DataMuseum.dk

Presents historical artifacts from the history of:

CR80 Wang WCS documentation floppies

This is an automatic "excavation" of a thematic subset of
artifacts from Datamuseum.dk's BitArchive.

See our Wiki for more about CR80 Wang WCS documentation floppies

Excavated with: AutoArchaeologist - Free & Open Source Software.


top - download

⟦2a240df86⟧ Wang Wps File

    Length: 4180 (0x1054)
    Types: Wang Wps File
    Notes: M]dereferat MARIENLYST    
    Names: »1764A «

Derivation

└─⟦780c36067⟧ Bits:30006094 8" Wang WCS floppy, CR 0146A
    └─ ⟦this⟧ »1764A « 

WangText




…02…CPS/MIN/026

…02…JHO/820326…02……02…#
M]dereferat - MARIENLYST
…02……02…CAMPS











                           
…02……02……02……02…          …02…82-03-26…02…26  …02…Marienlyst
                                            

          Referat af planl`gningsm]de - MARIENLYST
          10. - 12. marts 82.

…0f…      
         
                               Gert Jensen                       KFL
                          Ole Eskedal            BR
                          Bjarne Berthold
                               K. Nybroe-Nielsen
                               J. Holm
                               U. R. Holst
                               Anne Marie [rum

          
        
             



         ACTION

1.       S̲C̲H̲E̲D̲U̲L̲E̲-̲O̲P̲F̲[̲L̲G̲N̲I̲N̲G̲

             GJ foretager hver 14. dag (hveranden tirsdag)
             en schedule-opf]lgning individuelt med
             hver gruppeleder, hvorved level II og
             level III-schedules bliver opdaterede.

             Der holdes et m>nedligt f`llesm]de internt
             i gruppen ca. en ugen inden modet med
             SHAPE, ellers sidste tirsdag i m>neden.

             Hver sektion afleverer level II schedules;
             hvis der er konsekvenser til Master-planen
             og pert diagrammer, skal disse koordineres
             - dette sker via projekt-kontoret.

             Dagsorden er som f]lger for hvert m]de:

             a)  Program-status

             b)  Pr`sentation af status

             c)  Pr`sentation af problems/l]sninger

             d)  Koordinering.





2.       P̲R̲I̲O̲R̲I̲T̲E̲R̲I̲N̲G̲ ̲A̲F̲ ̲M̲A̲N̲A̲G̲E̲R̲-̲O̲P̲G̲A̲V̲E̲R̲

             GJ p>lagde gruppen at prioritere f]lgende
             opgaver h]jest:

             GJ:     Monitorere aktiviterer, kontrakt-sp]rgsm>l,
                     medarbejder motivering

             BHB:    ED-leverancer, FAT, PRO

             KNN:    SW, DAMOS

             URH:    DAMOS-aftestning, testprocedurer

             OE:     Monitorere ILS-aktiviteter p>
                     CAMPS

             JHO:    Monitorere aktiviteter med GJ.



3.       P̲R̲I̲O̲R̲I̲T̲E̲T̲ ̲A̲F̲ ̲S̲Y̲S̲T̲E̲M̲E̲R̲

             GJ prioriterede HW-leverancerne, s>ledes
             at SW blev fremmed mest muligt:

             Prioritet 1: CU 3 (CR80 D)

             Prioritet 2: System 0

             Prioriter 3: CU 4 (CR80 D)

             Prioriter 4: Comsec, System 1, dokumentation.



4.       A̲C̲T̲I̲O̲N̲S̲

         KNN Litsync testes mod en front end processor.
             Afklares med CR corp.

         KNN SCARS/CCIS design analyse med Burroughs
             koordineres med SHAPE.

         URH Dokument}r hvorledes man genererer et
             CAMPS-systems configuration.

         URH VCD opdateres efter detailed design.

         URH Damos aftestes n>r CSF, MMS og TMP er
             f`rdig med test driver i loop-mode.



         URH Integration af format handler format generator,
             LTUX handler, LTUX-FW. Test driver skrives
             for dette. Performance monitoreres.

         URH Beskriv utilities til aftestning: Hvilke
             findes, hvilke mangler, hvordan laves
             de (program dump interprocess dump, system
             dump, clear external channels, initiering
             af TDX alene, single step function).

         KNN Patch-facilitet: Hvorledes indf]jes nemt
             enkelte nye statements.

         KNN Compilering, Linkning, Pakning: Hvorledes
             kan det k]re nemt for programm]rerne.
             Sammenh`ng m. configurations control.

         BHB Status unders]ges for MD-programmel.

         BHB Saglig vurdering af produktionen af CAMPS-moduler.

         KNN Monitorering af antal linier pr. dag.
             Status for MD-programmel.

         BHB Hvorledes kobler man LTU D-moduler med
             en Cr80S-maskines S-moduler. Behov findes
             til TDS.

         KNN Vedligeholder for fremtiden administrativt
             ECP, SRS, ICD i stedet for FE.

         JHO Logbogen over ind- og udg>ende post benyttes
             for fremtiden kun til SHAPE-korrespondance.
             JHO f]lger op p>, at disse bliver besvaret.

         JHO Den interne meddelelse om koordinator-allokering
             opdateres, s>ledes at den svarer til den
             besluttede nye fordeling af disse.

         JHO/AM[ "M]blement" til CAMPS overtages af
                 AM[ (borde, stole, skabe, reoler),
                 s>ledes at foresp]rgsler for fremtiden
                 rettes til AM[, som s> s]rger for
                 at bestille, rykke, opstille og oprydde.

         JHO/AM[ N>r det nye kontonr.-system er indk]rt
                 overtager AM[ kontonummeringen af
                 fakturaer.

         KFL "Existing Documents" opdateres, ved at
             alle kontrakter inkluderes, ved at alle
             for`ldede dokumenter fjernes af subcontract-koordinator,
             og ved at der er overensstemmelse med
             den "r]de mappe".

         KFL Distributionslisten udvides til ogs> at
             omfatte vigtigere OEM-manualer.