…02…PROGRESS MEETING NO. 5
…02…GJ/800106 …02……02…#
…02…GJ/801212…02…CAMPS
…02……02……02……02……02……02…81-01-06…02…5…02…CR A/S
…02… Minutes of Meeting of the 5th Progress Meeting
between SHAPE and CHRISTIAN ROVSING A/S 11th
December 1980.
SHAPE:
Lt. Col. Stoltz Gert
Jensen
John Herrinck Kurt
Nybroe-Nielsen Boje
Rinhart
…02…Jens Peter Ringgaard
…02……02…Bjarne Berthold
Flemming
Enevoldsen
Ole
Eskedal
Svend
Olsen
A̲C̲T̲I̲O̲N̲ 1̲
̲
̲P̲R̲O̲G̲R̲E̲S̲S̲
̲M̲E̲E̲T̲I̲N̲G̲
The progress since the last meeting was
presented by the CR management team.
See the attachment "Progress Meeting
No. 5".
2̲ ̲ ̲C̲I̲V̲I̲L̲ ̲W̲O̲R̲K̲ ̲D̲R̲A̲W̲I̲N̲G̲S̲
CR a) CR
proposes
to
present
a
typical
site
Civil
Works
Requirement
(CWR)
to
SHAPE
at
the
end
of
first
quarter
1981
without
cost
impact.
SHAPE
accepted
this
offer.
SHAPE b) SHAPE
will
submit
request
for
schedule
changes
regarding
submittal
of
CWR
for
specific
sites
as
soon
as
possible.
c) SHAPE
informed
CR
about
the
requirements
expressed
by
the
sites
for
an
earlier
submission
date
of
the
Civil
Work
Drawing
package.
3̲
̲
̲S̲U̲M̲M̲A̲R̲Y̲
̲O̲F̲
̲S̲I̲T̲E̲
̲S̲U̲R̲V̲E̲Y̲S̲.̲
̲S̲T̲A̲T̲U̲S̲
̲O̲F̲
̲S̲U̲B̲M̲I̲T̲T̲E̲D̲
̲D̲O̲C̲U̲M̲E̲N̲T̲A̲T̲I̲O̲N̲
CR handed over the MEMO "List of Documentation"
to SHAPE and clarified the contents.
SHAPE SHAPE
will
respond
prior
to
7th
January
1981.
ACTION 4̲
̲
̲F̲L̲O̲O̲R̲
̲L̲O̲A̲D̲
̲I̲N̲
̲C̲P̲U̲
̲R̲O̲O̲M̲
CR explained the floor space used for
one EMI rack = 0.6 x 1.05 = 0.63 m…0e…2…0f….
The distributed floor load (Structural
Floor) 425 kg/m…0e…2…0f….
The distributed floor load (computer
floor) 825 kg/m…0e…2…0f….
SHAPE should be aware of this parameter
when evaluating the EMI Rack solution,
if any.
5̲ ̲ ̲E̲M̲P̲ ̲S̲H̲I̲E̲L̲D̲ ̲P̲E̲N̲E̲T̲R̲A̲T̲I̲O̲N̲ ̲O̲F̲ ̲O̲P̲T̲O̲ ̲C̲A̲B̲L̲E̲
CR CR will submit installation criteria
guidance on the subject of opto cables
leaving the EMP shields by the 15th January,
1981.
6̲ ̲R̲E̲M̲O̲T̲E̲ ̲T̲E̲R̲M̲I̲N̲A̲L̲ ̲C̲O̲N̲C̲E̲P̲T̲
a) SHAPE
clarified
that
45
of
the
66
remote
VDU's
shall
be
installed,
the
rest
are
spares.
SHAPE b) SHAPE
will
clarify
the
number
of
racks
and
location
(remote/main)
to
be
provided
by
CR
prior
to
22nd
December
1980.
SHAPE c) SHAPE
shall
inform
which
equipment
that
goes
into
the
racks.
At
remote
locations:
CR
will
install
modem
and
BPJF
in
a
standard
19"
rack
provided
by
either
CR
or
SHAPE.
SHAPE
should
SHAPE indicate
who
provides
the
modem
and
the
BPJF.
The
above
mentioned
equipment
is
in
CR's
opinion
not
in
the
letter
of
intent.
- The
crypto
and
RPJF
supplied
by
SHAPE
will
be
installed
in
racks
supplied
by
SHAPE.
- Multiplexers
and
opto
MUX/DEMUX
will
be
installed
in
tempest
racks.
These
3
items
are
supplied
by
CR.
CR CR will investigate the entire letter
of intent and will deliver the detailed
information to SHAPE.
d) SHAPE submitted the corrected Site
Network Diagrams previously submitted
by CR (ILS).
CR SHAPE will receive the updated document
from CR.
e) CR will investigate if Low Speed Printers
can be connected to the remote connection.
7̲ ̲ ̲D̲O̲C̲U̲M̲E̲N̲T̲A̲T̲I̲O̲N̲
SHAPE handed over the following documentation:
Letter 3840.1/SHHNP/80 dated 10. Dec.
80.
Letter 6550.5.4.2/SHCESH/80
Letter 3103.3.15/SHCEPA/80.
CR CR shall review the above letter and
comment especially on para. 5.
Document 027, NICS/TARE Interface.
Catalog of Tempest Installation Material.
8̲ ̲ ̲T̲E̲R̲M̲I̲N̲A̲L̲ ̲D̲O̲C̲U̲M̲E̲N̲T̲A̲T̲I̲O̲N̲
The Delta Data model 7260T was demonstrated
to SHAPE:
CR pointed out that the VDU, which is
intelligent, could impose security problems.
However, if anybody should attempt to
enter a program into the terminal from
the keyboard - and thereby take control
of the terminal - this would be prevented
by clearing the memory on a sign out
using a hard clear.
9̲ ̲ ̲S̲O̲F̲T̲W̲A̲R̲E̲ ̲W̲A̲R̲R̲A̲N̲T̲Y̲
SHAPE wanted clarified why the Software
Warranty had not been expanded to include
the delivery of all 16 sites.
CR answered that:
When the first contract was written for
the 12 sites, CR proposed a software
warranty of 12 month starting at the
acceptance of site one. As a consideration
to SHAPE the warranty period was expanded
to include the option for site 12 as
currently stated in the contract para.
26.
When the contract was amended to include
the sites 13 - 16 the software warranty
was purposely not extended.
1̲0̲ ̲ ̲S̲I̲T̲E̲ ̲R̲E̲L̲A̲T̲E̲D̲ ̲D̲O̲C̲U̲M̲E̲N̲T̲A̲T̲I̲O̲N̲
CR All documents in the CDRL which should
be mailed to SHAPE in 15 copies will
be extended to 19 copies without any
cost impact.
1̲1̲ ̲ ̲F̲U̲N̲C̲T̲I̲O̲N̲A̲L̲ ̲D̲E̲S̲C̲R̲I̲P̲T̲I̲O̲N̲ ̲O̲F̲ ̲S̲C̲A̲R̲S̲/̲C̲C̲I̲S̲
SHAPE CR would like SHAPE to ask Burroughs
for the promised documentation to
CR stating the level 3 and 4 of the
interface.
CR CR will send a telex to SHAPE clarifying
the subject prior to SHAPES enquiry.
1̲2̲ ̲ ̲M̲E̲E̲T̲I̲N̲G̲ ̲W̲I̲T̲H̲ ̲U̲K̲ ̲C̲O̲M̲S̲E̲C̲
CR urged SHAPE to arrange the meeting
with UK COMSEC regarding the Lynwood
terminal. SHAPE will provide an answer
during 12th December 1980.
1̲3̲ ̲ ̲N̲A̲T̲I̲O̲N̲A̲L̲ ̲Q̲A̲ ̲C̲E̲R̲T̲I̲F̲I̲C̲A̲T̲I̲O̲N̲
National QA (DAMC) will only be able
to take care of the cerfitication when
a contractual document between
CR/SHAPE CR
and
SHAPE
has
been
provided
stating
that
AQAP
1
is
applicable
to
QA
for
both
H/W
and
S/W.
1̲4̲ ̲ ̲F̲I̲X̲E̲D̲ ̲D̲I̲S̲C̲ ̲A̲P̲P̲R̲O̲A̲C̲H̲
The subject was discussed. If the maintainability
and the spareparts are nearly the same
as the removeable disc, then fixed discs
can be considered.
The SHAPE telex on the subject not yet
received states the complete area of
concern which will have to be investigated.
1̲5̲ ̲ ̲B̲I̲D̲ ̲1̲0̲0̲0̲ ̲I̲/̲F̲ ̲S̲P̲E̲C̲I̲F̲I̲C̲A̲T̲I̲O̲N̲
The specification has been sent from
SHAPE via curier. If not received by
next week CR will notify SHAPE.
1̲6̲ ̲ ̲D̲N̲'̲S̲ ̲A̲G̲A̲I̲N̲S̲T̲ ̲T̲H̲E̲ ̲C̲U̲R̲R̲E̲N̲T̲ ̲I̲C̲D̲/̲0̲0̲2̲
The major part of the DN's has been included
in the revised ICD/002. Approx. 10 are
still outstanding.
SHAPE SHAPE will submit a telex with comments
on the outstanding DN's and also state
which DN's that have been included
in the revised ICD/002. The telex
will be sent prior to 20th December
1980.
1̲7̲ ̲ ̲C̲D̲R̲L̲ ̲D̲O̲C̲U̲M̲E̲N̲T̲A̲T̲I̲O̲N̲ ̲S̲T̲A̲T̲U̲S̲
SHAPE SHAPE will notify CR if the RSPL can
be approved.
SHAPE SHAPE will submit a status report
on the document currently under review.
CR CR will prepare a list of all CDRL documents
submitted sofar with a status.
1̲8̲ ̲ ̲O̲E̲M̲ ̲D̲O̲C̲U̲M̲E̲N̲T̲A̲T̲I̲O̲N̲
It was agreed to put the OEM documentation
on the critical item list for SHAPE review.
1̲9̲ ̲ ̲B̲I̲D̲ ̲6̲1̲0̲ ̲A̲L̲A̲R̲M̲
CR CR will supply a telex to SHAPE requesting
additional information on the BID 610.
2̲0̲ ̲ ̲S̲R̲S̲ ̲P̲A̲G̲E̲ ̲3̲3̲7̲
CR The page 337 states "6 courses" it should
be "6 month". CR will clarify it.