DataMuseum.dk

Presents historical artifacts from the history of:

CR80 Wang WCS documentation floppies

This is an automatic "excavation" of a thematic subset of
artifacts from Datamuseum.dk's BitArchive.

See our Wiki for more about CR80 Wang WCS documentation floppies

Excavated with: AutoArchaeologist - Free & Open Source Software.


top - download

⟦233697134⟧ Wang Wps File

    Length: 17470 (0x443e)
    Types: Wang Wps File
    Notes: AFCAC                     
    Names: »3865A «

Derivation

└─⟦c33acb2c5⟧ Bits:30006217 8" Wang WCS floppy, CR 0278A
    └─ ⟦this⟧ »3865A « 

WangText

…00……00……00……00……00…9…02……00……00……86…1         …02…   …02…   …02…   …02…                                           



#









AIR FORCE COMPUTER ACQUISITION CENTER
Directorate of Contracting
Hanscom AFB, MA o1731
U̲.̲S̲.̲A̲.̲

Att.: L̲t̲.̲ ̲D̲.̲ ̲O̲'̲B̲r̲i̲e̲n̲              1983-07-12     FE/hho/LET/035




Gentlemen,

Subject: RFPF19630-82-R-0001 (ACCESS)
         negotiations of 26 and 27 June, 1983

Ref.:    Your letter of 30 June, 1983



1        Christian Rovsing A/S hereby forward the replies to
         the action items formed in the referenced letter.

         The actions have been replied to in alphabetically
         order from 1(a) to 1(g) and attached to this letter.
         (Please note that we have changed you second action
         1e to 1g.)

         In addition the statements of Agreements are returned
         signed by Christian Rovsing A/S.

2        Regarding the action item to be closed by you (ref
         para 2) we have the following comments:

a        We agree that clarification is needed. During our fact
         
2(e)     finding meeting Christian Rovsing pointed out that
         the two charges for purchased equipment could be deemed
         to be excessive and further noted that damages computed
         as "l/30th of the total monthly charge" were unclear
         in that the total monthly charge for purchased, as
         opposed to leased, equipment should be zero. The Air
         Force agreed to review this clause with respect to
         both of these concerns and to consider the possibility
         of a revision.

(b)      Also please clarify when we receive the replies to
         your actions.



3   Regarding your letter paragraph 3 we agree to the status
    of subparagraph a, b, and c.

4   Additional issues.

a   CR asks for confirmation of our understanding from
    the factfinding meeting that it is the Air Force's
    intention to issue a single delivery order at the date
    of contract award which will cover paragraph b.2 of
    rfp.

b   In the material forwarded together with you letter
    June 30, 1983, clause H 17 has been deleted which we
    appreciate. However, the reference to the H 17 in H
    16 has been maintained. Please clarify.

    A part of H 16 seems to be inadvertently omitted (?).

c   AFCAC distributed during the meetings June 27-28 a
    draft clause entitled H-X on Release of Information.

    Christian Rovsing expressed initial reservations about
    the clause in that it could possibly be read to allow
    disclosure of certain proprietary or confidential portions
    of Christian Rovsing's proposal. The Air Force agreed
    to take the matter under advisement and to consider
    redrafting the clause so as to eliminate the possibility
    of the release of confidential or proprietary data.

5   All replies has been mailed to you via courier. In
    addition this cover letter, the answers to our actions
    items 1(a) - 1(g), and those statements of Agreements
    which we have changed the wording on has been transmitted
    to you via FAX.



Kind regards,
CHRISTIAN ROVSING A/S



Gert Jensen…86…1    …02…    …02…   …02…   …02…   …02…                         
                  
Action item 1(a)

CR has reviewed the SAC desired schedule, and we have modified
 our original schedule (ref proposal II H page 26) in order
 to accomodate some of SAC's requests (see figure H-4).

The Program Management and the System Engineering are basically
 left unchanged. The activities connected to providing a
 TEMPEST certified Local Area Network and LQP are on the
 critical path of the project not allowing a final LAN prior
 to month 15, but in order to provide an early start up
 phase, CR is proposing to install a non tempest subsystem
 in month 7 after contract award. This subsystem will contain:

    o    Local Area Network, supporting 10 VDUs

    o    In addition the CR80 computer equipped with the
         IDM 500 and a line printer will be installed.
         This allows some users to get some handson experience.

    o    The system will be equipped with the basic System
         Software, and will be ready for installation of
         the total Data Base (none live). 

    o    The general Query Language and the Report Writer
         as demonstrated at the FLTD will also be installed.
         

    o    Finally the Interactive System Language, ISL will
         be installed at this point. The ISL will be used
         as a common shell to all the various applications,
         and it will enable the set up of all HELP menus.

Regarding software development and modification, CR's basic
 assumption is to initiate these activities by establishing
 a System Requirement Specification (SRS) as early as possible
 in the Project (see activity 2.1). The SRS will be submitted
 to AFCAC for approval. Once approved the Systems Design
 will be performed.
The Software Development phase will include a Detailed
 Design Specification and a Coding phase. Coding and modification
 of the applications has been subdivided in two subphases,
 in order to give a smooth installation.

After installation the S/W is available for handson experience
 (see the activities found in month 12). Site Acceptance
 has been divided in a unformal Functional part (CR only)
 and an formal Operational part (the Government only), where
 CR and RCA respectively will conduct/support the activities.
 The Functional Acceptance testing will be done after installation
 of the various application packages, while the Operational
 Acceptance testing will be done at the very end of the
 increment 1 phase. At this point in time the total Equipment,
 including the TEMPEST Local Area Network and all terminals
 pertaining to increment 1 will have been installed.



Training of SAC personel is proposed as follows. Subsequent
 to installation of the initial subsystem in month 7, CR
 propose to train the Operator and the Analyst in order
 to enable them to use the initial installed equipment.
 This training will be performed at SAC on the delivered
 equipment. After installation of the total increment equipment
 in month 15 after Contract Award, all remaining training
 courses can be initiated. The Operator can be given a course
 in operating the full blown system, equipped with all terminals
 and peripherals. The System Administrator, the Data Base
 and the Initial User training can now also be performed.
 Finally the Advanced User training can be initiated.

Regarding increment 2 and 3 CR is able to provide the phased
 installation of additional terminals asked for by the Government.…86…1
    …02…    …02…   …02…   …02…   …02…                                      
     
Action item 1(b) F̲o̲r̲e̲i̲g̲n̲ ̲P̲a̲r̲t̲i̲c̲i̲p̲a̲t̲i̲o̲n̲

CR has reviewed clause H-X and accepts its inclusion in
 the contract.






Action item 1(c)

We have reviewed the description found on page C-71A and
 have the following comments.

Para e1  We want to clarify that for the Long Haul Interface
         a change or problem could be introduced/exist
         in the interface outside the CR equipment causing
         the link not to work. Please clarify if you consider
         problem solving and possible updates to CR S/W
         to correct such problems for maintenance.

Para e2  Please clarify "immediate error correction".

Para e3  Please clarify the requirement: 

         "despite any changes made to systems and communication
         software"

         This requirement we consider open ended.






Action item 1(d) P̲r̲o̲g̲r̲e̲s̲s̲ ̲P̲a̲y̲m̲e̲n̲t̲s̲

CR has reviewed DAR Clause 7-104. 35(a) and the handed
 out document. CR accepts both and confirms that the auditing
 agency under the contract will be the Danish Department
 of Defence acting on behalf of the relevant US Department
 of Defence Agency.



Action item 1(e)  

                    B̲A̲S̲E̲ ̲S̲U̲P̲P̲O̲R̲T̲

In accordance with General Provision I8, Christian Rovsing
 and its subcontractor, RCA, agree that no direct or indirect
 cost will be incurred for the duplication of work or support
 capacity which the Government determines is available.
 It is therefore requested that the following Government-controlled
 working space, equipment, supplies, materials, services
 and other support requirements at Offutt AFB be set forth
 as an appendix to the contract.

GENERAL SUPPORT:

A.  Adequate access to all ACCESS equipments and locations
    for preventive and corrective maintenance during normal
    duty hours, and outside normal duty hours when required.
    Access must include that of the system terminals at
    the computers for software maintenance.

B.  On-base and local area telephone service will allow
    the installation of or access to a Class A telephone
    service suitable for both voice and Telefax service.
    This includes access to FTS and General Purpose AUTOVON
    service.

C.  Access to the ACCESS system for diagnostic and developmental
    software testing.

D.  Individual vehicle registration and personnel badging
    to allow free access to all ACCESS work areas except
    for those areas which require restricted or limited
    access. In the latter case, the Government must provide
    suitable escorted access.

E.  Access to and use of suitable copy machine service
    in support of the conduct of normal daily business.


HARDWARE AND SOFTWARE MAINTENANCE SUPPORT:

The initial assignment of RCA personnel to ACCESS will
 consist of three hardware technicians and two software
 programmers.

A.  Programmers will require approximately 100 ft.…0e…2…0f… each
    in a reasonably noise-free environment in close proximity
    to the computing facility. Furnishings for their area
    should include as a minimum:

    1.   File cabinets, 4 drawer - 2 each

    2.   Bookcases, 3w x 3b x 1d - 2 each



    3.   Chalkboard, 3' x 4' - 1 each

    4.   Desks - 2 each

    5.   Swivel desk chair on casters - 2 each

    6.   Chair straight-backed - 2 each

    7.   Desk lamps - 2 each

B.  The required hardware technical and spares storage
    area should not be less than 1000 ft.…0e…2…0f…

    1.   Technician office, general repair, and work area
         would consist of 700 ft.…0e…2…0f… with furnishings as
         follows:

         a.  Desks - 3 each

         b.  Swivel chair with casters - 3 each

         c.  Straight-backed chairs - 2 each

         d.  Bookcases - 3 each for:

             *   Reference material

             *   Training material

             *   Tech Orders

             *   Publications

             *   Administration

         e.  Work benches, 6' x 2-1/2' - 3 each

         f.  Rubber matting (insulating) - 40' x 2-1/2'
             for bench tops and floor space in front of
             benches.

         g.  File cabinets, 5-drawer - 4 each (for prints,
             schematic, documentation and administration)

         h.  Safe, two-drawer - 1 each

         i.  Bulletin boards, 3' x 4' - 2 each

         j.  Chalkboard, 3' x 4' - 1 each



     k.  Equipment lockers, 6' x 1/2' x 1-1/2' - 4 each
         for:

         *   Various types of test equipment

         *   Test leads, connetors, extension cords

         *   Adapters

         *   Bench power supplies

         *   Extender boards and cables

         *   Soldering equipment

         *   PC cards awaiting repair or parts

         *   Various unidentified miscellaneous storage

     l.  Scope carts - minimum 2 each

     m.  Multidrawer, roll-around tool chest - 1 each

     n.  Equipment cart, two-shelf, 2' x 3' minimum,
         on casters - 1 each

     o.  Stools, workbench (rotary drafting) - 3 each

     p.  Vacuum cleaner, large portable, shop type -
         1 each

     q.  Desk lamps - 3 each

     r.  Florescent magnification lamps - 2 each

     s.  Pace soldering set - 2 each

 2.  Spares storage would require an additional 300
     ft.…0e…2…0f… with approximately ten (10) each, 3' x 7'
     x 1-1/2', storage cabinets.



TECHNICAL SUPPORT:

The option for three software analysts will require
 an additional 300 ft.…0e…2…0f… of floor space in a reasonably
 noise-free environment. Furnishings would include:

A.   File cabinets, 4-drawer - 3 each

B.   Bookcase, 3w x 2h x 1d = 3 each

C.   Desks - 3 each

D.   Swivel desk chairs on casters - 3 each

E.   Straight-backed chairs - 2 each

F.   Desk lamps - 3 each

As stated during negotiations on 28 June, Christian
 Rovsing is proposing that the subcontracted maintenance
 and technical support will be provided on a full-time
 basis at Offutt AFB to assure system performance and
 responsiveness to the Government's requirements. Christian
 Rovsing did not contemplate establishing an off-site
 remotely-accessed diagnostic facility for maintenance,
 repair, systems analysis, training or storage of spares,
 tools, test equipment and documentation. If this approach
 is unacceptable due to the lack of available Government-provided
 base support capacity, please advise as soon as possible
 to enable us to make the necessary arrangements and
 revise our best and final offer if necessary.




Action item 1(f)

CR has included training in the revised schedule (ref
 action 1(a)), and it will be performed at OFFUTT AFB
 on the equipment delivered by CR to the Government,
 or in another place within continental USA.






Action item 1(g) I̲n̲s̲p̲e̲c̲t̲i̲o̲n̲ ̲a̲n̲d̲ ̲A̲c̲c̲e̲p̲t̲a̲n̲c̲e̲

It is CR's understanding that once accepted through
 acceptance test, equipment and system components will
 not be subsequently subjected to acceptance testing
 of capabilities, characteristics, and/or functions the
 quality and/or existence of which were documented through
 the initial acceptance test.

Warranty periods for a given piece of equipment or system
 component shall commence upon passing the first acceptance
 test to which it is subjected.












AIR FORCE SOMPUTER ACQUISITION CENTER
Directorate of Contracting
Hanscom AFB, MA 01731
U̲.̲S̲.̲A̲.̲

Att.: L̲t̲.̲ ̲D̲.̲ ̲O̲'̲B̲r̲i̲e̲n̲

                                1983-07-13   GJ/hho/FAX/006
                             






Gentlemen,

S̲u̲b̲j̲e̲c̲t̲:̲ ̲R̲e̲t̲r̲a̲n̲s̲m̲i̲s̲s̲i̲o̲n̲ ̲o̲f̲ ̲A̲C̲C̲E̲S̲S̲ ̲S̲c̲h̲e̲d̲u̲l̲e̲

As agreed, CR hereby resubmit the narrative line item
 headings of our proposed schedule. We also submit the
 total schedule in an enlarged format.



Kind regards,
CHRISTIAN ROVSING A/S



Gert Jensen


1    Program Management
 1.1 Progress Reports
 1.2 Progress Meetings
 1.3 Subcontractor Mgnt Plan
 1.4 Logistic Support Plan

2    System Engineering
 2.1 System Requirements Spec.
 2.2 System Design Spec.
 2.3 Acceptance Test Plan
 2.4 TEMPEST Test Plan
 2.5 TEMPEST Design
 2.6 TEMPEST Testing

3    Hardware Development
 3.1 Communication (LAN)
 3.2 LQP modification

4    Software Develop./Modificat.
 4.1 Detailed Design Spec
 4.2 Interactive System Language
 4.3 Electronic Mail
 4.4 Project Monitoring
 4.5 Personnel/Manpower
 4.6 Budget
 4.7 CINSAC Ex. Mng. Sup. (opt)
 4.8 Physical Resource Mon. (opt)
 4.9 Routine Executive Sup.(opt)

5    Integration and Test
 5.1 Incoming Inspection
 5.2 Factory Acceptance Test

6    Site Preparation and Installation
 6.1 Site Survey

7    Equipment Installation
     7.1.1   Comm. (LAN) (NT)
     7.1.2   Comm. (LAN) (T)

 7.2 Computer System
 7.3 Line Printer
 7.4 High-Speed Printer
 7.5 CGDU
 7.6 VDU
 7.7 LQP
 7.8 Video Copier
 7.9 Graphic Digitizer
 7.10 Color Camera
 7.11 Color Copier
 7.12 Optical Char. Reader



8  Software Installation
   8.1   System Software
   8.2   Data Base Est. (none live)
   8.3   Cobol
   8.4   General QUERY Language
   8.5   General Report Writer
   8.6   Interactive System Language
   8.7   Electronic Mail
   8.8   Project Monitoring
   8.9   Personnel/Manpower
   8.10 Budget
   8.11 CINSAC Mgt Sum. (opt)
   8.12 Physical Resource (opt)
   8.13 Routine Exec Sup. (opt)

9  Site Acceptance
   9.1   Computer H/W
   9.2   Communication (LAN)
   9.3   Appl. S/W (Funct)
   9.4   Appl. S/W (Oper.) (live data)
   
10 Logistic
   10.1 Maintenance
   10.2 Training
     10.2.1                                                      Operator
     10.2.2                                                      Analyst
     10.2.3                                                      System
                                                                 Administrator
     10.2.4                                                      Data
                                                                 base
     10.2.5                                                      Initial
                                                                 User
     10.2.6                                                      Advanced
                                                                 User

11 Documentation






                        3 of 12

The training will be performed at SAC, Offut AFB in
 2 phases following installation of the priliminary
 and the final increment 1 equipment. The detailed scheduling
 of training courses will be made by SAC, RCA and CR
 in collaboration. CR will attempt to accomodate SACs
 preference.




                        5 of 12

Optical Character Reader Software (OCR) 

Is the software for OCR off-the-shelf software?

Answer: No  The software was developed by CR, however
 the Software 
            does exist today.




                        8 of 12

Report Writer

(1) Is your Report Writer a standard off-the-shelf
 software package?

Answer: The Report Writer is n̲o̲t̲ off-the-shelf software.
 The query language software has been enhanced to the
 point where it provides extensive support to CR's developed
 Report Writer. The existing Report Writer was demonstrated
 during the FLTD.




                        9 of 12

Report Writer and the IDM.

Has the Report Writer been specially developed to support
 the IDM (Database Machine)?

Answer: Yes. The Report Writer and the Query can obtain
 data 
        through the IDM system. The Report Writer resides
 in the 
        CR80 host.




                       10 of 12

For new text creation, check pointing will be done
 line by line.



For text updates, the user will be provided with an
 option to aquire checkpointing either on a line by
 line basis or on a larger segment basis. This will
 be controlled by a special key similar to a "SEND"
 key. The purpose of providing this flexibility is to
 allow the user to make the trade off between the checkpointing
 and the associated response time increase.

The above features will be added to a current Christian
 Rovsing A/S text editor.