EMI,
etc.)
10) Interconnecting cabling with reference designators,
cable no., cable type, size and signal data
(Wire lists)
11) Cross connection frames and patch panel details
(IDF) to be incorporated in the A-T-B-B drawings
b) S̲D̲/̲H̲W̲ ̲a̲r̲e̲ ̲R̲e̲q̲u̲e̲s̲t̲e̲d̲ ̲t̲o̲ ̲D̲e̲l̲i̲v̲e̲r̲ ̲I̲n̲p̲u̲t̲ ̲t̲o̲ ̲I̲L̲S̲ ̲i̲n̲
̲A̲c̲c̲o̲r̲d̲a̲n̲c̲e̲ ̲w̲i̲t̲h̲ ̲t̲h̲e̲ ̲F̲o̲l̲l̲o̲w̲i̲n̲g̲ ̲S̲c̲h̲e̲d̲u̲l̲e̲
R̲E̲F̲ ̲M̲T̲F̲,̲ ̲P̲T̲ ̲2̲
Data for a typical site:
Above para 1-8, 15/1-1981
R̲E̲F̲ ̲M̲T̲F̲,̲ ̲P̲T̲ ̲3̲
Data for site 1 - 6:
Prelim above para 1-8, 1/3-1981
Final above para 1-10, 1/4-1981
R̲E̲F̲ ̲M̲T̲F̲,̲ ̲P̲T̲ ̲4̲
Data for site 7-16:
Prelim above para 1-10, 15/6-1981
Final above para 1-10, 15/7-1981
R̲E̲F̲ ̲M̲T̲F̲,̲ ̲P̲T̲ ̲5̲
Cross connecton frames and patch panel details (IDF)
are delivered to ILS with l site per month, starting
with first delivery 15/7.
R̲E̲F̲ ̲M̲T̲F̲,̲ ̲P̲T̲ ̲6̲
ILS will do the follow up on this subject i.e. it will
be put on the agenda for progress meeting and request
will be submitted to SHAPE.
R̲E̲F̲ ̲M̲T̲F̲,̲ ̲P̲T̲ ̲7̲
a) The following data will be needed from SHAPE for
preparation of CWR and A-T-B-B (Refer to sRS para.
3.6.6.2)
1) Cable routing from CAMPS room to user terminals
(Site 1-13) due date 1/10-1980 was agreed to
during the surveys by SHAPE.
2) Same as 1. For site 14-16 due date to be agreed
to during the site surveys .
Due Dates
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
3 months prior 3. Grounding
drawings
and specifications
to delivery of concerning
conductors,
electrodes
and
CWR. joints of the site grounding system.
3 months prior 4. Drawings
and specifications
concerning
to delivery of power
distribution
boards,
cabling,
wiring
CWR. and distribution, position of filters.
3 months prior 5. Modifications
or changes
to the
baseline
to delivery of established
at the
site
survey.
CWR.
3 months prior 6. Updated
site
documentation
with
CWR
to install. of incorporated.
each site.
1/10-1980 7. Documentation
requested
by ILS
during
site
surveys.
1/11-1981 8. Recommended
installation
material
(ducts,
conduits
etc.)
b) SHAPE has not agreed to any due date for the data
per 3-6 above.
R̲E̲F̲ ̲M̲T̲F̲,̲ ̲P̲T̲ ̲8̲
T̲r̲a̲n̲s̲p̲o̲r̲t̲a̲b̲i̲l̲i̲t̲y̲ ̲s̲p̲e̲c̲i̲f̲i̲c̲a̲t̲i̲o̲n̲s̲ ̲c̲o̲n̲c̲e̲r̲n̲i̲n̲g̲ ̲t̲h̲e̲ ̲C̲R̲8̲0̲
e̲q̲u̲i̲p̲m̲e̲n̲t̲ ̲a̲r̲e̲ ̲n̲e̲e̲d̲e̲d̲ ̲f̲r̲o̲m̲ ̲E̲D̲ in order to prepare the
transportation of CAMPS.
The following data are requested:
1) Requirements for special shipping if any.
2) Packaging of modules, crates and fans etc. (i.e.
specification of shipment containers).
3) Any test performance or test planning concerning
transportation and storage. (test reports or test
specifications).
R̲E̲F̲ ̲M̲T̲F̲ ̲P̲T̲ ̲9̲
Identification by SHAPE of customs document or other
special shipping documents to accompany each shipment
have been requested in the transportation plan (CPS/PLN/007).
No due date are agreed to.
R̲E̲F̲ ̲M̲T̲F̲ ̲P̲T̲ ̲1̲0̲
M&D will be used during site installation. The M&D
is needed per 1/1-1982 for planning and for training
of the installation technicians.
R̲E̲F̲ ̲M̲T̲F̲ ̲P̲T̲ ̲1̲1̲,̲ ̲1̲2̲,̲ ̲1̲3̲,̲ ̲1̲4̲
The documentation is needed for detailed installation
planning and preparation of as-built documentation.