top - download
⟦1d062c3c6⟧ Wang Wps File
Length: 23958 (0x5d96)
Types: Wang Wps File
Notes: CPS/SDS/001 ISSUE 1
Names: »0663A «
Derivation
└─⟦704904495⟧ Bits:30006007 8" Wang WCS floppy, CR 0042A
└─ ⟦this⟧ »0663A «
WangText
…0f……00……00……00……00……1c……0a……00……00……1c……0b……1c……02……1c……06……1c……07……1b……0e……1b…
…1b… …1a……0a……1a……0b……1a……02……1a…
…02…CPS/SDS/001
…02…BHB/810227…02……02…
CAMPS SYSTEM DESIGN SPECIFICATION
…02……02…CAMPS
T̲A̲B̲L̲E̲ ̲O̲F̲ ̲C̲O̲N̲T̲E̲N̲T̲S̲
4 SYSTEM OVERVIEW .......................... 2
4.1 CONFIGURATION SUMMARY ................ 2
4.1.1 Hardware System Partitioning ..... 2
4.1.1.1 Configuration Elements ........ 5
4.1.1.1.1 Distribution Equipment ..... 5
4.1.1.1.2 TDX Systems ................ 7
4.1.1.1.3 LTUs ....................... 9
4.1.1.1.4 Processor Units ............ 11
4.1.1.1.5 Mass Storage Disks ......... 13
4.1.1.1.6 Watchdog ................... 15
4.1.1.2 Site Equipment Layout .......... 17
4.1.1.2.1 Principle Diagram .......... 17
4.1.1.2.2 Equipment Matrix ........... 23
4.1.1.3 Site Equipment Complement ...... 23
4.1.1.3.1 Main Rack Design ........... 27
4.1.1.3.2 Connectivity ............... 30
4.1.1.3.2.1 VDUs and Medium Speed
Printers Assigned for Users,
Paper Tape Reader/Puncher
and OCR ..................... 30
4.1.1.3.2.2 External Circuits: CCIS,
SCARS, TARE. Terminals: VDU
and Printer for S/W Development
in the CSSI Site ............ 50
4.1.1.3.2.3 Standard Connected
Peripherals ................. 70
4.1.2 Software Configuration ............ 88
4.1.2.1 Software Subsystems ........... 88
4.1.2.2 Software Packages ............. 88
4.1.2.3 System Software Subsystem ..... 90
4.1.2.4 Applications Software Subsystem 93
4.1.2.5 Support Software Subsystem .... 96
4.1.3 Mapping of Software onto Hardware . 97
4̲ ̲ ̲S̲Y̲S̲T̲E̲M̲ ̲O̲V̲E̲R̲V̲I̲E̲W̲
4.1 C̲O̲N̲F̲I̲G̲U̲R̲A̲T̲I̲O̲N̲ ̲S̲U̲M̲M̲A̲R̲Y̲
4.1.1 H̲a̲r̲d̲w̲a̲r̲e̲ ̲S̲y̲s̲t̲e̲m̲ ̲P̲a̲r̲t̲i̲t̲i̲o̲n̲i̲n̲g̲
The hardware configuration for CAMPS is an integral
part of a total system concept which also includes
software and operational procedures. The system functions
are allocated between hardware, software, and firmware
and partitioned so as to provide the optimum implementation
of the CAMPS systems.
The allocation of functions between system elements
has resulted in the hardware configuration described
in this section. This configuration has been further
partitioned into well-defined sub-systems or sub-assemblies.
Fig. 4.1.1-1 shows the CAMPS Hardware Configuration
for the Main Site equipment. The major elements of
the configuration are:
a) Distribution equipment
b) TDX-systems
c) LTUs (Channel Unit)
d) Processor Units
e) Disk Systems (Channel Unit)
f) Watchdog Processor
Fig. 4.1.1-1…01…C̲A̲M̲P̲S̲ ̲H̲/̲W̲ ̲C̲o̲n̲f̲i̲g̲u̲r̲a̲t̲i̲o̲n̲
a) T̲h̲e̲ ̲D̲i̲s̲t̲r̲i̲b̲u̲t̲i̲o̲n̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲ consists of different
types of equipment used for transfer of the individual
data exchange channels from the main site to the
location of each connected terminal/external circuit.
The different types are based on different transmission
media, transmission concepts, and the interface
in the main site equipment.
b) T̲h̲e̲ ̲T̲e̲l̲e̲c̲o̲m̲m̲u̲n̲i̲c̲a̲t̲i̲o̲n̲ ̲D̲a̲t̲a̲ ̲E̲x̲c̲h̲a̲n̲g̲e̲ (TDX) system
performs the interconnection of part of the data
exchange channels with the Processor Units.
The LTUXs (Line Termination Unit, TDX) are placed
in TDX-crates. Each TDX-crate contains LTUXs interfacing
max. 8 channels. The two TDX Buses run a multiplexing
scheme for interconnection of the LTUX Crates with
either of the 2 Processor Units.
An LTUX Crate is switched to one of the two redundant
TDX Buses.
c) T̲h̲e̲ ̲L̲T̲U̲s̲ ̲(̲L̲i̲n̲e̲ ̲T̲e̲r̲m̲i̲n̲a̲t̲i̲o̲n̲ ̲U̲n̲i̲t̲s̲)̲ ̲o̲f̲ ̲t̲h̲e̲ ̲C̲h̲a̲n̲n̲e̲l̲
̲U̲n̲i̲t̲ interconnect part of the data exchange channels
with the Processor Units.
Each LTU interfaces max. 4 data exchange channels.
An LTU is switched to one of the two redundant
data channels. Each data channel is connected
to a Processor Unit.
d) T̲h̲e̲ ̲P̲r̲o̲c̲e̲s̲s̲o̲r̲ ̲S̲y̲s̲t̲e̲m̲ is composed of a dual set
of processor units, capable of independent operation.
Each Processor Unit contains multiple CPUs, main
memory modules and bus interfaces.
e) T̲h̲e̲ ̲M̲a̲s̲s̲ ̲S̲t̲o̲r̲a̲g̲e̲ ̲D̲i̲s̲k̲s̲ are shared by the two processor
units. Each of the 3 disks is individually switched
to one of the two data channels.
f) T̲h̲e̲ ̲W̲a̲t̲c̲h̲d̲o̲g̲ ̲S̲y̲s̲t̲e̲m̲ coordinates the configuration
control of the main site equipment.
Status polling and switching control are performed
via the Configuration Control Bus (CCB).
Data are transmitted by the two data channels connected
to the Processor Units.
The console terminals of the engineering positions
are connected to the Watchdog Processor.
4.1.1.1 C̲o̲n̲f̲i̲g̲u̲r̲a̲t̲i̲o̲n̲ ̲E̲l̲e̲m̲e̲n̲t̲s̲
This section gives a more detailed specification of
the six configuration elements as defined in sect.
4.1.1.
4.1.1.1.1 D̲i̲s̲t̲r̲i̲b̲u̲t̲i̲o̲n̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲
The data channels connecting the CAMPS Main Equipment
with the individual terminals/external circuits are
named Data Exchange Channels.
The individual channels are transmitted to a terminal
or an external circuit using distribution equipment
determined by the channel application. The distribution
equipment is providing the adaption necessary for the
transmission of each data channel.
The distribution systems can be categorized into 5
categories.
The characteristics and the applications of each category
are shown on fig. 4.1.1-2.
Each channel is connected in the Main site at the Standard
CCITT V24/V28 interface of the LTUs/LTUXs.
As indicated on the figure 4.1.1-2 part of the distribution
equipment is placed in the MAIN SITE racks.
Fig. 4.1.1-2…01…D̲i̲s̲t̲r̲i̲b̲u̲t̲i̲o̲n̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲
4.1.1.1.2 T̲e̲l̲e̲c̲o̲m̲m̲u̲n̲i̲c̲a̲t̲i̲o̲n̲ ̲D̲a̲t̲a̲ ̲E̲x̲c̲h̲a̲n̲g̲e̲ ̲(̲T̲D̲X̲)̲
The TDX equipment is used for interconnection of individual
data exchange channels with the Processor Units.
The interfaces of the data exchange channels in the
TDX-system are standard CCITT V24/V28 circuits of the
LTUX modules, see fig. 4.1.1-3.
Each LTUX module is able to interface 1, 2 or 4 data
exchange channels dependent on channel specifications,
and each TDX Crate assembly contains max. 2 LTUX modules.
Each TDX Crate assembly is switched to one of the two
TDX Buses. The switching is controlled by the Watchdog
Processor through the Configuration Control Bus (CCB).
The switching is performed by the BSM-X-module and
the interconnection to the buses are done by a TDX-outlet
on each bus.
A TDX Bus links together all the functional elements
of the TDX System. The Multiplexing Scheme of the
TDX Bus is driven and controlled by the TDX controller.
All the connected data exchange channels of the LTUXs
are polled and incoming/outgoing data are transferred
to/from the Processor Units by the TDX Interface Adapters
(TIAs) and the Supra/TDX Interface Modules (STI) placed
in the Processor Units.
The TDX controller of a TDX Bus is placed in one of
the Connected TDX Crate assemblies.
The Processor TDX I/F is able to communicate with the
two TDX Buses through the two TIAs.
The two TDX Buses are thus fully redundant.
Fig. 4.1.1-3…01…T̲D̲X̲ ̲S̲y̲s̲t̲e̲m̲
4.1.1.1.3 L̲T̲U̲s̲
The LTUs are front-end modules used for interconnection
of individual data exchange channels with the Processor
Units.
The interfaces of the data exchange channels in the
LTUs are as recommended by CCITT in the V24/V28 standards.
Each LTU module is able to interface 1,2 or 4 data
exchange channels dependent on channel specifications.
The position of the LTUs in the CAMPS Main Site Equipment
is shown on fig. 4.1.1-4.
An LTU module is positioned in the Channel Unit and
is connected to the two I/O Buses A and B. I/O Bus
A is connected to the Buses of Processor Unit #1 (PU
#1) by the Data Channel link A. I/O Bus B is connected
to PU #2 by the Data Channel link B.
The LTU is switched to one of the two I/O Buses A or
B by being claimed through the Bus. An LTU is thus
switched to one of the buses at a time. Each LTU has
dual Power Input, as power is supplied by the power
supplies of both I/O-bus A and I/O-bus B. Normally,
the load is shared by the two power buses, but one
power bus is able to supply the total current to the
modules connected to the bus.
Adapters, which are part of the Distribution Equipment
may be placed within the Channel Unit.
The LTU's buffer blocks data transferred from the PU
and conducts the transmission on the data exchange
channels. Received data blocks are stored in the LTU.
The PU transfers data from the LTUs governed by the
interrupt requests delivered from the LTUs.
Fig. 4.1.1-4…01…L̲T̲U̲s̲
4.1.1.1.4 P̲r̲o̲c̲e̲s̲s̲o̲r̲ ̲U̲n̲i̲t̲s̲
The CAMPS Main Site equipment contains two identical
Processor Units (PUs), see fig. 4.1.1-5. The two PUs
are placed in redundant elements in the configuration.
One set of redundant elements is composed of PU #1,
Data Channel A, the Channel Interface Adapter (CIA-A)
and I/O Bus A (included the connected Power module).
The other set of redundant elements is PU#2, Data Channel
B, CIA-B and I/O-Bus B.
Each Processor Unit is composed of:
- 3 Central Processing Units (CPUs) for parallel
program execution.
- 2 Random Access Memories (RAMs) forming 256K words
of working storage.
- 1 Supra-TDX Bus Interface (STI) interfacing the
PU to two TDX Bus Interface Adapters (TIAs)
- 1 Memory Mapping Unit (MAP) which together with
1 Map Interface Adapter (MIA) performs different
central functions in the PU, such as:
1) Logical to Physical Address translation
2) Interfacing the PU to the CU via the Data Channel
3) Generating timing signals and servicing of
interrupts to the CPUs
4) Controlling a V24/V28 communication port to
which the Operator Console is connected.
5) System Boot Load
- 2 TDX Bus Interface Adapters (TIAs) interfacing
the STI to the two TDX Buses.
4.1.1.1.5 M̲a̲s̲s̲ ̲S̲t̲o̲r̲a̲g̲e̲ ̲D̲i̲s̲k̲s̲
Three disk assemblies are included in the CAMPS Main
Site equipment.
Each assembly is composed of a disk drive unit including
a disk pack, a Disk Controller Adaptor (DCA) and a
Disk Controller.
The Disk Controller modules are positioned in the Channel
Unit (CU) and are connected to the two I/O Buses A
and B, see fig. 4.1.1-6.
I/O Bus A is connected to the Buses of Processor Unit
#1 (PU #1) by the Data Channel link A. I/O Bus B is
connected to PU #2 by the Data Channel link B.
The Disk controller is switched to one of the two I/O
Buses A/B by being claimed through the Bus. A Disk
assembly is thus switched to one of the buses at a
time.
The Power Buses of I/O Bus A and B are added together
on the Disk CTRL module. Normally, the load is shared
by the two power buses, but one power bus is able to
supply the total load of the modules connected to the
bus.
Fig. 4.1.1-5
FIGURE 4.1.1-6
4.1.1.1.6 W̲a̲t̲c̲h̲d̲o̲g̲
The Watchdog is composed of a Watchdog processor (WDP)
and a set of control adaptors, see fig. 4.1.1-7.
The WDP is contained in a self standing Crate Assembly.
Each control adaptor is placed in the unit/crate under
control.
The Control adapter collects the status monitoring
signals of the Unit/Crate and is able to execute the
switching functions, which are communicated from the
WDPU in order to perform configuration control.
The Control adaptors communicate with the WDPU by Configuration
Control Bus (CCB).
In addition to the CCB, two WD control channels are
used for the exchange of on and off-line diagnostic
and control information. The two WD control channels
connect the WDP with PU #1 and PU #2.
The VDU and Printer of the CAMPS Main Site Engineering
position are connected to the WDP.
Fig. 4.1.1-7…01…W̲a̲t̲c̲h̲d̲o̲g̲ ̲S̲y̲s̲t̲e̲m̲
4.1.1.2 S̲i̲t̲e̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲ ̲L̲a̲y̲o̲u̲t̲
4.1.1.2.1 P̲r̲i̲n̲c̲i̲p̲l̲e̲ ̲D̲i̲a̲g̲r̲a̲m̲
The complete site equipment layout of the CAMPS Main
Site equipment is shown on fig. 4.1.1.2-1 (drawing
1-151).
The functional aspects of the individual configuration
elements are described in section 4.1.1.1.
The minor boxes shown on fig. 4.1.1.2-1 represent functional
modules as well as mechanical modules. The modules
are placed in mechanical assemblies named crates or
crate assemblies. The crate allocation of each module
is indicated on fig. 4.1.1.2-1. The crates are designed
for mounting in standard 19 inch racks.
Some configuration elements on fig. 4.1.1.2-1 are not
placed in crates. These are selfstanding subsystem
assemblies and are mounted in the TEMPEST 19 inch racks
(e.g. disk drives) or are free standing (e.g. terminal
equipment).
Two families of modules are used for the CR80 modules,
the D modules and the S modules.
The D module concept is presented on fig. 4.1.1.2-2
and 3.
The S module concept is presented on fig. 4.1.1.2-4.
a) Fig. 4.1.1.2-2 shows the crating of the CR80D Processor
and Channel Unit. The three rows of connectors
visible in the front magazine are accessing the
upper bus, the lower bus and the external connections.
Modules on the CAMPS site equipment diagram, fig.
4.1.1.2-1 in the Processor/Channel Units placed
between the buses are Front modules, while the
modules terminating the buses and the modules placed
below the lower bus are rear modules/adapters.
Fig. 4.1.1.2-1…01…Drawing 1-151
(Format A1)
Rear crate modules/adaptors support the external
connections of the unit, i.e. signal and power
cabling.
Front and rear-crate modules are interconnected
by flat cables.
b) Fig. 4.1.1.2-3 shows the crating of the WD Processor.
The CR80D minicrate is used. The concept is as
described in a) above. The CR80D minicrate is
used for smaller configurations. Power regulation
and ventilation are integrated in the crate assembly.
c) Fig. 4.1.1.2-4 shows the crating of the TDX modules.
The height of the crate is half the height of the
normal CR80D crate.
The modules of the S crate are connected through
a Printed Circuit Board (PCB) with 1 row of connectors.
External connection of power and signal lines
may be performed both by connection to front mounted
modules and to rear mounted modules.
The CAMPS Main Site equipment shown on fig. 4.1.1.2-1
is separated in two by the horizontal V24-IDF-line.
Equipment above the IDF line is placed within the
CAMPS Main Site Racks. Equipment below the V24-IDF-line
is placed in the surrounding CAMPS installation as
appropriate.
Fig. 4.1.1.2-2…01…C̲R̲8̲0̲D̲ ̲P̲r̲o̲c̲e̲s̲s̲o̲r̲ ̲U̲n̲i̲t̲/̲C̲h̲a̲n̲n̲e̲l̲ ̲U̲n̲i̲t̲
Fig. 4.1.1.2-3…01…C̲R̲8̲0̲D̲ ̲W̲a̲t̲c̲h̲d̲o̲g̲ ̲U̲n̲i̲t̲
Fig. 4.1.1.2-4…01…T̲y̲p̲i̲c̲a̲l̲ ̲S̲-̲C̲r̲a̲t̲e̲ ̲A̲s̲s̲e̲m̲b̲l̲y̲
4.1.1.2.2 E̲q̲u̲i̲p̲m̲e̲n̲t̲ ̲M̲a̲t̲r̲i̲x̲
The design of the equipment supplied for each site
is identical. In some details the site equipment will
be identical and in some parts the site equipment will
differ due to differences in the connectivity of each
site.
The Equipment Matrix, fig. 4.1.1.2-5 shows the items
to be supplied to each site.
The matrix does not contain standard items for complete
assembly of each site equipment, i.e. signal cables,
power cables, mechanical parts.
The connectivity of each site is presented in section
4.1.1.3.2.
4.1.1.3 S̲i̲t̲e̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲ ̲C̲o̲m̲p̲l̲e̲m̲e̲n̲t̲
The equipment of a typical CAMPS room is shown on fig.
4.1.1.3-1.
All sites are equipped with:
a) two 3 bay rack assemblies, the computer racks (rack
A, B, C) and the line termination racks (rack D,
E, F).
b) Engineering Position Equipment.
1) 1 VDU with keyboard, 1 paper tape reader/paper
tape puncher and a printer as free-standing
units
2) 1 dual Floppy Disk station placed in the computer
racks.
c) 1 storage cabinet.
d) A number of supervisor position equipment, each
composed of 1 Visual Display Unit with keyboard
and 1 Medium Speed Printer.
FIGURE 4.1.1.2-5…01…MAIN SITES EQUIPMENT MATRIX
Fig. 4.1.1.3-1…01…C̲A̲M̲P̲S̲ ̲M̲a̲i̲n̲ ̲S̲i̲t̲e̲ ̲w̲i̲t̲h̲ ̲F̲o̲u̲r̲ ̲S̲u̲p̲e̲r̲v̲i̲s̲o̲r̲ ̲P̲o̲s̲i̲t̲i̲o̲n̲s̲
4.1.1.3.1 M̲a̲i̲n̲ ̲R̲a̲c̲k̲ ̲D̲e̲s̲i̲g̲n̲
The front elevation of the two rack assemblies of a
CAMPS Main Site Installation is shown on the figs.
4.1.1.3-2 and 4.1.1.3-3 (open doors).
Fig. 4.1.1.3-2 shows the computer racks, named rack
A, B, and C.
Fig. 4.1.1.3-3 shows the line termination racks, named
rack D, E, and F.
Each rack has a front door and a rear door.
When the doors of a 3 bay rack assembly are closed,
the cabinets will form the EMI shielding, to prevent
compromising emanations.
The front elevations identify the positions of the
various crates as defined in section 4.1.1.2.
The Fan assemblies assure the sufficient cooling of
the crates and units.
The air intake is from the front as indicated. The
air flows out through the top of each rack. The front
doors of the racks are perforated for air intake in
the two levels of air intake indicated.
Fig. 4.1.1.3-2…01…C̲A̲M̲P̲S̲ ̲M̲a̲i̲n̲ ̲S̲i̲t̲e̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲ ̲F̲r̲o̲n̲t̲ ̲E̲l̲e̲v̲a̲t̲i̲o̲n̲
Fig. 4.1.1.3-3…01…L̲i̲n̲e̲ ̲T̲e̲r̲m̲i̲n̲a̲t̲i̲o̲n̲ ̲R̲a̲c̲k̲s̲ ̲(̲3̲6̲ ̲u̲)̲
4.1.1.3.2 C̲o̲n̲n̲e̲c̲t̲i̲v̲i̲t̲y̲
The connectivity as described in this section concerns
the possibilities for connection of the different types
of terminals and external circuits to each CAMPS Main
Site equipment.
Three subsets are addressed:
a) Connectivity of VDUs and Medium Speed printers,
Low Speed Teleprinters, Papertape Reader/Puncher,
and OCR.
b) Connectivity of CCIS, SCARS, and TARE circuitry,
and terminals (VDU and printer) for S/W development
in the CSSI site.
c) Standard connected peripherals. This subset includes
disk drives, floppy disk drives and engineering
terminals (i.e. VDU and Printer).
The number of terminals is given for each site and
the modules/items of the distribution equipment supplied
for each data exchange channel are given.
4.1.1.3.2.1 V̲D̲U̲s̲ ̲a̲n̲d̲ ̲M̲e̲d̲i̲u̲m̲ ̲S̲p̲e̲e̲d̲ ̲P̲r̲i̲n̲t̲e̲r̲s̲ ̲A̲s̲s̲i̲g̲n̲e̲d̲ ̲f̲o̲r̲ ̲U̲s̲e̲r̲s̲,̲
P̲a̲p̲e̲r̲ ̲T̲a̲p̲e̲ ̲R̲e̲a̲d̲e̲r̲/̲P̲u̲n̲c̲h̲e̲r̲ ̲a̲n̲d̲ ̲O̲C̲R̲.
These types of terminals are connected to the TDX System
of the CAMPS Main Site.
Fig. 4.1.1.3-4 shows the Modules of the TDX Crate assembly.
In fig 4.1.1.3-4 a front view of the TDX Crate is shown.
The Crate contains max. 2 LTUX modules each supporting
max. 4 channels and max. 8 adapters: opto mux/demux
tranceivers or V28(L) adapters.
The opto cables leaving the modules of the crate are
run directly to the connected terminal equipment.
FIGURE 4.1.1.3-4
The electrical cables leaving the modules of the crate
are terminated for external connection in the IDF facility
in Rack F.
Fig. 4.1.1.3-5 gives a presentation of:
a) the number of terminals supplied for each site.
b) the modules/items of the distribution equipment
supplied for each site.
c) the amount of TDX Crates supplied (ready for operation).
d) the number of LTUX modules supplied and the application
of each module.
Signatures:
X: Item mounted
: Item not supplied
O: Opto mux/demux transceiver mounted
L: V24/V28(L) adaptor mounted (i.e. adaptor for
electrical low level, limited emanation V24
channel transmission)
VDU: VDU provided (with opto interface)
MSP: Medium Speed printer provided (with opto interface).
(LSM): Low Speed media can be connected, but are not
delivered (i.e. Point-to-Point, TRC, TTY).
(OCR): Optical Character Reader can be connected,
but is not delivered.
PTP/
PTR: Paper Tape Reader/Puncher provided.
(E): LTUX-modules are mounted for expansion. (Adaptors
shall be decided, when application is decided).
Fig. 4.1.1.3-5…01…C̲o̲n̲n̲e̲c̲t̲i̲v̲i̲t̲y̲ ̲(̲V̲D̲U̲s̲,̲ ̲M̲S̲P̲s̲,̲ ̲L̲o̲w̲ ̲S̲p̲e̲e̲d̲ ̲C̲h̲a̲n̲n̲e̲l̲s̲)̲
S̲i̲t̲e̲ ̲1̲-̲1̲7̲
4.1.1.3.2.2 E̲x̲t̲e̲r̲n̲a̲l̲ ̲C̲i̲r̲c̲u̲i̲t̲s̲:̲ ̲ ̲C̲C̲I̲S̲,̲ ̲S̲C̲A̲R̲S̲,̲ ̲T̲A̲R̲E̲.̲ ̲ ̲T̲e̲r̲m̲i̲n̲a̲l̲s̲:̲
V̲D̲U̲ ̲a̲n̲d̲ ̲P̲r̲i̲n̲t̲e̲r̲ ̲f̲o̲r̲ ̲S̲/̲W̲ ̲d̲e̲v̲e̲l̲o̲p̲m̲e̲n̲t̲ ̲i̲n̲ ̲t̲h̲e̲ ̲C̲S̲S̲I̲ ̲S̲i̲t̲e̲
̲
These terminals and external circuits are connected
to the LTUs of the CAMPS Main Site.
Fig. 4.1.1.3-6 shows the Modules of the Channel Unit
Assembly.
The electrical cables leaving the modules of the crate
are terminated for external connection in the Filter
Box facility in RACK F.
Fig. 4.1.1.3-7 gives a presentation of:
a) the modules/items of the distribution equipment
supplied for each site.
b) the number of LTU modules supplied, and the application
of each module.
The S/W development equipment will be delivered for
the one site chosen for S/W development (the CSSI site).
Signatures:
X: Item mounted
: Item not supplied
(CCIS): Specification of the external circuit,
(SCARS) which can be connected.
(TARE)
Fig. 4.1.1.3-6 …01…CAMPS, MAIN SITE, PROCESSOR RACKS, CHANNEL UNIT CRATE ELEVATION
Fig. 4.1.1.3-7
Site 1-17
4.1.1.3.2.3 S̲t̲a̲n̲d̲a̲r̲d̲ ̲C̲o̲n̲n̲e̲c̲t̲e̲d̲ ̲P̲e̲r̲i̲p̲h̲e̲r̲a̲l̲s̲
The standard connected peripherals include:
a) Mass storage drives, connected to the Channel Unit
of the Main Site.
b) The Engineering position terminals, i.e. one VDU
with keyboard and a printer for each site.
The Engineering position terminals connection are shown
on fig. 4.1.1.2. (Site Equipment Layout).
Fig. 4.1.1.3-6 identifies the positions of the Disk
and Floppy Disk Controllers and Controller adaptors
in the Channel Unit.
Fig. 4.1.1.3-8 presents the standard peripherals connected
into each site equipment.
Fig. 4.1.1.3-8…01…Site 1-17