⟦232e536a9⟧ Wang Wps File

    Length: 21497 (0x53f9)
    Types: Wang Wps File
    Notes: tilbud DISCON for F.Enevo 
    Names: »1492A «

Derivation

└─⟦496afff58⟧ Bits:30006254 8" Wang WCS floppy, CR 0115A
    └─ ⟦this⟧ »1492A « 

WangText



A…05…@…0b…@…0c…@
?…0a……86…1   
      
      
      
      
      
      
      …02…
      
     …02… 
  …02…    
    

…02…     
      

…02… FE/820111…02……02…#
CHRISTIAN
 ROVSING
 A/S response
to DISCON
 questionaire…02……02…
     








S̲e̲c̲t̲i̲o̲n̲ ̲1̲,̲ ̲q̲u̲e̲s̲t̲i̲o̲n̲ ̲1̲

Describe any prime/sub-contractor management arrangements which
 you might be likely to establish for the project.



R̲e̲s̲p̲o̲n̲s̲e̲:    CR A/S is not planning to have any sub-contractors
             on the DISCON project. CR A/S will be a subcontractor
             to Collins International Service Company.


S̲e̲c̲t̲i̲o̲n̲ ̲1̲,̲ ̲q̲u̲e̲s̲t̲i̲o̲n̲ ̲2̲

Describe management arrangements which you might use for project
 design, supply and installation of equipment, commissioning
 and post commissioning support; including reference to technical
 milestone monitoring and financial control.



R̲e̲s̲p̲o̲n̲s̲e̲:̲    C̲h̲r̲i̲s̲t̲i̲a̲n̲ ̲R̲o̲v̲s̲i̲n̲g̲ ̲A̲/̲S̲ ̲O̲r̲g̲a̲n̲i̲z̲a̲t̲i̲o̲n̲

         The organization of the DISCON project within Christian
         Rovsing A/S, CR A/S is shown in fig. 1.

         Systems Division of CR A/S will be responsible for
         the DISCON project. This division has specialized in
         management, development, installation education and
         support of large scale systems including relationship
         with other CR A/S divisions. Production of hardware
         and system software will be performed in other CR A/S
         divisions. The quality Assurance department within
         CR A/S will enforce QA requirement on the DISCON project.

         Financial control within a project is established by
         allocating payments to all major milestones, i.e. documentation,
         production and acceptance test.

         D̲I̲S̲C̲O̲N̲ ̲p̲r̲o̲j̲e̲c̲t̲ ̲o̲r̲g̲a̲n̲i̲z̲a̲t̲i̲o̲n̲

         The major activities to be performed in the DISCON
         project are envisaged as follows:

         -   Project Management
         -   Systems Engineering
         -   Hardware Development
         -   Software Development
         -   Fabrication Integration and Test
         -   Site Installation and Test
         -   Site Acceptance
         -   Logistic Support
         -   Documentation.


         The project organization to perform the above activites
         could be:


         P̲r̲o̲j̲e̲c̲t̲ ̲M̲a̲n̲a̲g̲e̲m̲e̲n̲t̲ will be assigned the authority to
         manage and direct the resources necessary to deliver
         the DISCON systems. The major responsibilities include:

         o   P̲r̲o̲g̲r̲a̲m̲ ̲P̲l̲a̲n̲n̲i̲n̲g̲ to determine the program "Success
             Parameters" and ensure that they are coordinated
             within the program. Additionally all tasks, inputs
             and deliverables shall be defined. These shall
             be used to create schedules and budgets.

         o   P̲r̲o̲g̲r̲a̲m̲ ̲O̲r̲g̲a̲n̲i̲z̲i̲n̲g̲, that is to develop a work breakdown
             structure so that the proper interfaces are developed
             to ensure inputs being ready when needed.

         o   P̲r̲o̲g̲r̲a̲m̲ ̲S̲t̲a̲f̲f̲i̲n̲g̲. Work with the line managers to
             determine what people can best support the program
             and then phase them in and out of the program so
             that the job is accomplished within cost and schedule,
             and contractual commitments are met.

         o   P̲r̲o̲g̲r̲a̲m̲ ̲D̲i̲r̲e̲c̲t̲i̲n̲g̲ to provide day-to-day management
             and technical direction to the program staff by
             making interpretations of the plan, and by working
             out modifications and changes with the customer
             and the line organization. Directing the program
             to produce the required items on the right schedule
             for the agreed-upon cost.

         o   P̲r̲o̲g̲r̲a̲m̲ ̲C̲o̲n̲t̲r̲o̲l̲, that is to conduct regular reviews
             of the program items or individuals so that line
             management and the customer will be regularly and
             routinely informed on program progress, accomplishment,
             and/or problems.

         o   C̲u̲s̲t̲o̲m̲e̲r̲ ̲R̲e̲l̲a̲t̲i̲o̲n̲s̲.̲ The program management has
             the ultimate authority for approving all contract
             changes, additions, or deletions. Additionally,
             program management is the focal point for all customer
             inquiries and shall approve all program related
             customer reports.





         H̲a̲r̲d̲w̲a̲r̲e̲ ̲D̲e̲v̲e̲l̲o̲p̲m̲e̲n̲t̲

         The Hardware development team will be assigned the
         responsibility for the development/coordination of
         the hardware for the DISCON system. The major areas
         of responsibility are as follows:

         -   production of the configuration drawings

         -   h/w development specifications on:

             a system level and on
             a detailed level

         -   creation of the development plan on the detailed
             level including the corresponding work break down
             descriptions

         -   creation of the work descriptions of the tasks
             to be performed by other divisions/departments

         -   design and development of all CR80 Modules needed
             for DISCON

         -   design and development of all special hardware,
             cabelling, racks and all other items needed for
             the DISCON Systems

         -   Development Software Maintenance Test (DSMT). Responsibility
             for Production Divisions preventive and corrective
             maintenance on the DSMT System.

         -   ensure that all documentation, internal and external
             (deliverable), is produced on schedule and in accordance
             with standards applicable for the DISCON program.

         -   providing support to the production dept. during
             final test and integration as well as to the field
             during the installation and warranty period. This
             support must be provided when required.

         -   reporting on the progress of Production Division
             h/w branch's effort.

         -   implementation of the DISCON Reliability Test Program
             carried out by Production Division and supervised
             by the DISCON reliability engineer.



         -   design and implementation of the firmware to be
             produced by the DISCON organization.

         The Hardware Manager is the single point interface
         between the Production Division's hardware development
         team and the DISCON organization.

         Within the DISCON organization the Hardware Manager
         reports to the Program Manager on the technical level.



         S̲o̲f̲t̲w̲a̲r̲e̲ ̲D̲e̲v̲e̲l̲o̲p̲m̲e̲n̲t̲

         The Software Development team will be assigned the
         responsibility for the development of the software
         used in the DISCON system.

         The development is divided into three major areas:

         o   the application software

         o   the CR80 standard systems support software

         o   the test software

         The major areas of responsibility are as follows:

         -   creation of a development plan and schedule, control
             of software development, and the day-to-day direction
             of the software team.

         -   creation of the work descriptions of the tasks
             to be performed by the Production Division's operating
             system team.

         -   control of the software development tasks being
             performed by the Production Division.

         -   assist on a full scale basis in establishment of
             the Systems Design.

         -   perform the detailed design of all modules in the
             application software.

         -   perform the integration and test of the software
             plus assist in the acceptance test phase.



         -   provide support during the installation and warranty
             period.

         -   development of the Software Test Bed for verification
             testing.

         -   ensure that the development standards are being
             enforced.

         -   ensure that all documentation, internal and external
             (deliverable), is produced on schedule and in accordance
             with standards.

         -   ensure that the security requirements are met and
             that the security integrity is assessed.

         The Software Manager is the interface between the Production
         Division's software development and the DISCON team.
         Within the DISCON organization the Software Manager
         reports to the Program Manager on the technical level.



         S̲y̲s̲t̲e̲m̲s̲ ̲E̲n̲g̲i̲n̲e̲e̲r̲i̲n̲g̲

         Systems engineering and design analysis tasks will
         be performed by the CAMPS Systems Engineering group
         to ensure that the CAMPS software/hardware requirements
         will result in a production of sw/hw that will be consistent.

         The major areas of responsibilities are as follows:

         -   creation of a development plan and schedule, control
             of the system engineering tasks and the day-to-day
             direction of the systems engineering team.

         -   creation of the Systems Requirements Specification

         -   establishment and control of software interfaces
             between the subsystem components, and hardware/software
             interfaces.

         -   monitor and analysis of external interfaces

         -   establishment of the systems design



         -   evaluation of the software and hardware design

         -   perform the sizing analysis to monitor memory budgets

         -   perform the systems performance analysis

         -   review subsystems design

         -   control the software data description document

         -   control the interface description document

         -   ensure that the system satisfies the environmental
             and electromagnetic radiation requirements

         -   specify the function to be performed by the firmware
             in general

         -   perform the System Maintainability/Availability
             analysis

         -   perform the task of Integration and Test, that
             is:

             establish the acceptance requirements
             write the acceptance test plan
             write the Integration and Test Plan
             specify the system verification procedures
             specify the acceptance test procedures
             conduct the tests in house
             produce the test reports
             perform the Site Provisional Tests

         The Systems Engineering Manager reports to the Program
         Manager on technical aspects.



         I̲n̲t̲e̲g̲r̲a̲t̲e̲d̲ ̲L̲o̲g̲i̲s̲t̲i̲c̲s̲ ̲S̲u̲p̲p̲o̲r̲t̲

         The Integrated Logistic Support team has been assigned
         the responsibility of the following support activities:

         -   produce the plans for documentation, production,
             transportation, installation, and training

         -   perform the site surveys and prepare for installation



         -   verify that all sites are ready for verification

         -   transportation of all final deliverable items to
             the sites

         -   perform the installation of the DISCON systems
             and verify that the system is ready to undergo
             the Site Provisional Acceptance Test.

         -   ensure that hardware and software support is provided
             during a warranty period

         -   perform the training of the customer personnel

         -   produce a Spare Part List and deliver the parts
             to the sites

         -   manage the documentation related to the DISCON
             program.


         Q̲u̲a̲l̲i̲t̲y̲ ̲A̲s̲s̲u̲r̲a̲n̲c̲e̲ ̲a̲n̲d̲ ̲C̲o̲n̲f̲i̲g̲u̲r̲a̲t̲i̲o̲n̲ ̲M̲a̲n̲a̲g̲e̲m̲e̲n̲t̲

         The QA and CM team will be assigned the responsibility
         for the overall quality assurance of the hardware and
         software in accordance with the contractual requirements.

         The major areas of responsibility are as follows:

         -   generation of the QA plan

         -   generation of the CM plan

         -   establishing and documenting the standards to be
             followed during the development

         -   establish the QA procedures to be used during the
             DISCON program

         -   establish change control procedures for documentation
             and software changes

         -   establish procedures for Problem Report processing
             for hardware and software. These shall pertain
             to CR produced modules and OEM equipment.



         -   establish procedures to manage hardware storage,
             software libraries and documentation.

         The QA/CM Manager reports directly to the Systems Division
         Manager.


S̲e̲c̲t̲i̲o̲n̲ ̲1̲,̲ ̲q̲u̲e̲s̲t̲i̲o̲n̲ ̲3̲

Provide details of possible arrangements for the handling of
 classified information for the project.



R̲e̲s̲p̲o̲n̲s̲e̲:̲    Christian Rovsing A/S is cleared by the Danish
             Defence Intelligence Service for handling of information
             up to and including NATO SECRET. Christian Rovsing
             A/S' facilities include approved "red areas", storage
             facilities, and access control in accordance with
             Danish Defence Intelligence Service instructions.
             A large number of Christian Rovsing A/S employees
             are cleared by NATO authorities to either NATO
             COSMIC TOP SECRET or NATO SECRET.

         Christian Rovsing A/S has vast experience in the handling
         of classified information not only within its own plant
         but also through Government to Government channels
         between different NATO countries. The Danish Defence
         Intelligence Service has procedures for the international
         handling of classified documents and information. Such
         procedures are in accordance with NATO document CM
         55/15 (enclosure D), and applied within Christian Rovsing
         A/S.







S̲e̲c̲t̲i̲o̲n̲ ̲1̲,̲ ̲q̲u̲e̲s̲t̲i̲o̲n̲ ̲5̲

State where overall project management would be carried
 out.



R̲e̲s̲p̲o̲n̲s̲e̲:̲    The overall management of the DISCON project
             or part hereoff to be performed in Denmark
             can best be performed at the same place,
             i.e. Denmark.






S̲e̲c̲t̲i̲o̲n̲ ̲1̲,̲ ̲ ̲q̲u̲e̲s̲t̲i̲o̲n̲ ̲6̲

State where critical areas of design would be carried
 out.



R̲e̲s̲p̲o̲n̲s̲e̲:̲    Christian Rovsing A/S believes that critical
             areas of design should be carried out at
             the location which has access to the greatest
             expertise on the subject in question. All
             critical areas assigned solely to Christian
             Rovsing should hence be performed on CR A/S'
             premises in Denmark.




S̲e̲c̲t̲i̲o̲n̲ ̲3̲,̲ ̲q̲u̲e̲s̲t̲i̲o̲n̲ ̲3̲

If you anticipate offering a system based in a switch/switches
 currently in service or under development, state whether
 the system would be developed by your firm or a sub-contractor.
 Where possible, identify candidate systems and sub-systems,
 including country of origin.



R̲e̲s̲p̲o̲n̲s̲e̲:̲    Christian Rovsing A/S plans to offer a system
             for the DISCON project based on another system,
             currently under development, i.e. test. The
             system in question is a communication network
             for the Danish Defence called FIKS, see attached
             description.

         Christian Rovsing A/S has gained experience in
         other military communication systems like, NICS-TARE,
         where CRAS has delivered front-end processors.
         Christian Rovsing A/S is currently developing
         the Computer Aided Message Processing Systems,
         CAMPS for NATO to be used in European NATO countries.

         Presently Christian Rovsing A/S plans to utilize
         systems and sub-systems from the FIKS and CAMPS
         system, hence Denmark will be the country of
         origin of those systems and sub-systems.





S̲e̲c̲t̲i̲o̲n̲ ̲3̲,̲ ̲q̲u̲e̲s̲t̲i̲o̲n̲ ̲4̲

If you anticipate using a system based on a switch/switches
 currently under development, describe the state of development
 of that system.



R̲e̲s̲p̲o̲n̲s̲e̲:̲    The FIKS system is currenty undergoing network
             acceptance test, which is expected to be
             finalized in the second quarter of 1982.





S̲e̲c̲t̲i̲o̲n̲ ̲3̲,̲ ̲q̲u̲e̲s̲t̲i̲o̲n̲ ̲5̲

If you anticipate the involvement of one or more sub-contractors
 in the supply and/or development of any major component
 of the DISCON switching systems, provide details of the
 expertise and experience of the proposed sub-contractor
 in the supply and/or development of SPC digital switching
 systems; especially voice (circuit) and/or message (store
 and forward) switching systems.



R̲e̲s̲p̲o̲n̲s̲e̲:̲    Christian Rovsing A/S has no plans of involving
             any sub-contractors in the DISCON project.




S̲e̲c̲t̲i̲o̲n̲ ̲3̲,̲ ̲q̲u̲e̲s̲t̲i̲o̲n̲ ̲1̲3̲

   State what high level language or languages you might
   propose to use in the implementation of DISCON switching,
   network control and management information systems
   and to what extent will it/they be used.



R̲e̲s̲p̲o̲n̲s̲e̲:̲    Christian Rovsing A/S will use the high level
             language SWELL to implement switching and
             network control. SWELL is a high level lenguage
             designed to implement well structured programs,
             e.g. it contains features known from PASCAL,
             like be in-end blocks, procedure call etc.
             On the other hand SWELL also provides generation
             of efficient code, because individual computer
             registers can be manipulated by the SWELL
             programmer.

         SWELL will be the prime language used, but for
         some off-line programs like statistics printout,
         PASCAL might be used.




S̲e̲c̲t̲i̲o̲n̲ ̲3̲,̲ ̲q̲u̲e̲s̲t̲i̲o̲n̲ ̲1̲4̲

State  your firm's experience in the implementation of
 digital trunk and loop signalling scheme for both commercial
 and military systems. For loop signalling, the response
 should relate to each of voice, telegraph and data.



R̲e̲s̲p̲o̲n̲s̲e̲:̲    Christian Rovsing A/S has gained experience
             in implementation of digital trunk signalling
             schemes for both commercial and military
             systems. The projects are, FIKS (see attached
             description), CAMPS, LME-net, CRISP and ICL
             front-end computers. The CAMPS system interfaces
             to NICS-TARE, SCARS II, and ACCIS.

         Christian Rovsing A/S has also experience in
         protocol converters. In the above mentioned CAMPS
         system some sites are connected to old ACCIS
         system, i.e. Honeywell equipment equipped with
         different communication protocols.

         Christian Rovsing A/S has gained experience in
         voice, telegraph and data transmission in several
         projects, e.g. in a project for Telefonaktiebolaget
         L.M. Ericsson Christian Rovsing A/S has designed
         a voice to digital converters. The converters
         are now implemented in Sweden in a combined voice
         and data network, i.e. Gota Kanal System.





S̲e̲c̲t̲i̲o̲n̲ ̲3̲,̲ ̲q̲u̲e̲s̲t̲i̲o̲n̲ ̲1̲5̲

State what effort you envisage being required to implement
 each of the following trunk signalling schemes in DISCON
 given your possible switching philosophies:

             a.  CCIT No. 7;
             b.  TRI-TAC;
             c.  EUROCOM



R̲e̲s̲p̲o̲n̲s̲e̲:̲    Christian Rovsing A/S has great experience
             in implementing different protocols. Hence
             Christian Rovsing A/S does not envisaged
             any difficulties in implementing any of the
             three signalling schemes, i.e. CCITT signalling
             system No. 7, TRI-TAC and EUROCOM.




S̲e̲c̲t̲o̲n̲ ̲3̲,̲ ̲q̲u̲e̲s̲t̲i̲o̲n̲ ̲1̲6̲

State what alternative  you see being available for loop
 signalling in DISCON for each voice, data and telegraph.
 Have  you any preferred schemes at this stage to meet
 the overall DISCON requirements ?



R̲e̲s̲p̲o̲n̲s̲e̲:̲    At present Christian Rovsing A/S has no preferred
             signalling schemes for the DISCON project.
             A detailed analysis of the DISCON system
             will be performed before deciding which schemes
             should be implemented.




S̲e̲c̲t̲i̲o̲n̲ ̲5̲,̲ ̲q̲u̲e̲s̲t̲i̲o̲n̲ ̲1̲

State what experience you have in secure military communication
 projects; especialy those involving secure computer-controlled
 digital switching systems.



R̲e̲s̲p̲o̲n̲s̲e̲:̲    Christian Rovsing A/S has great experience
             in secure military communication projects.
             The FIKS project (see attached description)
             handles security classification of messages
             up to the level of TOP SECURITY. CRYPTO-graphic
             security equipment protects all transmissions.
             The system is divided in RED areas, where
             plain text unencrypted information is allowed,
             and BLACK areas where classified information
             appears only in encrypted form.

         Christian Rovsing A/S has also experience in
         utilizing fiber optics and other Tempest features
         for secure communication systems. This experience
         has been gained from the CAMPS system.





S̲e̲c̲t̲i̲o̲n̲ ̲5̲,̲ ̲q̲u̲e̲s̲t̲i̲o̲n̲ ̲2̲

State what recent experience you have in overall COMSEC
 management for secure military communication systems.



R̲e̲s̲p̲o̲n̲s̲e̲:̲    Christian Rovsing A/S has great experience
             in overall COMSEC management. This experience
             has been gained in the CAMPS project, where
             all equipment including peripherals must
             be installed in accordance with criteria
             laid down in AMSG719B. Terminals like VDUs,
             printers, paper tape readers/punch in the
             CAMPS system are delivered with a TEMPEST
             clearance certificate according to AMSG720A.




S̲e̲c̲t̲i̲o̲n̲ ̲5̲,̲ ̲q̲u̲e̲s̲t̲i̲o̲n̲ ̲3̲

State whether you are familiar with the TEMPEST requirements
 which the Commonwelth is generally applying to individual
 secure systems.



R̲e̲s̲p̲o̲n̲s̲e̲:̲    Christian Rovsing A/S is familar with the
             TEMPEST requirements used by the NATO Alliance,
             i.e. as described in AMSG719B and AMSG720A.
             The CAMPS system will be installed in all
             European NATO countries, including Great
             Britain.





S̲e̲c̲t̲i̲o̲n̲ ̲5̲,̲ ̲q̲u̲e̲s̲t̲i̲o̲n̲ ̲4̲

State what recent experience your firm has in integrating
 COMSEC systems with computer controlled circuit and/or
 store and forward digital switching systems.



R̲e̲s̲p̲o̲n̲s̲e̲:̲    Both in the FIKS and the CAMPS system, there
             are interfaces to digital switching systems.
             These interfaces has been designed with encryption
             and decryption equipment to allow secure
             communication.




S̲e̲c̲t̲i̲o̲n̲ ̲9̲,̲ ̲q̲u̲e̲s̲t̲i̲o̲n̲ ̲1̲

State what elements of work for DISCON you would expect
 to be done in Australia.



R̲e̲s̲p̲o̲n̲s̲e̲:̲    Presently Christian Rovsing A/S has no plans
             of Australian Industry Participation, but
             CR A/S is willing to consider any proposal
             which might be forwarded.




S̲e̲c̲t̲i̲o̲n̲ ̲9̲,̲ ̲q̲u̲e̲s̲t̲i̲o̲n̲ ̲2̲

State what arrangements are anticipated for this work.
 If possible indicate the main firms that might be involved
 and the extent of their responsibilities.



R̲e̲s̲p̲o̲n̲s̲e̲:̲    Presently Christian Rovsing A/S has no plans
             of Australian Industry Participation, but
             CR A/S is willing to consider any proposal
             which might be forwarded.





S̲e̲c̲t̲i̲o̲n̲ ̲9̲,̲ ̲q̲u̲e̲s̲t̲i̲o̲n̲ ̲3̲

State what percentage AIP of a total tendered price you
 would expect to achieve.



R̲e̲s̲p̲o̲n̲s̲e̲:̲    Presently Christian Rovsing A/S has no plans
             of Australian Industry Participation, but
             CR A/S is willing to consider any proposal
             which might be forwarded.