SW DEVELOPMENT PROGRESS
-----------------------
NO OF SOURCE LINES OF CODE
Date: 830115
LEVEL 1
CODE AND UNIT TESTED INTEGRATED
DATE CAMPS MODULE UNIT
TOTAL CODED TESTED INTEGRATED PACKAGE SYSTEM
-----------------------------------------------------------------
1/5 102 0.3 0.1 0 0 0
1/6 102 4.1 2.3 1.4 0 0
1/7 106 12.6 8.5 5.1 0 0
1/8 106 21.4 14.9 9.4 0 0
1/9 106 29.1 26.5 20.4 7.2 0
9/9 16 34.3 28.5 26.5 8 4.0
17/9 106 38.1 31.8 27.5 8.0 7.8
24/9 106 39.0 34.7 29.7 8.8 8.8
1/10 108 42.2 37.9 34.1 8.8 8.8
8/10 108 43.9 39.1 36.9 8.8 8.8
15/10 108 48.1 42.9 39.9 9.4 9.4
29/10 108 55.0 40.4 45.6 11.9 1.9
5/11 110 57.3 50.9 46.6 15.1 12.6
12/11 110 61.3 54.4 48.8 16.1 15.4
25/11 112 69.1 62.8 54.6 21.5 16.6
1/12 112 72.6 68.9 56.1 21.8 16.6
10/12 112 73.8 70.1 58.8 35.4 29.9
17/12 112 76.4 73.0 60.6 38.5 33.4
31/12 112 80.1 73.5 62.1 42.7 3.6
6/1 112 80.7 74.8 66.2 45.7 42.3
13/1 112 81.7 77.4 68.1 48.3 44.2
SW ESTIMATES SUMMARY…01…--------------------------
Date: 830221
LATEST ESTIMATES (KLOC)
-----------------------
WP NO PACKAGE TOTAL REL BUILD REL BUILD REL BUILD REL BUILD REL BUILD
NAME 1 NO. 2 NO. 3 NO. 4 NO. 5 NO.
-------------------------------------------------------------------
4.4.2.1 VUP 14.0 9.6 1 1.3 2 3.1 3
4.4.2.2 PRT 4.3 2.2 2 2.1 3 - -
4.4.2.3 SUP 10.9 7.1 2 0.0 3 3.8 3
4.4.2.4) MDCO)…0f……0f…MSA…0e……0e…
4.4.2.5) MSO ) …0e… 3.8 0.5 3 1.7 3 1.6 3…0f…
4.4.2.6 SPR 1.9 1.9 3 - - - -
4.4.2.7 OCR 1.0 1.0 3 - - - -
4.4.3 MDP 2.4 2.4 1 - - - -
4.4.4 THP 11.8 7.5 3 3.1 3 1.2 3
4.4.5 LOG 1.4 0.2 1 0.4 3 0.8 3
4.4.6 SAR 5.9 1.9 2 2.5 2 1.5 3
4.4.7 STP 1.8 0.1 1 0.9 3 0.8 3
4.4.8 TMP 3.9 1.6 1 0.7 2 0.2 2 1.4 3
4.4.9 CSF 6.7 3.8 1 1.8 2 0.4 3 0.7 3
4.4.10.1 SYS GEN 1.0 1.0 1 - - - -
4.410.2.1 FORM
GEN VDU 1.6 1.6 1 - - - -
4.4.10.2.2 FORM
GEN PRT 0.5 0.5 2 - - - -
4.4.10.3 DATA BA-
SE GEN 1.0 1.0 - - - -
4.4.11 MMS 7.4 2.4 1 1.9 2 0.5 3 2.9 3 0.2 3
4.4.12 SS&C 20.0 6.2 1 6.3 2 7.5 3
4.4.13.1.1 IOC,
FORMAT 3.1 2.9 1 0.2 3 -
VDU
4.4.13.1.2 IOC,
FORMAT 0.8 0.6 2 0.2 3 - -
PRT
4.4.13.2 IOC,
LTUX 4.8 3.7 1 0.9 2 0.2 3
HDL
4.4.13.3 IOC,
LTU HDL 4.3 2.1 3 2.2 3 - -
4.4.13.4 IOC,
LTUX FW 8.2 3.6 1 3.2 2 1.4 3
4.4.13.5 IO
LTU,NT 3.8 3.8 3 - - - -
4.4.13.7 IOC,
SS&C I/F 1.0 1.0 3 - - - -
CAMPS TOTAL: 127.3 BUILD 1: 39.1
BUILD 2: 31.0
BUILD 3: 57.2
C A M P S P R O G R A M…01……01…M O N T H L Y P R O G R E S S R E P O R T…01……01…O V E R V I E W
15. December 1983
Kurt Nybroe-Nielsen…86…W …02… …02… …02… …02… …02…
T̲A̲B̲L̲E̲ ̲O̲F̲ ̲C̲O̲N̲T̲E̲N̲T̲S̲
MANAGMENT ....................................... 3
- 20
Appendix A CDRL CONTRACTUAL STATUS ...............
1 - 36
Appendix B CURRENT ACTION ITEMS CR ...............
1 - 4
Appendix C CURRENT ACTION ITEMS SHAPE ............
1 - 5
SYSTEM ENGINERING .............................. 21
- 35
SOFTWARE DEVELOPMENT ............................ 36
- 40
HARDWARE DEVELOPMENT ............................ 41
- 44
INTEGRATED LOGISTICS SUPPORT .................... 45
- 55 …86…W …02… …02… …02… …02… …02…
A̲ ̲C̲ ̲C̲ ̲O̲ ̲M̲ ̲P̲ ̲L̲ ̲I̲ ̲S̲ ̲H̲ ̲M̲ ̲E̲ ̲N̲ ̲T̲ ̲S̲
o M̲ ̲A̲ ̲N̲ ̲A̲ ̲G̲ ̲E̲ ̲M̲ ̲E̲ ̲N̲ ̲T̲
- Factory Acceptance Test of Site 3 (Sept.) and Site
10 (Nov.) and Site 13 (Dec.)
- CAMPS Application SW Course Listins have been forwarded.
- Approximately l000 out of 1150 test cases have been
performed successfully
- Site Verification at Site 12, 13 and 10.
- CAMPS equipment has been installed at site 5, 15
and 3
- Completion of RST2 and MT4 course
- AMPS Reference System under contract
N̲ ̲E̲ ̲A̲ ̲R̲ ̲ ̲ ̲ ̲T̲ ̲E̲ ̲R̲ ̲M̲ ̲ ̲ ̲ ̲A̲ ̲C̲ ̲T̲ ̲I̲ ̲V̲ ̲I̲ ̲T̲ ̲I̲ ̲E̲ ̲S̲
- Completion of integration of all
application software December 83
- Completion of all system I&T test cases (December 83)
- Start on the 240 hours test
- Factory Acceptance Test of Site 13, 16 (October 83)
- Completion of MT5 courses
- Get Test Drive System and Development
System under contract
- Installation of HW on site 10 and 13
- Site Verification site 8 (Jan.-Mar.83)…86…W …02… …02… …02… …02… …02…
…02…
S U B C O N T R A C T S…01……01…STATUS REPORT…86…W …02… …02… …02… …02… …02…
The subcontracts status report includes the deliveries according to:
- the CAMPS contract including amendment 1 to 7 updated to ECP 22
- The CAMPS remote terminals contrac including amendment 1
- The L-O-I on PROTO expansion dated 25.08.82.
The L-O-I on CAMPS remote terminals training equipment
The L-O-I on NATO HQ phase II
It is divided into four tables:
The first one is showing the peripherals and auxiiary equipment, invoiceable to SHAPE with
a certificate of compliance.
The second one is showing other subcontractors, with equipment going to to be invoiceable
as part of the CAMPS systems.
The third one is showing the spare parts delivery.
he fourth one gives the status of OEM equipment in the Mock-up contract.…86…1
…02… …02… …02…
P̲E̲R̲I̲P̲H̲E̲R̲A̲L̲S̲ ̲A̲N̲D̲ ̲A̲U̲X̲I̲L̲I̲A̲R̲Y̲ ̲E̲Q̲U̲I̲P̲M̲E̲N̲T̲,̲ ̲S̲T̲A̲T̲U̲S̲ ̲8̲3̲1̲2̲1̲5̲
Item Subcontractor Ord. Ord. Ord. Re- Ctf. Inv. Paid Pay-
BY by at cei- of to by ment
SHAPE SHAPE subct ved com- SHAPE SHAPE due
as part for by pli-
OEM main SHAPE CR ance
CAMPS
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
OM-1 Versitron 409 1 410 395 395 394 391 0
OM-2 Versitron 557 18 575 559559 554 539 0
OM-3 Versitron 183 17 200 200 200 183 183 1
Opto cable Versitron) 100 100 100 100 100 100 0
Metric)
VDU Delta Data 409 1 410 410 410 409 391 0
Printer Tracor 199 1 200 199 199 199 151 48
Modem BLT/Rcl. Milgo 12 8 20 20 20 12 12 0
Table Sor] 180 180 180 180 180 180 0
Disk Cab. Polexim 16 16 16 16 16 15 1
SMD CDC 16 16 16 16 16 16 0
MMD CDC(inc.packs) 32 32 32 32 32 32 0
Disc Packs CDC 80 80 80 80 32 31 1
Floppy DiscShugart 16 16 16 16 16 16 0
PTR/P Burroughs 16 16 16 12 12 12 0
Oscillo-
scope Tektronix 16 16 16 16 16 16 0
Comm. Test Tektronix 16 16 16 16 16 16 0
Disc Test CDC 16 16 16 16 16 16 0
Freq. Stab. Abacus 39 1̲1̲2̲3̲A̲…00…PROGRESS REPORT Feb. 83 …00…bko …00…KNN/URH/BHB/JAL/OE
…00…skal gemmes …00…0̲7̲…00…0̲7̲…00…8̲1̲…00…1̲2̲…00…0̲9̲…00… ̲ ̲ ̲ ̲…00…1̲9̲…00… ̲ ̲1̲6̲9̲0̲…00…2̲0̲…00…0̲1̲…00…8̲4̲…00…1̲6̲…00…0̲3̲…00…
̲ ̲ ̲ ̲…00…00…00… ̲ ̲ ̲ ̲22…00…2̲0̲…00…0̲1̲…00…8̲4̲…00…1̲6̲…00…0̲6̲…00…24…00…01…00…84…00…15…00…43…00…0350A…00… 54…00… ̲ ̲9̲1̲…00…06…00… 848…00…1̲6̲4̲6̲93…00……14……00……00……00……02…
…00… …00……02… &'…10……11……02… *̲J̲…15……05……00……00……00……00……00……00……01…7
…01……10……00……00…F…02…F
F E…02…E E…07… …01…
…1f……08……1f……0f……1f…
…1e……0b……1e……01……1d……08……1d……00……1c……09……1c……02……1b……0a……1b……01……1b……07……1a……0b……86…1 …02… …02… …02… …02…
- # -…86…W …02… …02… …02… …02… …02…
SW DEVELOPMENT PROGRESS
-----------------------
NO OF SOURCE LINES OF CODE
Date: 830115
LEVEL 1
CODE AND UNIT TESTED INTEGRATED
DATE CAMPS MODULE UNIT
TOTAL CODED TESTED INTEGRATED PACKAGE SYSTEM
-----------------------------------------------------------------
1/5 102 0.3 0.1 0 0 0
1/6 102 4.1 2.3 1.4 0 0
1/7 106 12.6 8.5 5.1 0 0
1/8 106 21.4 14.9 9.4 0 0
1/9 106 29.1 26.5 20.4 7.2 0
9/9 16 34.3 28.5 26.5 8 4.0
17/9 106 38.1 31.8 27.5 8.0 7.8
24/9 106 39.0 34.7 29.7 8.8 8.8
1/10 108 42.2 37.9 34.1 8.8 8.8
8/10 108 43.9 39.1 36.9 8.8 8.8
15/10 108 48.1 42.9 39.9 9.4 9.4
29/10 108 55.0 40.4 45.6 11.9 1