DataMuseum.dk

Presents historical artifacts from the history of:

CR80 Wang WCS documentation floppies

This is an automatic "excavation" of a thematic subset of
artifacts from Datamuseum.dk's BitArchive.

See our Wiki for more about CR80 Wang WCS documentation floppies

Excavated with: AutoArchaeologist - Free & Open Source Software.


top - download

⟦07aa4cdcb⟧ Wang Wps File

    Length: 21018 (0x521a)
    Types: Wang Wps File
    Notes: XFX/SPR/001               
    Names: »4930A «

Derivation

└─⟦743da5938⟧ Bits:30006201 8" Wang WCS floppy, CR 0294A
    └─ ⟦this⟧ »4930A « 

WangText



(…05…(…07…'…00…'…86…1
      
      
      
      
      
      
      
   …02…   
      
  …02…   …02… 
   

   …0f…4930A/bna…02…XFX/SPR/001

CROSS
 FOX MPF…02…NPP/840521…02……02…#
SITE PREPARATION
 REQUIREMENTS
FOR SITE
 101…02……02…XFOX
 MPF…0e…














                 CROSS FOX MPF
                 SITE PREPARATION REQUIREMENTS
                 FOR SITE 101

                 XFX/SPR/001 














                 Niels Peder Pedersen




                 Knud Benkjer







                 HARRIS Oslo (4), HARRIS Rochester (1), NODECA/THN
                 (3), KM, PMS KNB, LU, DL, HAU, NPP















                          Install. Mgr.   840521

                         ILS Conf. Mgr.   840521
             1  



             840521





   …0f…4930A/bna…02… XFX/SPR/001

CROSS FOX MPF…02… NPP/840521…02…    ii
SITE PREPARATION REQUIREMENTS
FOR SITE 101…02… Issue 1…02…XFOX MPF…0e…














         840521                 All      Issue 1 of document






   …0f…4930A/bna…02…XFX/SPR/001

CROSS FOX MPF…02…NPP/840521…02…  iii
SITE PREPARATION REQUIREMENTS
FOR SITE 101…02……02…XFOX MPF…0e…





                    T̲A̲B̲L̲E̲ ̲O̲F̲ ̲C̲O̲N̲T̲E̲N̲T̲S̲




     1 INTRODUCTION ................................. 1
         

       1.1 SCOPE .................................... 1
             
       1.2 DOCUMENT FORMAT .......................... 1
             
       1.3 REFERENCES ............................... 1
             
       1.4 SYSTEM DIAGRAM ........................... 2
             
       1.5 SITE IMPLEMENTATION SCHEDULE ............. 2
             

     2 RESPONSIBILITIES ............................. 3
         

       2.1 NODECA/THN ............................... 3
             
       2.2 CROSS FOX MPF CONTRACTOR ................. 3
             

     3 CROSS FOX MPF ROOM ........................... 4
         

       3.1 GENERAL .................................. 4
             
       3.2 CROSS FOX MPF EQUIPMENT .................. 4
             
       3.3 FLOORS ................................... 4
             
       3.4 WALLS .................................... 5
             
       3.5 CEILINGS ................................. 5
             
       3.6 ENTRANCE DOORS ........................... 5
             
       3.7 HEAT DISSIPATION ......................... 5
             
       3.8 EQUIPMENT COOLING ........................ 5
             
       3.9 POWER REQUIREMENTS ....................... 6
             
       3.10  GROUNDING REQUIREMENTS ................. 7
               
       3.11  SIGNAL CABLING ......................... 7
               
         3.11.1 MPF Room ............................ 7
           
         3.11.2 MPF/Crypto Room ..................... 7
           

     4 MCSF WORKSTATION .............................  
         

       4.1 GENERAL .................................. 8
             
       4.2 MCSF WORKSTATION ......................... 8
             
       4.3 LOCATION ................................. 8
             
       4.4 SIGNAL CABLING ........................... 9
             
       4.5 TYPICAL LAYOUT ........................... 9
             
       4.6 ENVIRONMENTAL CONTROL .................... 9
             
       4.7 POWER REQUIREMENTS ....................... 9
             
       4.8 GROUNDING REQUIREMENTS ................... 9
             




   …0f…4930A/bna…02…XFX/SPR/001

CROSS FOX MPF…02…NPP/840521…02…   iv
SITE PREPARATION REQUIREMENTS
FOR SITE 101…02……02…XFOX MPF…0e…





         5   CRYPTO ROOM ..................................10
               

             5.1 GENERAL ..................................10
                   
             5.2 MCU EQUIPMENT ............................10
                   
             5.3 LOCATION .................................10
                   
             5.4 SIGNAL CABLING ...........................10
                   
             5.5 TYPICAL LAYOUT ...........................10
                   
             5.6 ENVIRONMENTAL CONTROL ....................11
                   
             5.7 POWER REQUIREMENTS .......................11
                   
             5.8 GROUNDING REQUIREMENTS ...................11
                   

         6   EQUIPMENT DATA ...............................12
               

             6.1 GENERAL ..................................12
                   
             6.2 PHYSICAL DATA ............................12
                   
             6.3 POWER DATA ...............................12
                   
             6.4 ENVIRONMENTAL DATA .......................12
                   



   …0f…4930A/bna…02…XFX/SPR/001

CROSS FOX MPF…02…NPP/840521…02…    v
SITE PREPARATION REQUIREMENTS
FOR SITE 101 …02……02…XFOX MPF…0e…






                  L̲I̲S̲T̲ ̲O̲F̲ ̲T̲A̲B̲L̲E̲S̲/̲F̲I̲G̲U̲R̲E̲S̲



         6.2-1   EQUIPMENT DIMENSIONS AND WEIGHT  ..13

         6.2-2   PHYSICAL DIMENSIONS OF RACKS  .....14

         6.2-3   USER TERMINALS TYPICAL LAYOUTS  
                 AND REQUIREMENTS  .................15

         6.3-1   POWER CONSUMPTION AND HEAT 
                 DISSIPATION  ......................16

         6.3-2   POWER REQUIREMENTS  ...............17

         6.4-1   ENVIRONMENTAL REQUIREMENTS  .......18



                     L̲I̲S̲T̲ ̲O̲F̲ ̲D̲R̲A̲W̲I̲N̲G̲S̲

                                             DRAWING NO.


                 CROSS FOX MPF
                 SYSTEM CONFIGURATION        3-4916

                 CROSS FOX MPF and MCSF Room
                 Equipment Layout            1-453

                 CROSS FOX MPF and MCSF Room
                 Cable Ducting and 
                 Power Distribution          1-450

                 CROSS FOX MPF Equipment
                 Power and Grounding
                 Requirements                3-4917




    4930A/bna…02…CDE/SPR/001

CROSS FOX MPF…02…NPP/840521…02…   vi
SITE PREPARATION REQUIREMENTS
FOR SITE 101 …02……02…XFOX MPF






                D̲E̲F̲I̲N̲I̲T̲I̲O̲N̲S̲/̲A̲B̲B̲R̲E̲V̲I̲A̲T̲I̲O̲N̲S̲



         CR          CHRISTIAN ROVSING A/S
         DOC         DOCUMENT
         MCU         MESSAGE COMPILATION UNIT
         MPF         MESSAGE PROCESSING FACILITY
         PDB         POWER DISTRIBUTION BOARD
         ROP         RECEIVE ONLY PRINTER
         SPR         SITE PREPARATION REQUIREMENTS
         THN         TERRITORIAL HOST NATION
         VDU         VISUAL DISPLAY UNIT




                     1  I̲N̲T̲R̲O̲D̲U̲C̲T̲I̲O̲N̲



1.1      S̲C̲O̲P̲E̲

         This document specifies the Site Preparation Requirements
         related to the CROSS FOX MPF.

         NODECA/THN and Christian Rovsing A/S are responsible
         for accomplishing the works as specified in this document.

         In accordance with the contract, the SPR is subject
         to review and approval by ACE COMSEC.

         The preparation of this document is based on data obtained
         during the site survey and listed in the CROSS FOX
         MPF SITE SURVEY REPORT, SITE 101 (DOC. XFX/AUX/002).



1.2      D̲O̲C̲U̲M̲E̲N̲T̲ ̲F̲O̲R̲M̲A̲T̲

         This document is structured in the following sections:

         Section 1   Introduction
         Section 2   Responsibilities
         Section 3   CROSS FOX MPF room
         Section 4   MCSF Workstation 
         Section 5   Crypto room
         Section 6   Equipment data
         Section 7   Drawings


         Sections 1 to 5 provide the equipment related requirements
         to the facility with reference to the drawings in section
         7. Section 6 contains the physical characteristics
         of the equipment.



1.3      R̲E̲F̲E̲R̲E̲N̲C̲E̲S̲

         CROSS FOX MPF
         SYSTEM REQUIREMENT SPECIFICATION
         XFX/SRS/001

         CROSS FOX MPF
         SITE SURVEY REPORT SITE 101
         XFX/AUX/002




1.4      S̲Y̲S̲T̲E̲M̲ ̲D̲I̲A̲G̲R̲A̲M̲

         Drawing 3-4916 lists all the CR provided equipment
         at SITE 101 and shows the system signal cabling and
         defines the basic responsibilities for this cabling.

         The major assemblies of the CROSS FOX MPF system are
         identified with a unit number.



1.5      S̲I̲T̲E̲ ̲I̲M̲P̲L̲E̲M̲E̲N̲T̲A̲T̲I̲O̲N̲ ̲S̲C̲H̲E̲D̲U̲L̲E̲

         The following site implementation schedule is planned:

             June,    1984  Issue of SPR
             March,   1985  Site Preparation Works Completed
             April,   1985  Site Verification Completed










                   2  R̲E̲S̲P̲O̲N̲S̲I̲B̲I̲L̲I̲T̲I̲E̲S̲

         The following responsibilities and interfaces are defined
         for site preparation and site integration of the CROSS
         FOX MPF system (ref. drawing 3-4916).



2.1      N̲O̲D̲E̲C̲A̲/̲T̲H̲N̲

         NODECA/THN is responsible for:

         a)  Modification of the allocated CROSS FOX MPF room
             as specified in this SPR document including power,
             grounding distribution, and air conditioning. 
              (See chapter 3).


         b)  Preparation of the MCSF Room for workstation installation,
             including provision and installation of workstation
             tables.

         c)  Determination of routing and provision and installation
             of all cable ducts for signal cables between the
             MPF room and the Crypto room. (See chapter 3).



2.2      C̲R̲O̲S̲S̲ ̲F̲O̲X̲ ̲M̲P̲F̲ ̲C̲O̲N̲T̲R̲A̲C̲T̲O̲R̲

         CROSS FOX MPF contractor (CR) is responsible for:

         a)  Verification of Host Nation site preparation works.

         b)  Physical installation of all CR provided equipment
             in the MPF room, the MCSF room and the Crypto/Tare
             room.

         c)  Connection of power and ground to all CR provided
             equipment.  (See drawing 3-4917).

         d)  Provision and installation of signal cable ducts
             within the MPF room and from the MPF room to the
             MCSF room for the CROSS FOX MPF workstations (see
             drawing 1-450).

         e)  Provision and installation of all CROSS FOX MPF
             related signal cables between the MPF room and
             the Crypto room, the MCSF room and within the MPF
             room (see drawing 3-4916).


                  3  C̲R̲O̲S̲S̲ ̲F̲O̲X̲ ̲M̲P̲F̲ ̲R̲O̲O̲M̲



3.1      G̲E̲N̲E̲R̲A̲L̲

         This chapter defines the civil engineering requirements
         related to the modification of the CROSS FOX MPF room.



3.2      C̲R̲O̲S̲S̲ ̲F̲O̲X̲ ̲M̲P̲F̲ ̲E̲Q̲U̲I̲P̲M̲E̲N̲T̲

         a)  The equipment layout for the CROSS FOX MPF room
             is shown on drawing 1-453. CR will provide the
             following major equipment:

             pos.  1-5       CROSS FOX MPF racks
             pos.  6         one supervisor terminal
             pos.  7-9       three operator terminals
             pos. 10         one system control terminal
             pos. 12-13      two supervisor printers
             pos. 14         one system control printer

         b)  NODECA/THN will provide:

             5 tables for the terminals



3.3      F̲L̲O̲O̲R̲S̲

         The CROSS FOX MPF room is provided with concrete floors
         covered with vinyl tiles.

         
         The equipment floor load calculated from Table 6.2-1
         will be:
                      ̲ ̲ ̲2̲8̲6̲ ̲ ̲ ̲ ̲ ̲ ̲
                     1,05 x 0,60   …0e…= 454 kg/m…0f……0e……0e…2…0f……0f…


         The distributed load considering the work space required
         will be:

                      ̲ ̲ ̲2̲8̲6̲ ̲ ̲ ̲ ̲ ̲ ̲
                     2,45 x 0,60   …0e…= 195 kg/m…0f……0e……0e…2…0f……0f…

         Adding personnel (2x 75 kg.) and test equipment (50
         kg) the distributed load will be:

                     331 kg/m…0e……0e…2…0f……0f…




3.4      W̲A̲L̲L̲S̲

         All perimeter walls are covered with fire rated tiles.



3.5      C̲E̲I̲L̲I̲N̲G̲S̲ ̲

         The room has false ceiling covered with fire rated
         tiles.



3.6      E̲N̲T̲R̲A̲N̲C̲E̲ ̲D̲O̲O̲R̲S̲

         Entrance door opening of 900 x 2000 mm shown on Host
         Nation drawing is adequade for equipment entry.



3.7      H̲E̲A̲T̲ ̲D̲I̲S̲S̲I̲P̲A̲T̲I̲O̲N̲

         The total heat dissipated by the CROSS FOX MPF equipment
         in the MPF room is calculated to be 7200 kcal/h.  See
         Table 6.3-1.

         Note that the figures do not include heat loads by
         personnel, light, test equipment etc.



3.8      E̲Q̲U̲I̲P̲M̲E̲N̲T̲ ̲C̲O̲O̲L̲I̲N̲G̲

         The CROSS FOX MPF equipment does not require any direct
         cooling.  All equipment have internal blowers for forced
         ventilation.  A minimum free space for 200 mm above
         rack top is required (see Figure 6.2-2).





3.9      P̲O̲W̲E̲R̲ ̲R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲S̲

         a)  This section defines power supply requirements
             in the MFP room.  Reference is made to drawing
             1-450 and 3-4917. The required power characteristics
             are given in Table 6.3-2. The total equipment load
             within the MPF room is calculated to be 8.25 KW.
              (See Table 6.3-1). 

         b)  The location of the power distribution board for
             the CROSS FOX MPF equipment is shown in drawing
             1-450. The rack equipment requires eight 20 Amps
             and the terminal equipment four 10 Amps circuits
             inclusive utility outlets. A recommended distribution
             between phases is shown on drawing 3-4917.

         c)  NODECA/THN is responsible for the power distribution
             up to the equipment pick-up points (see drawing
             1-450).

             Eight power cables for the equipment racks are
             required. The cables shall be left with free ends
             which shall be able to reach the floor plus five
             metres.

             The terminal equipment is supplied from four ciruits
             and four cables terminated in power outlets at
             the respective terminated location.

             All outlets shall be a standard 3-pinned type with
             line, neutral and ground confirming to national
             regulations. NODECA/THN is to provide associated
             power plugs for CR's equipment.

         d)  All equipment circuits shall be properly labelled
             in the PDB in accordance with national regulations
             to clearly identify the designated equipment. It
             is further required to label all equipment outlets
             and cables (free ends) with the PDB reference no.
             and preferably also name or unit number of the
             designated equipment.

         e)  All power cabling will be installed on wall or
             overhead. 

             The main racks will be equipped for power intake
             on top of the racks.





3.10     G̲R̲O̲U̲N̲D̲I̲N̲G̲ ̲R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲S̲

         In the MPF room all CROSS FOX MPF equipment requires
         connection to a secure ground.

         It is the responsibility of THN to provide a secure
         ground in accordance with national regulations in the
         CROSS FOX MPF PDB. The ground is to be distributed
         to the equipment pick-up points as part of the power
         cable.

         The equipment connections from the pick-up points will
         be made by CR.



3.11     S̲I̲G̲N̲A̲L̲ ̲C̲A̲B̲L̲I̲N̲G̲



3.11.1   M̲P̲F̲ ̲R̲o̲o̲m̲

         The cable duct for signal cables within the MPF room
         is provided and installed by CR. Refer to drawing 1-453

         Minimum size of this duct is 60 x 120 mm.

         To support the cable duct THN is requested to provide
         and install bearings along the wall and above rack
         5.

         The load of 40 cables is estimated to 20 kg/m

         CR is to install and terminate the signal cables. The
         signal cabling is illustrated on drawing 3-4916



3.11.2   M̲P̲F̲/̲C̲r̲y̲p̲t̲o̲ ̲R̲o̲o̲m̲

         The cable duct between the MPF room and the Crypto
         room is provided and installed by THN.

         Minimum size of this duct is 60 x 120 mm or equal.

         The estimated load is as specified in para 3.11.1.

         CR is to install and terminate the signal cables.
         The Tare/TRC cables are to be terminated at the red
         patch.




                   4  M̲C̲S̲F̲ ̲W̲O̲R̲K̲S̲T̲A̲T̲I̲O̲N̲



4.1      G̲E̲N̲E̲R̲A̲L̲

         This chapter defines the requirements related to the
         MCSF workstation and the cabling from the main racks
         in the CROSS FOX MPF room to the MCSF workstation.



4.2      M̲C̲S̲F̲ ̲W̲O̲R̲K̲S̲T̲A̲T̲I̲O̲N̲

         a)  CR will provide the following workstation equipment:

             pos. 11 one MCSF workstation terminal 
             pos. 15 one MCSF workstation printer

         b)  NODECA/THN will provide:

             1 table for the terminal.



4.3      L̲O̲C̲A̲T̲I̲O̲N̲

         The workstation will be located in the MCSF room. (See
         drawing 1-453.





4.4      S̲I̲G̲N̲A̲L̲ ̲C̲A̲B̲L̲I̲N̲G̲

         The cable duct for signal cables between the MPF room
         and the workstation is provided and installed by CR.
         Refer to drawing 1-450.

         Minimum size of this duct is 10 x 20 mm.

         To support the cable duct THN is requested to provide
         and install bearings along the wall.

         CR is to provide installation and terminate the signal
         cables to the workstation

         The signal cabling is illustrated in the system diagram,
         drawing 3-4916.



4.5      T̲Y̲P̲I̲C̲A̲L̲ ̲L̲A̲Y̲O̲U̲T̲

         Typical layouts and access requirements are shown in
         Figure 6.2-3.

         Physical data are given in Table 6.2-1.



4.6      E̲N̲V̲I̲R̲O̲N̲M̲E̲N̲T̲A̲L̲ ̲C̲O̲N̲T̲R̲O̲L̲

         See Table 6.4.



4.7      P̲O̲W̲E̲R̲ ̲R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲S̲

         Black or filtered power is required as available.

         The power outlets (220V/50 Hz), which are of the Host
         Nation standard 3-pinned type, should be located as
         indicated on drawing 1-450.



4.8      G̲R̲O̲U̲N̲D̲I̲N̲G̲ ̲R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲S̲

         The workstation shall be supplied with a safety ground
         as part of the power cable.




                      5  C̲R̲Y̲P̲T̲O̲ ̲R̲O̲O̲M̲



5.1      G̲E̲N̲E̲R̲A̲L̲

         This defines the requirements related to the Crypto
         room concerning power, access etc.



5.2      M̲C̲U̲ ̲E̲Q̲U̲I̲P̲M̲E̲N̲T̲

         CR intends to install the MCU equipment in a 19" rack.
         For physical data see Table 6.2-1.



5.3      L̲O̲C̲A̲T̲I̲O̲N̲

         NODECA/THN must specify the location of the rack under
         consideration of the installation criteria for crypto
         rooms.



5.4      S̲I̲G̲N̲A̲L̲ ̲C̲A̲B̲L̲I̲N̲G̲

         Refer to section 3.11.2



5.5      T̲Y̲P̲I̲C̲A̲L̲ ̲L̲A̲Y̲O̲U̲T̲

         Typical layout and access requirements for the rack
         are shown in Figure 6.2-2.





5.6      E̲N̲V̲I̲R̲O̲N̲M̲E̲N̲T̲A̲L̲ ̲C̲O̲N̲T̲R̲O̲L̲

         See Table 6.4.



5.7      P̲O̲W̲E̲R̲ ̲R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲S̲

         The MCU is regarded as black equipment and is therefore
         to be supplied with black power.

         Two power outlets (220 v/50 Hz) of the Host Nation
         Standard 3-pinned Type, located within 1 metre of the
         chosen MCU equipment rack location are required.

         As stated on drawing 3-4917 each outlet must be fed
         from a seperate phase and powergroup.

         Recommended fuse size: 10 Amp.



5.8      G̲R̲O̲U̲N̲D̲I̲N̲G̲ ̲R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲S̲

         A safety ground confirming to national regulations
         is required for all MCU equipment.






                    6  E̲Q̲U̲I̲P̲M̲E̲N̲T̲ ̲D̲A̲T̲A̲



6.1      G̲E̲N̲E̲R̲A̲L̲

         This chapter contains the typical CROSS FOX MPF equipment
         data and requirements.



6.2      P̲H̲Y̲S̲I̲C̲A̲L̲ ̲D̲A̲T̲A̲

         Table no. 6.2-1 and Figure nos. 6.2-2 through 6.2-3
         contain equipment weight, physical dimensions and access
         requirements.
         The access requirements are recommended dimensions.



6.3      P̲O̲W̲E̲R̲ ̲D̲A̲T̲A̲

         Table nos. 6.3-1 and 6.3-2 contain equipment power
         consumption, heat dissipation and the required power
         characteristics.



6.4      E̲N̲V̲I̲R̲O̲N̲M̲E̲N̲T̲A̲L̲ ̲D̲A̲T̲A̲

         Table 6.4 gives data on environmental requirements.





      EQUIPMENT                       U̲N̲I̲T̲ ̲S̲I̲Z̲E̲ ̲C̲M̲    A̲C̲C̲E̲S̲S̲
                                                      ̲C̲M̲
                           UNIT
                           WEIGHT
                  I̲T̲E̲M̲     K̲G̲         W̲I̲D̲T̲H̲   D̲E̲P̲T̲H̲   H̲E̲I̲G̲H̲T̲  F̲R̲O̲N̲T̲  R̲E̲A̲R̲

                  RACK 1     286        60     105      180    120   100

                  RACK 2     266        60     105      180    120   100

                  RACK 3     198        60     105      180    120   100

                  RACK 4     186        60     105      180    120   100

                  RACK 5     136        60     105      180    120   100

                  VDU         35        48      76      
                                                        43     100   
                                                                     15

                  ROP         23        65      48      
                                                        22     100   
                                                                     15

                  MCU RACK   172        60      73      180    100   100



















  Figure 6.2-1…01…Equipment Dimensions and Weight

















































        Figure 6.2-2…01…Physical Dimensions of Racks

















































Figure 6.2-3…01…User Terminals Typical Layouts and Requirements


                    M̲P̲F̲ ̲R̲O̲O̲M̲



                                                   Per       Total  Total
Description      Qty.    Volts    Wires   Phase    U̲n̲i̲t̲      
                                                             ̲
                                                             ̲
                                                             ̲
                                                             ̲
                                                             ̲       Kcal/
                                                   
                                                   W
                                                   
                                                   
                                                   
                                                   
                                                   
                                                   
                                                   KW        hour
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
RACK 1      1    220     2 x 3      2     1800     1.8       1.55

RACK 2      1    220     2 x 3      2     1700     1.7       1.5

RACK 3      1    220     2 x 3      2     1700     1.7
                                                             1.5

RACK 4      1    220     2 x 3      2      700     0.7       0.6

VDU         5    220     3          1      250     1.25      1.1

ROP         3    220     3          1      370     1.1
                                                             0.95
                                                  
   ̲ ̲ ̲ ̲ ̲      ̲ ̲ ̲ ̲ ̲

TOTAL                                              8.25
                                                   
                                                             7.2



                    M̲C̲S̲F̲ ̲R̲O̲O̲M̲



VDU         1    220     3          1      250     0.25      0.215

ROP         1    220     3          1      370     0.37      0.32
                                                  
   ̲ ̲ ̲ ̲ ̲      ̲ ̲ ̲ ̲ ̲    
TOTAL                                              0.62
                                                   
                                                             0.535


                   C̲R̲Y̲P̲T̲O̲ ̲R̲O̲O̲M̲




MCU RACK    1    220     2 x 3      2     500      0.5       0.45



Table 6.3-1…01…Power Consumption and Heat Dissipation


         P̲o̲w̲e̲r̲

         a)  Power to equipment is fed from individual fuse
             protected 220 vac outlets.  The required power
             supply for the equipment is given in Table 5.3-1.

         b)  The CROSS FOX MPF equipment is designed to comply
             with the following power characteristics.

             PHASE:                  Single- or 3-phase, and
                                     ground

             VOLTAGE:                Nominal Value:  380/220
                                     VAC Tolerances: + 10%/-15%

             FREQUENCY:              Nominal Value:  50 Hz 
                                     Tolerances: + 10%/- 10%

             HARMONIC DISTORTION:    Max 5%

             TRANSIENTS:             Non-Repetive impulsive
                                     interference with a magnitude
                                     not to exceed 500 volts,
                                     pulse rise and fall time
                                     not faster than 10 microseconds
                                     and a total duration of
                                     maximum 1 millisecond.
                                      The available impulse
                                     energy at the equipment
                                     power inlet shall not exceed
                                     5J.

         Note:

         The Disk Drives in rack 3 will not operate within the
         tolerances of section b) above, but require.

         Voltage:    Nominal Value:  380/220V AC
                     Tolerances: + 16%/- 13%

         Frequency:  Nominal Value:  50 Hz
                     Tolerances:  +   2 Hz/ - 2 Hz





              Table 6.3-2…01…Power Requirements


         The CROSS FOX MPF equipment is designed to operate
         under the following conditions.

         T̲e̲m̲p̲e̲r̲a̲t̲u̲r̲e̲

         Range:  10 to 40 deg C
         Change: max 10 deg C per hour

         H̲u̲m̲i̲d̲i̲t̲y̲

         Range:  40 to 90% RH, non-condensing
         Change: max 6% RH per hour, non-condensing

         A̲i̲r̲ ̲c̲l̲e̲a̲n̲i̲n̲e̲s̲s̲

         Particle size               max allowable numbe
         (̲m̲i̲c̲r̲o̲n̲s̲)̲                   (̲p̲a̲r̲t̲i̲c̲l̲e̲s̲/̲c̲u̲b̲i̲c̲m̲e̲t̲e̲r̲)̲

         Greater than 5              4* (10 5)
         Greater than 1.5            4* (10 6)
         Greater than 1              4* (10 7)

         F̲u̲m̲e̲s̲

         Sulphur dioxide max 14 ppm






















          Table 6.4-1…01…Environmental Requirements