DataMuseum.dk

Presents historical artifacts from the history of:

CR80 Wang WCS documentation floppies

This is an automatic "excavation" of a thematic subset of
artifacts from Datamuseum.dk's BitArchive.

See our Wiki for more about CR80 Wang WCS documentation floppies

Excavated with: AutoArchaeologist - Free & Open Source Software.


top - download

⟦28307e800⟧ Wang Wps File

    Length: 4901 (0x1325)
    Types: Wang Wps File
    Notes: CPS/TLX/101/0558          
    Names: »2230A «

Derivation

└─⟦81108f261⟧ Bits:30006114 8" Wang WCS floppy, CR 0183A
    └─ ⟦this⟧ »2230A « 

WangText





                     1982-06-18   jho/bko

to:  shnmo division
     att.: mr. paul f. shey, contracting officer

cc.: lt. col. manfred stoltz, camps program manager
 

fm:  christian rovsing a/s, denmark
     gert jensen

our ref: cps/101/tlx/0558

subject: remote tare quotation
------------------------------
1.Introduction
--------------

As requested by SHAPE, Christian Rovsing A/S, hereby
 submit a Firm Fixed Proposal for 2 equipped Remote Tare
 Racks to be placed:

a) 1 remote tare rack at kolsaas tare site 8

b) 1 remote tare rack at reitan tare site 9


 The camps system at sonor is already connected to a
 tare rack at sonor. the remote tare racks at kolsaas
 and reitan connect sonor camps to the kolsaas tare
 and the reitan tare.

2.Price Quotation
-----------------

The cost related to the change is a non-recurring cost.
  the cost is divided into:

 overall requirements        dkr   202.339
 hardware                    dkr   162.106
 transportation              dkr    23.800
 site related services       dkr   537.756
                                                ̲ ̲ ̲ ̲
                                               ̲ ̲ ̲ ̲ ̲
                                               ̲ ̲ ̲ ̲
the total cost of the proposal is:             dkr 
                                                926.001
                                               =============

The price breakdown is as follows:

2̲.̲1̲ ̲o̲v̲e̲r̲a̲l̲l̲ ̲r̲e̲q̲u̲i̲r̲e̲m̲e̲n̲t̲s̲

this item covers the cost of

 system engineering, fabrication,
 integration and test, maintenance
 during warranty and documentation           dkr.  
 202.339
                                             --------------



2.2 hardware cost
-----------------

The proposed remote tare racks are designed in accordance
 with:

a) CPS/SDS/001 (CAMPS system design spec),section 5.5.5.4
 (introduced by ECO 15)

b) CPS/SDS/043 (Remote Tare Hardware Assembly Breakdown/Hardware
 Tree)

c) CPS/210/SYS/1001 (CAMPS SRS) section 3.4.1.10.6.

The following equipment is included in the racks for
 the two sites:

 1 rack per site
 unit price = dkr 19.440
 2 items    =                d.kr    38.880


 1 V24 BPJF per site
 unit price = d.kr  4.792
 2 items                     d.kr     9.584

 1 VF BPJF per site
 unit price = d.kr 14.406
 2 items                     d.kr    28.812

 1 Modem, per site
 unit price = d.kr 28.536
 2 items                     d.kr    57.072

 1 Mains Switch,( 220V) per site,
 unit price = d.kr  8.947
 2 items                     d.kr    17.894

 1 Power distr. panel per site
 Unit price = d.kr  2.296
 2 items                     d.kr     4.592

 1 power inlet box per site
 unit price = d.kr    411
 2 items                   d.kr         822

 1 V 24 cable per site
 unit price = d.kr    505
 2 items                   d.kr       1.010

 1 VF cable per site
 unit price = d.kr    220
 2 items                   d.kr         440

 mechanics per site
 unit price = d.kr. 1.500
 2 items                  d.kr        3.000

 subtotal, HW                                  d.kr
                                                   
                                               162.106
                                               -----------------


2.3 transportation
------------------

 cost per site dkr 11.900

 Sub total, transportation                     d.kr.
                                                   23.800
                                               ----------------


2.4 site related services
-------------------------

 costs per site: d.kr. 268.878 covering:
 site preparation and verification,
 site documentation(CWR,ATBB),
 site installation, and
 on-site testing

 total site costs                              d.kr
                                                   537.756

 spares are included in the l-o-i on spares.


3.schedule impact
-----------------
 The current installation plan (ref: CPS/TCN/026: installation
 sequence and site numbering) tells that the remote
 tare racks are installed as follows:

 a) kolsaas remote site together with sonar/site no
 15.

 b) reitan remote site together with reitan/site no
 9.

 This proposal has no impact on the installation schedule
 as described above.


4. bidding provisions
---------------------

4.1 validity
------------

 the cost and schedule impact stated in 2 and 3 above
 are under assumptions that the order is given to cr
 no later than 15/7-82.


4.2 delivery
------------

 the delivery of documentation, the fabrication and
 the installation will take place for Kolsaas together
 with sonor camps, site 15, for reitan together with
 reitan camps, site 9.


4.3 acceptance criteria
-----------------------

 the change has no impact on the present acceptance
 base line. it shall be noted that the total current
 connectivity has been increased by 8.

4.4 type of proposal
--------------------

 firm fixed price proposal

4.5 payment plan
----------------

 30 percent at approval of proposal
 70 percent of oem equipment by issue of certificate
 of conformance
 60 percent of cr equipment at factory acceptance
 10 percent of cr equipment at site accetpance.



 Of the quoted price d.kr 57.072 represent cost incurred
 in us dlrs, therefore d.kr 34.243 will be payable in
 us dlrs. applying to the exchange rate 8.32.

kind regards



Gert Jensen