1982-06-07 gj/vhn
to: shnmo division
att.: mr. paul f. shey, contracting officer
cc.: lt. col. manfred stoltz, camps program manager
fm: christian rovsing a/s, denmark
gert jensen
our ref: cps/101/tlx/0537
subject: quotation for remote terminal ocr connection
-----------------------------------------------------
Note: This telex replaces cps/101/tlx/0318 and CPS/101/TLX/0321.
1. CR hereby forward a quotation on a remote OCR connection
as required in the remote terminal contract appendix
C para. 3.
2. It shall be noted that site 9, 10, 13, 14, 15 are
quoted as an option.
3. As stated in pmom 7, appendix a, an additional
rack (rack i) is required at site 4 (proto) if
all 5 remote sites shall be supported. This is
not possible within the present allocated space
at proto. Therefore, this proposal concerns ocr-ltuxs
for 22 remote sites, excluding 1 remote site connected
to proto.
We will be happy to quote the expansion for the last
remote site, when a concept for providing the required
space has been established.
4. In order to support an ocr at remote sites (as
specified below) the following equipment is needed:
a) for site 2, 8
dkr.
1 ltux-s per site, unit price = dkr 24.320
2 items
48,640
1 v24 cable per site, unit price = dkr 505
2 items
1,010
1 back panel per site, unit price = dkr 2,359
2 items
4,718
Subtotal dkr
54,368
--------
b) for site 5, 6, 7, 11, 12
2 tdx outlets per site, unit price = 955
10 items
9,550
1 tdx crate per site, unit price = dkr 17,241
5 items
86,205
1 tdx power supply per site unit price
= dkr 25,451
5 items 127,255
1 power distribution panel per site, unit
price = dkr 2,296
5 items
11,480
1 bsm-x with panel per site, unit price = dkr
14,200
5 items
71,000
2 Ltux-s per site, unit price = dkr 24,320
10 items 243,200
2 back panel per site, unit price = dkr.2,359
10 items 23,590
2 v24 cable per site, unit price = dkr 505
10 items
5,050
2 cables for outlet per site, unit price
= dkr 530
10 items
5,300
1 fan unit per site, unit price = dkr 4,960
5 items
24,800
2 power cables per site, unit price
= dkr 656
10 items
6,560
Subtotal dkr 613,990
-------
c) for site 4
4 tdx-outlets, unit price = dkr 955
3,820
2 tdx-crates, unit price = dkr 17,241
34,482
2 tdx power supplies, unit price = dkr 25,451
50,902
2 bsm-x, with panel unit price = dkr 14,200
28,400
4 ltux-s, unit price = dkr 24,320
97,280
4 back panel, unit price = dkr 2,359
9,436
4 v24 cables, unit price = dkr 505
2,020
4 cables for outlet, unit price = dkr 530
2,120
2 fan units, unit price = dkr 4,960
9,920
4 power cables, unit price = 656
2,624
2 power dist panel, unit price = dkr. 2,296
4,592
Subtotal dkr 245,596
d) systems engineering
i.e. update of design, rspl, increased complexity
of program 169,683
e) logistics
i.e. documentation, installation and
transportation dkr 273,360
-------------------------------------------------------------
total cost dkr
1,356,997
f) Spares
CR has figured that spares are covered by
the current population of spares
5. CR has several times pointed out that memory is
being overloaded by the extra channels, which has
been added to the system little by little. It
is now necessary to add one more 128K memory module
per processor unit to the sites.
Due to the standardization of software two memory modules
are needed at all sites in addition to the existing
memory.
32 ea. 128K Memory Modules, at unit price = dkr.
69,223
Total = dkr.2.215,136
must be added to the quote for the remote terminal
OCR connections
6. payment should be effected as follows:
30 per cent at order
60 per cent at factory acceptance
10 per cent at site acceptance
7. this quotation is open for acceptance until 1.
july 1982.
8. As an option the following is quoted:
a. equipment breakdown:
unit price number at site:
dkr. 14 15 10
9
13
-------------------------------------------------------------------- ltux-s
24,320
1
2
1
1
1
V24 cable 505 1 2 1
1
1
back panel 2,359 1 2 1
1
1
tdx outlet 955 2
tdx crate 17,241 1
tdx power supply 25,451 1
bsm-x W.panel 14,200 1
cable f.o-let 530 2
fan-unit 4,960 2
power cables 656 2
power dist.pnl 2,296 1
logistics(hrs) 408 dkr/hr 70 70 70 70
70
b.total price site 14: dkr. 55,744
total price site 15: dkr.156,318
The quotation for site 14 and 15 is open until 1 july,
1982. If LOI can not be settled before this date CR
will prefer to postpone the installation of the remote
terminal OCR connection at site 14 and 15 until after
the SPA. CR is willing to quote this, if SHAPE forwards
a RFQ.
c.total price site 10: dkr. 57,416. The quotation
for site 10 is open until 1 October,1982.
d.Total price site 9:dkr. 59,086. The quotation for
site 9 is open until 1 January,1983.
e.Total price site 10: dkr. 56,859. The quotaion for
site 10 is open until 1 September, 1982.
kind regards,
christian rovsing a/s
gert jensen