INSPECTION
AND TEST
PROCEDURE
FOR
DELTA
DATA TERMINAL
7260TC…02……02…CAMPS
T̲A̲B̲L̲E̲ ̲O̲F̲ ̲C̲O̲N̲T̲E̲N̲T̲S̲
1. SCOPE ............................................
5
2. APPLICABLE DOCUMENTS .............................
5
3. TEST EQUIPMENT ...................................
6
4. TEST CONFIGURATION ...............................
7
4.1 TEST CONNECTION ................................
7
4.1.1 Test With Optical Modem ....................
7
4.1.2 Test Without Optical Modem .................
7
4.2 MAINS INPUT ....................................
9
4.2.1 Adjustable Input Supply ....................
9
4.2.2 Method of Input Control ....................
9
5. INCOMING INSPECTION ..............................
10
5.1 INCOMING INSPECTION LOG ........................
10
5.2 UNPACKING ......................................
10
5.3 PACKING LIST ...................................
10
6. VISUAL INSPECTION ................................
11
6.1 VISUAL INSPECTION FORMULA ......................
11
6.2 ELECTRICAL DEFECTS .............................
11
6.3 DISCREPANCIES ..................................
11
7. FUNCTIONAL TEST ..................................
12
7.1 GENERAL ........................................
12
7.1.1 Sections ...................................
12
7.1.2 Escape .....................................
12
7.2 INTERNAL DIAGNOSTICS ...........................
12
7.2.1 Start Up ...................................
12
7.2.2 Display Test ...............................
12
7.2.3 RAM Test ...................................
12
7.2.4 EAROM Test .................................
14
7.2.5 I/O PORT Test ..............................
14
7.3 KEYBOARD TEST ..................................
15
7.4 COMMUNICATION TEST .............................
15
7.4.1 Set Up .....................................
15
7.4.2 Linearity Test .............................
16
7.4.3 Test Of Splits .............................
16
7.4.4 PF-KEY Test ................................
16
7.4.5 Field Set Up ...............................
16
7.4.6 KEY Filter Test ............................
17
7.4.7 SIGN ON Test ...............................
17
7.4.8 Baud Rate Test .............................
17
7.5 INPUT VOLTAGE TEST .............................
18
7.5.1 High Input Voltage .........................
18
7.5.2 Low Input Voltage ..........................
18
7.5.3 Frequency Test .............................
18
8. BURN IN ..........................................
19
9. PACKING ..........................................
19
APPENDIX A: INCOMING INSPECTION LOG
APPENDIX B: VISUAL INSPECTION FORMULA
APPENDIX C: DDSC INSPECTION PROCEDURE 136
1̲ ̲ ̲S̲C̲O̲P̲E̲
This document describes the procedure and guidelines
for inspection and test of DELTA DATA terminal 7260TC.
2̲ ̲ ̲A̲P̲P̲L̲I̲C̲A̲B̲L̲E̲ ̲D̲O̲C̲U̲M̲E̲N̲T̲S̲
SD/STD/017 Incoming Inspection Standard
SD/STD/018 (Non Conformance Standard)
DDSC Inspection Procedure 136 (APP. C)
P/N 917M200A000 Maintenance Manual Vol. 1 7260T
P/N 917M200A000 Maintenance Manual Vol. 2 7260T
P/N 917M100A000 Operators Manual 7260T
3̲ ̲ ̲T̲E̲S̲T̲ ̲E̲Q̲U̲I̲P̲M̲E̲N̲T̲
The following test equipment and material will be utilized
during the functional test.
Communication tester Tektronix Type 834 ROM-Pack 834R01
and 834R03.
Frequency stabilizer ABACUS with option board Type
233-5. Two potentiometers with knobs mounted in a small
control box. The knobs are scaled in frequency and
voltages.
Mains step-down transformer (220/110/18/10 V.ac) 25W.
Test-set NU DATA-CORP. Type 921-T
Frequency counter
Opto modem OM2, VERSITRON
Multimeter FLUKE 8020 A
Cables, two V24 with RS232 plugs/sockets cables, twin
fiber optical cable with connectors 2 Km long. Shorter
cable can be used in connection with attenuators.
Plastic template for picture linearity judgement.
4̲ ̲ ̲T̲E̲S̲T̲ ̲C̲O̲N̲F̲I̲G̲U̲R̲A̲T̲I̲O̲N̲
4.1 T̲E̲S̲T̲ ̲C̲O̲N̲N̲E̲C̲T̲I̲O̲N̲
4.1.1 T̲e̲s̲t̲ ̲w̲i̲t̲h̲ ̲O̲p̲t̲i̲c̲a̲l̲ ̲M̲o̲d̲e̲m̲
The Delta Data terminal is via the internal FIBER OPTIC
MODEM connected through a 2 Km long twin fiber optical
Cable to a secondary optical modem, which is through
a V24-Cable connected via test-set 921T to the communication
tester 834. See fig. 4.1.1-1.
4.1.2 T̲e̲s̲t̲ ̲w̲i̲t̲h̲o̲u̲t̲ ̲O̲p̲t̲i̲c̲a̲l̲ ̲M̲o̲d̲e̲m̲
The Delta Data terminal, delivered with no internal
Fiber Optic modem, is through RS232 connector and via
Test-set 921-T connected to the communication tester
834. See fig. 4.1.2-1.
4.2 M̲A̲I̲N̲S̲ ̲I̲N̲P̲U̲T̲
4.2.1 A̲d̲j̲u̲s̲t̲a̲b̲l̲e̲ ̲I̲n̲p̲u̲t̲ ̲S̲u̲p̲p̲l̲y̲
To facilitate voltages and frequency variation test
of the Delta Data terminal, the mains input is supplied
via an ABACUS Frequency stabilizer which is altered
to a manual variable unit by swopping the control module
with option board 233-5 and connecting an auxiliary
control box.
4.2.2 M̲e̲t̲h̲o̲d̲ ̲o̲f̲ ̲I̲n̲p̲u̲t̲ ̲C̲o̲n̲t̲r̲o̲l̲
Module assy 40804 in the ABACUS Frequency stabilizer
is swopped with option board 233-5.
ON option board 233-5 is the voltages control for the
frequency oscillator IC6 and the voltage control for
the voltage stabilizer IC1 connected to the end-connector.
By connecting two auxiliary potentiometers to the relevant
4 pins on the end-connector it is possible to vary
the voltages output between 180 to 260V, and to vary
the frequency of the output between 45Hz to 65Hz.
The two potentiometers are mounted in a small adequate
box and through a five-core cable connected to the
end connector of the ABACUS unit.
By means of a Voltmeter and a frequency counter is
the two control Knobs of the potentiometers scaled
in Voltage and frequency.
5̲ ̲ ̲I̲N̲C̲O̲M̲I̲N̲G̲ ̲I̲N̲S̲P̲E̲C̲T̲I̲O̲N̲
5.1 I̲N̲C̲O̲M̲I̲N̲G̲ ̲I̲N̲S̲P̲E̲C̲T̲I̲O̲N̲ ̲L̲O̲G̲
The Incoming Inspection Log, App. A has to be filled
in carefully during the whole inspection and test operation.
When the inspection and test is terminated, the Incoming
Inspection Log shall be an annex to the concerned IKR.
5.2 U̲N̲P̲A̲C̲K̲I̲N̲G̲
Inspect the package and the unit for possible shipping
damage.
Attach the Acceptance tag T1 filled in with relevant
information to the unit and mark the carton with the
concerned IKR-number.
Check the unit serial number with the packing list
para. 5.3.
If any discrepancies are observed, report via the NCR-system.
5.3 P̲A̲C̲K̲I̲N̲G̲ ̲L̲I̲S̲T̲
TBD.
6̲ ̲ ̲V̲I̲S̲U̲A̲L̲ ̲I̲N̲S̲P̲E̲C̲T̲I̲O̲N̲
The following points have to be checked to fulfil requirements
to visual inspection:
a) Verify that all PCBs and the power supply are firmly
seated in chassis.
b) Verify that all connectors are firmly seated.
c) Verify that all cabling is intact, correctly marked
and anchored and that there are no broken or damaged
wires.
d) Check the interior for presence of foreign material
which could cause an electrical short.
6.1 V̲I̲S̲U̲A̲L̲ ̲I̲N̲S̲P̲E̲C̲T̲I̲O̲N̲ ̲F̲O̲R̲M̲U̲L̲A̲
The Visual Inspection formula App. B has to be used
to ensure, that all inspection points are checked.
6.2 E̲L̲E̲C̲T̲R̲I̲C̲A̲L̲ ̲D̲E̲F̲E̲C̲T̲S̲
The keyboard is connected to the unit. The unit is
switched on, and if the "Bell" sounds immediately and
a picture of reasonable size appears, the unit is left
ON for approximately 10 min., during this period it
is frequently checked that no smoke, excessive heat
or smell is generated.
6.3 D̲I̲S̲C̲R̲E̲P̲A̲N̲C̲I̲E̲S̲
If any discrepancies are observed, report via the NCR
system.
7̲ ̲ ̲F̲U̲N̲C̲T̲I̲O̲N̲A̲L̲ ̲T̲E̲S̲T̲
7.1 G̲E̲N̲E̲R̲A̲L̲
7.1.1 S̲e̲c̲t̲i̲o̲n̲s̲
Functional test for section 1 incorporates para. 7.1
to 7.6 and para. 8.
Functional test for section 2 incorporates para. 7.7
7.1.2 E̲s̲c̲a̲p̲e̲
Depress By activating the two keys simulta-
"Reset,CTRL" neously in approximately 10 seconds
it should be possible to return to
start position from any locked mode
due to ignorant operation.
7.2 I̲N̲T̲E̲R̲N̲A̲L̲ ̲D̲I̲A̲G̲N̲O̲S̲T̲I̲C̲S̲
7.2.1 S̲t̲a̲r̲t̲ ̲U̲p̲ Input voltages is set to nominal
voltages (220V).
POWER "ON" The "BELL" should sound immediately
and repeat 10 sec. later.
Depress "MON" The MONITOR menu appears on the screen.
Step " " Move the cursor to DIAG.
Depress "ENTER" ENTER PASSWORD: ......
appears on the screen.
Key in DIAG The diagnostic menu appears on the
screen.…86…1 …02… …02…
…02… …02… …02…
7.2.2 D̲i̲s̲p̲l̲a̲y̲ ̲T̲e̲s̲t̲
Depress "PF1" All possible 24 characters will be
displayed. Check that the following
7 display attibutes appear:
1. Characters with strike through
2. Blank characters
3. Reduced brightness
4. Inverted Video
5. Characters with dotted underline
6. Blinking characters
7. All modes without blank Characters.
After 20 sec. the diagnostic test
can be continued.
Depress any key The diagnostic menu reappears on
the screen.
7.2.3 R̲A̲M̲-̲T̲e̲s̲t̲
Depress PF2" During the RAM-TEST the display is
filled with alternating patterns.
When the RAM-TEST is completed check
that "RAM OK" is displayed.
7.2.4 E̲A̲R̲O̲M̲-̲T̲e̲s̲t̲
Depress any key During the EAROM-TEST the two lower
lines on the display will be used,
and check that the test is completed
with "EAROM OK" being displayed.
Depress any key The diagnostic menu reappears on
the screen.
7.2.5 I̲/̲O̲ ̲-̲ ̲P̲O̲R̲T̲ ̲T̲e̲s̲t̲
Depress "PF3" The screen will display: "DISCONNECT
I/O CABLES".
Disconnect the cables from I/O-Ports.
Depress any key Check that the screen display:
OK: I/O PORT 01
OK: I/O PORT 02
Depress "ESC" Exit from the diagnostics test.
7.3 K̲E̲Y̲B̲O̲A̲R̲D̲ ̲T̲E̲S̲T̲
Depress "RESET" Check that the LED on SHIFT LOCK
and "ALL CAPS" are extinguished
Release
"SHIFT LOCK"
Release "ALL CAPS"
Depress all keys Only light coloured keys with black
engravings are concerned. Observe
that the corresponding small characters
are written on the screen.
Depress The LED on "SHIFT LOCK" shall turn
on.
"SHIFT LOCK"
Depress all keys The above test of all keys is repeated,
and it is observed that the corresponding
capital characters are written on
the screen.
7.4 C̲O̲M̲M̲U̲N̲I̲C̲A̲T̲I̲O̲N̲ ̲T̲E̲S̲T̲
7.4.1 S̲e̲t̲ ̲U̲p̲
Tektronix Communication tester 834 is connected to
the V.D.U. either through the optical modem or directly
to PORT-1.
Switch the Com. Tester "Off" before inserting ROM PACK
RO-1.
Switch the Com. Tester "On" and wait for the display
text "DELTA TEST READY".
Press "Start" on the Com. Tester. Programming of the
configuration and setting up of the 16 splits are carried
out by the Com. Tester.
7.4.2 L̲i̲n̲e̲a̲r̲i̲t̲y̲ ̲T̲e̲s̲t̲
When the 16 splits are stable on the screen observe
if any irregularity, curved lines or unlinearity exists.
If there is any doubt control it with a ruler.
Irregularity and curved lines which are observable
with the naked eye and unlinearity greater than 5%
shall be reported.
7.4.3 T̲e̲s̲t̲ ̲o̲f̲ ̲S̲p̲l̲i̲t̲s̲
Write a single but different character in each split
and observe that each split can be recalled by using
"PRV SPLIT NXT".
Depress "ENTER" Check that only one split is available
and that it is possible to write
in it.
7.4.4 P̲F̲-̲K̲E̲Y̲ ̲T̲e̲s̲t̲
Depress "ENTER" All 36 PF-Keys are depressed in succession
and it is controlled that OK is written
on the screen for each PF-Key.
7.4.5 F̲i̲e̲l̲d̲ ̲S̲e̲t̲ ̲U̲p̲
Depress "ENTER" A field set up in format mode appears
on the screen.
Observe that is it only possible
to write in the reserved fields and
only with the right type of characters
as written on the screen.
Test all fields on both page 1 and
2 to reach page 2 use "TAB".
Depress "ENTER" The same test as above but with pre-determined
characters as indicated in relevant
paranthesis is carried out.…86…1
…02… …02… …02…
…02… …02…
7.4.6 K̲E̲Y̲ ̲F̲i̲l̲t̲e̲r̲ ̲T̲e̲s̲t̲
Depress "ENTER" The security key is turned anti-clockwise.
"KBD LOCK" should appear on the screen.
Observe that the keyboard is disabled.
Turn the Security
key clockwise Observe that the keyboard is enabled.
Depress "ENTER" After a few seconds "KDB LOCK" should
reappear on the screen. Observe that
the keyboard is disabled for about
8 seconds.
7.4.7 S̲I̲G̲N̲ ̲O̲N̲ ̲T̲e̲s̲t̲
Depress "ENTER" T.B.D.
7.4.8 B̲a̲u̲d̲ ̲R̲a̲t̲e̲ ̲T̲e̲s̲t̲
Depress "ENTER" All band rates as shown in the configuration
are now automaticly tested with both
+ and -2.5%.
The test is completed with the display
text "BAUD RATE TEST OK" on the Com.
tester.…86…1 …02… …02…
…02… …02… …02…
7.5 I̲N̲P̲U̲T̲ ̲V̲O̲L̲T̲A̲G̲E̲ ̲T̲E̲S̲T̲
7.5.1 H̲i̲g̲h̲ ̲I̲n̲p̲u̲t̲ ̲V̲o̲l̲t̲a̲g̲e̲
The input voltage is adjusted to nominal +10% and the
test in following paragraphs is carried out:
Para: 7.2 INTERNAL DIAGNOSTIC
Para: 7.4 COMMUNICATION TEST
7.5.2 L̲o̲w̲ ̲I̲n̲p̲u̲t̲ ̲V̲o̲l̲t̲a̲g̲e̲
The input voltage is adjusted to nominal -15% and the
test in following paragraphs are carried out:
Para: 7.2 INTERNAL DIAGNOSTIC
Para: 7.4 COMMUNICATION TEST
7.5.3 F̲r̲e̲q̲u̲e̲n̲c̲y̲ ̲T̲e̲s̲t̲
The input voltage is adjusted to nominal -15% and the
display screen is filled with characters (e.g. from
the Com. tester).
The frequency of the input voltage is slowly varied
from 45 Hz to 65 Hz and back to 45 Hz. Observe that
the displayed text is stable and no ripple is visible.
No audible noise may be present.
8̲ ̲ ̲B̲U̲R̲N̲-̲I̲N̲
To improve the future reliability a burn-in of 72 hours
duration of an environment temperature of 40…0e…o…0f… C is
carried out.
During the burn-in the unit is inspected three times
a day, at start of work, at mid-day, and at closing
time. This inspection is limited to a quick judgement
of the screen picture quality, that the keyboard still
can write on the screen and that no smoke, excessive
heat or smell is generated.
When the 72 hours burn-in time has expired
paragraph 7.2 INTERNAL DIAGNOSTIC
and
Paragraph 7.4 COMMUNICATION TEST
is carried out within 30 minutes.
9̲ ̲ ̲P̲A̲C̲K̲I̲N̲G̲
The accessories are checked with the packing list in
para 5.3, and are together with the unit and a silicagel
bag of 500 gram packed in a plastic bag and sealed.
The plastic bag is then packed in the relevant cartons
marked with the same IKR-numbers.
Paperworks are filled in and completed according to
SD/STD/017.