⟦2977fdbc3⟧ Wang Wps File

    Length: 168293 (0x29165)
    Types: Wang Wps File
    Notes: Spelunked
    Names: »~ORPHAN67.00«

Derivation

└─⟦f10202801⟧ Bits:30006091 8" Wang WCS floppy, CR 0143A
    └─ ⟦this⟧ »~ORPHAN67.00« 

WangText



A…06…@…0d…@
?…0b…?…02…>…08…>…0d…>
=…0b…=…00…=
<…0a…<…01…;…08…;…0a…;…00…;…07…:…00…:…06…9…0c…9…02…8…09…8…0b…8…01…8…06…7…0c…7
6…09…6…0f…6…05…5…0c…5…02…4…09…4…01…3…08…3…01…2…09…2…0f…1…08…1…0f…1…06…0…0d…0…86…1
         …02… 
  …02…   …02…   …02…  
          
          
          
          
 
3.4.2…02…P̲h̲y̲s̲i̲c̲a̲l̲
 ̲C̲h̲a̲r̲a̲c̲t̲e̲r̲i̲s̲t̲i̲c̲s̲


3.4.2.1 S̲i̲z̲e̲,̲
        ̲W̲e̲i̲g̲h̲t̲,̲
        ̲P̲o̲w̲e̲r̲
        ̲C̲o̲n̲s̲u̲m̲p̲t̲i̲o̲n̲
        ̲a̲n̲d̲
        ̲H̲e̲a̲t̲
        ̲D̲i̲s̲s̲i̲p̲a̲t̲i̲o̲n̲

        The
        site
        equipments
        consist
        of
        a
        number
        of
        terminals
        and
        one
        or
        two
        multi-bay
        rack
        asemblies.

        The
        racks
        of
        each
        site
        equipment
        will
        be
        equipped
        with
        subassemblies
        and
        modules
        according
        to
        the
        actual
        connectivity.

        Detailed
        technical
        information
        will
        be
        supplied
        in
        the
        System
        Design
        Specification.



3.4.2.2 P̲o̲w̲e̲r̲
        ̲I̲n̲p̲u̲t̲

        The
        eqipments
        shall
        be
        capable
        of
        satisfying
        the
        specified
        performance
        requirements
        when
        operating
        with
        following
        power
        input:

         a)  Phases:       Single- or 3-phase, and ground. (For
                           supplyof redundant elements within
                           the equipment, the power input shall
                           be established with 2 independent
                           sources as a minimum).

         b)  Voltage:      Nominal value 380/220 V AC
                           Tolerances: +10%/-15%
                           Except UKAIR where nominal value
                           is 405/240 V AC.

         c   Frequency:    Nominal value: 50 Hz
                           Tolerances: +10/-10%

         d)  Harmonic
             distortion:   Max. 5%

         e)  Transients:   Non-repetitive impulsive interference
                           with a magnitude not to exceed 500
                           volts, pulse rise and fall times
                           not faster than 10 miroseconds and
                           a total duration of maximum 1 millisecond.
                           The available impulse energy at the
                           equipment power inlet shall not exceed
                           5J.


         f)  Exemptions:   Each site equipment will contain
                           three disk drives. These will not
                           operate within the tolerances of
                           section b) and c) above, but:

                           1) Voltage:   Nominal value: 380/220V AC
                                         Tolerances: +6%/-10%

                           2) Frequency: Nominal value: 50 Hz
                                         Tolerance: +0,5 Hz/-1.0 Hz

             I order to meet these special tolerance requirements
             voltage/frequency stabilizers shall be inserted
             in the power lines for the disk drives.

             Frequency Stabilizers shall be delivered for installation
             at all non-optional sites of figure 3.4.1.7.1 ecept
             BALTAP, WEST STAR, and NATO.

             For UKAIR see para 3.7.1.2.4.


         g)  Exemptions:   Each site will contain a number of
                           Medium Speed Printers. These will
                           not operate within he tolerances
                           of section b) and c) above, but:

                           1)  Voltage:   Nominal value: 240/220V
                                          AC
                                          Tolerances: +10%/-15%

                           2)  Frequency: Nominal value: 50
                                          Hz
                                          Tolerance: 5 Hz/-3
                                          Hz




3.4.2.3  T̲e̲m̲p̲e̲s̲t̲ ̲R̲a̲c̲k̲s̲

         The EMI racks are constructed of heavy gauge steel,
         having all non-opening seams welded. The racks will
         be of slightly greater size than equivalent non-EMI
         racks and will be significantly heavier. Cable entrane
         for power and signals will be either through the top
         or bottom of each rack. The racks are prepared for
         both type of outlet.


         a)  R̲a̲c̲k̲ ̲C̲o̲n̲f̲i̲g̲u̲r̲a̲t̲i̲o̲n̲

             The racks will be used as a single, free-standing
             cabinet or assembled into bays of 2, 3, 4, or more
             racks in a row forming a cabinet.

             The individual rcks will be transported separately
             and joined with coupling accessories at site. Thus,
             four rack types are defined.

             1)  L̲E̲F̲T̲ ̲E̲N̲D̲ ̲R̲A̲C̲K̲S̲, which includes one welded panelled
                 side and one open side with joiner frame, hardware,
                 and accessories.

             2)  N̲T̲E̲R̲M̲E̲D̲I̲A̲T̲E̲ ̲R̲A̲C̲K̲, which includes both sides
                 open, but with only one joiner frame, hardware,
                 and accessories.

             3)  R̲I̲G̲H̲T̲ ̲E̲N̲D̲ ̲R̲A̲C̲K̲, which includes one open side
                 without joiner frame and one welded panelled
                 side and accessories.

             4)  F̲R̲E̲E̲-̲S̲T̲A̲N̲D̲I̲N̲G̲ ̲R̲C̲K̲, which includes both sides
                 welded panelled, and accessories.

         The types of racks are non interchangeable, left cannot
         be interchanged with right, a freestanding cannot be
         changed to a right, etc.

         b)  R̲a̲c̲k̲ ̲D̲o̲o̲r̲s̲

             Each rack shall have a full sze door in front and
             rear. Doors will be operated with recessed handles.
             The doors shall contain EMI gaskets.

         c)  R̲a̲c̲k̲ ̲V̲e̲n̲t̲i̲l̲a̲t̲i̲o̲n̲

             To allow ventilation and EMI shielding, perforated
             metal is used. The perforated areas are located
             in the front dors and at the top.

         d)  A̲C̲ ̲P̲o̲w̲e̲r̲ ̲F̲i̲l̲t̲e̲r̲s̲

             RF power filters shall be used, and they shall
             be mounted directly to either the top or bottom
             of racks.


         e)  I̲n̲t̲e̲r̲m̲e̲d̲i̲a̲t̲e̲ ̲D̲i̲s̲t̲r̲i̲b̲u̲t̲i̲o̲n̲ ̲F̲r̲a̲m̲e̲ ̲(̲I̲D̲F̲)̲

             The IDF shall be enclosed within one of the main
             frame EMI racks. It provides access to all input
             and output electrical signal connectins to the
             CAMPS mainframe. Filtered connectors will be installed
             in the IDF as described below to meet AMSG requirements.

             The IDF consists of a separately shielded box sealed
             to the rack surface within an EMI rack into which
             conduit or ducts fro all external electrical signal
             cables are passed. Upon removal of the IDF cover,
             52 banks of 25 pin connectors are accessible for
             user connection. Optical signal cables are fed
             through a wavequide placed separately or contained
             in the IDF.

             Rackcable connections between the multi-bay rack
             assemblies shall be passed in tubes sealed to the
             racks.

         f)  V̲2̲8̲(̲L̲)̲-̲A̲d̲a̲p̲t̲e̲r̲s̲ ̲f̲o̲r̲ ̲D̲r̲i̲v̲i̲n̲g̲ ̲E̲l̲e̲c̲t̲r̲i̲c̲a̲l̲ ̲C̲a̲b̲l̲e̲s̲

             The V28(L) shall provide 6-0-6 volts signal levels
             and waveshaping.

             2 types shall be provded.

             The first type shall cover the range up to 1200
             BPS. The second type shall cover the range up to
             9600 Bps.…86…1   …02… …02… …02… …02… …02… …02… …02… …02… …02… …02…                        
                                 






                    T̲A̲B̲L̲E̲ ̲O̲F̲ ̲C̲O̲N̲T̲E̲N̲T̲S̲
                      S̲e̲c̲t̲i̲o̲n̲ ̲3̲.̲4̲.̲3̲



…02……02……02…3.4.3  Environmental Conditions  ............  250
…02……02……02……02…3.4.3.1  Temperature and Humidity  ........  250
…02……02……02……02…3.4.3.2  Dust, Fumes  ....................  251…86…1         …02…  
 …02…   …02…   …02…                                             
3.4.3…02…E̲n̲v̲i̲r̲o̲n̲m̲e̲n̲t̲a̲l̲ ̲C̲o̲n̲d̲i̲t̲i̲o̲n̲s̲

         In designing the equipment to meet the specified requirements
         no account need be taken of catastrophic events such
         as fire, flood, explosion, etc, which are beyond the
         control of an equipment manufacturer.

         The equipment will normally operate within accomodation
         suitable for the operation of similar equipment produced
         for commercial use.

         After initial adjustments have been made, the equiment
         shall maintain normal operation under all specified
         environmental and power supply conditions.



3.4.3.1 …02…T̲e̲m̲p̲e̲r̲a̲t̲u̲r̲e̲ ̲a̲n̲d̲ ̲H̲u̲m̲i̲d̲i̲t̲y̲

         The equipment shall continue to function when the humidity
         and temperature of its environment are within theranges
         and cycling specified below.

         The equipment shall continue to operate in a fully
         satisfactory manner even under the worst conditions
         specified below.

…02…a) T̲e̲m̲p̲e̲r̲a̲t̲u̲r̲e̲                      

…02……02…Range  :  10 to 40 deg.C
…02……02…Change :  max 10 deg.C per hour

…02…b) H̲u̲m̲i̲d̲i̲t̲y̲ ̲(̲R̲e̲l̲a̲t̲i̲v̲e̲ ̲H̲u̲m̲i̲d̲i̲t̲y̲ ̲=̲ ̲R̲H̲)̲

…02……02…Range  :  40 to 90% RH, non-condensing
…02……02…Change :  max. 6% RH per hour, non-condensing

…02…c) A̲l̲t̲i̲t̲u̲d̲e̲

…02……02…Range  :  Sea level to 2000 meter

         The equipment shall be so designed that the loss of
         sit air conditioning or heating will not cause a catastrophic
         failure within 15 minutes after the loss.

         An alarm indication shall be given, when the environmental
         temperature reaches a value which will require intervention
         of supervisory personnel.


3.4.3.2  D̲u̲s̲t̲,̲ ̲F̲u̲m̲e̲s̲

         The equipment shall be able to operate continuously
         and with normal scheduled preventive maintenance in
         the following air environment:

         a)  Ai̲r̲ ̲c̲l̲e̲a̲n̲n̲e̲s̲s̲

         Particle size            Max. allowable number
             (̲m̲i̲c̲r̲o̲n̲s̲)̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲(̲p̲a̲r̲t̲i̲c̲l̲e̲s̲/̲c̲u̲b̲i̲c̲m̲e̲t̲e̲r̲)̲

             greater than 5           4* (10 5)
             greater than 1.5         4* (10 6)
             greater than 1           4* (10 7)

         b)  F̲u̲m̲e̲s̲

             sulphur dioxide max. 14 pm.…86…1   …02… …02… …02… …02… …02… …02… …02… …02… …02… …02…      
                                                   
             T̲A̲B̲L̲E̲ ̲O̲F̲ ̲C̲O̲N̲T̲E̲N̲T̲S̲…01…S̲e̲c̲t̲i̲o̲n̲ ̲3̲.̲4̲.̲4̲



…02……02……02…3.4.4  Availability and Maintainability  ....  253
…02……02……02……02…3.4.4.1  General  .........................  253
…02……02……02……02…3.4.4.2  Reliability Characteritics  .....  253
…02……02……02……02…3.4.4.3  Availability Calculation  ........  253
…02……02……02……02…3.4.4.4  Availability and Reliability
                    Performance Requirements  ........  254
…02……02……02……02……02…3.4.4.4.1  User Connecting Point  .......  254
…02……02……02……02……02…3.4.4.4.2  Individul User Connecting
                        Points  ......................  255
…02……02……02……02……02…3.4.4.4.3  Groups of User Connecting
                        Points  ......................  255
…02……02……02……02……02…3.4.4.4.4  User Connecting Points to
                        Suervisory and Service
                        Terminals  ...................  255
…02……02……02……02……02…3.4.4.4.5  External Channels and
                        Circuits  ....................  256
…02……02……02……02……02…3.4.4.4.6  Individual Channels  .........  256
…02……02……02……02……02…3.4.4.4.7  Goups of Channels  ..........  256
…02……02……02……02……02…3.4.4.4.8  All Circuits, Channels and
                        User Connecting Points  ......  256

…02……02……02……02…3.4.4.5  Equipment Redundancy  ............  257
…02……02……02……02……02…3.4.4.5.1  Withdrawal of Redundant
                       Items  .......................  257
…02……02……02……02……02…3.4.4.5.2  Loss of Redundancy  ..........  258

…02……02……02……02…3.4.4.6  Specific Equipment Availability
                    Requirements  ....................  258
…02……02……02……02…3.4.4.7  Terms  ........................... 258…86…1         …02…  
 …02…   …02…   …02…                                             
4.       A̲v̲a̲i̲l̲a̲b̲i̲l̲i̲t̲y̲ ̲a̲n̲d̲ ̲M̲a̲i̲n̲t̲a̲i̲n̲a̲b̲i̲l̲i̲t̲y̲



4.1      G̲e̲n̲e̲r̲a̲l̲

         Availability and maintainability requirements apply
         to the equipment excluding environmental control equipment,
         primary powersupply to the equipment, and other purchaser
         supplied equipment.

         The equipment will meet the specified requirements:

         a)  When operating in a support environment which lies
              within the limits of the specified operating requirements
             of the equipmnt.

         b)  When tools, repair parts, manuals, manpower, etc.
             required for maintenance are available.

         In designing the equipment to meet the specified requirements
         no account need to be taken to catastrophic events
         such as fire, flood, explosion, et. which are beyond
         the control of the equipment manufacturer.

         The definitions of the terms used in this section are
         given in section 4.2.



3.4.4.2  R̲e̲l̲i̲a̲b̲i̲l̲i̲t̲y̲ ̲C̲h̲a̲r̲a̲c̲t̲e̲r̲i̲c̲t̲i̲c̲s̲

         The reliability of the equipment is specified in terms
         of its availbility. The equipment is partitioned into
         modules and units, which are used for construction
         of the R & M models and block diagrams. A separate
         analysis shall be conducted for each module performance
         requirement specified below.



3.4.4.3  A̲v̲a̲i̲l̲a̲b̲i̲i̲t̲y̲ ̲C̲a̲l̲c̲u̲l̲a̲t̲i̲o̲n̲

         The inherent availability of a module or unit shall
         be measured in terms of two parameters:

         - Mean time between failure (MTBF)

         - Mean time to repair (MTTR)


         The availability of a module or unit shall be determined
         from the formula

             Ai =      ̲ ̲ ̲ ̲ ̲M̲T̲B̲F̲i̲ ̲ ̲ ̲ ̲ ̲
                      MTBFi  +  MTTRi

         The availability value associated with each reiability
         performance requirements, specified in succeeding paragraphs
         of this section, shall be determined from a R&M model
         and block diagram by combining the availability co-efficients
         for the modules and units affecting that availability
         performace requirement. The availability co-efficient
         for a series configuration shall be calculated by:

                         elements ̲ ̲     
         A (system)=             ll Ai
                             i=1

         where Ai is the availability co-efficient of the i…09…th
         element.
         In the case of modules and units provided for the purpose
         of redundancy (e.g. duplicated units) the availability
         co-efficient shall be calculated by:

         a)  For (N-1) out of N redundancy is the availability
             for (N-1) out of N being operative:
                                                          …0f…MTTR…0e…
            
            A(N-1 out of N operative) = 1 - N * (N-1) * (------)…0e…2…0f…
                                                          …0e…MTBF…0f…
            

            wher MTTR   MTBF.

         b)  For other types of redundancy the availability
             shall be calculated using the R&M model. Assumptions
             made shall be justified.


3.4.4.4  A̲v̲a̲i̲l̲a̲b̲i̲l̲i̲t̲y̲ ̲a̲n̲d̲ ̲R̲e̲l̲i̲a̲b̲i̲l̲i̲y̲ ̲P̲e̲r̲f̲o̲r̲m̲a̲n̲c̲e̲ ̲R̲e̲q̲u̲i̲r̲e̲m̲e̲n̲t̲s̲



3.4.4.4.1    U̲s̲e̲r̲ ̲C̲o̲n̲n̲e̲c̲t̲i̲n̲g̲ ̲P̲o̲i̲n̲t̲

         The demarcation point between terminals and the equipment
         is the user connecting point.  The availability of
         service shall be measured at the user connecting point
         of the equipment, towhich each terminal is attached.


3.4.4.4.2    I̲n̲d̲i̲v̲i̲d̲u̲a̲l̲ ̲U̲s̲e̲r̲ ̲C̲o̲n̲n̲e̲c̲t̲i̲n̲g̲ ̲P̲o̲i̲n̲t̲s̲

         a)  The availability of the subset of the equipment
             which provides service to each user connecting
             point shall be at least .9995.

         b   The MTBF of a failure which causes loss of service
             to a single user connecting point shall be at least
             3 months with an MTTR not to exceed 40 mins.



3.4.4.4.3    G̲r̲o̲u̲p̲s̲ ̲o̲f̲ ̲U̲s̲e̲r̲ ̲C̲o̲n̲n̲e̲c̲t̲i̲n̲g̲ ̲P̲o̲i̲n̲t̲s̲

         It shall be possible to select user connecting poins
         in groups in such a way that no single failure shall
         cause loss of service to more than one such group.
         Within the expansion capacity specified in this document,
         the maximum number of user connecting points in such
         a group is 8.

         The equipment sall be designed such that no single
         failure can cause loss of service to 25% or more user
         connecting points.

         a)  The availability of the subset of the equipment
             at the maximum expanded configuration which provides
             service to 75% or more of the use connecting points
             shall be at least 0.9999.

         b)  The MTBF of a failure which causes loss of service
             to 25% or more user connecting points of the maximum
             expanded configuration shall be at least 1 year
             with an MTTR not to exceed 1 hour.



3.4.4.4. U̲s̲e̲r̲ ̲C̲o̲n̲n̲e̲c̲t̲i̲n̲g̲ ̲P̲o̲i̲n̲t̲s̲ ̲t̲o̲ ̲S̲u̲p̲e̲r̲v̲i̲s̲o̲r̲y̲ ̲a̲n̲d̲ ̲S̲e̲r̲v̲i̲c̲e̲ ̲T̲e̲r̲m̲i̲n̲a̲l̲s̲

         It shall be possible to divide the connecting points
         providing service to the terminals of the supervisory
         and service positions into more than one group.

         a)  The availability of the sbset of the equipment
             which provides service to any such group shall
             be at least 0.9999.


         b)  The MTBF of a failure which causes loss of service
             to such a group shall be at least 1 year with an
             MTTR not to exceed 1 hour.



3.4.4.4.5    E̲x̲t̲e̲r̲n̲a̲l̲ ̲C̲h̲a̲n̲n̲e̲l̲s̲ ̲a̲n̲d̲ ̲C̲i̲r̲c̲u̲i̲t̲s̲

         Aailability of service to external channels circuits
         shall be measured at the connection point of the equipment,
         to which each circuit is attached.



3.4.4.4.6    I̲n̲d̲i̲v̲i̲d̲u̲a̲l̲ ̲C̲h̲a̲n̲n̲e̲l̲s̲

         1)  The availability of the subset of the equipment
             which provides ervice to each incoming or outgoing
             channel shall be at least .9995.

         2)  The MTBF of a failure which causes loss of service
             to a single incoming or outgoing channel shall
             be at least 3 months with an MTTR not to exceed
             40 mins.



3.4.4.4.7    G̲r̲o̲u̲p̲s̲o̲f̲ ̲C̲h̲a̲n̲n̲e̲l̲s̲

         It shall be possible to divide outgoing channels and
         incoming channels each into at least two groups such
         that no single failure shall cause loss of service
         to more than one such group.

         a)  The availability of the subset of the equipent
             which provides service to any such group of external
             connections of the maximum configuration shall
             be at least 0.9999. The requirement shall be met
             separately for incoming and outgoing channels.

         b)  The MTBF of a failure which causes loss of ervice
             to any such group of external connections shall
             be at least 1 year with an MTTR not to exceed 1
             hour.



3.4.4.4.8    A̲l̲l̲ ̲C̲i̲r̲c̲u̲i̲t̲s̲,̲ ̲C̲h̲a̲n̲n̲e̲l̲s̲ ̲a̲n̲d̲ ̲U̲s̲e̲r̲ ̲C̲o̲n̲n̲e̲c̲t̲i̲n̲g̲ ̲P̲o̲i̲n̲t̲s̲

         No single failure shall cause a total system failure.


         a)  The availability of the subset of the equipment
             which provides service to all user connecting 
             points and external circuits shall be at least
             0.99995.

         b)  The MTBF of a failre which causes loss of service
             to all external circuits and user connecting points
             shall be at least 2 years with an MTTR not to exceed
             1 hour.



3.4.4.5  E̲q̲u̲i̲p̲m̲e̲n̲t̲ ̲R̲e̲d̲u̲n̲d̲a̲n̲c̲y̲



3.4.4.5.1    W̲i̲t̲h̲d̲r̲a̲w̲a̲l̲ ̲o̲f̲ ̲R̲e̲d̲u̲n̲d̲a̲n̲t̲ ̲I̲t̲e̲m̲s̲

         It is acceptable that redudant modules and units can
         be withdrawn from use by the operational configuration
         in order to perform:

         a)  Preventive maintenance

         b)  Execution of test programmes

         c)  Loading and check-out of new software

         d)  On-job training

         e)  Training/exercse with alternative procedures.

         provided that:

         -   a failure, while in the degraded availability state,
             shall not result in the loss of operational messages
             and transaction accountability.

         -   the capability is maintained to re-integrate such
             redndant items into the operational configuration
             and return them to service within 5 minutes.




3.4.4.5.2    L̲o̲s̲s̲ ̲o̲f̲ ̲R̲e̲d̲u̲n̲d̲a̲n̲c̲y̲

         With respect to redundant modules or units provided
         to meet the availability and reliability requirements,
         no failure shall result in the equipmentbeing without
         the complete planned degree of redundancy for longer
         than 6 hours more than once a year.



3.4.4.6  S̲p̲e̲c̲i̲f̲i̲c̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲ ̲A̲v̲a̲i̲l̲a̲b̲i̲l̲i̲t̲y̲ ̲R̲e̲q̲u̲i̲r̲e̲m̲e̲n̲t̲

         a)  The reliability requirements with respect to contractor
             supplied terminal equipment cnnected to the processor
             equipment shall be as follows:

             1)  M̲e̲d̲i̲u̲m̲ ̲S̲p̲e̲e̲d̲ ̲P̲r̲i̲n̲t̲e̲r̲

                 MTBF:          3000 hrs

                 Downtime:      not to exceed 30 mins. per month
                                excluding preventive maintenance.

             2)  V̲D̲U̲

                 MTBF:          5000hrs.

                 Downtime:      not to exceed 30 mins. per month
                                including preventive maintenance.



3.4.4.7  T̲e̲r̲m̲s̲

         In interpreting specification and verification sections
         in this paper on reliability and availability the following
         term shall apply:

         a)  A̲v̲a̲i̲l̲a̲b̲i̲l̲i̲t̲y̲. The probability of finding an item
             (system, module, unit and part thereof) in a functioning
             condition at a given time.

         b)  C̲o̲r̲r̲e̲c̲t̲i̲v̲e̲ ̲M̲a̲i̲n̲t̲e̲n̲a̲n̲c̲e̲. The maintenance undertaken
             to restore an item to a specified conditon after
             a failure has occurred.

         c)  D̲o̲w̲n̲ ̲T̲i̲m̲e̲. The time during which any of the facilities
             or functions to be provided by the item is not
             available, for whatever reason.


         d)  F̲a̲i̲l̲u̲r̲e̲. The inability of any item to carry out
             its specified function within the tolerance allowed
             under its normal operating conditions.

             Following failure situations shal be disregarded
             in availability calculation:

             1)  The item is or has been exposed to conditions,
                 which are not within the tolerances allowed
                 under its normal operating conditions.

             2)  The item is or has been exposed to violence.

         e)  I̲t̲e̲m̲. An iem is defined as system, module, unit
             and part thereof.

         f)  M̲e̲a̲n̲ ̲T̲i̲m̲e̲ ̲B̲e̲t̲w̲e̲e̲n̲ ̲F̲a̲i̲l̲u̲r̲e̲ ̲(̲M̲T̲B̲F̲)̲. The statistical
             mean of the functioning time between failures.
              For a given interval, the total measured functioning
             time of the item divided by the tota number of
             failures of that item during the interval.  Agreed
             scheduled preventive maintenance of modules of
             the equipment shall not be counted when estimating
             mean time between failure of such modules.

         g)  M̲e̲a̲n̲ ̲T̲i̲m̲e̲ ̲t̲o̲ ̲R̲e̲p̲a̲i̲r̲ ̲(̲M̲T̲T̲R̲)̲. The statistial mean
             of the distribution of times-to-repair.  The summation
             of active repair times during a given period of
             time divided by the total number of malfunctions
             during the same time interval.  This repair time
             shall include all actions required to dtect, locate
             and repair the fault.

         h)  P̲r̲e̲v̲e̲n̲t̲i̲v̲e̲ ̲M̲a̲i̲n̲t̲e̲n̲a̲n̲c̲e̲. The maintenance undertaken
             systematically with the intention of keeping an
             item in a specified condition, reducing the occurrence
             of failures, and prolonging the useful life of
             the equpment.

         i)  R̲e̲l̲i̲a̲b̲i̲l̲i̲t̲y̲. The probability that an item will
             perform a required function under stated conditions
             for a stated period of time.

         k)  R̲e̲p̲a̲i̲r̲. A repair is the restoration of an item
             to the state in which it can provide its specified
             functons.

             When the item is a replaceable module or includes
             replaceable modules, the exchange operation is
             considered as the repair operation.


         l)  M̲o̲d̲u̲l̲e̲. A collection of one or more units as defined
             in this section which satisfy the following conditions:

             1)  It has a functional significance in the context
                 of R&M.

             )   Individual failures can be localised to the
                 specific module.

             3)  The module is capable of removal and replacement.

             4)  The module operational condition has a simple
                 two state classification (operative or inoperative)
                 in the availability calcuation.

         m)  U̲n̲i̲t̲. This has an exclusively functional significance
             in this R&M context.  The smallest hardware or
             software element utilized in the Reliability and
             Maintainability (R&M) models.  The set of all units,
             taken together make up the equipmnt.  Each unit
             shall satisfy the following conditions:

             1)  It does not contain any portion of any other
                 unit.

             2)  The failure of the unit is independent of the
                 failure of any other unit.

             3)  The unit operational condition has a simple
                 two-stae classification (operative or in-operative)
                 in the availability calculation.

             4)  Corrective maintenance on failed redundant
                 parts of a unit is performed only when the
                 unit containing these parts has failed.








          T̲A̲B̲L̲E̲ ̲O̲F̲ ̲C̲O̲N̲T̲E̲N̲T̲S̲ ̲…01…S̲e̲c̲t̲i̲o̲n̲ ̲3̲.̲4̲.̲5̲



…02……02……02…3.4.5  Security  ............................  262
…02……02……02……02…3.4.5.1  TEMPEST Acceptance ...............  262
…02……02……02……02…3.4.5.2  Control of Record Otput  ........  267
…02……02……02……02……02…3.4.5.2.1  Print-Out  ...................  267
…02……02……02……02……02…3.4.5.2.2  Punched Paper Tape  ..........  267
…02……02……02……02……02…3.4.5.2.3  Removable Storage Media  .....  268

…02……02……02……02…3.4.5.3  Accountability of Transaction  ...  268
…02……02……02……02…3.4.5.4  Superisory Security Monitoring  .  268
…02……02……02……02…3.4.5.5  Terminal Access Control  .........  268
…02……02……02……02…3.4.5.6  Security Classification and
                    Special Handling  ................
  269
…02……02……02……02…3.4.5.7  System Design Requirements  ......  269




3.4.5    S̲e̲c̲u̲r̲i̲t̲y̲

         This section addresses or references all requirements
         related to security.

         In general: Transfer and transmission within the installation
         means transfer and trasmission between the components.



3.4.5.1  T̲E̲M̲P̲E̲S̲T̲ ̲A̲c̲c̲e̲p̲t̲a̲n̲c̲e̲

         The components of the CAMPS equipment in the CAMPS
         Main Site locations are divided in the following 3
         categories.

         1)  2 multi-bay EMI-rack assemblies containing: Processor
             Unit, Chanel Unit, TDX-Unit, Watch Dog Processor
             Unit, and Disk Drives.

         2)  A number of terminals for maintenance and supervisory
             positions, i.e. VDUs, medium speed printers and
             paper tape reader/puncher.

         3)  Frequency stabilizers and the auxiliary equipmet.

         During short periods of corrective and preventive maintenance
         e.g. open back doors, the emanation requirements below
         are degraded.

         It must be within the operational procedures, that
         the supervisor is currently informed on activities
         concernig corrective and preventive maintenance and
         thus is able to decide whether it is acceptable to
         continue operation or not.

         a)  To meet the NATO Security requirements, the equipment,
             including ancillaries and peripherals, must be
             installed in accordnce with criteria laid down
             in AMSG 719B. The production equipments shall be
             subject to inspection and testing by ACE COMSEC
             Radiation Team at the factory premises prior to
             despatch/distribution to locations. After installation,
             a final COMSEC Radition Survey will be carried
             out at each location prior to operational approval
             being given. Rectification of the equipment characteristics
             shortcomings shall be the responsibility of the
             contractor.…86…1         …02…   …02…   …02…   …02…                
                                         
         b)  Regarding of the EMI-racks, ACE COMSEC shall be
             provided with tangible evidence as to their effectiveness.
             Detailed design and manufacturing specification
             shall be forwarded o SHAPE for evaluation. Also,
             laboratory data on the shielding effectiveness
             of the rack shall be provided. Finally a Quality
             Plan shall be laid down to assure that all racks
             are manufactured to the same performance.

             ACE COMSEC has measured the mbient noise at the
             factory site at Ballerup and subject to provision
             of customer supplied power filtering accepted its
             suitability for TEMPEST test (ref. CAMPS log 091
             and CAMPS log 111). The actual TEMPEST test will
             be perfomed as a qualificationtest by ACE COMSEC
             at the factory site.

             1)  All equipment contained in multi-bay EMI-racks
                 assembly shall be TEMPEST cleared as a result
                 of the TEMPEST qualification test (equipment
                 of category 1 above). This shall include opto-electrical
                 interfaes.

             2)  Equipment of category 2 (terminals) will be
                 delivered with a TEMPEST clearance certification
                 according to AMSG720A with the understanding
                 that the cerfification provided will apply
                 to the standard approved version of the equipment.
                 Where odifications are required, supplementary
                 test data will be provided, to confirm that
                 the EMI integrity has been maintained.

             3)  Equipment of category 3 need not be TEMPEST
                 cleared.

             During the contract phase, technical information
             will be suppled to ACE COMSEC for evaluation and,
             where required, a production model shall be delivered
             for testing purposes.…86…1         …02…   …02…   …02…   …02…      
                                                   
         c)  S̲p̲e̲c̲i̲a̲l̲ ̲e̲a̲r̲t̲h̲i̲n̲g̲ ̲a̲r̲r̲a̲n̲g̲e̲m̲e̲n̲t̲s̲ with respect to 1)
             AC power neutral, 2) safety ground, 3) Signalling
             and control ground are necessary within the complete
             system in order to comly with criteria laid down
             in AMSG 719B. In the terminal equipments signal
             common returns s̲h̲a̲l̲l̲ ̲b̲e̲ ̲s̲e̲p̲a̲r̲a̲t̲e̲ ̲a̲n̲d̲ ̲i̲n̲s̲u̲l̲a̲t̲e̲d̲
             ̲f̲r̲o̲m̲ ̲a̲l̲l̲ ̲o̲t̲h̲e̲r̲ ̲e̲a̲r̲t̲h̲s̲ or metal chassis (this includes
             protective earth which is usually derived from
             the station's main supply.

         d)  All electrical interconnections for data between
             the equipments will use low level keying systems,
             i.e. 6-0-6 volts at currents less than one milli-ampere.
             All the remaining control lines should conform
             to CCITT Recommendation V28.

             In speial cases where a line current of more than
             one milli-ampere is felt necessary then the contractor
             must submit his specific proposal for approval
             by ACE COMSEC.

         e)  All electrical wiring on the red side shall be
             run in a screened cable, consistingof twisted pairs
             and an overall continuous n̲o̲n̲-̲f̲e̲r̲r̲o̲u̲s̲ ̲s̲c̲r̲e̲e̲n̲.

             When installed, the cable will carry classified
             information in telegraph and data form in the clear
             text and must have been approved for this purpose
             by the NATO Communications Securty Authority.

             The cables must receive COMSEC approval before
             installation. Cable specifications and sample lengths
             of not less than three metres shall be supplied
             to A̲C̲E̲ ̲C̲O̲M̲S̲E̲C̲ for approval prior to installation.

             1)-7) below lists the specifiations, which should
             be used for selection of the cable.

             1)  C̲a̲b̲l̲e̲

             The cable shall contain 12 stranded conductors
             in PVC insulated cores with a single collective
             copper braid screen and overall PVC insulation.


             It shall conform to the following parameters:

                 1)  Number of strands in each conductor 7
                 2)  Diameter of wires in core            0.2
                     mm nominal
                 3)  Thickness of core inslation         0.3
                     mm nominal
                 4)  Overall diameter of cable minimum    6.6
                     mm
                                               maximum    7.2
                     mm…86…1         …02…   …02…   …02…   …02…                 
                                                
                 5)  Capacitance, wire to wire, and each
                     wire to sheath                       50
                     pF/metre max.

             2)  C̲o̲n̲d̲u̲c̲t̲o̲r̲s̲

             There shall be no kinks, broken wires or other
             irregularites in the conductors.

             The PVC insulation is to be extruded on to the
             conductors.

             3)  S̲c̲r̲e̲e̲n̲

                 The screen shall be of braided construction
                 and shall be formed of uniformly tinned copper
                 wires.

                 The screen shall be close fitting but it shal
                 be possible to slide back the screen by hand.

                 There shall be not more than one break in the
                 wires from any individual bobbin in any 25
                 mm length of cable.

                 There will be no joints in the complete braid.

                 The filling factor shall be not lss than 0.7.

             4)  C̲o̲n̲s̲t̲r̲u̲c̲t̲i̲o̲n̲

                 A polyester film not thicker than 0.025 mm
                 shall be applied over the laid up cores in
                 such a manner that each turn of the tape shall
                 overlap the preceding turn by at least 15%.

                 Successive layers of cores shal be laid up
                 in the same direction with the layer short
                 enough to ensure reasonable flexibility to
                 the cable.

                 PVC filling may be used to assist in obtaining
                 a circular formation to the cable.

                 Overall insulation shall be of black PVC and
                 be fee from inclusion and extrusion defects.

                 The sheath shall be easily removable from the
                 other component parts of the cable.

                 Colour coding shall be used for identification
                 of conductors.…86…1         …02…   …02…   …02…   …02…         
                                                    
             5)  E̲n̲v̲i̲r̲o̲n̲m̲e̲n̲t̲a̲l̲

                 The cable shall meet the following environmental
                 conditions:

                     Installation and operation:   0 C to 40
                     C, RH 10% - 88%
                     Storage and transportation: -0 C to 55
                     C, RH 10% - 98%

             6)  I̲n̲s̲u̲l̲a̲t̲i̲o̲n̲

                 The completed cable, in the dry state, shall
                 withstand for 1 min 1000 V rms. at 50 Hz applied
                 between all of the conductors connected together
                 and the screen.

             7)  P̲a̲c̲k̲a̲g̲i̲n̲g̲ ̲a̲n̲d̲ ̲M̲a̲r̲k̲i̲n̲g̲

                 The cable hall be delivered on disposable drums.

                 Each drum shall carry 500 meters (+/-5%) of
                 cable in one piece and both ends of the cable
                 shall be suitably sealed to prevent the ingress
                 of moisture.

                 Each drum shall carry a printed label containing,
                 s a minimum, the following data:

                 1)  NATO Property
                 2)  12W cable. CAMPS project
                 3)  500 metres
                 4)  Date of manufacture (month and year)
                 5)  NATO stock number

         f)  Installation of optical fibers shall be in accordance
             with AMSG 719B.

         g)As-built drawings and all circuit diagrams of the
         first operational system, and similar material for
         any variations in subsequent system to be delivered,
         showing all electrical interfaces and voltages, shall
         be supplied to ACE COMSEC before factoryinspection.

         h)  To assist in the assessment of physical security
             and guarding of classified information, a list
             of all items of equipment which will store, display
             or record classified information shall be supplied
             to ACE COMSEC by the contractor,both local and
             remote. From the list, an assessment will be made
             for physical security in accordance with AMSG 293D.…86…1
                     …02…   …02…   …02…   …02…                             
                            
         i)  Installation work will be witnessed by local COMSEC
             staff to ensure that all installation conforms
             to COMSEC requirements.

         j)  External traffic circuits connected to the cenral
             processor will normally be equipped with on-line
             synchronous cryptographic equipment to be supplied,
             installed and maintained by the purchaser.

         k)  The central processor will be installed in an area
             designated as a Red Area. Within the Red Are classified
             information may be handled in plain language; the
             transfer of information in an electrical form within
             this area shall be subject to and comply with the
             criteria laid down in AMSG 719B.

         l)  The crosstalk attenuation between any circui carrying
             classified information and any other circuit within
             the installation shall be not less than 100 dB.

         m)  Send and receive data circuits and release pulse
             circuits shall be capable of producing or interpreting
             signals when the pulse shape s such that the rise
             and fall times, defined as the time required for
             the voltage to rise or fall to 80% of its peak-to-peak
             value, shall be within 5% to 15% of the unit interval
             at the applicable modulation rate. Transitions
             in both directions shal be approximately equal
             with these limits and be equally affected by shunt
             capacitance. Pulse forms shall exhibit smooth exponential
             curves and contain no points of inflexion during
             reversals.

         n)  On send circuits the pulse form shall be measuredat
             the line tag blocks at the Patch Test and Monitor
             Facility. Limits shall be met at this reference
             plan with the circuits terminated with a 5000 and
             7000 ohm resistive load for the tests and repeated
             with an additional shunt capacitance of 2500 pcofarads.

         o)  The power supply to all the equipment in the Red
             Area will enter via a filter or a group of filters
             which will be supplied by the purchaser. The function
             of these filters is to ensure that no compromising
             signals are able to reach a lack Area via the power
             supply leads. The equipment shall function satisfactorily
             with these filters present in the power leads.


         p)  The design of any maintenance facility shall incorporate
             suitable security features which as a minimum shall
             prevent:

             1)  B̲y̲p̲a̲s̲s̲i̲n̲g̲ ̲t̲h̲e̲ ̲E̲n̲c̲r̲y̲p̲t̲i̲o̲n̲ ̲D̲e̲v̲i̲c̲e̲

                 Any test proceure incorporating the bypassing
                 of the Data Encryption Devices and Isolators
                 shall include a positive hardware feature which
                 prevents the simultaneous bypassing of the
                 Panel Switching Equipment and the connection
                 of the DCE to an external telephoneline.

             2)  I̲n̲a̲d̲v̲e̲r̲t̲e̲n̲t̲ ̲C̲o̲n̲n̲e̲c̲t̲i̲o̲n̲ ̲o̲f̲ ̲R̲e̲d̲ ̲a̲n̲d̲ ̲B̲l̲a̲c̲k̲ ̲W̲i̲r̲i̲n̲g̲

                 The test and patching facilities shall be designed
                 so that there is no possibility of inadvertently
                 connecting red and black wiring.



3.4.5.2  C̲o̲n̲t̲r̲o̲l̲ ̲o̲f̲ ̲R̲e̲c̲o̲r̲d̲ ̲O̲u̲t̲p̲u̲t̲

         To facilitate ontrol, procedures shall be implemented
         which provide means for identification of:

         1)  Print out
         2)  Punched paper tapes
         3)  Removable storage media



3.4.5.2.1    P̲r̲i̲n̲t̲-̲O̲u̲t̲

         Print-out shall carry document control number as defined
         in section 3.2.37.2.



3.4.5.2.2    P̲u̲n̲c̲h̲e̲d̲ ̲P̲a̲p̲e̲r̲ ̲T̲a̲p̲e̲

         Messages punched out shall be preceeded by 20 cms blank
         tape and succeeded by 30 cms blank tape. A document
         control number shall be punched in front of the message
         punched out. (The number consists of 4 digits.




3.4.5.2.3    R̲e̲m̲o̲v̲a̲b̲l̲e̲ ̲s̲t̲o̲r̲a̲g̲e̲ ̲m̲e̲d̲i̲a̲

         a)  Units of removable storage such as a removable
             disk pack shall be controlled logically by the
             supervisor.

         b)  Logically controlled means tat the supervisor shall
             have commands available to control the removable
             media after it has been physically mounted. Logically
             controlled is as opposed to physical control, which
             in principle can be performed by anyone having
             physical access to thediskdrive.

         c)  The following procedures are implemented (refer
             to supervisory functions, (section 3.2.4.  1.1.11).

             1)  Unit identification
             2)  Removal of previous stored information
             3)  Action on loading a unit for retrieval purposes
             4)  Unitdirectory
             5)  Display/print-out of stored information



3.4.5.3  A̲c̲c̲o̲u̲n̲t̲a̲b̲i̲l̲i̲t̲y̲ ̲o̲f̲ ̲T̲r̲a̲n̲s̲a̲c̲t̲i̲o̲n̲s̲

         Requirement related log and statistical information
         to be complied by the system are given in sections
         3.2.5 and 3.2.6 respectively.


3.4.5.4  S̲u̲p̲e̲r̲v̲s̲o̲r̲y̲ ̲S̲e̲c̲u̲r̲i̲t̲y̲ ̲M̲o̲n̲i̲t̲o̲r̲i̲n̲g̲

         All requirements related to supervisory security monitoring
         are specified in detail in section 3.2.4.1.1.5.



3.4.5.5  T̲e̲r̲m̲i̲n̲a̲l̲ ̲A̲c̲c̲e̲s̲s̲ ̲C̲o̲n̲t̲r̲o̲l̲

         All requirements related to terminal access control
         are specified in detail n section 3.2.3.2.




3.4.5.6  S̲e̲c̲u̲r̲i̲t̲y̲ ̲C̲l̲a̲s̲s̲i̲f̲i̲c̲a̲t̲i̲o̲n̲ ̲a̲n̲d̲ ̲S̲p̲e̲c̲i̲a̲l̲ ̲H̲a̲n̲d̲l̲i̲n̲g̲

         The classification applicable to CAMPS are the NATO
         classifications specified below:

         -   COSMIC TOP SECRET
         -   NATO SECRET
             NATO CONFIDENTIEL
         -   NATO RESTRICTED
         -   NATO UNCLASSIFIED

         S̲p̲e̲c̲i̲a̲l̲ ̲H̲a̲n̲d̲l̲i̲n̲g̲

         The number of special handling designators shall be
         as specified in section 3.4.1.1.1.

         The following designators applies:


         S̲P̲E̲C̲I̲A̲L̲ ̲C̲A̲T̲E̲G̲O̲R̲Y̲ ̲W̲A̲R̲N̲I̲N̲G̲S̲           D̲E̲S̲I̲G̲A̲T̲O̲R̲

         ATOMAL  ..............................  L
         EXCLUSIVE  ...........................  P
         CRYPTO SECURITY  .....................  Y
         DATA MESSAGE  ........................  D

         Other, e.g. for exercise traffic may be specified up
         to the maximum.


3.4.5.7  S̲y̲s̲t̲e̲m̲ ̲D̲e̲s̲i̲g̲n̲ ̲R̲e̲q̲u̲i̲r̲e̲m̲e̲n̲t̲s̲

         In this section requirements with respect to hardware
         and software aspects of equipment design are given.

         a)   H̲a̲r̲d̲w̲a̲r̲e̲

             1)  A clean architectural design where unassigned
                 codes must cause a trap.

             2)  Memoy bound mechanisms shall exist. The MAP
                 module prevents programs from being able to
                 write in memory occupied by the operating system
                 or by other application programs.

                 Attempt to illegally access occupied data areas
                 shall give rise to a warning o the supervisor.


             3)  Two classes of instructions, one for the privileged
                 use of the operating system and a user mode
                 used by both operating system and application
                 programs  shall exist.

                 A se of privileged instructions exclusively
                 reserved for the operating system. These instructions
                 must control all I/O, the setting of memory
                 bounds mechanism, the setting of the system
                 state - privileged or user problem.

                 Sensitive instructions whih could divert, disrupt
                 or inadvertently change the state of the application
                 software provided with CAMPS shall not be available
                 for execution unless the processor is in a
                 "privileged" state.

             4)  Every instruction code shall result in a prescribe
                 action. The occurence and/or attempted execution
                 of any illegal code or bit-pattern shall be
                 signalled and shall result in an abort procedure.

             5)  Key switches shall be provided on all VDU's
                 and medium speed teleprinters.

             6)  A read/write memoy erase function feature shall
                 be provided. HW/SW techniques must be available
                 to the accomplishment of this function.

             7)  All hardware shall be individually addressable
                 by the computer.

         b)  S̲o̲f̲t̲w̲a̲r̲e̲

             The following software features shall be povided:

             1)  All programmes and data files loaded into the
                 system shall carry block parity check sums
                 to allow the detection of corrupted data.

             2)  Access to CAMPS data files shall be made through
                 system calls which pass through the authorisatio
                 mechanism.

             3)  Recovery procedures after system failure shall
                 include checksumming of the operating system
                 software, reloading if this is necessary.


             4)  The supervisor shall have facilities to cause
                 a system integrity check (i.e. checksumming
                 of system software) to be performed at any
                 time he sees fit. This shall be done witout
                 disrupting the functioning of the system.

             5)  To the extent possible, the operating system
                 shall run in the non-privileged user state.…86…1
                         …02…   …02…   …02…   …02…                         
                                    
3.5      D̲E̲S̲I̲G̲N̲ ̲A̲N̲D̲ ̲C̲O̲N̲S̲T̲R̲U̲C̲T̲I̲O̲N̲ ̲R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲S̲



3.5.1    G̲e̲n̲e̲r̲a̲l̲

         The following section defines the general design and
         construction requirements applicable to CAMPS.



3.5.1.1  E̲q̲u̲i̲p̲m̲e̲t̲ ̲P̲r̲o̲d̲u̲c̲e̲d̲ ̲b̲y̲ ̲C̲h̲r̲i̲s̲t̲i̲a̲n̲ ̲R̲o̲v̲s̲i̲n̲g̲ ̲A̲/̲S̲

         a)  The CR produced equipment is designed and produced
             according to CR standard.

         b)  This standard is based on the following NATO standards:

             1)  NGTS 45   General Manufacturing Requirements.

             2)  NGTS 50   Dsign, Construction and Installation
                 
                           Criteria for electrical and electronic
                           material.

             3)  NGTS 40   Environmental Test Methods.

         c)  CR standards are currently updated in order to
             incorporate improvements in technology.

         d   Maintenance of CR standards are performed under
             configuration management and supervised by CRs
             Quality Assurance department.

         e)  All standards and their maintenance may be inspected
             by customers Quality Assurance Representative.



3.5.1.2  E̲q̲u̲i̲p̲m̲n̲t̲ ̲P̲r̲o̲d̲u̲c̲e̲d̲ ̲b̲y̲ ̲S̲u̲b̲c̲o̲n̲t̲r̲a̲c̲t̲o̲r̲s̲

         a)  The sub-contractor supplying equipment to CAMPS
             may propose the use of other standards, on condition
             that adequate documentary evidence is provided
             to demonstrate that the alternative standards are
             at least equivaent in scope and depth of coverage
             to this requirement section.


         b)  These proposals, if made, will take the form of
             formal contract change proposals. They will not
             be undertaken prior to contracting officer approval.
             If the contracting officer oes not approve, such
             proposals shall not be implemented.



3.5.1.3  P̲r̲o̲d̲u̲c̲t̲s̲ ̲F̲r̲o̲m̲ ̲O̲t̲h̲e̲r̲ ̲S̲u̲p̲p̲l̲i̲e̲r̲s̲

         a)  Equipment supplied by OEMs not quoted as sub-contractors
             - i.e. standard equipment from stock - is chosen
             in accordance with the requirements stted compared
             to the specification given by the OEMs.

         b)  Quality Assurance shall check and ensure that the
             quality of such equipment fulfill all requirements
             in respect of:

             1)  performance (in accordance with specifications
                 given by manufacturer

             2)  durability

             3)  stability under extreme working condition

             4)  maintainability



3.5.2    S̲p̲e̲c̲i̲a̲l̲ ̲R̲e̲q̲u̲i̲r̲e̲m̲e̲n̲t̲s̲ ̲f̲o̲r̲ ̲t̲h̲e̲ ̲C̲A̲M̲P̲S̲ ̲S̲y̲s̲t̲e̲m̲

         a)  In this section is mentioned a number of requirements
             special for the CAMPS project.

         b)  In case of conlict with the standards mentioned
             in 3.5.1 above, the following standards shall supersede.



3.5.2.1  E̲n̲v̲i̲r̲o̲n̲m̲e̲n̲t̲a̲l̲ ̲T̲e̲s̲t̲i̲n̲g̲

         The methods of NGTS 40 shall be used for environmental
         testing where they are applicable to CAMPS requirements.


         As testing limits shall be used the appropriate environmental
         characteristic from section 3.4.3.



3.5.2.2  U̲t̲i̲l̲i̲t̲y̲ ̲O̲u̲t̲l̲e̲t̲ ̲S̲o̲c̲k̲e̲t̲s̲

         Utility outlet sockets for the operation of tet equipment
         etc. shall be located in close proximity to all major
         racks or cabinets. Installation of utility outlets
         will be the responsibility of purchaser.



3.5.2.3  M̲a̲t̲e̲r̲i̲a̲l̲s̲

         Materials used for encapsulation and embedment shall
         be selected fo their electrical, operational, environmental
         and storage characteristics. Hard curing compounds
         to hold replaceable parts are prohibited. (Parts soldered
         to terminals, printed wiring boards etc. are not considered
         replaceable in this context).



.5.2.4   I̲n̲t̲e̲r̲c̲h̲a̲n̲g̲e̲a̲b̲i̲l̲i̲t̲y̲

         a)  Modular hardware construction should be used wherever
             feasible.

         b)  The items shall be designed to use the minimum
             number practicable of the different types of electrical
             cable, connectors, component and accessories.
         c)  Electrically identical units, assemblies, subassemblies
             and replaceable parts shall be physically interchangeable
             without modification of such items or of the equipment.

         d)  Interchangeable items shall be as defined in specifications,
             drawing, and/or documentation to permit their installation
             as interchangeable units, assemblies, subassemblies,
             and parts without regard to the source of manufacture
             or supply.


         e)  Provision shall be made for design tolerances such
             that items having the dimensions and characteristics
             permitted by the item specification may be used
             as replacement without slection or departure from
             the specified equipment performance.



3.5.2.5  B̲e̲n̲c̲h̲ ̲H̲a̲n̲d̲l̲i̲n̲g̲

         Smaller assemblies and sub-assemblies normally subject
         to bench repair shall be capable of withstanding being
         dropped onto a hard surface on all faces from a30…0e…o…0f…
         angle, using any one edge of the unit as a pivot, without
         any physical, electrical or electronic damage.



3.5.2.6  C̲o̲v̲e̲r̲ ̲P̲l̲a̲t̲e̲s̲

         Cover plates shall have a minimum of fasteners consistent
         with normal mechanical strength requirements. All suc
         fasteners should preferably be of the "captive" type.



3.5.2.7  C̲a̲b̲l̲i̲n̲g̲ ̲a̲n̲d̲ ̲F̲i̲t̲t̲i̲n̲g̲s̲

         For wiring and cabling the following shall apply:

         a)  Where inter-connecting cabling between assemblies
             is run in steel conduit or in shielded cables,
             electrial continuity of the conduit or shielding,
             as appropriate, shall be ensured to permit the
             correct grounding.

         b)  Wiring shall be identified by colour coding, numbering,
             or by other feasible means such as marking of terminals
             at both ends of lead. ll wires shall carry corresponding
             identification numbers at each end. Colour coding
             for chassis wiring shall be comforming to good
             engineering practice.

         c)  Where bus bars are used for interconnection between
             assemblies and subassemblies they maybe colour
             coded to permit quick identification.


         d)  Cables and wires or similar connectors shall carry
             a CR parts number. These numbers shall be the same
             numbers as given in the as-built drawings and in
             the maintenance and operaing manuals.



3.5.2.8  F̲l̲u̲x̲ ̲a̲n̲d̲ ̲S̲o̲l̲d̲e̲r̲i̲n̲g̲



3.5.2.8.1    F̲l̲u̲x̲

         Rosin fluxes conforming to recommended engineering
         practices shall be used for making electrical electronic
         connections. For fluxing purposes, a soldered joint
         the functions of which ar both a mechanical and an
         electrical connection (for example in grounding applications
         through a chassis) shall be considered an electrical
         connection.



3.5.2.8.2    S̲o̲l̲d̲e̲r̲i̲n̲g̲

         All soldered connections shall be clean and smooth
         in appearance. Suffiient solder shall be used to ensure
         a continuous strong concave fillet feathered into the
         base metals. Flux or other foreign residue must be
         removed. The insulation of soldered wires shall not
         show damage from the heat of the soldering operation.
         Dscolouration is permitted, but not charring, cracking,
         decomposition and distortion.



3.5.2.9  V̲e̲n̲t̲i̲l̲a̲t̲i̲o̲n̲ ̲a̲n̲d̲ ̲C̲o̲o̲l̲i̲n̲g̲

         a)  Intake cooling air, if considered necessary, shall
             be filtered such that the pressure within the associated
             cabinet is highr than the ambient pressure outside.
             The cooling air should preferably be exhausted
             to the atmosphere at the top of the cabinet.


         b)  Resonance effects and vibrations because of the
             ventilation and cooling shall not cause any deterioration
             of equipment performance.

         c)  The distributed cooling systems in the R produced
             equipment may be supplied with air filters of a
             nominal thickness of 2.5 cm.



3.5.2.10  E̲l̲e̲c̲t̲r̲o̲m̲a̲g̲n̲e̲t̲i̲c̲ ̲C̲o̲m̲p̲a̲t̲i̲b̲i̲l̲i̲t̲y̲

         a)  When installed the electromagnetic radiation of
             the equipment shall comply with the COMSEC requirements
             as descrbed in AMSG 720 A and in para. 3.4.5 of
             this specification.

         b)  When installed the different units, assemblies,
             and subassemblies shall be able to perform as intended
             in the presence of electromagnetic radiation from
             other parts of CAMPS. Furthermre, they shall be
             able to function in a radiation environment from
             other system within the limits specified in 3.5.2.10.a
             above.



3.5.2.11 T̲e̲s̲t̲ ̲a̲n̲d̲ ̲R̲e̲p̲a̲i̲r̲



3.5.2.11.1   A̲c̲c̲e̲s̲s̲i̲b̲i̲l̲i̲t̲y̲

         a)  Connections to parts inside removable container
             shall be alowed to run through the container by
             threading provided the container has a very low
             failure rate.

         b)  Only chassis and assemblies contained within cabinets
             or consoles shall be mounted on withdrawal slides
             if they require removal or replacement uring normal
             maintenance and repair actions.

         c)  Plug-in boards and modules shall be provided with
             a suitable removal tool, if they are not equipped
             with build-in ejectors/extractors.




3.5.2.11.2   T̲e̲s̲t̲p̲o̲i̲n̲t̲s̲

         a)  Testjacks can be of the banana plug type.

         b)  Test points/tracing points for monitoring voltage/currents
             and measuring/injecting signals/wave forms shal
             only be provided to the extent they form part of
             the maintenance/repair concept.



3.5.2.12 C̲o̲n̲s̲u̲m̲a̲b̲l̲e̲ ̲P̲a̲r̲t̲s̲ ̲

         All fluids, life limited parts, and any other comsumable
         parts required for continuous operation of the equipment
         shall be kept to a mnimum both in number and quantities
         required.



3.5.2.13 S̲a̲f̲e̲t̲y̲

         All necessary safeguards shall be taken during the
         design, development, production and installation of
         the equipment to ensure safety of operating and maintenance
         personnel from eletrical and mechanical hazards.



3.5.2.13.1   R̲e̲g̲u̲l̲a̲t̲i̲o̲n̲s̲

         a)  The actual site installations in the different
             host nations shall be made in accordance with the
             appropriate National Safety Regulations of the
             country concerned according to installatio drawings
             as approved by the purchases.

         b)  The equipment itself and its associated power cabling
             shall comply with the National Safety Regulations
             of the country of origin for the equipment.



3.5.2.13.2   P̲e̲r̲s̲o̲n̲n̲e̲l̲ ̲S̲a̲f̲e̲t̲y̲

         a)  Interlocks or key lcks shall be incorporated where
             appropriate to prevent any major assembly carrying
             high tension voltages from being opened by unauthorised
             personnel.


         b)  With the equipment assembled and set up for operation,
             personnel shall be protected from contact with
             potentials in excess of 30 volts to ground, chassis
             or frame, including poentials or charged capacitors.

         c)  Relevant notice and markings on equipment or documents
             are to be provided to draw the attention of operating
             and maintenance personnel to points where dangerous
             voltages may be encountered.

         d)  Where a voltage o 50 or more volts is exposed during
             the maintenance activities a suitable warning shall
             be provided. It should be made according to the
             following principles:

             1)  "DANGER (xxx) VOLTS WHEN COVER REMOVED" (in
                 aluminium or white lettering l.5 cm highon
                 a red background) where (xxx) is the nominal
                 voltage.

             2)  "DANGER HIGH VOLTAGE (xxx) VOLTS" where (xxx)
                 is the nominal voltage.

             3)  "CAUTION (xxx) VOLTS. DISCONNECT POWER BEFORE
                 REMOVAL OF COVER" where (xxx) is the nominal
                 voltage.



3.5.2.3.3    E̲q̲u̲i̲p̲m̲e̲n̲t̲ ̲S̲a̲f̲e̲t̲y̲

         a)  Circuit breakers or switches which operate to make
             or break AC power lines shall make or break all
             conductors at the same time. The neutral wire in
             three-phase circuits shall not pass through any
             fuse.

         b)  Fuses and circut breakers shall be provided within
             the equipment as required for protection of the
             equipment from damage due to overload. Each major
             assembly shall be individually protected so that
             a fault in one major assembly cannot damage any
             other major assemly.

         c)  All fuses and circuit breakers should be located
             such that they are readily accessible. Fuses shall
             incorporate a visual system of failure indication.




3.5.2.13.4   G̲r̲o̲u̲n̲d̲i̲n̲g̲

         a)  The grounding system shall provide effective protection
             for personnel and material against insulation defects.
             It shall be arranged so that there are thre separate
             and isolated ground circuits, namely:

             1)  AC power neutral
             2)  Equipment frame ground
             3)  Signalling and control ground
             
         b)  The AC power neutral shall provide a return for
             the primary current so that the equipment frame
             ground is ued only to establish a safety ground
             and is not used as a normal current grounding element.
             No place in the equipment or power filters shall
             the AC power neutral be connected directly to equipment
             frame ground.

         c)  All panels, drawers and other su-assemblies, whether
             fixed or removable, shall be fastened, or connected
             to the associated frame, in a manner that ensures
             they are securely grounded.

         d)  The signalling and control ground is to be routed
             via the interconnecting wires and cables a appropriate.



3.5.2.14 N̲a̲m̲e̲p̲l̲a̲t̲e̲s̲ ̲a̲n̲d̲ ̲P̲r̲o̲d̲u̲c̲t̲ ̲M̲a̲r̲k̲i̲n̲g̲

         A nameplate giving the serial number, SHAPE contract
         number, date of manufacture, manufacturers name and
         address and principal characteristics, where appropriate,
         shall be attached in a proinent position on each major
         assembly.




3.5.2.15 C̲o̲n̲t̲r̲o̲l̲s̲

         The type and layout of controls shall be such as to
         avoid an interruption of service or change of operational
         mode as a result of accidental bumping, touching o
         catching of clothing.



3.5.2.16 A̲c̲o̲u̲s̲t̲i̲c̲ ̲N̲o̲i̲s̲e̲

         The maximum sound level due to noise emitted from the
         equipment shall be less than 70 dB (A) when measured
         under free field conditions by a precision sound level
         meter located at a point 2 meters istant from the noise
         source, and at the height at which the maximum reading
         of the meter is obtained. The measuring instrument
         shall be in accordance with IEC publication 179 second
         edition 1973.

         The contents of 3.5.3 to 3.5.10 of issue 1 is conained
         3.5.1 and 3.5.2 in sunsequent issues.



3.5.11   S̲o̲f̲t̲w̲a̲r̲e̲ ̲E̲n̲g̲i̲n̲e̲e̲r̲i̲n̲g̲ ̲R̲e̲q̲u̲i̲r̲e̲m̲e̲n̲t̲s̲



3.5.11.1     S̲y̲s̲t̲e̲m̲s̲ ̲P̲r̲i̲n̲c̲i̲p̲l̲e̲s̲

         Fundamental properties of the software which shall
         be considered in depth during the design, development
         and production are it quality, integrity and flexibility.
         The software shall meet the operational requirements
         together with the requirements for ease of maintenance
         and modification. The software shall be structured
         in a clearly identifiable hierarchical way to ensurethat
         the integrity and reliability requirements of this
         specification are met. At the same time it shall be
         readily expandable and must provide the facilities
         specified below in such a way that the tasks of future
         modification, error elimination an maintenance are
         facilitated.

         a)  The software shall be provided as a complete, well
             structured system consisting of three s̲u̲b̲-̲s̲y̲s̲t̲e̲m̲s̲:̲


             1)  The system software comprises all the software
                 (i.e. the program code, permanent data, pre-set
                 work space, etc.) which is required to be resident
                 in or accessible to the syste during its operation.
                 The system software shall provide the services
                 to the applications software.

             2)  The support software comprises all off-line
                 software required to support the implementation,
                 modification, testing and maintenance of the
                 opertional system.

             3)  The applications software is defined as the
                 software providing the functional capabilities
                 called for in this specification.

         b)  The software, in conjunction with the hardware,
             shall be designed to detect and limit the effect
             f hardware faults which occur in the system. Upon
             detection of the fault, action should be taken
             to:

             1)  Report the fault.

             2)  Optimize the remaining system operational capabilities
                 while the fault persists.

         c)  The system design shall seek tomaintain maximum
             isolation and independence between units of all
             types during program design and implementation
             and during on-line operation of the system. Facilities
             shall be provided by the hardware/software structure
             to enforce the isolation beteen modules during
             system run-time such as detection of program access
             to an incorrect area of memory, or attempts to
             make use of a machine facility to which it should
             not have access.

         d)  In the construction of program code, clarity of
             meaning shll be a major consideration. When writing
             the program code comments shall be inserted to
             aid comprehension and improve the readability.

         e)  It is mandatory that no instruction and constants
             of the system software are modified during execution.
             If t is done the circumstances must be well documented
             and the program listing must contain complete cross-referencing
             comments. In the applications software the use
             of this technique shall be unacceptable.


         f)  The data areas of a module shall be logically contiguous
             and all exchange of data between different modules
             shall take place either through well defined shared
             data areas or bya parameter passing.

         g)  The minimum program language requirements for the
             software is an assembly language providing relocatable
             code, symbolic addressing, and a sub-routine or
             procedure concept. A macro facility is desirable
             but not mandatory. Te use of a high level language
             is highly desirable for application programs and
             desirable for system software.

         h)  The software shall be carefully documented in parallel
             to the design during the production phase. The
             documentation shall form part f the deliverable
             software package and conform to the software documentation
             standards specified elsewhere in this document.



3.5.11.2 S̲y̲s̲t̲e̲m̲ ̲S̲o̲f̲t̲w̲a̲r̲e̲

         a)  The system software facilities must allow the applications
             software to be structured in tems of functional
             modules.

         b)  The system software shall include the following
             general facilities in some form:

             1)  Multi-programming and scheduling at run time,
                 i.e. the provision of a set of processes or
                 equivalent entities as the basic entitie to
                 which processor time, store and other system
                 resources are allocated at run time.

             2)  Store management, i.e. facilites for permanently
                 or dynamically allocating areas of core store
                 and backing store to processes or their equivalents
                 in a secue manner; for initializing data areas
                 securely when required; and for obtaining permanent
                 or dynamic access to such areas when required;
                 for ensuring the secure duplication of data
                 when required.


             3)  Device control and interrupt response, i.e.
                 standardized interfaces between hardware devices
                 (including traffic channels) and applications
                 software, such that the system softwre is wholly
                 responsible for the immediate control of hardware
                 device interfaces.

             4)  Inter-process interfaces, i.e. facilities for
                 securely passing activations and data between
                 processes over standardized interfaces.

             5)  Fault handling, e.e. fcilities for the detection,
                 location and containment of software and hardware
                 faults: for ensuring the secure duplication
                 of data when required by applications or system
                 software in case of fault conditions; for maintaining
                 system operation and dat integrity during fault
                 incidents (in conjunction with applications
                 software); and for providing adequate reports
                 of fault incidents for subsequent diagnosis
                 and correction of the faults.

         c)  The system software shall be implemented as a well-strutured
             suite of code and data modules incorporating sufficient
             hardware protection and software checking to ensure
             that:

             1)  The system software itself can achieve and
                 maintain the status of high integrity, trusted
                 code with respect to the applicaions software.

             2)  The structures present in the applications
                 software are maintained and enforced at all
                 stages of development, integration and run
                 time operation.

                 Preferably, the system software shall reside
                 in "read-only" memory.

         d)  The upport element of the system software must
             allow the secure preparation, editing, compilation,
             linkage, module testing, integration, realtime
             testing, system testing and incorporation into
             run time operation of new or modified source code
             modules. ny disturbance caused to the operational
             system by each of these procedures should be minimal
             and well defined. The support software shall include
             facilites for maintaining and accessing any required
             off-line libraries of procedures, data declaratins,
             macros, etc.


         e)  The use of the word secure in section 3.5.11.2
             refer to requirements stated in section 3.4.5.7
             and 3.5.11.



3.5.11.3 A̲p̲p̲l̲i̲c̲a̲t̲i̲o̲n̲ ̲S̲o̲f̲t̲w̲a̲r̲e̲

         The application software shall be rovided as well-structured
         modules. The application software is to provide, in
         conjunction with the system software, all the functional
         capabilities called for in this specification. The
         application software for each installation shall be
         identicalor, as a minimum, generated from a common
         library of program routines.

         a)  O̲v̲e̲r̲a̲l̲l̲ ̲S̲t̲r̲u̲c̲t̲u̲r̲e̲. The applications code and data
             shall be structured in a hierarchical manner into
             a well defined set of functional modules and units
             at different functionl levels and with distinct
             data areas for each transaction processed by the
             system.

             The ways in which the various applications software
             modules are multi-programmed at run-time (i.e.
             recursive/re-entry or "fresh copy", etc.) shall
             be clearly defned.

             Communication between modules shall wherever practicable,
             take place via standardised system facilities such
             as interprocess calls and procedure calls. The
             sharing of data areas between two or more units
             or modules handling different transations shall
             be avoided and the situations in which such sharing
             takes place shall be clearly defined. It shall
             be a design aim to ensure that whenever data is
             transmitted across an inter-module interface, the
             data is in a compact, well defined form

             Sufficient validity checks must be applied at appropriate
             points in the applications software and/or system
             software at compile time, and/or runtime to ensure
             that the integrity requirements will be met, attention
             being paid to maintaining effiiency.

             The process of integrating a module into the system
             shall not require recompilation of the other elements
             of the system.


         b)  M̲o̲d̲u̲l̲e̲s̲ ̲o̲f̲ ̲A̲p̲p̲l̲i̲c̲a̲t̲i̲o̲n̲ ̲S̲o̲f̲t̲w̲a̲r̲e̲. It shall be a
             design aim that each functional module of applications
             software should satisfy the following criteria:

             1)  Provide a well defind function or group of
                 functions at some hierarchical level in the
                 software system, i.e. can be implemented as
                 self-contained programming task given a functional
                 specification, interface specifications of
                 any external modules and data structures towhich
                 it must refer.

             2)  Has well defined, compact input and output
                 interfaces.

             3)  Can be separately compiled/assembled.

             4)  Hides its decisions from other modules (e.g.
                 it allows access to internal data structures
                 only through one access mehanism provided by
                 the module).



3.5.11.3.1   I̲m̲p̲l̲e̲m̲e̲n̲t̲a̲t̲i̲o̲n̲

         a)  U̲s̲e̲ ̲o̲f̲ ̲L̲a̲n̲g̲u̲a̲g̲e̲s̲

             If a high level language is used, the use of assembly
             language in the applications software shall be
             confined to small well defined units and where
             practicable emodied either in macros or library
             procedures. In any case the use of assembly/machine
             code should be restricted to the following circumstances:

             1)  Interfacing to system software calls.

             2)  Providing realtime critical facilities where
                 code prodced by the high level language compiler
                 is too inefficient.

             3)  Implementing essential facilities not provided
                 by the high level language or the rest of the
                 system.


         b)  P̲r̲o̲g̲r̲a̲m̲s̲

             It is mandatory that programme instructions shall
             not be modified during run time and that within
             each applications software module the programme
             code and constantsshould be segregated from the
             modifiable data. It is highly desirable, that,
             wherever practicable, each segment of applications
             code or data should be accessed and protected by
             appropriate hardware facilities at run time. The
             direct use of or acces to absolute store addresses
             by applications programmes should be reduced to
             a minimum. Synchronization processes shall take
             place at clearly defined points in the programme.
             To maintain security and accountability, reservation
             and release of share resources, such as data areas,
             must only take place at clearly defined points
             in the applications programme.

         c)  M̲o̲d̲u̲l̲e̲ ̲S̲i̲z̲e̲ ̲C̲o̲n̲s̲t̲r̲a̲i̲n̲t̲s̲

             The function of each module should be readily understandable.
             As a rule, no module shall contain more than250
             source statements unless approved by CR QA internally
             and notification to SHAPE. It shall be a design
             aim to limit the number of modules, exceeding the
             250 line limit to 5% of the modules. Each module
             must implement a CAMPS function or functions) as
             specified in this document. Any requirement which
             would lead to implementation of a module unable
             to satisfy this constraint must be sub-divided
             into more manageable units. It is essential that
             any constraints imposed on the module size by copilers,
             loading methods, store management arrangements,
             etc., must be clearly defined and adequate methods
             for dealing with these constraints must be defined
             and implemented.

         d)  M̲a̲n̲/̲M̲a̲c̲h̲i̲n̲e̲ ̲I̲n̲t̲e̲r̲f̲a̲c̲e̲

             In addition to the levels of command and cotrol
             specified elsewhere in this specification for supervision/operation,
             and control for engineers limited facilities shall
             be provided at operational sites for control of
             system software. Provisions shall be made for dead
             start, warm start, and ctover to an updated version
             of the control software, the latter without affecting
             the operational user facilities. In addition, the
             supervisor shall have facilites to record the…86…1
                     …02…   …02…   …02…   …02…                             
                          
             current state of the machine for diagnostic purposes
             on a loadable medium in a secure manner, e.g.,
             raw dumps on a hardcopy printer are not acceptable.
             This facility shall be avalable without affecting
             user operational facilities.



3.5.11.4 S̲o̲f̲t̲w̲a̲r̲e̲ ̲M̲a̲i̲n̲t̲e̲n̲a̲n̲c̲e̲ ̲a̲n̲d̲ ̲M̲o̲d̲i̲f̲i̲c̲a̲t̲i̲o̲n̲

         The systems software shall be structured in a way that
         will permit the addition or deletion of applications
         units throughout the operational lie of the system.
         The degree of flexibility should at least be sufficient,
         to allow:

         a)  Changes in format, new formats, changes in format
             tolerances, improvements in man/machine interfaces,
             and the accommodation of more CAMPS hardware.

         b)  Procesing information which may be subject to change,
             for example, specific character strings such as
             security examining groups, which are searched for
             during analysis, should wherever possible, be held
             in specific data tables rather than embodied in
             theprogram source code in order to preclude unnecessary
             compilation/assembly of program modules.



3.5.11.5 S̲u̲p̲p̲o̲r̲t̲ ̲S̲o̲f̲t̲w̲a̲r̲e̲

         a)  The support software includes all off-line software
             required to support the implementation, modification
             testing and maitenance of the on-line system. All
             support software shall be available at the CAMPS
             software support installation (CSSI), while only
             that related to installation of changes and assisting
             in fault finding is necessary at the operational
             sites.

         b)  ny disturbance caused to the operational system
             by use of the support software shall be minimal
             and well defined. New code and data shall be transferred
             to an operational installation on a machine readable
             medium generated at the CSSI.




3.5.11.5.1   C̲S̲S̲I̲ ̲R̲e̲s̲i̲d̲e̲n̲t̲ ̲S̲u̲p̲p̲o̲r̲t̲ ̲S̲o̲f̲t̲w̲a̲r̲e̲

         At the CSSI site the support software shall as a minimum
         accommodate the following functions:

         a)  Compilation/assembly shall be accomplshed on the
             CSSI system. Appropriate diagnostics shall be provided
             when compilation/assembly cannot be carried out
             successfully. Compilers/assemblers must make adequate
             provision for insertion of programmers' comments.

         b)  Library maintenance - rotines for the creation
             and maintenance of the programs and other libraries
             as applicable.

         c)  Data conversion shall be made for the transcription
             and re-formatting of data from disc to floppy disc
             and vice versa.

         d)  A debugger shall be provided t the CSSI. This debugger
             shall together with a facility for simulation of
             modules under test aid the programmer in testing.
             The debugger shall support insertion of breakpoints,
             dumps of registers and memory. Further the following
             shall be supporte from the terminal conducting
             the test.

             1)  Display of memory or register dumps on the
                 console, VDU, and/or medium speed printer.

             2)  Updating the contents of main memory areas
                 and registers.

             3)  Transcription of the main memory contents to
                 o from backing store.

             4)  Loading of programs to be tested.

             5)  Program initiation and termination.

             6)  Deletion of main memory contents.

             7)  Recording of software modules being accessed
                 during test.

         e)  Loaders, editors and other utility pograms which
             are necessary to facilitate the compilation assembly
             and testing of program changes in an efficient
             and timely manner.


         f)  A cross reference listing tool which allows the
             determination of which modules might be affected
             by a programme change.

         g)  At the CSSI site a test and integration facility
             shll be provided which in conjunction with other
             CR supplied equipment can run the software module
             under test as if it was part of an operational
             CAMPS.



3.5.11.5.2   F̲a̲c̲t̲o̲r̲y̲ ̲T̲e̲s̲t̲ ̲S̲o̲f̲t̲w̲a̲r̲e̲

         a)  At the CR factory a factory-test simulator shall
             be provded to run the software under test emulating
             the operational CAMPS environment.

         b)  The standard test environment shall be provided
             by simulation of pseudorandom operational environment
             in the factory such that:

             1)  All input channels are loadedto at least 0.5
                 Erlangs for low speed channels and 0.3 Erlangs
                 for medium speed channels.

             2)  The traffic input on the channels shall be
                 representative of the message traffic which
                 will be encountered in an operational environment,
                 including trafic corrupted by transmission
                 media failure and noise.

             3)  The following traffic sources shall generate
                 simulated traffic in accordance with the throughput
                 requirements in section 3.4.1.2.1.

                 -   Message preparation facilities.

                 -   Traffic exchnged with ACE CCIS facilities.

                 -   Traffic exchanged with SCARS II.

                 -   Traffic associated with message service
                     and operator distribution control facilities.

         c)  The simulation shall be performed under the restraints
             defined below:

             1)  All o the following stores are loaded to at
                 least 0.75 of the design capacity.


                 -   In-transit store for messages being processed.

                 -   Queue storage.

                 -   Message on-line storage.

             2)  At least 0.9 of all available output channels
                 shall be open.

             3)  Alloperator positions shall be manned so that:

                 -   action can be taken with respect to situations
                     which arise in the equipment. The action
                     taken shall be that appropriate to an operational
                     environment.

                 -   all available commands are used to exercie
                     the equipment.



3.5.11.6 S̲o̲f̲t̲w̲a̲r̲e̲ ̲I̲n̲t̲e̲g̲r̲i̲t̲y̲

         a)  Re-loadable copies of all the software in binary
             form shall be held on backing store (e.g. disc,
             magnetic tape on-line to the system) to permit
             replacement of the software if it is suspected
             of bing corrupt.

         b)  Each module should contain credibility check to
             contain the effects of corrupt or inaccurate data
             to the extent this does not introduce redundant
             processing which will decrease the system throughput.

         c)  It shall be a design aim hat wherever possible
             the consequence of a single software fault incident
             will not affect more than one transaction. The
             detection of an inconsistency indicating a fault
             shall initiate a report and the re-processing from
             a validated check-point in n attempt to recover
             with a minimum of discontinuity. Only after further
             failures should major recovery or operator intervention
             action be invoked.


3.6      D̲O̲C̲U̲M̲E̲N̲T̲A̲T̲I̲O̲N̲ ̲R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲S̲



3.6.1    G̲e̲n̲e̲r̲a̲l̲

         a)  Hardware documentation developed by CR under this
             contract will be produced in accordance with the
             requirements as stated in ths section of the System
             Requirements Specification.  Documentation for
             OEM equipment will be delivered according to the
             requirements as stated in the contract.

         b)  Software documentation developed by CR under this
             contract will generally be producd in accordance
             with the structure of ACE directive 007-3 issue
             2.

         c)  System Requirements Specification developed under
             this contract shall be produced and maintained
             in accordance with MIL SPEC 490 unless otherwise
             specified in the ConfigurationManagement Plan.



3.6.2    F̲o̲r̲m̲a̲t̲ ̲a̲n̲d̲ ̲P̲u̲b̲l̲i̲c̲a̲t̲i̲o̲n̲ ̲C̲r̲i̲t̲e̲r̲i̲a̲

         All documentation delivered by the contractor shall
         be prepared in accordance with the following requirements.



3.6.2.1  P̲a̲p̲e̲r̲

         The documents, exclusive of covers, shall be printed
         on a ood grade of white paper of sufficient weight
         and substance to permit printing on both sides. The
         paper size will be DIN A4. The paper used for fold-out
         drawings shall be of a quality and thickness that permits
         repeated opening and folding without racking or tearing
         at the folds.



3.6.2.2  B̲i̲n̲d̲i̲n̲g̲

         a)  The documents shall be bound between hardbacked
             covers that incorporate a metal binding system
             which will permit easy removal and insertion of
             pages, photographs, illustrations and drawings
             ad which will permit the documents to lie flat
             when opened at any page.


         b)  The information on pull-out sheets bound in the
             hard-backed covers shall be positioned so that
             it is clear of the text of its associated document
             when opened up so that the rader can readily cross-refer
             between text, drawings and illustrations.

         c)  If they are not accountable items for security
             reasons, excessively large drawings may be placed
             in pockets formed in the rear covers of binders,
             or in the case of, as-buil and installation instructions,
             to contain large drawings in separate folders equipped
             with a fastening arrangement to prevent accidental
             loss and spillage of the contents.

         d)  The cover and title page of the document shall
             show the classificationof the document, manufacturer
             of the equipment, number of the document and its
             issue number, number of the contract and the date
             of issue. In the case that a subject is covered
             in more than one volume then an indication of the
             contents of each manul shall be shown. The title
             and number of the document shall also be shown
             on the spine of the cover if applicable.



3.6.2.3  N̲u̲m̲b̲e̲r̲i̲n̲g̲

         a)  The pages of Sections and Chapters are to be separately,
             and sequentially numbered beginning with the numbr
             one in each case, with the associated Section or
             Chapter number added as a prefix. The page numbers
             are to be inserted at the centre of the lower margin
             above the classification, or in the appropriate
             box if preprinted formsheets are used.

         b)  Pragraphs, sub-paragraphs, and sub-sub-paragraphs,
             are to be numbered sequentially commencing with
             one, and sub-paragraphs are to have the associated
             paragraph number added as a prefix (i.e. 1.1.,
             1.2., 1.3., etc.) and sub-sub-paragraphs, the associted
              sub-paragraph number added as a prefix (i.e. 1.1.1.,
             1.1.2., 1.1.3. etc). The maximum depth will be
             4 (i.e. 1.1.1.1) unless otherwise agreed.

         c)  For sub-divisioning identification, lower-case
             alphabetical characters enclosed in half bracketsshall
             be used (i.e. a), b), c), etc.). For Sub-sub divisioning,
             upper-case Arabic numerals enclosed in half brackets
             shall be used (i.e. 1), 2), 3), etc).


         d)  Tables shall be captioned and allocated a Table
             Number having the Section or Chapter number as
             appropriate added as a prefix (e.g. Table 1.1).
             Tables may be included as a par of the text or
             printed on a fold-out sheet. When printed on a
             fold-out sheet, the table number must be positioned
             on the fold-out portion so that it is visible on
             opening the document to which it belongs.



3.6.2.4  P̲r̲e̲f̲a̲c̲e̲

         a)  Each separately bond document (manual) shall commence
             with a set of introductory pages, and when a manual
             or set of documentation consists of only one separately
             bound document, the introductory pages shall consist
             of the following:

             1)  Title pages with the securiy classification
                 of the handbook, manufacturer of the equipment,
                 number of the handbook and its relevant issue
                 number, number of the relevant contract and
                 date of issue.


             2)  When applicable, instructions covering treatment
                 for electric shock.

         3)  Amendment history sheet.

             4)  Record of modifications to the equipment.

             5)  Introduction giving the purpose of the handbook
                 and instructions for its use.

             6)  Table of contents listing the titles of all
                 sections, headings and sub-headings, tgether
                 with relevant paragraph and page numbers.

             7)  Detailed list of all tables together with relevant
                 table and page numbers.

             8)  Detailed list of all drawings, illustrations
                 and photographs together with a relevant reference
                 and page numbers

             9)  Legend explaining all abbreviations and symbols
                 used in the text and on the drawings.


             10) Photographs or drawings of the major items/bays
                 described in the handbook.

         b)  When a manual or set of documentation consists
             of more than one volume, each separately boun volume,
             section or part, shall contain a set of introductory
             pages as described, plus an additional page inserted
             after the front sheet containing an abbreviated
             list of contents for the complete manual or set
             of documentation, as applicable.

         c)Wherever possible, photographs, drawings and illustrations
         shall be bound in the same cover as the associated
         text. In addition when a manual or set of documentation
         consists of more than one separately bound document
         the first document of the seris shall be identified
         as the master document and shall contain all information
         of a general nature applicable to all documents of
         the series.



3.6.2.5  P̲r̲i̲n̲t̲i̲n̲g̲ ̲a̲n̲d̲ ̲T̲y̲p̲e̲

         A conventional typewriter font shall be employed for
         the printing of all leters and figures in the text
         of all documents.

         All titles and headings shall be underlined.

         Operation and maintenance manuals shall be printed
         using either a multilith or offset process.



3.6.2.6  L̲a̲n̲g̲u̲a̲g̲e̲

         All documents shall be written in te English language.

         All descriptions shall be written in a clear and precise
         manner, using unambiguous English and a minimum of
         words. Wherever feasible descriptions and procedures
         shall be supported either by diagrams and photographs
         or other tyes of illustrations to facilitate understanding
         of the text by personnel having only a working knowledge
         of the English language.




3.6.2.7  S̲e̲c̲u̲r̲i̲t̲y̲ ̲C̲l̲a̲s̲s̲i̲f̲i̲c̲a̲t̲i̲o̲n̲

         Manuals and documents shall be classified in accordance
         with the classification of the information included
         therein. The relevant classificationof a document shall
         be printed at the centre top and bottom of all pages,
         photographs, illustrations and drawings, and at the
         centre top and bottom of the front cover of all binders.
         The highest classification of any section of a document
         shall be rinted on the cover of that binder.

         Applicable document for security classification is
         NATO Document CM(55)15 Final "Security within the North
         Atlantic Treaty Organization".


3.6.2.8  P̲h̲o̲t̲o̲g̲r̲a̲p̲h̲s̲,̲ ̲I̲l̲l̲u̲s̲t̲r̲a̲t̲i̲o̲n̲s̲ ̲a̲n̲d̲ ̲D̲r̲a̲w̲i̲n̲g̲s̲

         a)  All titles and inluded text and annotations shall
             be in the English language in addition to any other
             language that may be employed. To facilitate correlation
             the figure numbers are to be preceded by the associated
             chapter or section number as appropriate (e.g.
             Figre 1.1).

         b)  The lettering and layout of drawings shall be in
             accordance with recognized industrial or national
             standards. Hand lettering shall be avoided except
             on advance information copies and for marking-up
             ATBB documents during site implementtion.

         c)  Symbols, when employed, shall be defined so that
             there can be no confusion in their interpretation.
             The definitions may, at the discretion of the contractor,
             be given on the drawings or collectively in the
             associated document in the formof a glossary.

         d)  The use of drawings and illustrations that exceed
             1 x 1.5 metres shall be avoided. Where necessary
             the scale shall be shown.




3.6.2.9  A̲m̲e̲n̲d̲m̲e̲n̲t̲s̲

         The contractor shall be responsible for the issue,
         control and distribution of amendments to all delivered
         documents, resulting from changes and/or modificatons
         in the equipment or spare parts, until expiration of
         the warranty period for the associated equipment. In
         the case of the training documentation the contractor
         shall be similarly responsible until the end of the
         first training year.



3.6.2.10L̲e̲v̲e̲l̲s̲ ̲o̲f̲ ̲M̲a̲i̲n̲t̲e̲n̲a̲n̲c̲e̲

         Documentation shall be written to be in keeping with
         all the levels of maintenance as outlined in contractor's
         maintenance plan.



3.6.2.11 U̲s̲e̲ ̲o̲f̲ ̲R̲e̲f̲e̲r̲e̲n̲c̲e̲s̲

         To avoid duplication of information references to other
         parts o the documentation may be made.


3.6.3    A̲p̲p̲r̲o̲v̲a̲l̲ ̲a̲n̲d̲ ̲D̲e̲l̲i̲v̲e̲r̲y̲

         Approval and delivery of documentation will be in accordance
         with paragraph 15 Special Provisions under this contract
         unless otherwise agreed or stated in this section.

         a)  Six monthsbefore the provisional site acceptance
             (PSA) of the first site four copies of each draft
             document shall be submitted to the purchaser for
             review. The resulting recommended changes shall
             be considered and incorporated by the contractor
             who shall re-ubmit one copy of the revised document
             for printing approval. Upon receipt, in writing
             from the purchaser, that the contents of the revised
             version contain all of the purchaser's recommended
             correcti- ons, changes and comments to his satisfaction,
             he contractor shall be responsible for the editing,
             production and delivery of the required number
             of the documents. The contractor shall provide
             page changes or if necessary shall re-issue portions
             of the documents whenever changes/modifications
             i equipment or spare parts are made.


         b)  In the event that approved copies are not available
             at the time of on-site acceptance of equipments,
             preliminary version of each document (advance information
             in sufficient dtail to permit satisfactory operation
             and maintenance of the equipment) shall be provided
             to each site at the time of the provisional site
             acceptance.

         c)  Q̲u̲a̲n̲t̲i̲t̲i̲e̲s̲ 

             The contractor shall deliver the following quantities
             of handbooks (i.e. Equiment, maintenance and Test
             Equipment Handbooks).…06…1         …02…   …02…   …02…   …02…      
                                                   


   T̲O̲         D̲R̲A̲F̲T̲ ̲P̲R̲E̲L̲I̲M̲I̲N̲A̲R̲Y̲ ̲V̲E̲R̲S̲I̲O̲N̲    F̲I̲N̲A̲L̲ ̲V̲E̲R̲S̲I̲O̲


   Each Site  0                            2 (each)    (Delivery
                                                       2
                                                       weeks
                                                       before
                                                       PSA)

   Purchaser  4 (each) Delivery 6 months   5 (each)  
        "
                before PSA of first site

   NCS        0                           20 (each)  
        "



3.6.4   E̲q̲u̲i̲p̲m̲e̲n̲t̲ ̲H̲a̲n̲d̲b̲o̲o̲k̲s̲



3.6.4.1 C̲R̲ ̲P̲r̲o̲d̲u̲c̲e̲d̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲

        Equipment handbooks shall be prepared for all main
        and miscellaneous equipment supplied. The equipment
        handbook shall conain as a minimum:

        a)  Equipment Specifications.

        b)  Installation and Commissioning Instructions.

        c)  Operating Instructions.

        d)  Technical Description.

        e)  Parts Lists.



3.6.4.1.1    E̲q̲u̲i̲p̲m̲e̲n̲t̲ ̲S̲p̲e̲c̲i̲f̲i̲c̲a̲t̲i̲o̲n̲s̲

         a)  This section shall contain a listing of all the
             important parameters of the described equipment.
             It shall include but not be limited to th following:

         b)  The required external power supply voltage and
             frequency characteristics with acceptable tolerances.

         c)  Power consumption, ventilation and environmental
             control data.

         d)  Characteristics and acceptable tolerances of all
             input an output signals.

         e)  The environmental conditions over which the equipment
             performance will continue to meet the design performance
             criteria.

         f)  The overall weight and the weight of each typical
             unit or sub-unit.

         g)  The overall dimensions and he dimensions of each
             major unit or sub-unit.


3.6.4.1.2    I̲n̲s̲t̲a̲l̲l̲a̲t̲i̲o̲n̲ ̲a̲n̲d̲ ̲C̲o̲m̲m̲i̲s̲s̲i̲o̲n̲i̲n̲g̲ ̲I̲n̲s̲t̲r̲u̲c̲t̲i̲o̲n̲s̲

         a)  This section shall include the electrical and mechanical
             information necessary for mounting and demounting
             the equipment especially:

         b)  Detiled mechanical installation instructions.

         c)  Detailed external and inter-unit cabling instructions,
             including earthing connections.

         d)  Specification of the cables to be used.

         e)  A detailed list of checks to be carried out prior
             to applicatio of power for the first time.

         f)  A detailed list of checks to be carried out following
             the application of power and prior to putting the
             equipment into service. Where these checks are
             identical to the maintenance procedures references
             shall be mae to the maintenance procedures. Duplication
             of the text is not required.


         g)  List of tools and test equipment required for installation,
             commissioning and check-out of the equipment.


3.6.4.1.3    O̲p̲e̲r̲a̲t̲i̲n̲g̲ ̲I̲n̲s̲t̲r̲u̲c̲t̲i̲o̲n̲s̲

         a)  The operating instructions sall be detailed and
             cover all applicable equipment both central computer
             and peripherals.

         b)  Operating instructions shall include the basic
             functions such as:

             1)  Power ON and OFF.

             2)  Emergency power OFF.

             3)  Interpretation of alarm and waning conditions
                 and associated immediate action instructions.

             4)  Description of controls and indicators.

         c)  A user's manual will be written for the following
             user categories:

             1)  CAMPS operator.

             2)  CAMPS supervisor.

             3)  CAMPS supervisorassistant.

         d)  The user's manual will describe all the functions
             of the CAMPS System and illustrate how to operate
             it.



3.6.4.1.4    T̲e̲c̲h̲n̲i̲c̲a̲l̲ ̲D̲e̲s̲c̲r̲i̲p̲t̲i̲o̲n̲

         a)  The depth of description will be in accordance
             with the level of maintenance as outlinedin contractor's
             maintenance plan.

         b)  First section will give a general introduction
             to the equipment and explain its purpose. It shall
             give a brief description covering the overall physical,
             electrical and electronic characteristics as applicable
             using as back-up information block diagrams, photographs
             or other suitable illustrations.



         c)  Subsequent sections will describe the major elements
             and assemblies, and present the overall functional
             description of the system.

         d)  The object of the Technical Descriptio is to provide
             sufficient technical information to operating and
             maintenance personnel to enable them to understand
             and use the Maintenance Handbooks and Operating
             Instructions respectively.


3.6.4.1.5    P̲a̲r̲t̲s̲ ̲L̲i̲s̲t̲

         This section shall consist of a abulation following
         a "family tree" type breakdown of all parts for the
         described equipment, and shall provide the following
         information.

         a)  Manufacturer's part number and an associated brief
             descriptive phrase for each major assembly.

             b)  The omponent reference number as used on the
                 circuit diagrams for all electrical/electronic
                 components parts. Each reference number shall
                 be followed by a brief descriptive phrase,
                 nominal value, rating and tolerance of the
                 associated component, togethr with the manufacturer's
                 reference number and manufacturer's address
                 or NATO code (if readily available).

             c)  Manufacturer's part number and an associated
                 brief descriptive phrase for each mechanical
                 part, together with the manufacturer's addres
                 for each item listed.

             d)  A list of the sizes and types of nuts, bolts,
                 washers and fasteners supplied as a repair
                 kit to each site and depot.



3.6.4.2  O̲E̲M̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲

         Handbooks and other relevant documentation for peripherals
         and test equipmet supplied shall be delivered in accordance
         with the terms of the contract.


         Contents of the documentation must be relevant to the
         supplied equipment, and will be identical in scope
         wherever applicable to that described in 3.6.4.1. The
         applicability can e met either by the contents itself
         or by marking up the document in a clear and unambiguous
         way. Such markings shall be consistent with good legibility,
         readability and utility of the end product.


3.6.5    M̲a̲i̲n̲t̲e̲n̲a̲n̲c̲e̲ ̲H̲a̲n̲d̲b̲o̲o̲k̲


         The maintenance prcedures handbook is the basic document
         which outlines how the maintenance of the system will
         be effected. It shall be, in effect, the final version
         of the contractor's maintenance plan. It shall be the
         one document which will give precise instructins to
         a  technician as to how he will fulfil his responsibilities.

         Drawings, illustrations and photographs used in connection
         with maintenance will permit identification of the
         location of all replaceable units to permit a technician
         to repair an to satisfactorily maintain the equipment.
         Equipment layout drawings, inter-unit and sub-unit
         cabling and wiring diagrams shall be provided for all
         electrical and electronic assemblies. Annotated line
         drawings, annotated cut-away illustrations, andannotated
         photographs, as appropriate, shall be provided to permit
         identification of all mechanical assemblies and mechanisms
         and parts thereof. As a minimum the following drawings
         shall be included:

         a)  Block diagram of the whole equipment.

         b)Block diagram of assemblies divided into units.

         c)  Block diagram of major units.

         d)  Detailed interconnection diagrams and internal
             cabinet cabling diagrams including the views of
             plug-in connectors.

         e)  If applicable, flow diagrams of the signls through
             the equipment will be shown as part of the fault
             isolation procedure.

         f)  Circuit diagrams of all units and subassemblies
             will be supplied as part of the depot maintenance
             documentation.




3.6.5.1  P̲r̲e̲v̲e̲n̲t̲i̲v̲e̲ ̲M̲a̲i̲n̲t̲e̲n̲a̲n̲c̲e̲

         The preventive maintenance instructions shall contain:

         a)  All recommended routine maintenance tasks necessary
             to ensure continuous and satisfacory performance
             of the equipment, based on the periodicity of maintenance
             (i.e. daily, weekly, monthly etc.).

         b)  Illustrations and test set up schematics shall
             be included to ensure that the procedures can be
             understood by the CAMPS technician.

c)       All test points clearly identified. The nominal values
         and the acceptable limits that should be measured at
         each test point shall be indicated.

         d)  The document shall include system and sub-system
             alignment procedures.

         e)  Where necessary, refrence shall be made to other
             documentation where more detailed information regarding
             the maintenance task may be found.

         f)  List of all required tools and test equipment supplied
             for maintenance purposes.

         g)  Dismantling and re-assembly instructins shall be
             given where applicable.

         h)  Procedures for adjusting factory sealed controls
             and mechanisms are also required and shall include
             statements giving the levels of maintenance where
             these adjustments would normally be performed (i.e.
             depot etc.).



3.6.5.2  C̲o̲r̲r̲e̲c̲t̲i̲v̲e̲ ̲M̲a̲i̲n̲t̲e̲n̲a̲n̲c̲e̲

         The corrective maintenance instructions supplied to
         each site will reflect the level of maintenance applicable
         to CAMPS, i.e. module replacement.

         The corrective maintenance instructions shall contain:

a)       Detailed descriptions of the symptoms of a fault to
         include alarm conditions if applicable.


         b)  Description of the possible fault isolation methods
             and tools used in connection with fault isolation.

         c)  Comprehensive procedures for fault tracing and
             fault isolation.


3.6.5.3  A̲s̲s̲o̲c̲i̲a̲t̲e̲d̲ ̲D̲o̲c̲u̲m̲e̲n̲t̲a̲t̲i̲o̲n̲

         Appropriate documentation, either in the form of the
         manufacturer's handbook or leaflet, shall be provided
         where applicable for each delivered item of test equipment.
         Similarly, documentation shall be provided forthose
         tools, other than simple hand tools, which require
         operation and maintenance instructions, when full information
         is not given in the Maintenance and Operating Manual.



3.6.6    E̲n̲g̲i̲n̲e̲e̲r̲i̲n̲g̲ ̲D̲r̲a̲w̲i̲n̲g̲ ̲D̲o̲c̲u̲m̲e̲n̲t̲a̲t̲i̲o̲n̲



3.6.6.1  C̲i̲v̲i̲l̲ ̲W̲o̲r̲k̲s̲ ̲R̲e̲q̲u̲i̲r̲e̲m̲e̲t̲s̲

         The civil works requirements are to be provided by
         contractor 12 months prior to equipment installation
         at each site.  This document should, as a minimum,
         be in the form of engineering sketches and written
         text describing all civil works that eed to be accomplished
         to prepare the site for contractor equipment installation.
          This documentation must be in sufficient technical
         detail to instruct a civil works contractor in the
         work to be performed.



3.6.6.2  A̲s̲-̲t̲o̲-̲b̲e̲-̲B̲u̲i̲l̲t̲ ̲a̲n̲d̲ ̲A̲s̲-̲B̲u̲i̲l̲t̲ ̲D̲o̲u̲m̲e̲n̲t̲a̲t̲i̲o̲n̲

         a)  This documentation shall provide full details of
             how all the major assemblies of the supplied equipment
             at each location have been physically installed
             and electrically integrated.  They will be supplied
             by CR as two deliveries:

             )   As-to-be-Built drawings (due nine months before
                  scheduled start of equipment installations).

             2)  As-Built Drawings (due at time of PSA).


         b)  These documents shall be self sufficient and not
             depend on any other documents other than the supplied
             maintenance manual and equipment handbooks.  If
             reference to another doument is unavoidable, then
             a copy of, or a pertinent extract from the reference
             document shall be included.  These documents shall
             be prepared for each location and include all relevant
             information covering the following:

             1)  Floor and wall plansshowing all cable runs
                 within the CAMPS equipment room.  Cable runs
                 must be CAMPS related or have COMSEC implications.
                  Signal cable runs from CAMPS equipment room
                 to user terminals shall be incorporated in
                 the as-to-be-built and as-built documentaion.
                  (Information on the routing of the cable-runs
                 will be provided by customer).

             2)  Plan showing grounding system related to CAMPS
                 with description of conductors, electrodes
                 and joints.  Drawings and specifications to
                 be provided by customer.
             3)  Cable racking and cable runs with cable numbers
                 and cable functions to include as appropriate
                 all terminating points, connections, connectors
                 and sockets.  The functions of all conductors
                 shall be shown.

             4)  Physical layout (plan and elevatin) of all
                 major equipments.

             5)  Ventilation and environmental control systems
                 that impact on COMSEC.  Drawings and specifications
                 to be supplied by customer if installed or
                 modified after site survey.

             6)  Cross-connection frames and patch paneldetails.

             7)  Power distribution boards, cabling, wiring
                 and distribution schemes showing position of
                 filters if fitted.  Drawings and specifications
                 to be supplied by customer.

             8)  Ancillary equipment that have COMSEC implications.
                  Drawings an specifications to be provided
                 by customer if installed or modified after
                 site surveys.


             9)  Layout and cable runs of all intercom equipment
                 having a COMSEC impact relative to CAMPS equipment.
                  Drawings and specifications to be supplied
                 by customer if installed afte site surveys.

             10) All other information necessary for the Purchaser
                 to operate, maintain, and expand or modify
                 the installation.



3.6.7    I̲n̲v̲e̲n̲t̲o̲r̲y̲



3.6.7.1  G̲e̲n̲e̲r̲a̲l̲

         The contractor shall prepare a property inventory for
         each CAMPS site.



36.7.2   P̲r̲o̲p̲e̲r̲t̲y̲ ̲I̲n̲v̲e̲n̲t̲o̲r̲y̲

         a)  The contractor shall prepare a property inventory
             of each site and shall deliver them to the related
             sites before provisional site acceptance (PSA).

         b)  The inventory shall be prepared in block form and
             shall consist f the following sections, as applicable:

             1)  Main Equipment.

             2)  Ancillary Equipment.

             3)  Test Equipment.

             4)  Technical Furnishings (tools etc.).

             5)  Spare Parts (Site and Depot).

             6)  Installation Material (Cable and Hardware).

             7)  Doumentation (Handbooks and Drawings, Installation
                 Drawings, and Plans, As Built Drawings, Cable
                 and Wiring Diagrams).


         c)  For each applicable item a family tree breakdown
             of the equipment (from main equipment, major assembly,
             sub-assembly items etc. down to module PC board
             level) shall be given n the inventory.

         d)  The inventory information, shall include as a minimum
             the following data elements:

             -   Site
             -   Item Number
             -   Description
             -   True Manufacturer's Part Number
             -   Manufacturer's Identification Code
             -   Quantity
             -   Price
             -NATO Stock Number (as available)
             -   Item Serial Number (for test equipment and
                 for major assemblies)
             -   Working or Spare
             -   Remarks

         e)  The inventory shall be checked against the installed
             equipment at time of PSA and changed as necessary.
             The arked up copy shall then form the official
             record of all equipment and other items that have
             been delivered.  The deliverable final inventory
             will be submitted in the form of a hard copy list
             subsequent to SPA.



3.6.7.3  F̲i̲n̲a̲l̲ ̲I̲n̲v̲e̲n̲t̲o̲r̲y̲ ̲(̲o̲p̲t̲i̲o̲n̲a̲l̲)̲
         An Optional Final Inventory will be prepared by contractor
         in a form compatible with the purchaser's computer
         punch cards or magnetic tapes with a hard copy. This
         inventory will be made based on the hard copy inventory.

         Work on the Optional Finl Inventory will be initiated
         after basic contract has been appropriately amended.




3.6.8    F̲a̲c̲t̲o̲r̲y̲ ̲a̲n̲d̲ ̲A̲c̲c̲e̲p̲t̲a̲n̲c̲e̲ ̲T̲e̲s̲t̲ ̲D̲o̲c̲u̲m̲e̲n̲t̲a̲t̲i̲o̲n̲



3.6.8.1  G̲e̲n̲e̲r̲a̲l̲

         As stated in section 4 of System Requirements Specification
         the delivered equipment will be tested to verify ts
         compliance with the contractual requirements.

         The quality and quantity of documentation produced
         and delivered by contractor for class II tests is determined
         solely by the extent to which customer and contractor
         has agreed to test the equipmen (i.e. requirements
         stated in System Requirements Specification).

         The documentation requirements listed below are applicable
         for the tests conducted according to the test plan.

         Documentation for class I test (contractor's internal
         verification)will be developed for in-house use only.



3.6.8.2  P̲r̲o̲t̲o̲t̲y̲p̲e̲ ̲T̲e̲s̲t̲ ̲D̲o̲c̲u̲m̲e̲n̲t̲s̲

         Documentation for the following class II tests will
         be submitted by contractor:

         -   DSMT (Prototype) System Verification
         -   Availability Verification
         -   In-Plant Softwar Verification
         -   Software Functional Verification
         -   Software Operational Verification

         Detailed test requirements will be described in the
         System Integration and Test Plan.



3.6.8.3  F̲a̲c̲t̲o̲r̲y̲ ̲A̲c̲c̲e̲p̲t̲a̲n̲c̲e̲ ̲T̲e̲s̲t̲ ̲D̲o̲c̲u̲m̲e̲n̲t̲s̲

         Factory Acceptance Test Doument shall contain the procedures
         for the tests that have to be performed on each equipment
         and its associated accessories following manufacture
         to ensure that all items to be delivered are in accordance
         with the requirements of the contract priorto shipment
         from the factory.




3.6.8.4  S̲i̲t̲e̲ ̲P̲r̲o̲v̲i̲s̲i̲o̲n̲a̲l̲ ̲A̲c̲c̲e̲p̲t̲a̲n̲c̲e̲ ̲D̲o̲c̲u̲m̲e̲n̲t̲ ̲(̲S̲P̲A̲)̲

         This document shall contain all test procedures and
         inspections that are necessary to verify that the equipment
         has been corrctly installed and aligned. It shall also
         contain a check list of all items that should be supplied
         under terms of the contract such as accessories, spare
         parts, tools, test equipment and documentation. (For
         a brief description of the SPA test see ection 4.2.3.2
         of System Requirements Specifications).



3.6.8.5  T̲e̲s̲t̲ ̲P̲r̲o̲c̲e̲d̲u̲r̲e̲s̲

         Each procedure shall, where applicable, include as
         a minimum the following:

         a)  The title of the proposed procedure and a list
             of all required test equipment, wher applicable.

         b)  Required test limits, where applicable.

         c)  A detailed step-by-step procedure written so that
             the procedure can be understood by technician.

         d)  A block diagram of the required test set-up if
             more than two test connections are ivolved.



3.6.8.6  T̲e̲s̲t̲ ̲R̲e̲s̲u̲l̲t̲ ̲F̲o̲r̲m̲s̲

         The Test Results Forms to be used in conjunction with
         the test procedures may be part of the test procedure
         itself. They shall contain as a minimum a space for
         inclusion of:

         a)  Test location and date.

         b)  Euipment type and serial number(s).

         c)  Test procedure reference number and issue number.

         d)  Type of test equipment employed.

         e)  Test Results.

         f)  Comments.


         g)  Signatures of official representatives of the contractor
             and the purchaser.



3.6.8.7  A̲p̲p̲r̲o̲v̲a̲l̲ ̲a̲n̲d̲ ̲D̲e̲l̲i̲v̲e̲r̲y̲

         A copy of each class II test document complete with
         samples of he associated test result forms, shall be
         submitted to SHAPE for approval at least thirty days
         before the scheduled date for commencement of the associated
         tests. Submittal will take place only, if SHAPE has
         not previously approved the document. SHPE and the
         contractor shall mutually agree on any changes to the
         scope and content during the period between submission
         of the test procedures and the scheduled date for commencement
         of the associated tests.



3.6.9    S̲o̲f̲t̲w̲a̲r̲e̲ ̲D̲o̲c̲u̲m̲e̲n̲t̲a̲t̲i̲o̲n̲



3.6.91   G̲e̲n̲e̲r̲a̲l̲

         CR will produce all future CAMPS related software documentation
         in accordance with ACE directive 007-3 issue 2, dated
         14th January 1980.



3.6.9.2  D̲o̲c̲u̲m̲e̲n̲t̲a̲t̲i̲o̲n̲ ̲S̲t̲r̲u̲c̲t̲u̲r̲e̲

         The CAMPS software documentation shall be structured
         in a hierrchical system of levels in accordance with
         the hierarchical structure of the software.

         The software shall be documented in 2 levels:

         -   System Design Specification.
             System Engineering CDRL NO. 07.

         -   Detailed Design Specifications.
             Softwar Development CDRL NO. 05.

         The software documentation shall, furthermore, be complemented
         with:


         -   Data Base Design Specification.

         -   Software Test Specification and Test Procedures.



3.6.9.3  S̲y̲s̲t̲e̲m̲ ̲D̲e̲s̲i̲g̲n̲ ̲S̲p̲e̲c̲i̲f̲i̲c̲a̲t̲i̲o̲n̲ ̲(̲S̲D̲S̲)̲

         The System Design Specification shall provie an introduction
         to the complete CAMPS system consisting of both hardware,
         firmware, and software. It shall show how the system
         is constructed of subsystems, how these subsystems
         are interrelated, and how the requirements of this
         System Requiremens Specification and associated ICDs
         are mapped onto the subsystems. ACE Directive 007-3
         is generated for software specifications only, and
         is consequently not adequate for a full System Design
         Specification. CR shall, however, use ACE Directive
         0073 as a guideline when producing the SDS.

         a)  S̲u̲b̲s̲y̲s̲t̲e̲m̲ ̲D̲e̲f̲i̲n̲i̲t̲i̲o̲n̲

             A Subsystem shall have a well defined function
             represented by a well defined set of requirements.
             It is further essential that the division into
             subsystems is made so that inter-ubsystem interfaces
             are simple and well defined.

             The CAMPS subsystem shall be specified as follows:

             1)  Hardware Subsystems shall be documented as
                 described in section 3.6.4 to 3.6.6 (incl.)

             2)  The system software subsystems shall be documeted
                 in accordance with the following:

                 a)  Existing system software and software that
                     is a modification of existing software
                     shall be documented in accordance with
                     CR standard for system software.

                 b)  Purchased software products shall be documnted
                     in accordance with the internal standards
                     of the Purchaser. The level of details
                     shall, however, be equivalent to ACE Directive
                     007-3.


                 c)  New System Software developed by CR shall
                     be documented in accordance with ACE Directive
                     007-3 Annex C.

             3)  The application software subsystems shall be
                 specified in accodance with ACE Directive 007-3
                 Annex C Subsystem Specification.

         b)  D̲o̲c̲u̲m̲e̲n̲t̲ ̲C̲o̲n̲t̲e̲n̲t̲

             The SDS shall include the following information:

             1)  A chart showing the hierarchical breakdown
                 into subsystems.

             2)  Input-process-output diagrams (HIPO) sowing
                 the flow of data between the subsystems.

             3)  Flow charts showing the logical relationship
                 between the subsystems.

             4)  Hardware configuration.

             5)  A mapping of the software and firmware onto
                 the hardware.

             6)  A mapping of the requiremets of the SRS onto
                 the individual subsystem.

             7)  Performance budgets for the individual subsystem.

             8)  A description of how all the security requirements
                 are being met.



3.6.9.4  D̲e̲t̲a̲i̲l̲e̲d̲ ̲D̲e̲s̲i̲g̲n̲ ̲S̲p̲e̲c̲i̲f̲i̲c̲a̲t̲i̲o̲n̲

         The software shall be broken dow into software package
         with well defined functions and interfaces. The Application
         software package and new System Software shall be specified
         in accordance with ACE Directive 007-3 Annex D "Program
         Specification". The package Specifications will apear
         in two issues: As-to-be-built and As-built.




3.6.9.6  D̲a̲t̲a̲ ̲B̲a̲s̲e̲ ̲D̲e̲s̲i̲g̲n̲ ̲D̲o̲c̲u̲m̲e̲n̲t̲

         All commonly used data and files shall be specified
         in accordance with ACE Directive 007-3 Annex E "Data
         Base Specification" (Dated l4th Januay 1980).



3.6.10   F̲i̲e̲l̲d̲ ̲M̲o̲d̲i̲f̲i̲c̲a̲t̲i̲o̲n̲ ̲D̲o̲c̲u̲m̲e̲n̲t̲s̲



3.6.10.1 G̲e̲n̲e̲r̲a̲l̲

         Copies of all modification advices shall be supplied
         giving full information as regards all modifications
         carried out on the equipment up to expiration of the
         warranty period forthe equipment in question. The modification
         advices shall include the reason for the modification,
         tools required, time required, parts required, equipment
         to be modified and full instructions for the implementation
         of the modification.

         A master ist of all modifications carried out on the
         equipment shall be provided. The modifications shall
         be presented consecutively showing the reason for the
         modification equipment modified and a short description
         of how it was carried out.

         Where a modiication necessitates amendment of the documentation
         changed pages shall be provided in sufficient quantity
         to amend all affected documentation.



3.6.10.2 D̲e̲l̲i̲v̲e̲r̲y̲

         The contractor shall provide 2 copies at each modification
         advice to the purchase and 2 copies to each site affected
         by the particular modification.


3.7      L̲O̲G̲I̲S̲T̲I̲C̲ ̲R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲S̲



3.7.1    T̲r̲a̲n̲s̲p̲o̲r̲t̲a̲t̲i̲o̲n̲ ̲a̲n̲d̲ ̲I̲n̲s̲t̲a̲l̲l̲a̲t̲i̲o̲n̲



3.7.1.1  T̲r̲a̲n̲s̲p̲o̲r̲t̲a̲t̲i̲o̲n̲



3.7.1.1.1    S̲e̲c̲u̲r̲i̲t̲y̲

         In the case of classified equipment and/or material,
         special hipping shall be provided by the contractor
         and confirmed/co-ordinated with the purchaser. NATO
         Security manual C-M(55)15 Final, Volume 2 Enclosure
         D, Section V defines special security requirements.
         The contractor shall ensure that all classified aterial
         and/or equipment to be provided under the terms of
         this contract will not be transported over or through
         any non-NATO country, nor will any of the material
         and/or equipment be handled by any non-NATO aligned
         freight forwarder or shipping agncy.



3.7.1.1.2    P̲a̲c̲k̲i̲n̲g̲

         All equipment delivered under this contract will be
         packed and crated in accordance with the best commercial
         practices for the type of supplies involved, given
         due consideration to climatic and shipping conditions
         in ordr to ensure safe arrival to destination.

…02…a)       Items returned for repair will be transported in the
         original container used for transport to site.  Contractor
         will identify all items delivered in reusable containers.

…02…b)       All delivered spares will b packed individually for
         long term storage without performance or physical deterioration
         with expected shelf life. Full details of the contents
         and the shelf life shall be clearly indicated on the
         package.


3.7.1.1.3    M̲a̲r̲k̲i̲n̲g̲

         Items of supply and the packages or containers in which
         supplies are transported shall in addition to normal
         mercantile marking be marked with the following dta
         on a separate nameplate (tranfers or stamping acceptable
         if nameplate is not practical).

…02…         Project title
…02…         Purchaser Contract Number
…02…         Contract Item Number
…02…         Manufacturer's name and address
…02…         Ship to address

3.7.1.1.4    P̲a̲c̲k̲i̲n̲g̲ ̲L̲i̲s̲t̲s̲

         Packing lsts shall accompany all shipments and two
         copies each shall be provided to the purchaser. Each
         packing list will contain the following information:

…02…         Shipping Address
…02…         Package Number
…02…         Contract Number
…02…         Contract Item Number
…02…         Item Description
…02…         Prt Number
…02…         NATO Stock Number (if available)
             Serial Number
…02…         Quantity shipped
…02…         Date Shipped



3.7.1.1.5    N̲A̲T̲O̲ ̲S̲h̲i̲p̲p̲i̲n̲g̲ ̲D̲o̲c̲u̲m̲e̲n̲t̲s̲

         Whenever shipments under this contract requires NATO
         Form 302 or other NATO shipping documents these shall
         be madeavailable to contractor without delay when requested
         by contractor.




3.7.1.2  I̲n̲s̲t̲a̲l̲l̲a̲t̲i̲o̲n̲



3.7.1.2.1…02…S̲e̲c̲u̲r̲i̲t̲y̲

…02…a)       The CAMPS Central Processor together with the supervisor
         and maintenance positions will at each site be installed
         in a communicatins security (red) area. The installation
         shall therefore conform with the relevant requirements
         to automatic processing devices contained in the current
         issue of AMSG 719B.

…02…b)       Customers local COMSEC staff shall be entitled to monitor
         the installaion works. A final test and inspection
         before each installation becomes operative will be
         carried out by an ACE-COMSEC team.

…02…c)       The power supply to all equipment in the red area will
         enter via a filter or a group of filters, which will
         be provide by the customer.Detailed requirements will
         be part of the Civil Works Requirements data package
         to be supplied by contractor.



3.7.1.2.2…02…S̲t̲a̲n̲d̲a̲r̲d̲s̲

         a)  The equipment shall operate from mains power installations
             conforming to national regulationsconcerning power
             and safety.

         b)  Contractor will ensure that As-To-Be-Built drawings
             submitted to SHAPE will conform to national safety
             regulation.

         c)  Customer will approve the As-To-Be-Built drawings
             for conformance to national regulations as wll
             as obtain approval of the completed installation
             from national authorities.

         d)  The CAMPS Central Processor, together with supervisor
             and maintenance positions are processing NATO classified
             information in a "clear" electrical form and will
             theefore be installed in a communications security
             (red) area in conformity with criteria laid down
             in the current edition of AMSG-719-b.




3.7.1.2.3…02…G̲r̲o̲u̲n̲d̲i̲n̲g̲

         a)  An efficient and comprehensive grounding system
             shall be provided on each site by customer. The
             grounding system shall comprise:

             Safety ground (frame round)

         b)  The safety ground will be part of the main power
             system and conform to national regulations.



3.7.1.2.4…02…M̲a̲i̲n̲s̲ ̲P̲o̲w̲e̲r̲ ̲S̲u̲p̲p̲l̲i̲e̲s̲

         a)  To be provided at each site by customer.

         …02…1)  Three phase and single phase 380/220 volts 50 HZ
             power suplies will be available at all sites, except
             UKAIR where the nominal voltage is 405/240, with
             a frequency of 50 HZ.

         …02…2)  If consisting with national regulations the following
             color coding shall apply:

         …02…    Line:     Brown
         …02…    Neutral:  Blue
         …02…    Groun:   Yellow/green

         b)  In case of 3 phase installation, the lines can
             be of any color, except blue and yellow/green.

         c)  In conformance with national regulations each end
             of the neutral and ground wire shall be clearly
             marked (coloured sleeves or cloured durable adhesive
             tape).

         …02…1)  P̲r̲o̲t̲e̲c̲t̲i̲v̲e̲ ̲D̲e̲v̲i̲c̲e̲s̲

                 Protective devices for the mains power installation
                 shall be provided.


…02…             Circuit breakers which operate to make or break
             A.C. power lines shall make or break all conductors
             at the same time. The neutral wire shall not pass
             through any fuse.

…02…             Allfuses and circuit breakers shall be so located
             such that they are readily accessible.

…02…         2)  U̲t̲i̲l̲i̲t̲y̲ ̲O̲u̲t̲l̲e̲t̲s̲ ̲S̲o̲c̲k̲e̲t̲s̲

…02…             Utility outlets sockets for operation of each terminal
             shall be provided as close as possible to the required
             installation site f a terminal.

…02…             The outlet sockets shall be of a uniform 220 V
             AC standard type with ground and break of line
             only according to the national standard for each
             installation. The socket shall be of a type that
             only allows the plug to mate in the corect orientation.

…02…         3)  Contractor shall deliver his requirements to the
             power installation specifying the required number
             of utilily as part of the Civil Works Requirements
             Package.



3.7.1.2.5    E̲f̲f̲e̲c̲t̲ ̲o̲n̲ ̲M̲i̲l̲i̲t̲a̲r̲y̲ ̲A̲c̲t̲i̲v̲i̲t̲i̲e̲s̲

         Installations in buidings shall be performed in a manner
         that avoids disruption of on-going military activities.
         Contractor may be required under special circumstances
         to stop work for military reasons. Under such circumstances,
         the contractor shall furnish a report t SHAPE giving
         details of the time that the stop work order was enforced,
         together with any other pertinent information. 



3.7.1.2.6    S̲p̲a̲c̲e̲ ̲a̲n̲d̲ ̲A̲c̲c̲e̲s̲s̲ ̲D̲i̲m̲e̲n̲s̲i̲o̲n̲s̲

         a)  At each site an area of 7 meters by 5 meters will
             be made available for the instalation of the CAMPS
             Central equipment (duplicated processor) and supervisory
             positions with a minimum floor to ceiling height
             of 220 cm without a raised floor, or 2 meters minimum
             if a raised floor is provided.


…02…b)       A̲c̲c̲e̲s̲s̲ ̲D̲i̲m̲e̲n̲s̲i̲o̲n̲s̲

             All sites have access dimensions equal to or better
             than:

             Height  1.70 meters
             Width   0.65 meters
             Length  3.70 meters

             Above dimensions will be guarnteed as the minimum
             envelope along the equipment access route of any
             site.



3.7.1.2.7    S̲i̲t̲e̲ ̲S̲u̲r̲v̲e̲y̲s̲

…02…a)       Immediately following contract award contractor shall
         perform formal site surveys at each site.

         b)  Subject to coordination with contractor HAPE will
             arrange a visit to each site. The purpose of the
             site surveys is to ensure that the contractor can
             perform the following tasks.

…02…         1)  Verification of the site documentation specified
             in d) below.

…02…         2)  Preparation of the site civil works rawings/specifications
             and the as-to-be-built drawings.

         c)  SHAPE representatives will assist contractor to
             collect the relevant information to be used to
             prepare the site for installation of the CAMPS
             equipment. At least one of SHAPE representaties
             on each site survey team will be authorized to
             make decisions and to sign a survey protocol on
             behalf of SHAPE.

…02…d)       S̲i̲t̲e̲ ̲D̲o̲c̲u̲m̲e̲n̲t̲a̲t̲i̲o̲n̲

             Customer will deliver a data package to contractor
             prior to site survey to permit him to conduct the
             surve. Data not delivered prior to site survey
             will be supplied during the survey. Additional
             data will be supplied by customer in accordance
             with minutes of meeting agreed to during the conclusion
             of the site survey.


         e)  Drawings and specifications supplied by customer,
             must contain sufficient information to permit contractor
             to generate Civil Works Requirements, As-to-be-built
             drawings and A-built Drawings as described in section
             3.6.6.

         f)  Customer shall without being requested so by contractor
             submit all of the above data and subsequent updates
             to ensure that contractor at all times has the
             most current documentation package for th site
             in question.

         g)  Above data shall be submitted to contractor no
             later than 3 months prior to contractors scheduled
             delivery of Civil Engineering requirements.



3.7.2    M̲a̲i̲n̲t̲e̲n̲a̲n̲c̲e̲ ̲a̲n̲d̲ ̲S̲u̲p̲p̲o̲r̲t̲



3.7.2.1  M̲a̲i̲n̲t̲e̲n̲a̲n̲c̲e̲ ̲P̲l̲a̲n̲

         Contractor shall deelop a maintenance plan identified
         in the CDRL of the contract. After review by the Customer
         the plan will be updated.



3.7.2.2  R̲e̲p̲o̲r̲t̲i̲n̲g̲ ̲S̲y̲s̲t̲e̲m̲

         Contractor shall establish and manage a fault reporting
         system to monitor system status and to analze failures.



3.7.2.3  S̲o̲f̲t̲w̲a̲r̲e̲ ̲M̲a̲i̲n̲t̲e̲n̲a̲n̲c̲e̲ ̲S̲u̲p̲p̲o̲r̲t̲

         Contractor shall provide a system analysis and programming
         service to the Customer. This service shall commence
         with the Provisional Site Acceptance (PSA) of the first
         site and will continue unil such a time that the Customer
         has formed his own capability for software maintenance.
         The following functions shall be fulfilled:

         a)  To design and implement changes and modifications
             to the system and application software at the request
             of theCustomer. All software modifications and
             changes shall be authorized, produced and issued
             centrally.


         b)  Provide assistance and expertise to the purchaser
             when required.

         c)  Diagnose and correct all faults that occur in the
             software at all installations.

         d)  To control and maitain the software documentation.

             Note: Effort in connection with subparagraph a)
             and b) above is considered out of scope of contract
             but will be performed on request and at additional
             cost.



3.7.2.4  T̲o̲o̲l̲s̲ ̲a̲n̲d̲ ̲T̲e̲s̲t̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲

         a)  G̲e̲n̲e̲r̲a̲l̲.̲ As pat of the CAMPS Maintenance Plan the
             Contractor will submit a price list of all tools,
             test equipment, test cables, test adapters, test
             programmes and other items required at each CAMPS
             site, and maintenance depots to support the equipment
             supplied,and necessary to make all measurements
             on any part of the system at any time during installation,
             alignment, maintenance and repair and testing to
             specification.

         b)  Special type tools, test equipment and test programs
             shall be clearly identified s well as the purpose
             for which each tool and piece of test equipment
             is required.

         c)  The list shall include, where applicable, associated
             ancillaries such as signal sources, cable adapters,
             matching devices, power sources and extension jigs
             and ables.

         d)  The test equipment and tools supplied under this
             contract may be supplemented with other items which
             will be listed in the maintenance plan.




3.7.2.4.1    P̲u̲r̲c̲h̲a̲s̲e̲

         Test equipment and tools suggested by the Contractor
         may be substituted or augmented by the purchaser. Such
         items will be deleted from or added to the contrat
         by an appropriate amendment. Test equipment supplied
         with the site hardware and included in the basic contract
         will be clearly identified.



3.7.2.4.2    U̲s̲e̲ ̲P̲r̲i̲o̲r̲ ̲t̲o̲ ̲A̲c̲c̲e̲p̲t̲a̲n̲c̲e̲

         a)  All test equipment and tools to be used by the
             Contractor on sitefor the setting up, alignment
             and measurement of performance shall be equipment
             identical to that which is recommended by the Contractor.

         b)  Test equipment, facilities and tools for delivery
             to the purchaser are not to be used by the Contractor
             wthout prior approval from the purchaser. Approval
             for the use of such items will be subject to:

             1)  All used items being in an "as new" state at
                 the time of on-site acceptance.

             2)  Re-calibration of test equipment where appropriate,
                 at the Contactor's expense.



3.7.2.4.3    A̲u̲t̲o̲m̲a̲t̲i̲c̲ ̲T̲e̲s̲t̲i̲n̲g̲

         The Contractor shall quote for the supply of test adaptors
         and programs for use with the purchaser's automatic
         test equipment held at the central repair depot(s),
         so that all repairable modules whic are to be supplied
         by the Contractor may be tested by this automatic test
         equipment. The Contractor shall also quote for the
         supply of Contractor's own in-house test equipment
         to serve above purpose.




3.7.2.5  C̲a̲l̲i̲b̲r̲a̲t̲i̲o̲n̲

         The Contractor shall prepare a plan and procedures
         for the calibration of each item of suggested special
         test equipment. Calibration plans and procedures shll
         also be provided for items of test equipment built
         into the main equipment. A list of parameters to be
         covered and recommended standards necessary for the
         calibration of each item shall also be provided by
         the Contractor. The calibration plan wil be part of
         the CAMPS Maintenance Plan.



3.7.2.6  F̲i̲e̲l̲d̲ ̲S̲u̲p̲p̲o̲r̲t̲

         The Contractor shall be responsible for generation
         of all modifications found necessary to make the supplied
         equipment conform to the requirements as stated in
         the contract; includng the supply of all modification
         kits, any special test equipment and tools required
         to implement and test modifications, and the updating
         of handbooks and drawings. During the warranty period
         all necessary kits and instructions will be supplied
         b the contractor free of charge fob destination.

         All modifications subsequent to the SHAPE witnessed
         factory tests shall be correctly documented. Modifications
         shall by numbered sequentially commencing with 01,
         and shall contain modification instrctions.



3.7.3    S̲p̲a̲r̲e̲s̲ ̲a̲n̲d̲ ̲C̲o̲d̲i̲f̲i̲c̲a̲t̲i̲o̲n̲

         a)  G̲e̲n̲e̲r̲a̲l̲.̲ Contractor shall deliver to the Customer
             the optimum range and level of spare parts, common
             and special tools and test equipment required to
             support the system.

         b)  Provisions to be supplied sall include the recommended
             list of spares to be held on each site to cover
             90 days operation without support from another
             site and those to be held in a depot to cover 270
             days operation. The parts selected and the quantities
             recommended shall be ased on provision of adequate
             support to meet the reliability and maintainability
             requirements for CAMPS at the lowest possible cost.…86…1
                     …02…   …02…   …02…   …02…                             
                            
             To this end it is understood that some spares will
             take the form of insurance items.



3.7.3.1  S̲u̲p̲p̲l̲y̲ ̲o̲f̲ ̲P̲a̲r̲t̲s̲



3.7.3.1.1    R̲e̲c̲o̲m̲m̲e̲n̲d̲e̲d̲ ̲S̲p̲a̲r̲e̲ ̲P̲a̲r̲t̲s̲ ̲L̲i̲s̲t̲ ̲(̲R̲S̲P̲L̲)̲

         a)  60 days afer contract signature, the Contractor
             shall submit a Recommended Spare Parts List (RSPL).
             The RSPL shall include all spare parts required
             to support all equipment supplied by the Contractor.
             The method of calculation and the justification
             outlined n the development and preparation of RSPL
             shall be provided.

         b)  The RSPL will include:

             1)  A 90 days stock for each site (80% confidence).

             2)  A 270 days stock for one supply depot (80%
                 confidence).

             3)  A 270 days stock for two supply depot (80%
                 confidence).

             4)  A maintenance float to be held at the supply
                 depot.

             5)  Insurance items to be held on each site and
                 at the supply depot.



3.7.3.1.2    A̲p̲p̲r̲o̲v̲e̲d̲ ̲S̲p̲a̲r̲e̲ ̲P̲a̲r̲t̲s̲ ̲L̲i̲s̲t̲ ̲(̲A̲S̲P̲L̲)̲

         The Approved Spare Parts List (ASPL) will be derivedby
         using the RSPL, the equipment and documentation and
         will be determined jointly by the Customer and the
         Contractor during provisioning meetings to be held
         by the Contractor. The ASPL shall be incorporated in
         the contract by an appropriate amendmet 60 days after
         the receipt of the RSPL.




3.7.3.l.3    P̲r̲o̲v̲i̲s̲i̲o̲n̲ ̲o̲f̲ ̲S̲p̲a̲r̲e̲ ̲P̲a̲r̲t̲s̲ ̲D̲u̲r̲i̲n̲g̲ ̲F̲i̲r̲s̲t̲ ̲Y̲e̲a̲r̲ ̲o̲f̲ ̲O̲p̲e̲r̲a̲t̲i̲o̲n̲

         a)  The Contractor shall provide all spare parts listed
             in the ASPL prior to the provisional site acceptance
             ofeach site.

         b)  The Contractor shall replenish the spare parts
             at each site for a period of one year after PSA.
             Follow-on procurement of spare parts as well as
             spares needed for the replenishment described above
             shall be covered by separate contracs.

         c)  Prior to Provisional Site Acceptance (PSA) at any
             site the Contractor shall provide his own spare
             parts to maintain the equipment to the required
             performance level.



3.7.3.1.4    F̲o̲l̲l̲o̲w̲-̲o̲n̲ ̲S̲p̲a̲r̲e̲s̲

         a)  The Contractor agrees that follow-on spaes in support
             of items supplied under this contract shall be
             available on order, for delivery within a reasonable
             period, for a period of ten years following the
             date of final payment of the last delivered items
             procured under this contract. The cotractor further
             agrees that the unit prices charged for such spares
             shall be fair and reasonable and that spares will
             be sold to SHAPE at the current catalog price for
             CR's most favoured customer.

         b)  During the ten year period of guaranteed availbility
             of the follow-on spares the Customer may purchase
             a fixed delivery time for follow-on spares.



3.7.3.1.5    S̲p̲a̲r̲e̲ ̲P̲a̲r̲t̲s̲ ̲A̲v̲a̲i̲l̲a̲b̲i̲l̲i̲t̲y̲

         The Contractor shall promptly notify the Customer upon
         receipt of notice of any non-availability of spare
         prts and will provide all data with respect to the
         replacement and interchangeability of new parts.




3.7.3.1.6    I̲n̲v̲e̲n̲t̲o̲r̲y̲

         The Contractor shall prepare a property inventory for
         each site. The inventory will form part of the site
         documentation.



3.7.3.1.7    D̲e̲f̲i̲n̲i̲t̲i̲o̲n̲s̲

         a)  I̲n̲s̲u̲r̲n̲c̲e̲ ̲T̲y̲p̲e̲ ̲I̲t̲e̲m̲.̲ Item which is generally not
             subject to periodic replacement or wear out but
             is subject to infrequent replacement as the result
             of accidents and other unexpected occurrences and
             the stockage of which is considered to be necessary
             for perational reasons and lead time considerations.

         b)  M̲a̲i̲n̲t̲e̲n̲a̲n̲c̲e̲ ̲F̲l̲o̲a̲t̲.̲ Pool of all, or of selected
             end items comprised in a system which are kept
             in storage and made available as rapid replacement
             for like but unserviceable end items to allow formaintenance
             processing. They can be used either on an exchange
             or a rental basis.

         c)  M̲o̲d̲u̲l̲e̲/̲P̲r̲i̲n̲t̲e̲d̲ ̲C̲i̲r̲c̲u̲i̲t̲ ̲C̲a̲r̲d̲s̲.̲ Part of an assembly
             replaceable as a whole but also having some components
             that may be replaceable individually; consisting
             of a cobination of components having a common mounting
             or mounted on each other.



3.7.3.1.8    S̲p̲a̲r̲e̲ ̲P̲a̲r̲t̲s̲ ̲D̲e̲s̲i̲g̲n̲ ̲C̲h̲a̲n̲g̲e̲ ̲N̲o̲t̲i̲c̲e̲s̲

         a)  The Contractor will issue to the Customer Spare
             Parts Design Change Notices (SPDCN) for each item
             (fuse, resistor, capacitr, lamp, transistor, inductance
             module, etc.) affected within:

             1)  Four weeks of the Customer's approval of the
                 Equipment Design Change Notice affecting the
                 spare parts change.

             2)  Not later than nine months before an item will
                 no longer be prouced.


         b)  The SPDCN will refer to the assembly and the part
             involved, the improvement achieved, the technical
             manuals and the parts thereof to be amended, the
             impact on the provisionin actions already taken
             and/or stocks of parts and components already delivered.
             The SPDCN will also indicate the price of the new
             part and provide recommendations as to the disposition
             actions to be taken on the previously recommended
             part, as apprpriate.

         c)  The above services are to be furnished at no additional
             cost to the Customer, as long as the service is
             rendered within the warranty period of the equipment.

         d)  Cost of issuing SPDCNs subsequent to expiration
             of warranty period will e negotiated separately
             or be part of additional spares procurement.



3.7.3.1.9    P̲r̲o̲v̲i̲s̲i̲o̲n̲i̲n̲g̲ ̲C̲o̲n̲f̲e̲r̲e̲n̲c̲e̲s̲

         The Contractor and purchaser will schedule and conduct
         provisioning conferences within a mutually agreed and
         suitable time frame to allow slection and timely delivery
         of parts, tools and test equipment. Conference facilities,
         documentation and equipment as required/ available
         will be provided by the Contractor.



3.7.3.2  N̲A̲T̲O̲ ̲C̲o̲d̲i̲f̲i̲c̲a̲t̲i̲o̲n̲

         The Contractor shall codify before final aceptance
         of all CAMPS sites at no additional cost to purchaser:

         a)  Items shown in the approved spare parts list (ASPL).

         b)  Major and minor sub-assemblies (if not included
             in the ASPL).

         c)  Equipment/spare parts affected by the equipment
             Design hanges Notices.

         Codification required in addition to a), b), and c)
         above shall be established by the purchaser at progress
         meetings with the Contractor.




3.7.4    T̲r̲a̲i̲n̲i̲n̲g̲



3.7.4.1  G̲e̲n̲e̲r̲a̲l̲ ̲R̲e̲q̲u̲i̲r̲e̲m̲e̲n̲t̲s̲

         a)  Contractor shall develop training programs and
             supply associated course material for the following
             courses:

         …02…1)  Technical Hadware Training Course
         …02…2)  Operator Training Course
         …02…3)  On-The-Job Training
         …02…4)  Software Maintenance Course (optional)
         …02…5)  Training of Customer Resident Field Technicians
             6)  Depot level Training Course (optional)

         b)  …02…Contractor shall conductthe following training:

         …02…1)  Initial series of Technical Hardware Training Courses
             to be conducted at contractor's facility. (Training
             at NCS is optional).

         …02…2)  Training of customers Resident Field Technicians
             (RFT) to be conducted at contractor' facility.

         …02…3)  Software Maintenance Course to be conducted at
             contractors facility when customer has the resources
             available to form a maintenance capability (optional).



3.7.4.1.1    E̲q̲u̲i̲p̲m̲e̲n̲t̲ ̲a̲t̲ ̲N̲C̲S̲

         a)  The contractor shall install the trainingequipment
             at the NATO Communications School (NCS) Latina,
             so that it is fully operational before the first
             formal training courses to be conducted at the
             NCS by customer's instructors.

         b)  In addition to spares delivered to NCS the contractor
             shal supply some modules and sub-assemblies with
             representative and realistic faults so that the
             fault finding techniques shall be true to life.
             The lay-out of the installed equipment shall be
             representative of a CAMPS configuration. Test equipment
             of he same type and quantity as for a normal CAMPS
             installation shall be provided to carry out all
             maintenance activities that will be required of
             the technicians. All such equipment will become
             the property of the purchaser.


         c)  L̲a̲n̲g̲u̲a̲g̲e̲. All courses shall be conducted in English
             and all equipment handbooks and training material
             shall be produced only in English.


         d)  C̲o̲u̲r̲s̲e̲ ̲L̲e̲n̲g̲t̲h̲. Formal Courses sall be designed
             to be effective and efficient, but should be kept
             as short as possible. The integrated training plan
             is to be based upon a 6 hour day, 45 minute training
             period and a 5 day week, and take account of NATO
             holidays (approx. 1 day/mont) and course administration
             (1 day/course and 1 day/month).


         e)  C̲o̲u̲r̲s̲e̲ ̲S̲t̲r̲e̲n̲g̲t̲h̲. There shall be a maximum of 12
             students per course. For practical work a course
             shall be divided into 6 groups of 2 students if
             possible, or individual "stands" if cntinuous flow
             self-paced methods are selected for formal courses.
             The courses shall be developed to provide for hands-on
             equipment training for at least 60% of the time.


3.7.4.1.2    T̲a̲r̲g̲e̲t̲ ̲P̲o̲p̲u̲l̲a̲t̲i̲o̲n̲

         a)  All students to be trained except RFT (see . below)
             will be military and civilian personnel from various
             NATO countries, each having an English language
             proficiency level of at least SLP 3232 (as described
             in STANAG 6001 of 21. Oct. 76.).

         b)  All operators will be capable of operating compter
             type terminal equipment such as VDUs and line printers
             through the former use of teleprinters and typewriters
             but may not necessarily be experienced in working
             with a processor.

             Furthermore operating personnel must be conversant
             with messagehandling procedures as defined in ACP
             127-3.

…02…c)       All technicians will have been trained in general 
          electronics but may not have extensive knowledge in
         the electronic and digital techniques used in computer
         equipment.


…02…d)       Personnel requirements applicable to customers Resident
         Field Technician (RFT) are as follows:

…02…         1)  The RFT shall have an English language proficiency
             level of SLP 4443 as dscribed in STANAG 6001 of
             21 Oct 1976. The RFT must be graduate of an accredited
             advanced communication or electronics technical
             school and have a minimum of 5 years' experience
             in modern communication systems using digital switching
             techniques. Ths experience must include the maintenance
             of installation testing of such equipment. He shall
             have a generel knowledge of software to permit
             an initial diagnosis and analysis of software faults
             in order to furnish relevant data to the system
             analyss and programming service.

             2)  He shall have the necessary qualifications
                 to conduct extensive OJT courses attended by
                 operators and technicians.



3.7.4.1.3    D̲o̲c̲u̲m̲e̲n̲t̲a̲t̲i̲o̲n̲ ̲a̲n̲d̲ ̲T̲r̲a̲i̲n̲i̲n̲g̲ ̲A̲i̲d̲s̲

         a)  The training documentation to be provided in suppot
             of the training programme for the contract shall
             be written, compiled, published and delivered in
             accordance with the contractual requirements for
             documentation applicable for this contract.

         b)  The contractor shall prepare and provide all trainng
             aids in the light of the maintenance requirements.


         c)  I̲n̲s̲t̲r̲u̲c̲t̲o̲r̲'̲s̲ ̲M̲a̲n̲u̲a̲l̲. For each course supplied under
             this contract contractor shall provide an instructor's
             manual which will comprise a collection of all
             the training material in one looseleaf binder,
             properly indexed.

         d)  V̲u̲f̲o̲i̲l̲s̲ ̲a̲n̲d̲ ̲S̲l̲i̲d̲e̲ ̲S̲p̲e̲c̲i̲f̲i̲c̲a̲t̲i̲o̲n̲s̲. Vufoils shall
             be prepared on transparent plastic sheets no larger
             than 25 cm x 25 cm and no smaller than 17.5 cm
             x 23.5 cm and shall be mounted in permanent cardboard
             or plastic olders.


             They shall be numbered in a manner, which clearly
             identifies each vufoil with its associated lesson
             plan and student notebook.

         e)  Slides shall be standard 35 mm slides mounte in
             card or plastic holders. They shall be numbered
             in a manner which clearly identifies each slide
             with its associated lesson plan and student notebook.

         f)  A̲p̲p̲r̲o̲v̲a̲l̲ ̲a̲n̲d̲ ̲D̲e̲l̲i̲v̲e̲r̲y̲. The contractor shall submit
             a sample copy (preliminary version) ofthe training
             documentation with readable prints of each associated
             vufoil and slide, and films, to the purchaser and
             the NCS (see annex A). Recommended changes shall
             then be incorporated by the contractor and finalized
             copies of the training documetation together with
             training aids shall be delivered to the NCS and
             purchaser.

             The contractor shall deliver all training documentation
             in the quantities shown at Annex A.

         g)  S̲e̲c̲u̲r̲i̲t̲y̲ ̲C̲l̲a̲s̲s̲i̲f̲i̲c̲a̲t̲i̲o̲n̲. The contractor shall mark
             the appropriate scurity classifications on all
             documentation and training material following the
             current ACE security directives. The purchaser
             shall approve the security grading before production
             in quantity.



3.7.4.2  T̲r̲a̲i̲n̲i̲n̲g̲ ̲P̲r̲o̲g̲r̲a̲m̲ ̲P̲l̲a̲n̲

         a)  Contractor shall ubmit to purchaser a Training
             Program Plan for his approval no later than 6 month
             before the scheduled commencement of the first
             course.

         b)  The plan shall give a detailed description of the
             Training program and the interrelationship between
             the fve types of training:

             -   hardware training

             -   operator training

             -   on-the-job training

             -   software training

             -   training of customers Resident Field Technicians…86…1
                         …02…   …02…   …02…   …02…                         
                                    
         c)  The training plan for each of the five types of
             courses will include appropriate subsets of the
             following training objectives:

             l)  A general description of the system.

             2   Operation and maintenance philosophy and policies.

             3)  Electronic components utilized.

             4)  Transmission and operation techniques.

             5)  Detailed step-by-step signal and information
                 flow through all equipment.

             6)  Use of test equipment and mesuring techniques.

             7)  Practical training for fault diagnosis, alignment,
                 testing maintenance and operating procedures.

             8)  Sufficient instruction regarding the software
                 so that a technician will be able to diagnose
                 and analyze a software faultand furnish the
                 relevant details to the software maintenance
                 team.

             9)  The intended method of instruction, that is:

                 -   Continuous flow, self paced method using
                     self
                     learning materials OR.

                 -   Traditional classroom/laboratory methods
                     OR.
                 -   A combination of both.

             10) The expected duration of the course.

             11) The syllabus and integrated training plan.

         d)  Furthermore, the following information will be
             provided:

             1)  Skills and Knowledge Specification (SAKS).

                 That is, th skills and knowledge required of
                 the trained person as determined by the contractor.

             2)  Training and Enabling Objectives.


                 These are to be formulated from the SAKS. 
                 They are precise objective statements in behavioural
                 terms of what a trained person must be able
                 to do, the conditions under which h must carry
                 out the performance, and the standards which
                 the trained person must achieve to enable him
                 to do the job safely and effectively. Training
                 and enabling objectives will be developed for
                 each course and included in the respective
                 training lan.

             3)  Entry Standards.

                 The contractor shall state in the Training
                 Program Plan the required entry standards and
                 technical background of prospective students.



3.7.4.3  T̲e̲c̲h̲n̲i̲c̲a̲l̲ ̲T̲r̲a̲i̲n̲i̲n̲g̲



3.7.4.3.1    T̲r̲a̲i̲n̲i̲n̲g̲ ̲P̲l̲a̲n̲

         a)  Contractor shall sumit an integrated Training Plan
             no later than 6 months before the scheduled commencement
             of the first formal course to be conducted.

         b)  The training plan will be worked out in conjunction
             with the purchaser, based on the installation schedule,
             atthe same time ensuring that the initial training
             courses shall be programmed so as to permit sufficient
             qualified personnel to be available at each site
             upon provisional acceptance.

         c)  The training programme shall be planned to allow
             for the traiing of the NCS instructors before the
             changeover of the training venue from contractor's
             facility to NCS, Latina.

         d)  The Training and Enabling objective of this course
             is two fold:

             1)  to let the technician diagnose and correct
                 a fault accordin to the requirements in the
                 Maintenance plan i.e. repair by module replacement.
                  Consequently, training below module level
                 will not be performed.


             2)  to let the technician perform Software program
                 and data base changes as directed.



3.7.4.3.2    C̲o̲n̲d̲u̲c̲t̲i̲o̲n̲ ̲o̲f̲ ̲C̲o̲u̲r̲s̲e̲s̲

         a)  The initial courses, 6 courses held at contractor'sfacility,
             will ensure training of personnel to be available
             at sites before PSA.  Furthermore, the two NCS
             instructors will be trained in the following way:

         b)  The NCS instructors shall attend one course as
             students, the following course shall betaught by
             the contractor assisted by the NCS instructors.
              The third course shall be taught by the NCS instructors
             supervised by the contractor's instructors.

         c)  These three courses shall be programmed to be the
             last three courses of the initial eries of 6 courses
             being taught by the contractor.

         d)  During and between the course the contractor shall
             give all necessary support to the NCS instructors
             for their theoretical and practical training.

         e)  The contractor shall provide two instrucors for
             the purpose of the initial training.

         f)  The contractor's instructors shall be qualified
             to teach telecommunications and computer technology
             to degree standard and have an English language
             proficiency of SLP 4443 as explained in STANAG
             600 of 21. Oct. 76.  The instructors shall have
             full knowledge of the operation and maintenance
             of the equipment being supplied by the contractor.

         g)  Contractor will develop the Formal Technical Training
             course as a 10 days hardware course and a 15 ay
             software course.

         h)  At the end of each of the initial 6 courses all
             students will be required to complete a questionnaire
             on the training course content, length of course,
             method of instruction, and all other circumstances
             affecting student prgress and/or proficiency.…86…1
                     …02…   …02…   …02…   …02…                             
                            
             The questionnaires will be submitted by the contractor
             who shall forward them to the purchaser for his
             comments.  The questionnaires will be compiled
             and produced by the contrator.



3.7.4.3.3    T̲r̲a̲i̲n̲i̲n̲g̲ ̲M̲a̲t̲e̲r̲i̲a̲l̲

         The contractor shall provide the following for each
         technical course.  All instruction and material is
         to be based on the approved training and enabling objectives.
          For documentation quantity requirements see nnex A.



3.7.4.3.3.1 T̲e̲s̲t̲ ̲I̲t̲e̲m̲s̲

         Test items, if of the multiple choice type, derived
         from the approved training objectives, stating how
         these tests will be carried out, i.e. at the end of
         various phases or on a continuous assessment for practica
         work shall be adopted.



3.7.4.3.3.2 L̲e̲s̲s̲o̲n̲ ̲P̲l̲a̲n̲s̲

         These shall include statements on: 

         a)  The objectives of the lesson.

         b)  The structure of the lesson indicating key teaching
             points/words and test items.

         c)  The audio-visual aids required.
         d)  The time allowed for the lesson.

         e)  Reference documents, handbooks, etc.



3.7.4.3.3.3 S̲t̲u̲d̲e̲n̲t̲ ̲L̲a̲b̲o̲r̲a̲t̲o̲r̲y̲ ̲N̲o̲t̲e̲b̲o̲o̲k̲s̲ ̲(̲g̲u̲i̲d̲e̲s̲)̲

         These shall contain for each practical exercise:

         a)  The objective of the exercise.


         b)  Appropriate diagrams (if not included in a separate
             book).

         c)  Space in which to write exercise reports, results
             and conclusions.

         d)  Trouble shooting charts.



3.7.4.3.3. I̲n̲s̲t̲r̲u̲c̲t̲o̲r̲ ̲L̲a̲b̲o̲r̲a̲t̲o̲r̲y̲ ̲G̲u̲i̲d̲e̲s̲

         These shall be in more detail than the corresponding
         student guides and must show:

         a)  The equipment required for each exercise and how
             it should be set up to enable the objective to
             be achieved.

         b)  How student peformance should be monitored and
             assessed.

         c)  Trouble shooting techniques.



3.7.4.3.3.5 V̲i̲s̲u̲a̲l̲ ̲A̲i̲d̲s̲ 

         These shall include one or more of the following: vufoils,
         slides, films or video tapes to demonstrate techniques,
         procedures, etc.



3.7.4..3.6 S̲t̲u̲d̲e̲n̲t̲ ̲T̲e̲x̲t̲b̲o̲o̲k̲s̲

         Comprehensive student notes should be produced for
         all parts of training.  They must include copies of
         all visual aids used in instruction.  Student texts
         shall be produced in a loose leaf form with binders
         so that the studnt is only issued with those notes
         which are pertinent to the current part of the course
         he is studying.




3.7.4.3.3.7 S̲t̲u̲d̲e̲n̲t̲ ̲L̲o̲g̲ ̲B̲o̲o̲k̲

         A Student Log Book for objectives achieved shall be
         supplied by the contractor.  This log book shall be
         a copy of the syllabus of the course which ay be updated
         as the course progresses and referred to later on-the-job
         as a record of training performance standard achieved.



3.7.4.4  O̲p̲e̲r̲a̲t̲o̲r̲ ̲T̲r̲a̲i̲n̲i̲n̲g̲



3.7.4.4.1    T̲r̲a̲i̲n̲i̲n̲g̲ ̲P̲l̲a̲n̲

         The contractor shall submit specific proposals for
         the operator course to the purchaser for his approval
         6 months before the equipment is scheduled to become
         operational.  These proposals shall include:

         a)  Methods to be used e.g. Programmed learning texts,
             use of a software package, multiple choice question
             apers.

         b)  Samples of training aids.

         c)  Details of any essential off-line training equipment
             required.

         d)  A statement as to the length of time an operator
             will be required to carry out OJT before he will
             be able to competently operate the equiment to
             Operational Performance Standards.

         Upon approval of his proposals the contractor shall
         provide all materials and equipment to enable students
         to reach the required objectives.



3.7.4.4.2    C̲o̲n̲d̲u̲c̲t̲i̲o̲n̲ ̲o̲f̲ ̲C̲o̲u̲r̲s̲e̲s̲

         Formal operator training hall be carried out on-site
         as on-the-job training, at customers full responsibility.


         As the equipment will be in position and available
         for use the self-paced method of instruction shall
         be adopted.  For supervision, the contractor can depend
         on the availabilityof a part-time instructor.  In the
         first instance this part time instructor will be the
         Resident Field Technician and later it will be the
         operational supervisor.



3.7.4.4.3    T̲r̲a̲i̲n̲i̲n̲g̲ ̲M̲a̲t̲e̲r̲i̲a̲l̲

         Upon customer's approval of the Training Plan, contrctor
         shall provide all training material in the quantity
         stated in Annex A.



3.7.4.5  O̲n̲-̲T̲h̲e̲-̲J̲o̲b̲ ̲T̲r̲a̲i̲n̲i̲n̲g̲



3.7.4.5.1    T̲r̲a̲i̲n̲i̲n̲g̲ ̲P̲l̲a̲n̲

         a)  The contractor shall prepare a detailed OJT programme
             for both operators and maintenance personnel for
             implemntation at all sites.

         b)  The maintenance personnel to be given OJT will
             have attended the appropriate formal training course
             at NCS or the initial Technical Course held at
             contractors facility.

         c)  The operator personnel to be given OJT will hav
             attended the appropriate formal training on-site
             (see Operator Training).

         d)  The contractor shall indicate, in detail, the contents
             of each instruction phase and the time to be spent
             on each phase of the OJT.  The contractor shall
             identify and pepare all training documents and
             materials and aids necessary for the OJT.

         e)  The OJT programmes shall be in addition to the
             formal training and be designed to qualify station
             personnel to operate installed equipment, to carry
             out required prevenive maintenance and to perform
             corrective maintenance.


         f)  A written and practical test shall be developed
             by contractor to be taken by the participants at
             the end of each phase of OJT. The written tests,
             shall be of the multiple choce question type. Evaluation
             of the test results will be done by the RST.



3.7.4.5.2    C̲o̲n̲d̲u̲c̲t̲i̲o̲n̲ ̲o̲f̲ ̲C̲o̲u̲r̲s̲e̲s̲

         OJT training will be conducted by the purchaser. The
         purchaser is responsible for restoring equipments to
         full operational status after cmpletion of training
         sessions. This customer's responsibilty in no way affects
         the contractor's responsibility under the warranty
         or contract special provision number 24.



3.7.4.5.3    T̲r̲a̲i̲n̲i̲n̲g̲ ̲M̲a̲t̲e̲r̲i̲a̲l̲

         Upon customer's approval of the Training proram, contractor
         shall provide all training material in the quantity
         stated in annex A.



3.7.4.6  S̲o̲f̲t̲w̲a̲r̲e̲ ̲M̲a̲i̲n̲t̲e̲n̲a̲n̲c̲e̲ ̲C̲o̲u̲r̲s̲e̲ ̲(̲O̲p̲t̲i̲o̲n̲a̲l̲)̲




3.7.4.6.1    T̲r̲a̲i̲n̲i̲n̲g̲ ̲P̲l̲a̲n̲

         a)  The contractor shall develop a training plan for
             the software maintenance of te systems.  The purpose
             of this course shall be to give sufficient knowledge
             and expertise to the students for maintenance and
             modification of the software independently of the
             contractor.  These students shall be the software
             maintenance personnelof the purchaser.

         b)  This course will only be required when the purchaser
             has the resources and the possibilities of maintaining
             the software.  For this reason, the contractor
             shall provide a separate training plan for this
             course.  The software raining plan shall be submitted
             to the purchaser within 6 months after the site
             acceptance of the first site.  Generation of the
             Software Training Plan is considered within scope
             of the basic contract.…86…1         …02…   …02…   …02…   …02…     
                                                    
3.7.4.6.2    C̲o̲n̲d̲u̲c̲t̲i̲o̲n̲ ̲o̲f̲ ̲C̲o̲u̲r̲s̲e̲s̲

         Conduction of courses is not within scope of this contract.
          As part of the proposal for the training plan contractor
         will submit detailed costig for the development and
         conduction of the software Maintenance Courses.  The
         courses may take place at one or more of three places.

         -   contractor's plant

         -   CSSI

         -   NCS Latina



3.7.4.6.3    T̲r̲a̲i̲n̲i̲n̲g̲ ̲M̲a̲t̲e̲r̲i̲a̲l̲

         Upon customer's approval of the Sotware Training Plan
         contractor shall deliver training material for the
         software Maintenance Course.



3.7.4.7  T̲r̲a̲i̲n̲i̲n̲g̲ ̲o̲f̲ ̲C̲u̲s̲t̲o̲m̲e̲r̲'̲s̲ ̲R̲e̲s̲i̲d̲e̲n̲t̲ ̲S̲i̲t̲e̲ ̲T̲e̲c̲h̲n̲i̲c̲i̲a̲n̲s̲

         It is Customer's intention to have 12 persons trained
         by contractor at his plant.  Thee persons are termed
         Resident Site Technicians (RST) and will be assigned
         to the individual CAMPS site 2 weeks prior to site
         installation.



3.7.4.7.1    T̲r̲a̲i̲n̲i̲n̲g̲ ̲P̲l̲a̲n̲

         Contractor shall submit a separate training plan 6
         months before the scheduled cmmencement of the courses.

         The level of training shall be such that the RST will
         have sufficient knowledge to diagnose hardware faults
         down to unit level and perform pull and replace maintenance.
          He shall be able to identify software errors and eport
         them to contractor's software maintenance and support
         team.  After software corrections are made by contractor,
         the RST shall implement the program change at his CAMPS
         site.  Furthermore, he will receive training in implementation
         of Field Moifications required by the maintenance plan.…86…1
                 …02…   …02…   …02…   …02…                                 
                    
3.7.4.7.2    C̲o̲n̲d̲u̲c̲t̲i̲o̲n̲ ̲o̲f̲ ̲c̲o̲u̲r̲s̲e̲s̲

         The two proposed courses will be carried out at contractor's
         facility.

         Formal classroom training of the RST will be conducted
         in classes of ma. 6 students.  Hands-on training will
         be carried out on contractor's DSMT system and on Hardware
         produced for NCS, Latina.  To the extent possible the
         students will participate in the integration and test
         of the production systems.  If relevant, viits to a
         site will be made during the training period, to familiarize
         the student with site installations etc.

         After training the RST must be qualified to conduct
         OJT and supervise maintenance as well as undertake
         all the tasks as described in cotractor's maintenance
         plan.



3.7.4.7.3    T̲r̲a̲i̲n̲i̲n̲g̲ ̲M̲a̲t̲e̲r̲i̲a̲l̲

         Upon customers approval of the training program contractor
         shall provide each student with a complete set of training
         material.  Additional sets (two) shall be delivered
         to customer for iformation.



3.7.4.8  D̲e̲p̲o̲t̲ ̲L̲e̲v̲e̲l̲ ̲T̲r̲a̲i̲n̲i̲n̲g̲ ̲(̲O̲p̲t̲i̲o̲n̲a̲l̲)̲

         Training of customer's personnel in depot level repair
         of the CAMPS hardware modules will be carried out by
         contractor at customer's request.  This option should
         be exercised when the final Deot Level repair method
         has been selected i.e. use of customer's universal
         test equipment (ATE) or contractor supplied CAMPS Module
         Test Equipment.



                   ANNEX A 1 of 3 pages



           D̲o̲c̲u̲m̲e̲n̲t̲a̲t̲i̲o̲n̲ ̲Q̲u̲a̲n̲t̲i̲t̲y̲ ̲R̲e̲q̲u̲i̲r̲e̲m̲e̲n̲t̲s̲

         The contractor is to provide training documentation
         in the following quantities:



P̲r̲e̲l̲i̲m̲i̲n̲a̲r̲y̲ ̲V̲e̲r̲s̲i̲o̲n̲…02…P̲u̲r̲c̲h̲a̲s̲e̲r…02…N̲C̲S̲…02…O̲p̲t̲i̲o̲n̲a̲l̲ ̲s̲i̲t̲e̲…02…T̲o̲t̲a̲l̲ ̲

1.  Preliminary ver-
    sion of all do-
    cumentation list-
    ed below 6 months
    before commence-
    ment of the first
    course…02……02……02…2…02…2…02…0…02…4

F̲i̲n̲l̲ ̲V̲e̲r̲s̲i̲o̲n̲s̲

2.  Integrated train-
    ing plan for for-
    mal courses…02…2…02…6…02…0…02…8

3.  Integrated train-
    ing plans for
    programmed learn-
    ing courses…02…2…02…4…02…2…02…8

4.  Integrated train-
    ing plan for OJT…02…2…02…1…02…2…02…5

5.  Skills and Know-
    lede Specifica-
    tions (SAKS),
    sets per course…02…1…02…1…02…1…02…3

6.  Training and
    Enabling Objec-
    tives, sets,
    for all cour-
    ses…02……02……02…2…02…6…02…1…02…9


                   ANNEX A 2 of 3 pages




7.  For formal courses:

a. Course log book
   & test items…02…2…02…14…02…-…02…16

b. Student assess-
   ment sheets/
   cards…02……02……02…2…02…200…02…-…02…202

c. Lessons plans,
   sts…02……02……02…2…02…6…02…-…02…8

d. Course syllabus…02…2…02…6…02…-…02…8

e. Student log
   book…02……02……02…2…02…200…02…-…02…202

f. Student lab
   guides…02……02……02…2…02…200…02…-…02…202

g. Instructor
   lab guides…02……02…2…02…6…02…-…02…8

h. Equipment
   handbooks…02……02…2…02…20…02…-…02…22

i. Student text
   books, sets…02……02…2…02…200…02…-…02…202

j. Visul aids,
   sets…02……02……02…2…02…6…02…-…02…8



                   ANNEX A 3 of 3 pages



P̲r̲e̲l̲i̲m̲i̲n̲a̲r̲y̲ ̲V̲e̲r̲s̲i̲o̲n̲s̲

k. Student
   aptitude
   questionnaires…02…2…02…200…02…-…02…202


8. Instructors'
   manuals…02……02……02…2…02…6…02…-…02…8

9. For OJT - all
   documentation…02…2…02…2…02…0…02…14

10.Student's
   Questionnaire…02…2…02…200…02…-…02…202



…02…Note 1   All documentation shall have one copy produced as a
         master suitable for offset printing - this master shall
         be delivered to the purchaser.…86…1         …02…   …02…   …02…   …02… 
                                                  
             4̲ ̲ ̲Q̲U̲A̲L̲I̲T̲Y̲ ̲A̲S̲S̲U̲R̲A̲N̲C̲E̲ ̲P̲R̲O̲V̲I̲S̲I̲O̲N̲S̲



         This section specifies the quality assurance provisions
         applicable to verification of equipment and software.



4.1…02…T̲E̲S̲T̲ ̲A̲N̲D̲ ̲V̲E̲R̲I̲F̲I̲C̲A̲T̲I̲O̲N̲ ̲M̲E̲T̲H̲D̲S̲

         The unit test requirements will be met by one of the
         following methods:

…02…a.       E̲x̲a̲m̲i̲n̲a̲t̲i̲o̲n̲.̲ This method is a non-functional verification,
         such as visual inspection of the physical characteristics
         of the item or of the documentation associated wih
         the item.

…02…b.       A̲n̲a̲l̲y̲s̲i̲s̲.̲ This method is a non-functional verification,
         such as deduction or translation of data, review of
         analytical data, or performance of a detailed analysis.

…02…c.       T̲e̲s̲t̲ ̲D̲e̲m̲o̲n̲s̲t̲r̲a̲t̲i̲o̲n̲.̲ This method is a functional verification,
         uch as actual operation wherein the element of verification
         is instrumented, measured, or displayed directly (test)
         or where the element of verification is logically obvious,
         as the result of some other verification, but not itself
         displayed (demontration).



4.2…02…V̲E̲R̲I̲F̲I̲C̲A̲T̲I̲O̲N̲

         a)  The verification efforts are divided into hardware,
             software and system verification.

         b)  The verification will be divided into two classes
             which are

…02…         I   - Internal verification
…02…         II  - External verification

c)       Only class II verifications shall be approved by SHAPE.


         d)  Class I verifications shall be approved by CR's
             internal QA only, but may be inspected by SHAPE's
             QAR.

         e)  The verification efforts shall be divided into
             the verification tye defined below.



         f)  H̲A̲R̲D̲W̲A̲R̲E̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲


…02…         C̲l̲a̲s̲s̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲ ̲T̲y̲p̲e̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

         …02…I…02…Prototype Verification
…02……02…I        Preproduction Verification
         …02…I…02…Production Verificatin
         …02…II…02…DSMT (Prototype) System Verification
         …02…II…02…Factory Acceptance Verification
         …02…II…02…COMSEC In-Plant Verification
         …02…II…02…Availability Verification

         g)…02…S̲O̲F̲T̲W̲A̲R̲E̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲


         …02…C̲l̲a̲s̲s̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲ ̲T̲y̲p̲e̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

         …02…I…02…Software Developmnt Verification
         …02…II…02…In Plant Software Verification
         …02…II…02…Software Functional Verification
         …02…II…02…Software Operational Verification

         h)  S̲Y̲S̲T̲E̲M̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲


             C̲L̲A̲S̲S̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲ ̲t̲y̲p̲e̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
             ̲ ̲ ̲

             II     Comsec On-site Verification
             II     Ste Provisional Acceptance (SPA)


4.2.1…02…H̲a̲r̲d̲w̲a̲r̲e̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲


4.2.1.1…02…P̲r̲o̲t̲o̲t̲y̲p̲e̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲

         The Prototype Verification is an internal verification
         (class I).  The verificatin methods used are examination
         and test.  The purpose of the prototype verification
         is…86…1         …02…   …02…   …02…   …02…                             
                        
         to verify that the prototype meets the basic requirements
         of its product specification.  This is only applicable
         to new design of units, modules and subsystems or modifications
         o existing design.



4.2.1.2…02…P̲r̲e̲p̲r̲o̲d̲u̲c̲t̲i̲o̲n̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲

         The preproduction verification (First Article Qualification
         Test) is an internal verification (class I).  The verification
         methods used are examination and test.  This verification
         shall veify that the preproduction item meets all the
         requirements of its product specification.  This verification
         is only applicable to new design of units, modules
         and subsystems or modifications to existing design.



4.2.1.3…02…P̲r̲o̲d̲u̲c̲t̲i̲o̲n̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲

         he production verification which is internal (class
         I) is the verification to be performed on each unit,
         module and subsystem following manufacture to ensure
         that all items are in accordance with product specification
         prior to system integration.


4.2.1.4…02…D̲S̲M̲T̲ ̲(̲P̲r̲o̲t̲o̲t̲y̲p̲e̲)̲ ̲S̲y̲s̲t̲e̲m̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲

         a)  When the hardware of DSMT System has been integrated
             and the system software completed, a DSMT (Prototype)
             Acceptance Verification of the integrated system
             will be performed.

         b)  This is an externl verification (class II). Upon
             SHAPE approval of the results of the tests, the
             manufactured systems are baselined.




4.2.1.5…02…F̲a̲c̲t̲o̲r̲y̲ ̲A̲c̲c̲e̲p̲t̲a̲n̲c̲e̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲

         a)  When a CAMPS has been integrated at the factory,
             a test will be carried out to verify that all hardware
             fulfils the functional specifcations.  The test
             is a subset of the DSMT (Prototype) System Verification.
             The subset of test procedures will be identical
             to the performance test procedures used for the
             DSMT (Prototype) tests, except for the exclusion
             of the environmental tests.
         b)  This test is according to contract document para.
             17.4 This is an external verification (class II).



4.2.1.6…02…C̲O̲M̲S̲E̲C̲ ̲I̲n̲-̲P̲l̲a̲n̲t̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲

         The CAMPS equipment will be tested by Purchaser at
         the factory. The purchaser will liaise directly wih
         the national COMSEC authorities where appropriate.
         Refer to section 3.4.5.1.



4.2.1.7  A̲v̲a̲i̲l̲a̲b̲i̲l̲i̲t̲y̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲

         a)  The availability and reliability performance characteristics
             specified in section 3.4.4 shall be demonstrated
             by performing avalability measurements/calculations,
             in which the values of the module/unit MTBFs and
             MTTRs are verified by:

             1)  Testing/analysis in accordance with sections
                 4.2.1.7.1, 4.2.1.7.2 and 4.2.1.7.3 or,


             2)  Provision of acceptable evidence of conformity
                 to requirements, i.e. evidence supported by
                 prior observation of system or module performance
                 over a length of time sufficientto have the
                 same degree of confidence as the test procedure
                 that the required availability can be archived.

             3)  Availability/reliability/maintainability observations
                 which the contractor wishes to submit in lieu
                 of testing shall be provided as pat of the
                 R&M Plan for agreement by the purchaser.

         b)  The set of units and modules, taken together, shall
             make up the CAMPS equipment of the R&M model(s)
             used for verification of system availability. A
             definition of the terms module and unit is gien
             in section 3.4.4.7 l and m.

         c)  The R&M Characteristics shall be considered acceptable
             if it is verified that the reliability performance
             requirements specified in section 3.4.4. are met.
             Demonstration that the specified availability requiremens
             have been met shall be accomplished prior to acceptance
             of the first site.



4.2.1.7.1    M̲T̲B̲F̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲



4.2.1.7.1.1  M̲T̲B̲F̲s̲ ̲o̲f̲ ̲3̲5̲0̲0̲ ̲H̲o̲u̲r̲s̲ ̲o̲r̲ ̲L̲e̲s̲s̲

         a)  Tests shall be performed to measure the MTBF of
             all units and modules having a predicted MTB value
             of 3500 hours or less. The contractor need not
             test all the individual units of a module being
             tested unless the unit has a MTBF value less than
             3500 hours and is part of another module which
             is not being tested.

         b)  R&M testing shall be coducted in accordance with
             an approved unit or module test plan. The overall
             system test programme shall be planned so that
             reliability data is obtained from as many functional
             tests as possible. In this manner the performance
             of reliability testing per se, will be reduced
             to the minimum necessary for the demonstration
             of system compliance with the R&M availability
             requirements.


         c)  The R&M Test Programme shall make provisions for
             the accumulation of sufficient testing time on
             each type of module. The accumulated testing time
             shall be equivalent to at lest three multiples
             of either:

             1)  the predicted MTBF value of the module with
                 an MTBF of 3500 hours or less, or

             2)  the largest predicted unit MTBF value for units
                 having a predicted MTBF value less than 3500
                 hours and forming part of a module ith a MTBF
                 value greater than 3500 hours.

         d)  The R&M test programme shall provide for demonstrating
             that unit and module MTBF values are equal to or
             greater than the respective predicted values, to
             a lower confidence limit value in accordance wit
             the following schedule:

             1)  70% lower confidence limit value at the time
                 of Factory Acceptance Verification (site 1)

             2)  80% lower confidence limit value at the time
                 of SPA (Site 1)

         e)  The lower confidence limit values of MTBF shall
             be deterined from the test data using the following
             equation:


                                    2T…0f…M…0e…                    
             
               MTBF…0f…LCL…0e…       …0f…=…0e…   …0e… ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲…0f…            
                                       2                   
          
                                          ,f               
         

            where
                   T…0f…M…0e…         =   the total cumulative module
                              or
                                  unit operating time obtained
                                  from the tes programme
                     2  
                      ,…0f…f…0e…      =   chi-square value with    
                                  probability and f degrees
                                  freedom

                              =    (̲1̲0̲0̲-̲L̲C̲L̲)̲
                                      100


                   LCL        =    Specified Lower Confidence
                                     Level, expressed as a percentage

                   f          =    2x(N…0f…p…0e… + 1)

                   N…0f…p…0e…         =    the actual number of va-
                                    lid module or
                                     unit failures observed
                                     during the period T…0f…M…0e….



4.2.1.7.1.2  M̲B̲F̲s̲ ̲G̲r̲e̲a̲t̲e̲r̲ ̲T̲h̲a̲n̲ ̲3̲5̲0̲0̲ ̲H̲o̲u̲r̲s̲

         a)  The contractor shall justify the use of MTBF values
             greater than 3500 hours for individual units and
             for modules, without redundant units, by means
             of analytical calculations. Such calculations shall
             use values take from actual test data on "like"
             or similar equipment or from a component analysis,
             utilizing values taken from recognized sources,
             e.g. reliability and maintainability handbooks
             maintained by National Government and by Industry.

         b)  The preliminay and final R&M Programme Plans shall
             identify those units and modules which have predicted
             MTBF values greater than 3500 hours, and which
             will have the MTBF values justified rather than
             tested. The list shall include the predicted value
             of MTBF fo such units and modules. The list may
             be changed as the programme progresses provided
             notification is given at least 60 days in advance
             of starting or cancelling any planned tests. The
             change process contemplated for this list is the
             same as that povided in the contract for all items
             (data) under Configuration Control except:

             1)  The contractor's proposals will not include
                 any consideration of the cost impact for contractor's
                 proposed change.

             2)  Such proposals, once mutually agreed for ll
                 project impacts other than cost, will be contractually
                 implemented at no change in contract price.

             3)  These change proposals shall be treated as
                 "critical documents" within the meaning of
                 Contract Special Provision No. 11, Approval
                 and Submital of Documentation.


             The analytical calculations for all units, and
             modules in this category shall be submitted to
             the purchaser for approval at least 60 days prior
             to the start of any acceptance tsting.



4.2.1.7.2    M̲T̲T̲R̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲



4.2.1.7.2.1  M̲T̲T̲R̲s̲ ̲o̲f̲ ̲4̲5̲ ̲M̲i̲n̲u̲t̲e̲s̲ ̲o̲r̲ ̲L̲e̲s̲s̲

         a)  Tests shall be performed to measure the MTTR of
             all types of units and modules with a predicted
             MTTR value of 45 minutes or less.

             The contractor need not test ndividual units of
             a module that is being tested unless the unit is
             also a part of another module that is not being
             tested.

         b)  The tests shall be carried out in accordance with
             an approved R&M Unit or Module Test Plan. The overall
             test programme hall be planned so that data related
             to maintainability is obtained from as many functional
             tests as possible. In this manner the performance
             of maintainability testing, per se, will be reduced
             to the minimum  necessary for the demonstration
             of sysem compliance with the R&M availability requirements.


         c)  The MTTR measurements shall include corrective
             and preventive maintenance actions, the time to
             localise the failure to a particular module, time
             to replace the failed module, verify the reair
             action and restoring the system to operational
             configuration exclusive of any software load requirements.
             The MTTR does not include the repair time of the
             failed module. The R&M test programme shall provide
             for demonstrating that unit and modul MTTR values
             are less than or equal to the respective predicted
             MTTR values to an upper confidence limit value
             in accordance with the following schedule:

             1)  70% upper confidence limit value at the time
                 of Factory Acceptance Verification (Site 1)

             2)  80% upper confidence limit value at the time
                 of SPA (Site 1).


         d)  The upper confidence limit values of MTTR shall
             be determined from the test data by the following
             equation:
                            ̲                    
             MTTR…0f…UCL…0e…  =  X + (t  …0f…,f…0e…)  .  ̲S̲ ̲      
                                                 
                                           …0e…N…0f…  

             where
                             
                             
             X      = the observed statistical mean of
                        the measured maintenance action
                        periods:

                ̲                        
                       X                 
             X  =    ̲ ̲i̲
                             
                       N              
                                    


         Where X…0f…i…0e… ae the individual observations and N is the
         number of test measurements.

             t  …0f…,f   = Students t-value with probability   and
                       f   degrees of freedom,

                 = (̲1̲0̲0̲-̲U̲C̲L̲)̲
                     100

             UCL = Specified Upper Confidence Limit expressed
                 as
                   a percetage.

             f   = (N-1),

             S   = Observed standard deviation of the measured
                 
                   maintenance action periods:
                                  ̲              
                 S…0e…2…0f… =    (X…0f…i…0e… - X)…0e…2…0f…/(N - 1)

4.2.1.7.2.2  M̲T̲T̲R̲s̲ ̲G̲r̲e̲a̲t̲e̲r̲ ̲T̲h̲a̲n̲ ̲4̲5̲ ̲M̲i̲n̲u̲t̲e̲s̲

         a)  The preliminary and final R&M Programme Plans shall
             identify those units and modules that have MTTR
             values greater than 45 minutes, together with the
             predicted MTTR values. Reasons for assiging a MTTR
             value in excess of 45 minutes to a unit or module
             shall be given and shall explain the maintenance
             procedures involved in restoring such a unit or
             module to service when a malfunction occurs.…86…1 
                    …02…   …02…   …02…   …02…                              
                           
             Justifying analyses to prove that the overall availability
             requirements can be met with units having MTTR
             values in excess of 45 minutes shall be provided.

         b)  The list of unis and modules having MTTR values
             greater than 45 minutes may be changed as the programme
             progresses provided notification is given at least
             60 days in advance of starting any testing or cancelling
             any planned tests. The change process contemplated
             or this list is the same as that provided in the
             contract for all items (data) under Configuration
             Control except:

             1)  The contractor's proposals will not include
                 any consideration of the cost impact for contractor's
                 proposed change.

             2)  Such poposals, once mutually agreed for all
                 project impacts other than cost, will be contractually
                 implemented at no change in contract price.

             3)  These change proposals shall be treated as
                 "critical documents" within the meaning of
                 Contract Special Prvision No. 11, Approval
                 and Submittal of Documentation.



4.2.1.7.3    R̲&̲M̲ ̲U̲n̲i̲t̲ ̲o̲r̲ ̲M̲o̲d̲u̲l̲e̲ ̲T̲e̲s̲t̲ ̲P̲l̲a̲n̲s̲

         The MTBF and MTTR for each unit and module shall be
         part of a R&M Unit and module test plan which in detail
         will specify how the MTBF and/or MTTR s to be verified
         either by test, analysis or presentation of evidence
         of conformity.



4.2.2    S̲o̲f̲t̲w̲a̲r̲e̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲



4.2.2.1  S̲o̲f̲t̲w̲a̲r̲e̲ ̲D̲e̲v̲e̲l̲o̲p̲m̲e̲n̲t̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲

         The software development verification is an internal
         verification (class I) performedduring the development
         of the software.


         All software and parts thereof shall be thoroughly
         tested at each step of development and integration.



4.2.2.2  I̲n̲ ̲P̲l̲a̲n̲t̲ ̲S̲o̲f̲t̲w̲a̲r̲e̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲

         In plant software verification(class II) shall be performed
         as outlined in the software test plan.

         The software test will be performed in the factory
         with a simulated environment specified in section 3.5.11.5.2.
         The status information on request refer section 3.2.3.6
         shall no be used during acceptance test of busy hour
         performance. The test criteria requires an accumulated
         test time of 240 hours with the following allowable
         errors:

         a)  C̲a̲t̲e̲g̲o̲r̲y̲ ̲1̲

             a total of 1 error allowed of the following types:

             - Loss of a mesage or other transaction.
             - Corruption of a message or other transaction.
             - A message or transaction being missent.
             - Misapplication of security rules.
             - Failure of accounting procedures.

         b)\C̲a̲t̲e̲g̲o̲r̲y̲ ̲2̲

             A total of 2 errors allowed of th following types:

             1)  loss of service to more than 25% of all 
                 channels and user connecting points.

             2)  loss of service to more than 50% of all
                 operating positions or system reporting
                 facilities.

             3)  Loss of ability to recovr the system.

         c)  C̲a̲t̲e̲g̲o̲r̲y̲ ̲3̲

             a total of 3 errors allowed of the following types:

             1)  errors not included in 1 and 2 above.


         d)  The software Test Plan shall specify the tests
             which will provide the reliability prediction to
             calculate the probability that the MDSD of:

             1)  category 1 SW errors is    20 hours

             2)  category 2 SW errors is    120 hours

             3)  category 3 SW errors is     80 hours



4.2.2.3…02…S̲o̲f̲t̲w̲a̲r̲e̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲a̲l̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲

         a)  At the first site (SHAPE) CR shall conduct a formal
             functional test (class II) to verify basic system
             funtions and interfaces.  The test will be supervised
             by CR test engineers and SHAPE operational staff
             will assist in operating the system.

         b)  NICS-TARE, ACE CCIS, and SCARS II are planned to
             be available, however, in the event one or more
             of the inerfaces are not available, the contractor
             shall proceed with all of those components of the
             system that are independent of the missing interfaces.

         c)  In this event SHAPE will give Site Provisional
             Acceptance, not withstanding the inability to tes
             all interfaces, providing all other aspects of
             the test are satisfactorily completed.


4.2.2.4…02…S̲o̲f̲t̲w̲a̲r̲e̲ ̲O̲p̲e̲r̲a̲t̲i̲o̲n̲a̲l̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲

         a)  Immediately after successful completion of the
             Software Functional Verification at the SHAPE site,
             an Operationa Test (class II) shall take place
             in order to verify the reliability of the software
             system. The status information on request shall
             (refer section 3.2.3.6) not be used during busy
             hour test performance.

         b)  The operational test will take place uner CR control
             but SHAPE personnel will operate the system in
             a live operational mode in accordance with agreed
             test plans and procedures.


         c)  The acceptance test criteria shall be that the
             CAMPS system shall be able to execute the basic
             software functions according to the approved System
             Requirements Specification or a period of 60 calendar
             days in a live operational mode without any software
             failure.

         d)  Any software failure, which concept will be defined
             in the acceptance test plan, shall require a complete
             retest cycle.  The duration of the test or retes
             may be shortened at SHAPE's discretion.



4.2.3…02…S̲y̲s̲t̲e̲m̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲


4.2.3.1…02…C̲O̲M̲S̲E̲C̲ ̲O̲N̲-̲S̲i̲t̲e̲ ̲V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲

         a)  When the CAMPS computer equipment and peripherals
             have been installed on-site, a COMSEC verification
             will be performed by the national OMSEC authorities.

         b)  Purchaser will supervise the verification and Christian
             Rovsing A/S test engineers will assist in operating
             the system.  The COMSEC on-site verification is
             a formal verification (class II). The verification
             shall take place n conjunction with the SPA.


4.2.3.2…02…S̲i̲t̲e̲ ̲P̲r̲o̲v̲i̲s̲i̲o̲n̲a̲l̲ ̲A̲c̲c̲e̲p̲t̲a̲n̲c̲e̲ ̲(̲S̲P̲A̲)̲

         a)  Site provisional acceptance is the act whereby
             SHAPE will acknowledge by protocol that CR has
             fully demonstrated that a site is complete and
             ready for initial operation an will take place
             when the following requirements have been met:

             1)  Completion of an agreed on-site acceptance
                 test.

             2)  Verification of the site inventory.

             3)  If applicable, availability of a mutually agreed
                 discrpancy list showing the agreed date for
                 clearance of each listed discrepancy.