⟦12d22d237⟧ Wang Wps File

    Length: 10677 (0x29b5)
    Types: Wang Wps File
    Notes: SW Preliminary Design     
    Names: »1009A «

Derivation

└─⟦ecb9329a3⟧ Bits:30006006 8" Wang WCS floppy, CR 0041A
    └─ ⟦this⟧ »1009A « 

WangText





…02…CPS/AUX/013

…02…KNN/810617…02……02…#
SOFTWARE PRELIMINARY DESIGN - REVIEW PLAN
…02…810601…02…CAMPS









                 T̲A̲B̲L̲E̲ ̲O̲F̲ ̲C̲O̲N̲T̲E̲N̲T̲S̲



   1   INTRODUCTION ................................ 
       4 

   2   ACTIVITIES/SCHEDULES ........................ 
       6 

   3   RESPONSIBILITIES ............................ 
       9 

   4   DISCREPANCY NOTES (DNs) AND THEIR PROCESSING  11
       
     4.1 DISCREPANCY NOTES DESCRIPTION ............. 11
         
     4.2 ACCOUNTABILITY OF DNs ..................... 13
         



                     1̲ ̲ ̲I̲N̲T̲R̲O̲D̲U̲C̲T̲I̲O̲N̲



         The purpose of this plan is to establish specific procedures
         to be followed during the Preliminary Design Review
         (PDR).

         A general standard for design reviews can be found
         in ED/SPC/0001.

         This plan presents the plans for Preliminary Design
         Review activities related to review of the CAMPS Application
         Software Packages, Data Base Design Document, and Software
         Interface Control Document.

         This plan has been prepared according to AQAP 13, para.
         207, January 81.

         Chapter 2 contains a schedule for review related activities
         and an activity description.

         Chapter 3 defines the responsibilities of the review
         participants.

         Chapter 4 describes the Discrepancy Notes DNs and how
         these are going to be generated and accounted for.

         The success of the PDR is closely related to the degree
         thoroughness by which each participant has prepared
         himself to the review he has been assigned to.

         The purpose of the PDR is to determine the adequacy
         of the basic design approach.

         The reviewers should assure that:

         -   the software packages functional flow, summarize
             flow of information for the complete software package
             and identifies/defines subpackages, their relationship
             within the software package, and with the software
             package external interfaces.

         -   the software package contains a computer storage
             allocation.  The intent of this part is to ensure
             the compability between packages and available
             computer storage.



         -   the requirements defined in the CAMPS System Requirements
             Specification CPS/210/SYS/0001 and associated Interface
             Control Documents CPS/ICD/001 - CPS/ICD/008 are
             fulfilled.

         -   the structure and organization of Data Base is
             defined.  This is a description of the structural
             layout and the allocation of storage requirements
             of the data base, identifying the types and characteristics
             of data.

         -   the Interface Requirements are defined.  Although
             these were identified in the SW package specification
             and approved, it is important that they be reviewed
             again at this time.  Interface requirements include
             such things as definitions of word length, message
             formats, available computer storage, and timing
             considerations.

         -   the ECP Status is reflected.  Review the configuration
             management accounting  records to determine which
             approved ECPs should be reflected in the design
             presented at PDR and to ensure that they are included.


                 2̲ ̲ ̲A̲C̲T̲I̲V̲I̲T̲I̲E̲S̲/̲S̲C̲H̲E̲D̲U̲L̲E̲S̲



         This chapter defines the overall activities and schedules
         for the PDR.

         Detailed information such as review participants, meeting
         rooms, detailed agenda will be contained in separate
         "Invitation for Review."

         A maximum of 8 persons will be invited to each review.

         The PDR will consist of series of reviews.  One review
         will be scheduled for each design package.  The packages
         are listed below.

         CAMPS System Functions                       CPS/SDS/002

         Message Management                           CPS/SDS/003

         System Status and Control                    CPS/SDS/004

         Table Management                             CPS/SDS/005

         Input/Output Control                         CPS/SDS/006

         Storage and Retrieval                        CPS/SDS/007

         Statistics                                   CPS/SDS/008

         Logging                                      CPS/SDS/009

         Traffic Handling                             CPS/SDS/010

         Message Distribution Package                 CPS/SDS/011

         Terminal Package                             CPS/SDS/012

         Data Base Design Document                    CPS/DBD/001

         CAMPS Software Interface Control Document    CPS/ICD/009

         For each of the packages the following activities shall
         take place:

         1)  book captain submits design package to reviewers,
             possibly with a kick-off presentation.



         2)  book captain collects DNs from reviewers.

         3)  book captain coordinate DNs (i.e. provide answers,
             state his position and by the DN (refer chapter
             4))

         4a) review team makes a walk-through of the DNs and
             the document.

         4b) review team makes decisions as how to update the
             document and approves/disapproves the document.

         5a) book captain updates document.

         5b) actionees close open actions generated during review.

         6)  document is proofread to ensure all decisions have
             been implemented.




                 REVIEW SCHEDULE

 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

 DOCUMENT                 DOC. TO     DNs FROM                UPDATE
                          REVIEWERS   REVIEWERS    REVIEW     DOCUMENT
                          DUE DATE    DUE DATE     DATE       DUE
                                                              DATE
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

 CAMPS System Functions    19/6        25/6        
                                                   29/6       
                                                              10/8

 Message Management         1/7         6/7        
                                                   
                                                   7/7        
                                                              10/8

 System Status and Control 30/6         3/7        
                                                   
                                                   9/7        
                                                              
                                                              1/8

 Table Management          26/6         1/7        
                                                   
                                                   3/7        
                                                              10/8

 Input/Output Control      26/6        30/6        
                                                   
                                                   1/7        
                                                              
                                                              5/8

 Storage and Retrieval      3/7        11/7        
                                                   14/7       
                                                              
                                                              1/8

 Statistics                 7/7        14/7        
                                                   20/7       
                                                              
                                                              1/8

 Logging                    9/7        16/7        
                                                   22/7       
                                                              
                                                              5/8

 Traffic Handling          16/6        22/6        
                                                   24/6       
                                                              
                                                              1/8

 Message Distribution      30/6         7/7        
                                                   11/7       
                                                              
                                                              1/8

 Terminal Package           8/7        14/7        
                                                   16/7       
                                                              10/8

 Data Base Design Doc.     11/7        17/7        
                                                   23/7       
                                                              
                                                              5/8

 CAMPS SWICD               11/7        17/7        
                                                   24/7       
                                                              
                                                              5/8


                   3̲ ̲ ̲R̲E̲S̲P̲O̲N̲S̲I̲B̲I̲L̲I̲T̲I̲E̲S̲



         This section will describe the responsibilities in
         relation to the PDR.

         Responsibilities will be described for the following
         review personnel.

         -   reviewers
         -   book captains
         -   review chairman
         -   review secretary
         -   project review board

         for each of the phases:

         -   prereview
         -   review
         -   post review

         A reviewer is a person who is reviewing the design
         and produce DNs against the design.

         The book captain is the person who has produced the
         design document.

         The review chairman is responsible for organizing and
         conducting the reviews.

         The review secretary assists the review chairman in
         producing minutes of meeting and keeps accountability
         of all DNs generated against the review package.

         The project review board consists of the CAMPS management
         team, which in case of non-consensus between review
         team members has the final authority to resolve problems.

         The responsibilites of the above categories are defined
         overleaf.




 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

                     REVIEW     PRIOR TO         DURING            AFTER
                     PHASE      REVIEW           REVIEW            REVIEW
              REVIEW
              PERSON
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

                                1) Generate DNs  1)
                                                 Evaluate
                                                 book
              Reviewers            and forward    
                                                  captains
                                   to book capt.  
                                                  response.
                                                 2)
                                                 Generate
                                                 DNs
                                                  
                                                  ad
                                                 hoc
                                                 as                None
                                                  
                                                  required.
                                                 3)
                                                 Participate
                                                  
                                                  in
                                                 review
                                                  
                                                  decision
                                                 team
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

                                1) Collect DNs                     1)
                                                                   Update
                                                                   accor-
              Book                 from reviewers                   
                                                                    
                                                                    
                                                                    ding
                                                                    to
                                                                    DNs
              Captain           2) Log DNs (refer                  Refer
                                                                   to 
                                                                      
                                                                      
                                                                      (review
                                                                      team)
                                   section 4.2)  review            2)
                                                                   Solve
                                                                   action
                                3) Produce ans-  secretary         
                                                                   
                                                                   
                                                                   items.
                                   wers to DNs
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

                                                 1)
                                                 Update
                                                 log
              Review                              
                                                  of
                                                 DNs
                                                 (re-
              Secretary         None              
                                                  fer
                                                 section           Refer
                                                                   to
                                                  
                                                  4.2).            book
                                                                   captain
                                                 2)
                                                 Produce
                                                 mi-
                                                  
                                                  nutes
                                                 of
                                                 
                                                  
                                                  meeting.
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

              Project                            1)
                                                 Make
                                                 de-               1)
                                                                   Approve
              Review            None              
                                                  cision
                                                 on
                                                 re-               
                                                                   
                                                                   
                                                                   updates
              Board                               
                                                  view
                                                 issues            
                                                  
                                                  coming
                                                 from
                                                  
                                                  review
                                                 team
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

                   Figure 3-1



     4  D̲I̲S̲C̲R̲E̲P̲A̲N̲C̲Y̲ ̲N̲O̲T̲E̲S̲ ̲(̲D̲N̲s̲)̲ ̲A̲N̲D̲ ̲T̲H̲E̲I̲R̲ ̲P̲R̲O̲C̲E̲S̲S̲I̲N̲G̲



         This chapter describes procedures for generating a
         discrepancy note and how to establish accounting control
         of the DNs.



4.1      D̲I̲S̲C̲R̲E̲P̲A̲N̲C̲Y̲ ̲N̲O̲T̲E̲S̲ ̲D̲E̲S̲C̲R̲I̲P̲T̲I̲O̲N̲

         Overleaf is presented a CAMPS Discrepancy Note (DN).
          During review preparation the reviewers fill out the
         following fields on the DN page.

         -   Reviewers Name

         -   Document Title

         -   Paragraph and Page No. (of findings)

         -   Findings

         -   Recommended Action (related to finding)

         Findings are the only of the above fields which will
         be discussed further.

         Considering the attributes outlined in chapter 1, the
         reviewer might/will find portions of the specifications
         which does not satisfy these attributes.  In such case
         DNs shall be generated.

         Comments shall not be limited to generality, but address
         specific areas.

         To make life easier for the reviewer to write a DN,
         it is acceptable to attach a copy of the page/section
         from the specification with corrections to the DN.
















































                  CAMPS DISCREPANCY NOTE



4.2      A̲C̲C̲O̲U̲N̲T̲A̲B̲I̲L̲I̲T̲Y̲ ̲O̲F̲ ̲D̲N̲s̲

         In order to ensure accountability of the DNs being
         generated and processed during the P̲reliminary D̲esign
         R̲eview (PDR) a DN record shall be maintained for each
         document being reviewed.

         The PDR DN record shall be kept up to date reflecting
         the status of all DNs.

         Overleaf is presented a PDR DN record.

         Column 1-3 are self explanatory, therefore only column
         4-13 will be described in the following.

         In column 4-6 it shall be indicated which disposition
         the DN coordinator has taken (accepted, accepted with
         modification or rejected).

         In column 7-9 it shall be indicated which disposition
         the review has taken (accepted, rejected or action
         item (further study)).

         In column 10-13 all action items indicated in column
         9 shall be logged by actionee, due date, action number,
         and completion date.