…02…
…02… GJ/810513…02……02…#
CAMPS MANAGEMENT MEETING
MINUTES OF MEETING NO. 6…02……02…CAMPS
Participants: GJ, BHB, FE, KNN
Copy: KM
1. I̲n̲s̲t̲a̲l̲l̲a̲t̲i̲o̲n̲
In a meeting with ACE COMSEC 12-5-81 it was decided
that the terminal shall have more security ground stud
connection. The secure ground is provided by the safety
ground. The power cable has a free wired cable where
1 wire is safety/secure ground.
2. L̲i̲n̲e̲ ̲D̲r̲i̲v̲e̲r̲s̲
The low level line concept was presented to Shape and
ACE COMSEC at a meeting on the 12th. of May. The result
of the meeting was that the technical concept was approved
unofficially. Shape asked CR to provide an ECP on
the subject. Minutes of Meeting will be provided by
KM.
3. M̲i̲s̲c̲e̲l̲l̲a̲n̲e̲o̲u̲s̲
List of CAMPS Documentation is to be regarded as restricted
and shall thus be kept locked down.