⟦136a7dd2a⟧ Wang Wps File

    Length: 27382 (0x6af6)
    Types: Wang Wps File
    Notes: CPS/SDS/001  ISSUE 1      
    Names: »0666A «

Derivation

└─⟦704904495⟧ Bits:30006007 8" Wang WCS floppy, CR 0042A
    └─ ⟦this⟧ »0666A « 

WangText



:…0a…:…0d…:…02…:…06…:…07…9…86…1
      
      
      
      
      
      
      
    …02…  
      
   …02…   …02…
      
  

…02…CPS/SDS/001

…02…FH/810227…02……02…
CAMPS
 SYSTEM
 DESIGN
 SPECIFICATION
…02……02…CAMPS









                 T̲A̲B̲L̲E̲ ̲O̲F̲ ̲C̲O̲N̲T̲E̲N̲T̲S̲



     4.3   SYSTEM SUPERVISION .................. 157
       4.3.1 CAMPS Modes of Operation .......... 157
         4.3.1.1 On-Line Operation ............. 158
         4.3.1.2 Off-Line Operation ............ 160
         4.3.1.3 Watchdog Operation ............ 160
         4.3.1.4 Switch-Over ................... 164
           4.3.1.4.1 Emergency Switch-Over ..... 164
           4.3.1.4.2 Ordered Switch-Over ....... 165

         4.3.1.5 Start-Up of CAMPS Modes ....... 165
         4.3.1.6 Load of Modified Software ..... 167
           4.3.1.6.1 Load of Modified Applica-
                     tion Software Prepared at
                     the CSSI .................. 167

         4.3.1.7 Detailed Start-Up of On-Line
                 Operations .................... 168
         4.3.1.8 Close Down of CAMPS Modes of
                 Operation ..................... 168

       4.3.2 Equipment Resource Handling ....... 169
         4.3.2.1 Disk Equipment ................ 170
           4.3.2.1.1 Modes of Operation ........ 170
           4.3.2.1.2 Hardware Control .......... 171
           4.3.2.1.3 Software Control .......... 173
           4.3.2.1.4 Reconfiguration ........... 173

         4.3.2.2 TDX-Bus System ................ 173
           4.3.2.2.1 Modes of Operation ........ 173
           4.3.2.2.2 Hardware Control .......... 174
           4.3.2.2.3 Software Control .......... 174
           4.3.2.2.4 Reconfiguration ........... 174

         4.3.2.3 LTU and Attached Lines ........ 174
           4.3.2.3.1 Modes of Operation ........ 174
           4.3.2.3.2 Hardware Control .......... 175
           4.3.2.3.3 Software Control .......... 176
           4.3.2.3.4 Re-configuration .......... 176



         4.3.2.4 LTUX and Attached Terminal
                 Equipment ..................... 176
           4.3.2.4.1 Modes of Operation ........ 176
           4.3.2.4.2 Hardware Control .......... 176
           4.3.2.4.3 Software Control .......... 177
           4.3.2.4.4 Re-configuration .......... 177

       4.3.3 Watchdog and Manual Supervision
             Facilities ........................ 178
         4.3.3.1 Watchdog Control .............. 178
         4.3.3.2 Watchdog Monitoring ........... 180
         4.3.3.3 Manual Fallback ............... 182



4.3      S̲Y̲S̲T̲E̲M̲ ̲S̲U̲P̲E̲R̲V̲I̲S̲I̲O̲N̲

         System supervision addresses the monitoring and control
         of the CAMPS modes of operation.

         The description is separated into three sections:

         1)  control of CAMPS modes of operation
         2)  control of peripheral equipment
         3)  watchdog and manual control and monitoring facilities.



4.3.1    C̲A̲M̲P̲S̲ ̲M̲o̲d̲e̲s̲ ̲o̲f̲ ̲O̲p̲e̲r̲a̲t̲i̲o̲n̲

         The CAMPS system supports on-line and off-line operations.

         The on-line modes of operation are:

         -   a dualized mode consisting of an active and a standby
             processor.

         -   a degraded mode consisting of an active processor
             unit (PU).

         In the degraded mode, the non-active processor is used
         for off-line operations:

         -   software development and test (SD&T) at CSSI site

         -   table generation (TG) at CSSI site

         -   maintenance and diagnostics (M&D) at all sites

         -   off-line utilities (OU) at all sites

             -   print memory dump

             -   print trace records

         The CAMPS modes of operations are controlled software-
         and hardware-wise from the watchdog position, which
         contains:



         -   the watchdog (WPD)
         -   the operator VDU
         -   the operator printer



4.3.1.1  O̲n̲-̲L̲i̲n̲e̲ ̲O̲p̲e̲r̲a̲t̲i̲o̲n̲

         CAMPS on-line operations are supported by either a
         dualized PU configuration or by a single PU configuration.

         The dualized configuration consists of an active PU,
         which performs on-line functions and a standby PU,
         which is ready to assume on-line functions, when a
         switch-over is executed.  On an event basis checkpoints
         (defining e.g. terminal and traffic status) are transferred
         to the standby processor to assure an acceptable level
         of data continuity at the time of recovery and restart
         during a switch-over.  The active processor owns all
         disks, terminals, and external channels, whereas the
         standby PU has none.  The dualized configuration is
         depicted in figure 4.3.1-1 overleaf.

         The single PU configuration consists of an active PU,
         which operates as the active PU above, except for checkpoint
         generation.



















































             Fig. 4.3.1-1…01…D̲u̲a̲l̲i̲z̲e̲d̲ ̲O̲p̲e̲r̲a̲t̲i̲o̲n̲



4.3.1.2  O̲f̲f̲-̲L̲i̲n̲e̲ ̲O̲p̲e̲r̲a̲t̲i̲o̲n̲

         In the M&D configuration (refer to figure 4.3.1-2),
         the off-line processor may be assigned a number of
         devices:

         -   the off-line disk or the floppy disk for load of
             M&D SW
         -   two LTUXs on the same DTM-X
         -   one LTU
         -   the off-line disk or an out of service mirrored
             disk

         The M&D test programs are operated from the operator
         VDU, whereas test output is directed to the operator
         printer.  M&D programs are residing on the off-line
         disk and on the floppy disk.

         The OU configuration is assigned the floppy disk or
         the off-line disk. OU programs are operated like M&D
         Programs.

         The SD&T and TG configuration (refer figure 4.3.1-3)
         at the development site (CSSI) is assigned VDU and
         printer on the IO BUS for control of operation and
         output of results.

         The SD&T and TG programs are residing on the floppy
         disk or on the off-line disk.  Modified software (incl.
         M&D software) are generated at a floppy disk for transportation
         to CAMPS sites.



4.3.1.3  W̲a̲t̲c̲h̲d̲o̲g̲ ̲O̲p̲e̲r̲a̲t̲i̲o̲n̲

         The watchdog is an independent processor, which:

         -   monitors and controls the CAMPS hardware as described
             in section 4.3.3.

         -   determines and executes switch-over, thereby authority
             conflicts between the two processors are avoided.

         -   provides an operator command interface from the
             operator VDU to both PUs, thereby enabling a software
             control of all CAMPS modes of operation.



         -   monitors the active and standby PU by the periodic
             reception of a "keep alive" message.

         The operator VDU contains a display of the CAMPS system
         status.

         The operator printer provides a hard copy facility
         for system status print-out (e.g error reports).



















































          Fig. 4.3.1-2…01…D̲e̲g̲r̲a̲d̲e̲d̲ ̲O̲p̲e̲r̲a̲t̲i̲o̲n̲ ̲(̲M̲&̲D̲)̲



















































           Fig. 4.3.1-3…01…D̲e̲g̲r̲a̲d̲e̲d̲ ̲O̲p̲e̲r̲a̲t̲i̲o̲n̲ ̲S̲D̲&̲T̲



4.3.1.4  S̲w̲i̲t̲c̲h̲-̲O̲v̲e̲r̲

         During dualized operation, a switch-over to the standby
         PU will take place:

         -   subsequent to a non-recoverable hardware or software
             error in the active PU (emergency switch-over).

         -   subsequent to an operator switch-over command (ordered
             switch-over).

         The error detection is described in section 4.11.

         A switch-over implies, that:

         -   the active PU is taken off-line by the watchdog.

         -   the watchdog directs the standby PU to capture
             all peripherals and go into a recovery/restart
             procedure to restore CAMPS on-line operations.

         The active PU normally directs the watchdog to perform
         a switch-over, however, the watchdog executes automatically
         an emergency switch-over, if:

         -   no keep alive message is received from the active
             PU.

         -   a non-recoverable hardware error (e.g. power down)
             is detected via the configuration control bus (refer
             section 4.3.3).



4.3.1.4.1    E̲m̲e̲r̲g̲e̲n̲c̲y̲ ̲S̲w̲i̲t̲c̲h̲-̲O̲v̲e̲r̲

         The faulty active PU is electrically disconnected from
         its peripherals and the standby PU is commanded to
         go active.  The standby PU captures all peripherals
         and loads and starts the application software.  The
         recovery actions based upon received checkpoints are
         defined in section 4.7.





4.3.1.4.2    O̲r̲d̲e̲r̲e̲d̲ ̲S̲w̲i̲t̲c̲h̲-̲O̲v̲e̲r̲

         All input/output to/from external lines are stopped,
         when a complete message is received/transmitted.

         Terminal operators are given a limited time to stop
         input.  Having completed a transaction (inclusive presentation)
         the terminal position is signed off.  All remaining
         packages are commanded to stop processing and the standby
         PU is notified to become active.



4.3.1.5  S̲t̲a̲r̲t̲-̲U̲p̲ ̲o̲f̲ ̲C̲A̲M̲P̲S̲ ̲M̲o̲d̲e̲s̲ ̲o̲f̲ ̲O̲p̲e̲r̲a̲t̲i̲o̲n̲

         The operator starts all CAMPS modes of operation. 
         At first, the operator defines an initial hardware
         configuration via operator commands directly to the
         watchdog:

         -   enable Pu
         -   set PU in normal mode
         -   connect disk to the PU in question
         -   issue master clear

         (Refer to section 4.3.3 for a detailed description
         of these signals).

         Hereby a dialogue to a MIA PROM program executed by
         a CPU is set-up and the PU has access to a disk.

         The operator specifies a disk drive and the above program
         loads a number of segments into RAM and starts execution.
          The loaded program performs further loading, which
         may be:

         -   start-up active PU
         -   start-up standby PU
         -   start-up M&D in off-line PU
         -   start-up OU in off-line PU
         -   start-up SD&T in off-line PU
         -   start-up TG in off-line PU

         Overleaf in figure 4.3.1.5-1, the start-up modes of
         on-line operations are illustrated. Prior to a start-up,
         a memory dump can be performed to the floppy disk or
         the off-line disk.  Via OU software, it can later be
         disassembled and printed at the operator printer.



















































      Fig. 4.3.1.5-1…01…S̲t̲a̲r̲t̲-̲U̲p̲ ̲o̲f̲ ̲O̲n̲-̲L̲i̲n̲e̲ ̲O̲p̲e̲r̲a̲t̲i̲o̲n̲s̲



4.3.1.6  L̲o̲a̲d̲ ̲o̲f̲ ̲M̲o̲d̲i̲f̲i̲e̲d̲ ̲S̲o̲f̲t̲w̲a̲r̲e̲



4.3.1.6.1    L̲o̲a̲d̲ ̲o̲f̲ ̲M̲o̲d̲i̲f̲i̲e̲d̲ ̲A̲p̲p̲l̲i̲c̲a̲t̲i̲o̲n̲ ̲S̲o̲f̲t̲w̲a̲r̲e̲ ̲P̲r̲e̲p̲a̲r̲e̲d̲
             ̲a̲t̲ ̲t̲h̲e̲ ̲C̲S̲S̲I̲

         At the CSSI site new application software is developed
         and tested.  On floppy disk packs, the modified application
         software is transported to CAMPS sites, where it is
         copied to the mirrored disks or the off-line disk.
          At a subsequent switch-over or a start-up subsequent
         to an ordered close down, the modified application
         software can be brought into operation.





4.3.1.7  D̲e̲t̲a̲i̲l̲e̲d̲ ̲S̲t̲a̲r̲t̲-̲U̲p̲ ̲o̲f̲ ̲O̲n̲-̲L̲i̲n̲e̲ ̲O̲p̲e̲r̲a̲t̲i̲o̲n̲s̲

         During start-up of on-line operations the CAMPS operating
         system (COPSY) is loaded and started at first.  COPSY
         is the parent of all processes and assigns resources
         (e.g. memory, CPU, lines, access, and security rights)
         to its children based on a system status table.  LTU
         and LTUX lines are assigned/deassigned by COPSY, whereas
         THP(LTU-lines), TEP (LTUX terminal lines), and THP
         (LTUX-TRC lines) opens/closes the lines.  During assignment,
         the watchdog is commanded to execute physical connection
         as described in section 4.3.3.

         Processes and procedures are given start-up information,
         which defines the type of start-up.  So initialization
         and recovery actions are performed decentralized. 
         The mapping of recovery requirements to packages are
         defined in section 4.7.

         A description of disk start-up information is given
         in section 5.10.1.2.1.1.



4.3.1.8  C̲l̲o̲s̲e̲-̲D̲o̲w̲n̲ ̲o̲f̲ ̲C̲A̲M̲P̲S̲ ̲M̲o̲d̲e̲s̲ ̲o̲f̲ ̲O̲p̲e̲r̲a̲t̲i̲o̲n̲

         The operator can close all CAMPS modes of operation
         either ordered or non-ordered.

         During a non-ordered close down, the PU in question
         is physically isolated (the PU is disabled as described
         in section 4.3.3).  If the active PU is closed non-ordered
         an emergency switch-over will take place.

         During an ordered close down the concerned PU is commanded
         to stop execution.  Having done so, the PU is disabled.
          For the active PU two types of ordered close-down
         are handled:



         a)  C̲l̲o̲s̲e̲-̲d̲o̲w̲n̲ ̲a̲n̲d̲ ̲D̲i̲e̲-̲o̲u̲t̲

             All input from external lines are stopped, when
             a complete message is received (Handled by THP).
              All input from terminals are stopped after a limited
             time (Handled by TEP).

             Hereafter, the system will slowly die out.  When
             all queues are empty, all processing will be terminated
             and the PU disabled.

         b)  C̲l̲o̲s̲e̲-̲d̲o̲w̲n̲ ̲a̲n̲d̲ ̲S̲a̲v̲e̲ ̲Q̲u̲e̲u̲e̲ ̲I̲n̲f̲o̲r̲m̲a̲t̲i̲o̲n̲

             All input/output to/from external lines are stopped,
             when a complete message is received/transmitted
             (handled by THP).  Terminal operators are given
             a limited time to stop all input.  Having completed
             a transaction (incl. presentation) the terminal
             position is signed off.  (TEP and SSC actions).
              All remaining packages are commanded to stop execution
             and the current queue content are saved on disk
             by the CAMPS system function (CSF) package.



4.3.2    E̲q̲u̲i̲p̲m̲e̲n̲t̲ ̲R̲e̲s̲o̲u̲r̲c̲e̲ ̲H̲a̲n̲d̲l̲i̲n̲g̲

         This section defines the:

         -   modes of operation
         -   hardware and software control
         -   reconfiguration possibilities

         for DISK, TDX-bus system, LTU and LTUX equipment.

         The Configuration Table contains a description of all
         CAMPS equipment.  The SSC in the active PU updates
         this table, when:

         -   operator commands  or
         -   error fix-up procedures

         are executed.

         Device control is implemented via hardware and software.


         The hardware control connects a device to either of
         the PUs.  Also it ensures that active PU activities
         will not interfere with off-line PU activities.  The
         hardware control is implemented by the SSC, but executed
         by the watchdog as described in section 4.3.3.

         The software control is handled by the SSC, which defines
         access and security rights for the users of the devices.



4.3.2.1  D̲i̲s̲k̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲



4.3.2.1.1    M̲o̲d̲e̲s̲ ̲o̲f̲ ̲O̲p̲e̲r̲a̲t̲i̲o̲n̲

         A CAMPS site configuration contains:

         -   two mirrored disk drives
         -   one off-line disk drive
         -   one floppy disk drive

         The mirrored disk drives are always assigned to the
         active PU, except when a drive is erroneous.

         The off-line disk drive may be assigned to either the
         active or the off-line PU.

         The off-line disk is used in performing the following
         active PU functions:

         -   retrieval of off-loaded messages
         -   start-up of active operation
         -   back-up of the system parameter file
         -   off-loading of messages
         -   memory dump and trace information storage
         -   loading of modified application software

         and for the following standby PU function:

         -   start-up of standby operation

         and for the following off-line PU functions:



         -   start-up of off-line operation
         -   source for memory dump and trace information print-out
         -   source for load of M&D SW

         The mirrored and off-line disks are permanently defined
         at start-up time i.e. no interchange between mirrored
         and off-line disk drives takes place.

         The floppy disk is used as storage for:

         -   modified application software, which are generated
             at the CSSI and loaded at CAMPS sites.

         -   M&D and OU programs.

         -   memory dump and trace information



4.3.2.1.2    H̲a̲r̲d̲w̲a̲r̲e̲ ̲C̲o̲n̲t̲r̲o̲l̲

         The SSC controls via the watchdog whether all DISKs
         in common can be accessed from either IO BUS-A or B,
         or from both A and B, or from none. Access means that
         the PU "take ownership", i.e. executes an IO instruction,
         which connects an IO BUS device to the PU issuing the
         command. The command has only effect if the IO BUS
         in question is not disabled by the watchdog.  Via manual
         switches in the Channel Unit, it is possible to override
         this decision and enable a specific device to be accessed
         via either of the IO BUSes.

         The use of the manual facility makes it possible to
         assign peripherals to the off-line PU and totally shield
         the off-line operations from those of the active PU.

         In table 4.3.2.1.2-1 below, the co-operation of the
         above facilities are defined.










 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Start-up of    Start-up of      Dualized           Off-Line 
Active PU      Standby PU       Operation          Operation
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
IO BUS A enable                 IO BUS A enable    IO BUS A enable      IO
                                                                        BUS
                                                                        A
                                                                        enable

IO BUS B disable                IO BUS B enable    IO BUS B disable     IO
                                                                        BUS
                                                                        B
                                                                        disable

                                                   Manual enable of:

                                                   - floppy disk
                                                   - off-line disk
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Assumption:  IO Bus A is connected to the active PU








         …01…Table 4.3.2.1.2-1…01…I̲O̲ ̲B̲U̲S̲ ̲H̲a̲r̲d̲w̲a̲r̲e̲ ̲C̲o̲n̲n̲e̲c̲t̲i̲o̲n̲s̲



4.3.2.1.3    S̲o̲f̲t̲w̲a̲r̲e̲ ̲C̲o̲n̲t̲r̲o̲l̲

         During on-line operation, the assignment/deassignment
         of disk drives are performed by the SSC, whereas the
         volume handling is split:

         -   the mirrored and the floppy disk volumes are controlled
             by the SSC via operator commands.

         -   the off-line disk volumes are controlled by the
             TEP (via supervisor commands).

         However, during start-up, the PU in question performs
         assignment and volume handling.

         During off-line operation, the off-line PU performs
         assign/deassign and mount/dismount.



4.3.2.1.4    R̲e̲c̲o̲n̲f̲i̲g̲u̲r̲a̲t̲i̲o̲n̲

         A suspected erroneous disk drive may be connected to
         the off-line PU.  A repaired disk drive can be connected
         to the active PU.  The off-line and the floppy disk
         may be connected to either the active or the off-line
         PU.  Reconfigurations will affect the packages described
         during software control.



4.3.2.2  T̲D̲X̲-̲B̲U̲S̲ ̲S̲y̲s̲t̲e̲m̲



4.3.2.2.1    M̲o̲d̲e̲s̲ ̲o̲f̲ ̲O̲p̲e̲r̲a̲t̲i̲o̲n̲ ̲(̲P̲U̲-̲A̲s̲s̲i̲g̲n̲m̲e̲n̲t̲)̲

         The TDX-bus system contains two TDX-buses each equipped
         with a TDX-CTR, and a number of TDX crates connected
         to the TDX-bus by BSM-Xs.

         Except for M&D degraded operation, the active PU runs
         the TDX-bus systems in active/standby mode.  A switch
         to the standby TDX-bus is supported softwarewise by
         the THS in the IOC. 

         In M&D operation, the standby TDX-bus is used by the
         off-line PU during TDX Bus system test.



4.3.2.2.2    H̲a̲r̲d̲w̲a̲r̲e̲ ̲C̲o̲n̲t̲r̲o̲l̲

         The SSC controls via the watchdog, whether a PU has
         access to the TDX-bus systems or not.  (Refer to section
         4.3.3 for a description of PU control). Prior to a
         switch, the SSC will command the watchdog to switch
         LTUXs at the active TDX-bus to the standby TDX-bus.

         During power-up a TDX-CTR built-in self test program
         is executed.  The result is indicated via a LED on
         the TDX-CTR and via a watchdog monitoring signal. 
         (Refer section 4.3.3.2).



4.3.2.2.3    S̲o̲f̲t̲w̲a̲r̲e̲ ̲C̲o̲n̲t̲r̲o̲l̲

         The TDX-bus system is in the active PU controlled by
         the SSC and the THS (in the IOC), which:

         -   defines the TDX-bus communication
         -   switches between TDX-bus systems
         -   connects a TDX-bus system to the off-line PU
         -   inserts a TDX-bus system as standby
         -   switches a BSM-X to TDX-bus 1 or 2



4.3.2.2.4    R̲e̲c̲o̲n̲f̲i̲g̲u̲r̲a̲t̲i̲o̲n̲

         An erroneous TDX-bus system is taken out of on-line
         operation and may be tested by the off-line PU.  A
         repaired TDX-Bus system can be re-inserted.  It is
         possible to switch between the TDX-bus systems.



4.3.2.3  L̲T̲U̲ ̲a̲n̲d̲ ̲A̲t̲t̲a̲c̲h̲e̲d̲ ̲L̲i̲n̲e̲s̲



4.3.2.3.1    M̲o̲d̲e̲s̲ ̲o̲f̲ ̲O̲p̲e̲r̲a̲t̲i̲o̲n̲

         During M&D operation in the off-line PU, a suspected
         erroneous LTU can be connected to the off-line PU.



         During SD&T or TG operation in the off-line PU at the
         CSSI site an LTU equipped with VDU and printer is connected
         to the offline PU.

         The remaining LTUs are connected to the active PU.



4.3.2.3.2    H̲a̲r̲d̲w̲a̲r̲e̲ ̲C̲o̲n̲t̲r̲o̲l̲

         The LTU control is similar to the disk control described
         in section 4.3.2.1.2.

         In table 4.3.2.3.2-1, the co-operation of control facilities
         are defined.



 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Dualized Operation   M&D                 SD&T and TG
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
IO BUS A enable      IO BUS A enable     IO BUS A enable

IO BUS B disable     IO BUS B disable    IO BUS B disable

                     Manual enable of    Manual enable of

                     - erroneous LTU     - SD&T or TG LTU
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Assumption:  IO BUS-A is connected to the active PU.



            Table 4.3.2.3.2-1…01…I̲O̲ ̲B̲U̲S̲ ̲H̲a̲r̲d̲w̲a̲r̲e̲ ̲C̲o̲n̲n̲e̲c̲t̲i̲o̲n̲s̲



         During power-up, module built-in self test programs
         in the LTUs are executed.  The result is available
         through a LED on the LTU front panel (refer section
         4.3.3.2).

         Also, the module built-in selt test programs can be
         executed via an I/O instruction. If the built-in testprogram
         detects an error the result is given on a LED and the
         device is not accessable.


4.3.2.3.3    S̲o̲f̲t̲w̲a̲r̲e̲ ̲C̲o̲n̲t̲r̲o̲l̲

         The SSC supports downline load of LTU programs.  The
         SSC controls assign/deassign of LTU/LTU-lines, whereas
         the THP handles open/close.

         Assign/deassign includes the "take ownership" command.

         During SD&T and TG off-line operation, the LTU and
         LTU equipment are entirely handled by the SSP or the
         OLP.



4.3.2.3.4    R̲e̲c̲o̲n̲f̲i̲g̲u̲r̲a̲t̲i̲o̲n̲

         A suspected erroneous LTU can be connected to the off-line
         PU. Also, an LTU can be taken out of service.  It is
         possible to connect an LTU to the active PU and to
         enable/disable the operational use of an LTU line.
         It is possible to specify channel designator to LTU-line
         connection.



4.3.2.4  L̲T̲U̲X̲ ̲a̲n̲d̲ ̲A̲t̲t̲a̲c̲h̲e̲d̲ ̲T̲e̲r̲m̲i̲n̲a̲l̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲



4.3.2.4.1    M̲o̲d̲e̲s̲ ̲o̲f̲ ̲O̲p̲e̲r̲a̲t̲i̲o̲n̲

         During M&D operation in the off-line PU a suspected
         erroneous LTUX can be connected to the off-line PU
         in this way:

         The standby TDX-bus is taken off-line and the LTUX
         and its neighbour LTUX in the crate is switched to
         the off-line TDX-bus.  This facility is used, when
         either the TDX-bus system or the LTUX is erroneous.
         The remaining LTUXs are connected to the active TDX-bus.



4.3.2.4.2    H̲a̲r̲d̲w̲a̲r̲e̲ ̲C̲o̲n̲t̲r̲o̲l̲

         The SSC controls via the watchdog, if two LTUXs in
         a TDX crate are connected to TDX-bus 1 or 2.



 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Dualized Operation or                                            M&D

 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
All LTUXs connected to                                           An
                                                                 erroneous
                                                                 LTUX
                                                                 and
                                                                 the
                                                                 neighbour
TDX-BUS 1                                                        LTUX
                                                                 is
                                                                 connected
                                                                 to
                                                                 TDX-bus
                                                                 2.
                              Remaining LTUXs are connected
                              to TDX-bus 1
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Assumption:  TDX-bus 1 is active.



            Table 4.3.2.4.2-1…01…L̲T̲U̲X̲ ̲C̲o̲n̲n̲e̲c̲t̲i̲o̲n̲





         During power-up, module built-in self test programs
         are executed.  The result is given on a LED on the
         LTUX front panel.



4.3.2.4.3    S̲o̲f̲t̲w̲a̲r̲e̲ ̲C̲o̲n̲t̲r̲o̲l̲

         The SSC controls assignment/deassignment, whereas the
         TEP handles open/close of LTUX-lines to terminal equipment
         and the THP handles open/close of LTUX-lines to TRC.



4.3.2.4.4    R̲e̲c̲o̲n̲f̲i̲g̲u̲r̲a̲t̲i̲o̲n̲ 

         An LTUX can be connected to the active or the off-line
         TDX-bus.

         An LTUX can be taken out of service. It is possible
         to specify that an LTUX-line is enabled/disabled for
         active operational use. It is possible to specify the
         terminal/device designator to LTUX-line connection.


4.3.3    W̲a̲t̲c̲h̲d̲o̲g̲ ̲a̲n̲d̲ ̲M̲a̲n̲u̲a̲l̲ ̲S̲u̲p̲e̲r̲v̲i̲s̲i̲o̲n̲ ̲F̲a̲c̲i̲l̲i̲t̲i̲e̲s̲

         The watchdog monitors and controls the CAMPS hardware
         via a serial configuration control bus (CCB), which
         is connected to adapters in each crate.

         If the watchdog fails a back up is provided via manual
         switches in the crates.



4.3.3.1  W̲a̲t̲c̲h̲d̲o̲g̲ ̲C̲o̲n̲t̲r̲o̲l̲

         Overleaf in figure 4.3.3.1-1 a summary of the watchdog
         control facilities is given.

         The watchdog control of a channel unit is defined in
         section 4.3.2.1.2 and 4.3.2.3.2.

         The watchdog control of a TDX-crate is defined in section
         4.3.2.2.2 and 4.3.2.4.2.

         The watchdog control of a PU crate is defined below.

         The watchdog has three PU control signals:

         -   Enable/disable PU
         -   Set normal mode/maintenance mode
         -   Issue master clear

         a)  P̲U̲ ̲e̲n̲a̲b̲l̲e̲/̲d̲i̲s̲a̲b̲l̲e̲

             This signal connects/disconnects a PU to/from the
             Data Channel and TDX-buses in the MIA/TIAs.

         b)  N̲o̲r̲m̲a̲l̲/̲m̲a̲i̲n̲t̲e̲n̲a̲n̲c̲e̲ ̲M̲o̲d̲e̲

             In maintenance mode, the watchdog communicates
             directly with the MAP microprocessor.  The PU is
             disabled and the MAP is able to execute a set of
             low level M&D commands.

             In normal mode, the watchdog communicates with
             a CPU, which executes a PROM program in the MIA.
              This program requests the operator to define a
             disk drive, from which a number of segments is
             loaded into normal RAM.  The loaded program is
             started and communicates with the operator for
             determination of the further start-up.


















































                     FIGURE 4.3.3.1-1


         c)  M̲a̲s̲t̲e̲r̲ ̲C̲l̲e̲a̲r̲

             The setting of master clear starts execution of
             built-in tests in the CPUs and in the MAP and in
             appropriate modules and initiates the normal mode
             or maintenance mode operation.  Power-up of a PU
             implies the issuing of a master clear signal.

             In figure 4.3.3.1-1 the used combination of the
             above signals in controlling the CAMPS modes of
             operation, are defined.



 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
MODE                 PU       PU        NORMAL   MAINTENANCE
                     ENABLE   DISABLE   MODE     MODE
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Active and Standby PU           X                 X               

M&D initial                     X                X

M&D extended PU test            X        X

M&D load of test
programs and execution
of peripheral tests    X                 X

SD&T, TG ad OU         X                 X

 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

           Fig. 4.3.3.1-1…01…W̲a̲t̲c̲h̲d̲o̲g̲ ̲C̲o̲n̲t̲r̲o̲l̲ ̲o̲f̲ ̲P̲U̲ ̲O̲p̲e̲r̲a̲t̲i̲o̲n̲



4.3.3.2  W̲a̲t̲c̲h̲d̲o̲g̲ ̲M̲o̲n̲i̲t̲o̲r̲i̲n̲g̲

         The watchdog monitors the PU signals:

         1)  power
         2)  whether the PU is manually or automatically controlled



         The watchdog monitors the IO-crate signals:

         1)  power

         The watchdog monitors the TDX-crate signals:

         1)  power
         2)  setting of auto/manual switch
         3)  the result of self test routines
         4)  the status of the TDX-CTR

         If a power-down is detected in the active PU, an emergency
         switch-over is initiated automatically.

         If a power-down is detected in the non-active PU, then
         the PU is disabled.

         The Channel unit contains two power-supplies:

         -   one supply for each CIA

         -   dualized supply per IO-BUS device

         A single power-down has effects identical to a PU power
         down. A dualized power down implies a total system
         failure.

         A power down in the watchdog inplies that the watchdog
         is taken out of service (refer to section 4.3.3.3).

         A power down in a TDX-crate implies, that the 2 LTUXs
         in the crate are taken out of service.

         The setting of the auto/manual switch is displayed
         at the operator VDU.

         If the TDX-CTR status indicates an error, the SSC in
         the active PU is notified and a TDX-bus switch-over
         will take place.




4.3.3.3  M̲a̲n̲u̲a̲l̲ ̲F̲a̲l̲l̲-̲B̲a̲c̲k̲

         If the watchdog fails, it is automatically taken out
         of service and the objects controlled by the watchdog
         will remain unchanged.  However, the watchdog monitoring
         and control via the configuration control bus, is not
         possible.

         Monitoring is provided by means of LEDs on the crates.