top - download
⟦055d6341d⟧ Wang Wps File
Length: 1384 (0x568)
Types: Wang Wps File
Notes: Spelunked
Names: »~ORPHAN05.10«
Derivation
└─⟦89b9efcb1⟧ Bits:30006072 8" Wang WCS floppy, CR 0029A
└─ ⟦this⟧ »~ORPHAN05.10«
WangText
the schematic diagram
d) Special Test Equipment
Contractor will be willing to supply STE for test of the circuit card and readermechanisms.…86…1
…02… …02… …02… …02…
6.2.5 F̲a̲i̲l̲u̲r̲e̲ ̲R̲e̲p̲o̲r̲t̲i̲n̲g̲ ̲A̲n̲a̲l̲y̲s̲i̲s̲
6.2.5.1 F̲a̲i̲l̲u̲r̲e̲ ̲R̲e̲p̲o̲r̲t̲i̲n̲g̲ ̲a̲n̲d̲ ̲C̲o̲n̲t̲r̲o̲l̲ ̲S̲y̲s̲t̲e̲m̲
The Contractor's Failure Reporting and Control System shall be designed and implemented
to the copatible with the purchaser's Failure Reporting and Control System. The Contractor
shall describe his proposed system for initiating failure reports, collecting and
producing Reliability and Maintainability data, failure analyses and feedback of
corective action. The analysis and reporting of failures and subsequent maintenance
actions shall differentiate between, but not be restricted to, those due to equipment
failure and human error. The Contractor's failure reporting system shall include
rovisions to assure that effective corrective actions are taken on a timely basis
to reduce or prevent repetition of the failures and it shall be conducted under the
surveillance of, and shall be subject to, Quality Control and Quality Assurance asdefined
in Part 6, section 1 of this contract. The Contractor's progam shall include an audit
of all open reports, analyses and corrective action suspense dates and reporting
of all delinquencies.
6.2.5.2 F̲a̲i̲l̲u̲r̲e̲ ̲A̲n̲a̲l̲y̲s̲i̲s̲
Should a number of de