    Notes: Appendix D                
    Names: »0903A «

Derivation

└─⟦d10d3ed68⟧ Bits:30006014 8" Wang WCS floppy, CR 0055A
    └─ ⟦this⟧ »0903A « 

WangText




                         -  #  -

























   A  P  P  E  N  D  I  X    D…01……01……01…ACCEPTANCE…01……01……01…CRITERIA




         This appendix defines the acceptance criteria to be
         met on designing and producing racks for this contract.





                  1̲ ̲ ̲D̲O̲O̲R̲ ̲D̲E̲S̲I̲G̲N̲ ̲R̲E̲V̲I̲E̲W̲



         A design review on the door design shall be performed.

         CR or CR's representative shall be present at the review.

         During the review it shall be demonstrated by the vendor
         that the design meets the requirements of appendix
         B of this contract.

         The following issues shall be covered:

1.1      Calculated worst case gasket compression based on manufacture
         tolerances shall be checked as quality control provisions.

1.2      Calculated or measured flange defecting based on nominal
         draw down. Worst case flange areas shall be identified.

1.3      Identification of field adjustment/wear points and
         estimate end-of-life effects.

1.4      Support of choice of gasket in terms of 

         1   electrochemical activity
         2   compression set
         3   compression range
         4   manufacturers part number or specification
         5   transfer impedance data and/or wear characteristics

1.5      Show that with worst case manufacturing and field tolerances
         and a given choice of gasket that gasket remains within
         recommended compression range within entire door surface.

1.6      Filter Panel design feature and choice of a filter
         foam.

1.7      Latch handle design

1.8      A prototype door assembly shall be defined.


                2̲ ̲ ̲T̲E̲S̲T̲ ̲O̲F̲ ̲P̲R̲O̲T̲O̲T̲Y̲P̲E̲ ̲D̲O̲O̲R̲



         When the door design is approved, the vendor shall
         produce a working prototype of a door, using actual
         gaskets and latches, as they will be provided for production
         racks.

         If special stampings will be used for production racks,
         they may be simulated with hand worked sheet metal
         pieces. To the extent, the front face of the cabinet
         plays a role in the operation and effectiveness of
         the door, latch and gasket, these parts shall be simulated
         as well.

         CR or CR's representative shall be present at the test.

         A complete set of drawings for the racks shall be presented
         for approval.

         The vendor shall prepare a test procedure demonstrating
         that the requirements concerning door and door operation
         defined in appendix B of this contract are met. These
         procedures shall be approved by CR and be submitted
         to CR two (2) weeks prior to test.

         Deficiencies found during the test shall be corrected
         in the first lot of racks.

         The following issues shall be covered by the test:

2.1      Smooth operation. No binding scrapping or hang up for
         50 successive closures without adjustment or other
         maintenance operations.

2.2      Operating force to engage and draw down the latch.

2.3      a)  Demonstrate door lift-off capability

         b)  Re-install door without further adjustment

         c)  Demonstrate smooth operation or 50 more operations

2.4      Demonstrate that door is impressing gasket in a worst
         case spot chosen by customer or representative either
         with measurement or with plastic gage.

2.5      Demonstrate that compression set of gasket compared
         with "near new" is less than 25 per cent of incompressed
         height when "near new".



2.6      Demonstrate that gasket stays in adjustment, or in
         channel over operations.

2.7      Filter panel design.






                    3̲ ̲ ̲P̲R̲O̲T̲O̲T̲Y̲P̲E̲ ̲T̲E̲S̲T̲



         The first lot of production racks are the Prototype
         racks.

         The lot contains at least

         a)  one left end rack

         b)  one intermediate rack

         c)  one right end rack

         d)  one stand-alone rack

         a), b), and c) shall be assembled in one 3-bay-assembly.



3.1      A prototype inspection shall be performed to verify
         that the racks meet the requirement of appendix B to
         this contract.

         The following issues shall be covered by the prototype
         inspection:

3.1.1    Use of specified materials.

3.1.2    Use of specified gaskets.

3.1.3    Base material of rack (thickness)

3.1.4    Perforated metal type.

3.1.5    Built to approved print (prints should designate any
         approved alternative process or material)



3.1.6    Check of important tolerances

         -   for gasket performance

         -   for form/fit/function

3.1.7    Check of workmanship

         -   weld quality and grinding

         -   plating or metalizing of gasket surface

3.1.8    Check of smoothness of door operation

3.1.9    Check of appearance

         -   paint finish, colour, texture

3.1.10   Check or accessories and packing crate.



3.2      A shielding effectiveness test shall be performed on
         the 3-bay rack assembly by CR's consultant ARC.

         The test is performed at the Vendors facility, if possible,
         or at a locality agreed by CR, ARC, and the Vendor.

         The test shall qualify the tempest performance of the
         rack design.

         If the test shows problems with meeting the required
         tempest performance for CR's application, the Vendor
         shall be willing to correct the design at CR's and
         ARC's advise. 

         Corrections are considered a new cost item for development
         and production.

         As an example it may be necessary to attach honeycombs
         behind the perforated ventilation areas.



3.3      Having passed the Prototype inspection an the shielding
         effectiveness tests, the racks are approved for production.