⟦1cfa89d20⟧ Wang Wps File

    Length: 21739 (0x54eb)
    Types: Wang Wps File
    Notes: CPS/TSP/004               
    Names: »1167A «

Derivation

└─⟦c9afadba6⟧ Bits:30006061 8" Wang WCS floppy, CR 0093A
    └─ ⟦this⟧ »1167A « 

WangText

…00……00……00……00……08……0a……00……00……08……0b……07……02……07……05……06……0b……06……0d……06……0e……06……86…1                                             …02…            …02…    …02…            

…02…CPS/TSP/004

…02…EW/811020 …02……02…#
INCOMING INSPECTION TEST PLAN
…02…Issue 1…02…









                 T̲A̲B̲L̲E̲ ̲O̲F̲ ̲C̲O̲N̲T̲E̲N̲T̲S̲



   1   SCOPE AND RESPONSIBILITIES................... 
         4

   2   APPLICABLE DOCUMENTS......................... 
         5

   3   FLOW......................................... 
         6
     3.1   FLOW-DIAGRAM............................. 
             7
     3.2   TRANSPORTATION........................... 
             9
       3.2.2   Local Transportation................. 
                 9
       3.2.3   Handling............................. 
                 9

     3.3   VISUAL-INSPECTION........................ 
             9
     3.4   FUNCTIONAL TEST.......................... 
            10
     3.5   REPAIR................................... 
            11
     3.6   BURN-IN.................................. 
            11
     3.7   RESTORE.................................. 
            11
     3.8   WARRANTY CLAIMS.......................... 
            12

   4   FACILITIES................................... 
        12
     4.1   TEST AND HANDLING ROOM .................. 
            12
     4.2   BURN-IN ROOM............................. 
            16
     4.3   REPAIR ROOM.............................. 
            18
       4.3.1   Measurement Equipment and Tools...... 
                18
       4.3.2   General spareparts................... 
                20

     4.4   STORAGE ROOM............................. 
            21

   5   EQUIPMENT DELIVERY SCHEDULE.................. 
        22

   6   INSPECTION AND TEST.......................... 
        23
     6.1   TEST SPECIFICATIONS...................... 
            23
     6.2   TEST PROCEDURES.......................... 
            23

   7   WORK-LOAD PLAN............................... 
        24

   8   PAPER FLOW .................................. 
        28


              1̲ ̲ ̲S̲C̲O̲P̲E̲ ̲A̲N̲D̲ ̲R̲E̲S̲P̲O̲N̲S̲I̲B̲I̲L̲I̲T̲I̲E̲S̲ ̲


         The Incoming Inspection Test (IIT) plan is made to
         establish the facilities and procedures for incoming
         inspection of CAMPS peripherals.


1.1      O̲b̲j̲e̲c̲t̲i̲v̲e̲

         The objective of IIT is to:

         -   detect damaged equipment and accessories

         -   perform initial functional test.

         -   perform a functional test at high temperature.

         -   verify MTBF through a duration test which also
             prevent later excessive field service problems.


1.2      R̲e̲s̲p̲o̲n̲s̲i̲b̲i̲l̲i̲t̲y̲

         ILS will perform the inspection and test.

         Q.A. will provide the test requirement.

         The CAMPS project will provide special test requirements
         if any.





1.3      E̲q̲u̲i̲p̲m̲e̲n̲t̲ ̲L̲i̲s̲t̲

         Delta Data             Terminal D 7260TC

         Tracor Inc.            Medium Speed printer 8000

         Abacus                 Frequency stabilizer

         CDC                    Disk drive SMD 9762 (MMD 9730)

         Shugarth               Floppy disk drive

         Systematic general     PTR/PTP

         Micom System Inc.      Stat. Multiplexer Micro 800/2

         Versitron               OMDT

         Electronic Enclosures  Rack

         Atlantic Research      Intermediate distribution filter

         Atlantic Research      V24/V28 (L/L) Adaptor

         Captor                 Power line filter EMI A3975A

                                Modem

                                Patch panel


…02……01…2̲ ̲ ̲A̲P̲P̲L̲I̲C̲A̲B̲L̲E̲ ̲D̲O̲C̲U̲M̲E̲N̲T̲S̲



         SD/STD/018             Non Conformance Standard
         SD/STD/017             Indgangskontrol Standard
                                Test Procedure for V.D.U. Type
                                7260TC
                                "       "       "  M.S.P. Model
                                800RO
                                "       "       "  Freq.stab
                                Mod.1152-3
                                "       "       "  Disk Drive
                                "       "       "  Fl.Disk
                                "       "       "  PTR/PT
                                "       "       "  Stat MUX
                                "       "       "  OMDT
                                "       "       "  Modem
                                "       "       "  Power Line
                                Filter





                         3̲ ̲ ̲F̲L̲O̲W̲


3.1      T̲H̲E̲ ̲F̲L̲O̲W̲-̲D̲I̲A̲G̲R̲A̲M̲

         The flow diagram describes the flow of peripherals
         from the delivery of a consignment until repacked and
         stored in the storage or returned to the vendor.



















































                FIGURE 3.1-1…01…FLOW-DIAGRAM
















































                FIGURE 3.1-2…01…MINOR REPAIR


3.2      T̲R̲A̲N̲S̲P̲O̲R̲T̲A̲T̲I̲O̲N̲



3.2.1    D̲e̲l̲i̲v̲e̲r̲y̲

         Units from ED will be delivered to ILS at Ballerup,
         other units according to the various contracts will
         be delivered by the shipping agency LEMAN.               The
                                                                  shipping
                                                                  agency
                                                                  generally
                                                                  delivers
                                                                  the
                                                                  consignment
                                                                  at
                                                                  our
                                                                  request
                                                                  either
                                                                  to
                                                                  the
                                                                  remote
                                                                  storage
                                                                  or
                                                                  to
                                                                  the
                                                                  test-room.
                                                                  This
                                                                  transport
                                                                  is
                                                                  arranged
                                                                  by
                                                                  the
                                                                  agency.

         Package inspection will be carried out.

         The header of the Incoming inspection Report-IKR is
         filled in and the cartons marked with the relevant
         IKR-Numbers.



3.2.2    L̲o̲c̲a̲l̲ ̲T̲r̲a̲n̲s̲p̲o̲r̲t̲a̲t̲i̲o̲n̲

         The local transport between the test room and the remote
         storage will be carried out by "3 x 34".



3.2.3    H̲a̲n̲d̲l̲i̲n̲g̲

         Unpacking will only take place in the test-room. When
         a unit is unpacked a tag (T1) with the IKR-number is
         attached to it, and it is assured that the carton is
         marked with the same IKR-number.

         The empty cartons are placed on the shelves in such
         a way that the IKR-numbers are visible. The units are
         arranged at the table or the shelf below.



3.3      V̲I̲S̲U̲A̲L̲ ̲I̲N̲S̲P̲E̲C̲T̲I̲O̲N̲

         Visual inspection is performed according to appendix
         1 to SD/STD/017 para 5 and para 6 (enclosed).


3.4      F̲U̲N̲C̲T̲I̲O̲N̲A̲L̲ ̲T̲E̲S̲T̲


3.4.1    The functional test is described in the test procedure for the relevant equipment listed
         in para 2 "Applicable Documents".



3.4.2    T̲e̲s̲t̲ ̲M̲a̲t̲r̲i̲x̲







         V.D.U. Delta Data        all   all   all   all  10    0  M.S.P.
                                                                  
                                                                  
                                                                    all all all all 
                                                                                    0 0
         Fl.DISK  *               all    0     0     0    0    0
         Disk Drive *             all    0     0     0    0    0
         Freq. Stab.              all   all   all   all   1    0
         PTR/PTP                  all   all   all   all   0    0
         Stat.MUX                 all   all   all   all   0    0
         Modem                    all   all   all   all   0    0
         Opto OMDT                all   all   all    0    0    0
         PLF                      all   all   all    0    0    0
         V24/V28                  all   all   all    0    0    0
         Rack                     all   all    0     0    0    0
                                  all   all    0     0    0    0


         * Tested by ED





3.5      R̲E̲P̲A̲I̲R̲



3.5.1    Minor repair flow diagram is shown on fig. 3.1-2



3.5.2    Before any attempt to repair is made a fault analysis
         is carried out. If the fault can be rectified by a
         few solderings, adjustments, change of a single component
         or change of PCB-modules this is carried out. After
         it has been observed that the fault is corrected, the
         unit is returned to resume the function-test.

         If the above is insufficient to rectify the fault the
         unit is passed to MRB for evaluation, see SD/STD/017.



3.6      B̲U̲R̲N̲-̲I̲N̲

         To improve the future reliability a burn-in of 72 hours
         duration at an environment temperature of 40…0e…0…0f…C will
         be carried out in accordance with para 3.4.2.

         During the burn-in a limited functional test is carried
         out of each unit three times a day. If a fault is observed
         the burn-in of the faulty unit is discontinued and
         will restart after the repair.



3.7      R̲E̲S̲T̲O̲R̲E̲

         The unit with accessories is packed in the relevant
         cartons.


3.8      W̲A̲R̲R̲A̲N̲T̲Y̲ ̲C̲L̲A̲I̲M̲S̲

         Warranty claims due to damages arising from transportation
         shall be presented to the shipping agency or local
         representative within the same day. Other warranty
         claims shall be telexed to the ventor within 24 hours
         of the discovery of the defects.



                      4̲ ̲ ̲F̲A̲C̲I̲L̲I̲T̲I̲E̲S̲



4.1      T̲E̲S̲T̲ ̲A̲N̲D̲ ̲H̲A̲N̲D̲L̲I̲N̲G̲-̲R̲O̲O̲M̲



4.1.1    A̲s̲s̲u̲m̲p̲t̲i̲o̲n̲s̲ ̲a̲n̲d̲ ̲c̲o̲n̲s̲i̲d̲e̲r̲a̲t̲i̲o̲n̲s̲

         Of all the peripherals to be tested the V.D.U. has
         the highest quantity of units of an adequate size and
         was therefore chosen as a basis for the plan of the
         interior arrangement in the test- and handling-room.

         Due to the warranty of V.D.U.s it is convenient to
         test these in batches of approx. 40.

         The test and handling-room will be located in the basement
         of building RO II. See Fig. 4.1-1.


                       FIGURE 1.1-1
















































4.1.2    F̲l̲o̲o̲r̲ ̲S̲p̲a̲c̲e̲ ̲A̲l̲l̲o̲c̲a̲t̲i̲o̲n̲

         One lot of V.D.U. (40 pc.) in cartons will occupy 1.8
         x 4 m…0e…2…0f… of the floor as the stack is not to exceed 3
         layers.

         The packing/unpacking process requires approx. 6 m…0e…2…0f….

         The entrance must be kept free and there must be room
         for a trolley-table to pass around.

         Room for parking of 2 trolley-tables is allocated.



4.1.3    T̲a̲b̲l̲e̲s̲ ̲a̲n̲d̲ ̲S̲h̲e̲l̲v̲e̲s̲

         All tables and shelves are assembled of standard bars
         and modules of 750 x 900 mm manufactures by "BV".



4.1.3.1  16 sections of tables are provided with a shelf below
         the table top in a height of 15 cm above the floor
         and are combined to one table 12 meter long which allows
         successive test of 16 V.D.U.s.

         Access to the rear of the V.D.U. under test is necessary,
         therefore the table is placed 0.9 meters from the wall.



4.1.3.2  A table consisting of 8 sections without shelves is
         used for temporary storage of 8 V.D.U.s. Below this
         table on the floor is room for the 8 cartons from the
         V.D.U.s above.



4.1.3.3  The shelf-rack for packing material is combined of
         16 sections provided with 2 shelves. The lower shelf
         is mounted  1.65 meters above the floor. The shelf-rack
         is arranged in the spacing between the wall and the
         table and will store 32 cartons.

4.1.3.4  The room lay-out is shown on fig. 4.1.


                        FIGURE 4.1





















































4.2      B̲U̲R̲N̲-̲I̲N̲-̲R̲O̲O̲M̲

         The burn-in room is shown in fig. 4. This room will
         be used for an extended test-run with the room temperature
         controlled and increased above normal.



4.2.1    In the table below the heat dissipation through the
         walls, floor and ceiling is given in KW/hour both for
         the uninsulated room, a room with only the ceiling
         insulated with 1" of glasswool and for the room insulated
         with 5 cm glasswool on the walls and the ceiling.


                   HEAT-FLOW IN KW/HOUR
          ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
         ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

                  Naked  Walls etc.  Insul.ceiling      Insul.ceiling
         Out.                        naked walls        and
                                                        walls
         Temp.    0…0e…o…0f…     10…0e…o…0f… 20…0e…o…0f…     0…0e…o…0f… 10…0e…o…0f… 20…0e…o…0f…         0…0e…o…0f…10…0e…o…0f…
                                                        20…0e…o…0f…
          ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
         ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

         Room
         Temp.
         30…0e…o…0f…      3.5    3    2.5                       1.3
                                                         1.1
                                                         0.97
         40…0e…o…0f…      6      5.6  5      4.3 3.9   3.5      2.2
                                                         2 
                                                          1.9
         50…0e…o…0f…      8.6    8.1  7.6.                      3.2
                                                         3 
                                                          2.9

          ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
         ̲ ̲ ̲ ̲ ̲ ̲ ̲



         20 V.D.U.s under Test are supplying appr. 1.2 KW/hour.


4.2.2    P̲a̲r̲a̲m̲e̲t̲e̲r̲s̲ ̲u̲s̲e̲d̲ ̲f̲o̲r̲ ̲c̲a̲l̲c̲u̲l̲a̲t̲i̲o̲n̲ ̲o̲f̲ ̲t̲h̲e̲ ̲h̲e̲a̲t̲-̲f̲l̲o̲w̲.̲

         Adjacent room temp. 20…0e…0…0f…C
         Outside-Wall 17.5 m…0e…2…0f…
         Inside-Walls 36.5 m…0e…2…0f…
         Door 2 m…0e…2…0f…
         Floor 15 m…0e…2…0f…
         Ceiling 15 m…0e…2…0f…
          l = 0.05 for glasswool
          l = 2.0  for concrete
         a…0f…i…0e… = 7
         a…0f…n…0e… = 13





         1/k = 1/a…0f…i…0e… + L…0f…i…0e…/l…0f…1…0e… + L…0f…2…0e…/l…0f…2…0e…   (L in meters)

         V = (K…0f…1…0e…A…0f…1…0e…+K…0f…2…0e…A…0f…2…0e…)(T…0e…o…0f…room-20…0e…o…0f…) +
             K…0f…3…0e…A…0f…3…0e…(T…0e…o…0f…room-U…0e…o…0f…) Kgcal/hour…86…1         …02…   …02…   …02…   …02… 
                                                  
4.3      R̲E̲P̲A̲I̲R̲ ̲R̲O̲O̲M̲

         The repair facility will consist of two tables not
         smaller than 1.7 x 0.8 m…0e…2…0f… each, two chairs, one trolley-table
         and a shelf for spare-parts. A floor-room of appr.
         25 m…0e…2…0f… will be required. The repair facility will be
         located in the integration area on 1st floor of ROIII.



4.3.1    M̲e̲a̲s̲u̲r̲e̲m̲e̲n̲t̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲ ̲a̲n̲d̲ ̲T̲o̲o̲l̲s̲

         A list of proposed items.

         a)  A̲d̲j̲u̲s̲t̲a̲b̲l̲e̲ ̲T̲r̲a̲n̲s̲f̲o̲r̲m̲e̲r̲

                 Input 220 V 50 cycles
                 Output 1 KVA
                        260 V - 180 Volts

         b)  M̲u̲l̲t̲i̲m̲e̲t̲e̲r̲ ̲F̲L̲U̲K̲E̲ ̲8̲0̲2̲0̲A̲

         c)  C̲o̲m̲m̲u̲n̲i̲c̲a̲t̲i̲o̲n̲s̲ ̲T̲e̲s̲t̲e̲r̲               Tektronix 834
                     Rom-Pack                    Tektronix RO1
                     "    "                      Tektronix RO3

         d)  T̲e̲s̲t̲-̲S̲e̲t̲*
                     Injector
                     Current tracer
                     Puls-probe

         e)  O̲s̲c̲i̲l̲l̲o̲s̲c̲o̲p̲e̲*
                     Storage 10MHZ
                     Analog 100MHZ

         f)  F̲r̲e̲q̲u̲e̲n̲c̲y̲ ̲C̲o̲u̲n̲t̲e̲r̲
                     6-8 digit

         g)  S̲h̲u̲g̲a̲r̲t̲ ̲D̲i̲s̲k̲e̲t̲t̲e̲ ̲T̲e̲s̲t̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲*    S̲A̲ ̲8̲0̲9̲
                     Alignment Diskette          SA 120-1
                     Cartridge Guide Tool        50377-1
                     Head penetration gauge      50380-0
                     Load Bail gauge             50391-0
                     Spanner Wrench              50752-O
                     Exerciser                   50619-O



         h)  C̲D̲C̲ ̲F̲i̲e̲l̲d̲ ̲T̲e̲s̲t̲ ̲U̲n̲i̲t̲ ̲T̲B̲ ̲2̲1̲6̲*
                     60 pin Connector

         i)  T̲e̲s̲t̲ ̲S̲e̲t̲ ̲9̲2̲1̲-̲T̲
                 NU DATA Corp.

         j)  O̲p̲t̲i̲c̲a̲l̲ ̲M̲u̲l̲t̲i̲m̲e̲t̲e̲r̲
                 Photodyne Inc. Model 11XE

         k)  T̲e̲m̲p̲e̲r̲a̲t̲u̲r̲e̲ ̲r̲e̲c̲o̲r̲d̲e̲r̲


                      L̲i̲s̲t̲ ̲o̲f̲ ̲T̲o̲o̲l̲s̲

             Screwdriver, plain-head             3
             Screwdriver, Philips-head           3
             A pair of nippers                   1
             A pair of pincers                   1
             A pair of tweezers                  1
             Flat nose pliers                    1
             Point nose pliers                   1
             Pump type pliers                    1
             Spanner                             2
             Hack saw                            1
             Set of Slip point wrench            1 (a socket
                                                 set
                                                    with ratchet)
             Set of Umbraco-Keyes                1
             Set of Key-files                    1
             Solder-iron with transformer        1


         *Equipment will be purchased at a later stage


4.3.2    G̲e̲n̲e̲r̲a̲l̲ ̲S̲p̲a̲r̲e̲-̲p̲a̲r̲t̲s̲


         Asssortment of
         resistors 1/4 W, 1%         96 serial

         Assortment of
         Capacitors low Volt.10%     24   "

         Teflon insulation flex etc  0.7 and 1.2 mm



4.3.2.1  The CAMPS project is currently planning the advance
         procurement of spares to support Incoming Inspection
         and test.



4.3.2.2  S̲P̲A̲R̲E̲P̲A̲R̲T̲S̲ ̲F̲O̲R̲ ̲I̲N̲C̲O̲M̲I̲N̲G̲ ̲I̲N̲S̲P̲E̲C̲T̲I̲O̲N̲

         1   AC Line Cord            210D005U01  Delta Data
         1   Fan                     206F001U01  -
         2   Power Supply            211B013U01  -
         1   CRT Board Module        785A220U01  -
         2   DMM Board Module        785A262U01  -
         2   PMM Board Module        785A263U01  -
         2   I/O Board Module        785A265U01  -
         1   Flyback Transformer     792A001U01  -
         1   Transformer Assembly    792A009U01  -
         1   Keyboard Assy           802A022U01  -
         1   12" Extension Board                 -

         1   Fan                                 Tracor
         2   CCA Motor Driver                    -
         2   CCA Printer Interface               -
         2   CCA Signal Interface                -
         2   CCA Filter Interface                -
         2   CCA CPU                             -
         2   CCA Printhead Driver                -
         1   Printer Sub Assy                    -
         2   Power Sub Assy                      -
         1   Indicator Control Assy              -
         1   Extender Board 1 set                -
         …86…1         …02…   …02…   …02…   …02…               …02…           …02…     
                     

         2   L.V. Power Supply       21167       Abacus
         2   Driver Card             20990       -
         2   Logic Card              41096       -
         2   Power Module 1          41094-1     -
         2   Power Module 2          41094-2     -
         1   Logic Card (45-6 Hz)    41096-5     -
         1   Extension Board 1 set   21186/7/8   -
         
         1   Version 1 Module PCB                Atlantic Research
         1   Version 2 Module PCB                -
         
         1   PCB OM-1                14970       Versitron
         1   PCB OM-2                149xx       -
         1   Optical Bias Network    15026       -
         1   OD-1                    15050       -
         1   Detector                VTI-1       -
         1   RS232 Interface                     -
         1   EIA to OM Adapter                   -


4.4      S̲t̲o̲r̲a̲g̲e̲ ̲R̲o̲o̲m̲

         As no adequate facility is available at CR's premises
         a remote storage facility is provided at CR in Herlev.
         The facility shall hold all peripherals for CAMPS stored
         in such a way that any arbitrary type of equipment
         can be accessed and easily removed.

         The table below gives the relevant peripherals with
         quantity, the size of packing-carton, the max. safe
         stacking and the floor-room seized.


          ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
         ̲ ̲ ̲ ̲                              Quantity  Cartons
                                                    cm…0e…3…0f…          Stacked Area
                                                                         m…0e…2…0f…
          ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
         ̲ ̲ ̲

         V.D.U.   389      80x60x60       3         62
         Opto     541      30x30x10       10         5
         Disk      50      65x110x40      2         18
         Fl.Disk   16      60x150x30      5          2
         Freq.st   48      60x50x40       4          4
         PTP/PTR   16                                3
         Stat.Mux  46      60x40x20       6          2
         Modem     10      60x50x30       5          1
         M.S.P.   200      80x60x40       4         25
          ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

                                          Sum      122m…0e…2…0f…
                                          U̲t̲i̲l̲i̲z̲a̲t̲.̲ ̲6̲0̲%̲ ̲ ̲ ̲

                                          Appr.    210m…0e…2…0f…


         Depending on the dimension of the available room the
         requirement will vary between 210 - 260m…0e…2…0f….













































STORAGE ROOM…01…FIGURE 4-4…86…1         …02…        …02…        …02…              …02…         …02…    
        
              5̲ ̲ ̲E̲Q̲U̲I̲P̲M̲E̲N̲T̲ ̲D̲E̲L̲I̲V̲E̲R̲Y̲ ̲S̲C̲H̲E̲D̲U̲L̲E̲


                  6̲ ̲ ̲I̲N̲S̲P̲E̲C̲T̲I̲O̲N̲ ̲A̲N̲D̲ ̲T̲E̲S̲T̲



6.1      T̲E̲S̲T̲ ̲S̲P̲E̲C̲I̲F̲I̲C̲A̲T̲I̲O̲N̲S̲

         Our obligations for test are specified in the applicable
         documents, para 2, which our test fully includes.



6.2      T̲E̲S̲T̲ ̲P̲R̲O̲C̲E̲D̲U̲R̲E̲S̲



6.2.1    I̲n̲s̲p̲e̲c̲t̲i̲o̲n̲

         The unit is inspected for loose or missing screws,
         knobs etc. and that there is no damage to the finishing.

         The list of all accessories is checked and collated.
         The unit is connected to the mains, and if it is not
         workable as a stand-alone unit it is connected to test
         equipment or connected as part of a system. The unit
         is switched "on", and it is verified that it is functioning,
         and that after approximately 15 minutes that no smoke,
         excessive heat or smell is generated.



6.2.2    T̲e̲s̲t̲

         The basis for the test is the functional test described
         in para 3.4.

         Additional to this test a verification of the claimed
         MTBF is performed on a sample basis. 

         (For V.D.U.'s 10 samples out of 400 units will be used).
         This verification is performed by running each sample
         for a duration of the claimed MTBF.


                    7̲ ̲ ̲W̲O̲R̲K̲-̲L̲O̲A̲D̲ ̲P̲L̲A̲N̲

         The estimated work-load for the inspection and test
         including packing and handling is shown on Fig. 7-1
         and Fig. 7-2

         The output from incoming inspection of approved units
         is shown in Fig. 7-3.






                      8  P̲A̲P̲E̲R̲ ̲F̲L̲O̲W̲



         A schematic of the paper flow is shown on Fig. 8-1.



8.1      A̲P̲P̲L̲I̲C̲A̲B̲L̲E̲ ̲D̲O̲C̲U̲M̲E̲N̲T̲S̲

         SD/STD/017  Incoming Inspection Standard
         SD/STD/018  Non-Conformance Standard



8.2      D̲O̲C̲U̲M̲E̲N̲T̲S̲ ̲U̲S̲E̲D̲ ̲B̲Y̲ ̲I̲I̲T̲

         8.2.1    PACKING NOTE
         8.2.2    INDGANGSKONTROL RAPPORT
         8.2.3    RAPPORT FRA INSPEKTIONEN
         8.2.4    BLACK LABEL: NATO PROPERTY
         8.2.5    GREEN ACCEPT-LABEL
         8.2.6    RED ACCEPT/REJECT-LABEL
         8.2.7    NON-CONFORMANCE REPORT
         8.2.8    INCOMING INSPECTION LOG
         8.2.9    STOCK-LIST



8.2.1    P̲A̲C̲K̲I̲N̲G̲ ̲N̲O̲T̲E̲

         PACKING NOTE/SHIPPING INVOICE/F[LGESEDDEL is issued
         by  the vendor and is enclosed with the shipment. It
         contains the vendor's name and address. The contents
         with part numbers and serial numbers. Date of shipments.

         On the basis of the packing note the heading of INDGANGSKONTROL
         RAPPORT is filled in. The date of receipt is added
         to the packing note, and it is filed at IIT. Copies
         of the packing note are transferred to the purchase
         office and to CAMPS project office.

         When the shipment has been checked aginst the packing
         note IIT informs by telex the vendor of the receipt.
         The telex shall contain date of receipt, type of unit,
         quantity, and all serial numbers.





8.2.2    I̲N̲D̲G̲A̲N̲G̲S̲K̲O̲N̲T̲R̲O̲L̲ ̲R̲A̲P̲P̲O̲R̲T̲ ̲(̲I̲K̲R̲)̲

         The IKR is pre-numbered and this number is used as
         a file-number for one whole shipment and is for references
         purpose added on all papers used during the incoming
         inspection and test. The IKR is filled in at the receipt
         of the shipment and remarks that may arise at the arrival
         and at the visual inspection are noted on this report.
         If the shipment contains more than a few items an additional
         paper, as an appendix, to the IKR "RAPPORT FRA INSPEKTIONEN"
         is used. The IKR is filed at IIT.



8.2.3    R̲A̲P̲P̲O̲R̲T̲ ̲F̲R̲A̲ ̲I̲N̲S̲P̲E̲K̲T̲I̲O̲N̲E̲N̲ ̲(̲R̲F̲I̲)̲

         The RFI is used if the writing-space on the IKR is
         insufficient, and if the shipment contains several
         items. It is used to give an improved overview.

         The RFI is filled in with all the serial numbers and
         remarks, if any. Then the RFI is attached as an appendix
         to the IKR.

         The RFI is filed at IIT.



8.2.4    L̲A̲B̲E̲L̲:̲ ̲N̲A̲T̲O̲ ̲P̲R̲O̲P̲E̲R̲T̲Y̲

         This label is filled in with the relevant serial numbers
         and is attached to the unit until the installation
         has taken place.



8.2.5    G̲R̲E̲E̲N̲ ̲A̲C̲C̲E̲P̲T̲ ̲L̲A̲B̲E̲L̲ ̲T̲1̲

         This label is filled in with: the project name, the
         itentity type, the serial number, and the IKR number.
         The accept date and initials are filled in upon acceptance
         by the IIT.

         If any non-conformance is observed T1 is removed and
         replaced with red accept/reject-label T2.





8.2.6    R̲E̲D̲ ̲A̲C̲C̲E̲P̲T̲/̲R̲E̲J̲E̲C̲T̲-̲L̲A̲B̲E̲L̲ ̲T̲2̲

         T2 is used whenever a non-conformance is observed.
         If the unit formerly was supplied with Tag T1 it is
         removed and replaced with T2. T2 is filled in with
         the project name, the identity type, the serial number,
         the IKR number, and the number of the non-conformance
         report NCR.

         The accept/reject date is filled in after MRB-decision.



8.2.7    N̲O̲N̲-̲C̲O̲N̲F̲O̲R̲M̲A̲N̲C̲E̲ ̲R̲E̲P̲O̲R̲T̲ ̲(̲N̲C̲R̲)̲

         The NCRs are prenumbered.

         Whenever a non-conformance is observed a NCR is filled
         in with the following information:

         Project Name
         Date of non-conformance observed
         Initials of originator of the report
         Type of unit
         IKR-number
         Quantity of units received in the relevant shipment.

         The relevant squares are marked according to when the
         non-conformance is observed.

         A concise description of the non-conformance observed
         The original of the NCR is filed at QA and a copy of
         the NCR is filed at IIT.



8.2.8    I̲N̲C̲O̲M̲I̲N̲G̲ ̲I̲N̲S̲P̲E̲C̲T̲I̲O̲N̲ ̲L̲O̲G̲ ̲(̲I̲I̲L̲)̲

         A distinct IIL is made for each type of unit. The IIL
         is filled in with the IKR number and serial number.
         All the tests and inspections with remarks, if any,
         are noted on the IIL.



         The IIL shall contain all information and status of
         the unit for the spedific serial number. Therefore,
         it is the incoming inspection status log used continously
         during the incoming inspection and test.

         The IIL is filed at IIT.



8.2.9    S̲T̲O̲C̲K̲-̲L̲I̲S̲T̲

         The stock-list is made to give an overview of all units
         handled by IIT. The list contains all types of units
         with serial number, location, IKR number, and status.
         The list is run on CR80 and updated when convenient
         or at least once a week.