⟦37d5cfae1⟧ Wang Wps File

    Length: 8086 (0x1f96)
    Types: Wang Wps File
    Notes: DNs on Maintenance Plan   
    Names: »1038A «

Derivation

└─⟦5a07e954e⟧ Bits:30006038 8" Wang WCS floppy, CR 0062A
    └─ ⟦this⟧ »1038A « 

WangText






   - # -





  Telex handed over at Progress Meeting…01…10-12 June 1981.



                     1981-06-12    fc/sdv

to:  shnmo division
     att.: mr. paul f. shey, contracting officer

cc.: lt. col. manfred stoltz, camps program manager 

fm:  christian rovsing a/s, denmark
     gert jensen

our ref: cps/101/tlx/0273

S̲u̲b̲j̲e̲c̲t̲:̲ ̲ ̲C̲R̲'̲s̲ ̲r̲e̲s̲p̲o̲n̲s̲e̲ ̲t̲o̲ ̲S̲H̲'̲s̲ ̲D̲N̲s̲ ̲o̲n̲ ̲t̲h̲e̲ ̲M̲a̲i̲n̲t̲e̲n̲a̲n̲c̲e̲ ̲P̲l̲a̲n̲

         Ref. a):    CAMPS Log no. 211.


1.       P̲a̲g̲e̲ ̲1̲1̲,̲ ̲p̲a̲r̲a̲ ̲1̲.̲4̲.̲1̲

         Add para 1.4.1.1 subpara f) quote S/W maint. description
         explaining how S/M maint. is handled at site. unquote.


2.       P̲a̲g̲e̲ ̲1̲1̲,̲ ̲p̲a̲r̲e̲ ̲1̲.̲4̲.̲1̲.̲1̲ ̲s̲u̲b̲p̲a̲r̲a̲ ̲d̲)̲ ̲a̲n̲d̲ ̲e̲)̲

         Last sentence will be deleted.


3.       P̲a̲g̲e̲ ̲1̲2̲,̲ ̲p̲a̲r̲a̲ ̲1̲.̲4̲.̲1̲.̲2̲

         The descriptions include hardware and firmware as applicable
         on the module level.  Software descriptions are found
         at the CSSI site.



4.       P̲a̲g̲e̲ ̲1̲4̲,̲ ̲p̲a̲r̲a̲ ̲1̲.̲4̲.̲2̲

         The following will be added quote Where appropriate
         the test equipment manuals will also contain calibration
         procedures unquote.



5.       P̲a̲g̲e̲ ̲1̲4̲,̲ ̲p̲a̲r̲a̲ ̲1̲.̲4̲.̲3̲

         The following sentence will be added quote The OEM
         manuals will be annotated to display the delivered
         configuration in order to avoid confusion unquote.


6.       P̲a̲g̲e̲ ̲1̲5̲,̲ ̲p̲a̲r̲a̲ ̲1̲.̲5̲

         CR suggests no change.  This is a general remark and
         S/W maintenance procedures will be reflected throughout
         in the maintenance plan.



7.       P̲a̲g̲e̲ ̲2̲1̲ ̲a̲n̲d̲ ̲2̲3̲,̲ ̲p̲a̲r̲a̲ ̲2̲.̲2̲.̲1̲.̲5̲ ̲a̲n̲d̲ ̲f̲i̲g̲.̲ ̲2̲.̲2̲.̲2̲-̲1̲

         The parts list will be implemented to include quote
         S/W object code storage media unquote.  However, the
         CAMPS documentation tree (page 13, fig. 1.4-1) will
         be changed in order to reflect the documentation separated
         towards the users.  An outline is given below:

         C̲S̲S̲I̲

         -   Operator Guide
         -   S/W Descriptions
         -   S/W Listings

         D̲e̲p̲o̲t̲ ̲L̲e̲v̲e̲l̲

         -   Technical Manual

                 Vol. 1  Depot Level Maintenance
                 Vol. 2  Module Documentation
                 Vol. 3  Inventory
                 Vol. 4  Parts List

         -   Peripheral Manuals

                 Disk
                 Floppy Disk
                 Display
                 M.S. Teleprinter
                 Paper Tape Punch
                 Paper Tape Reader
                 Modem
                 Stat. Mux.
                 Frequency Stabilizer
                 Opto Modem

         -   Test Equipment Manuals
         
                 Standard TE
                 Special TE
                 Monitors



         S̲I̲T̲E̲ ̲L̲E̲V̲E̲L̲

         -   Guides
         -   Technical Manual

                 Vol. 1  Site Level Maintenance
                 Vol. 2  Installation Manual
                 Vol. 3  Inventory
                 Vol. 4  Parts Lists

         -   Peripheral Manuals

                 Same as for depot level.

         -   Test Equipment Manuals

                 Same as for depot level.

         C̲A̲M̲P̲S̲ ̲R̲E̲M̲O̲T̲E̲ ̲T̲E̲R̲M̲I̲N̲A̲L̲S̲

         -   Operator's Guide
         -   Technical Manual
         -   Peripheral Manuals

                 corresponding to equipment.

         The maintenance plan will be changed in accordance
         with this structure.  This will influence para 1.4
         through para 2.2, but the contents will basically remain
         unchanged.



8.       P̲a̲g̲e̲ ̲2̲1̲,̲ ̲p̲a̲r̲a̲ ̲2̲.̲2̲.̲1̲.̲5̲

         The following sentence will be added quote Note, that
         parts lists for OEM and test equipment will be found
         in their respective manuals unquote.



9.       P̲a̲g̲e̲ ̲2̲2̲,̲ ̲p̲a̲r̲a̲ ̲2̲.̲2̲.̲2̲

         The para will be reworded to quote As details within
         the depot level repair have yet to be finalized, although
         the general depot level philosophy is clear, the contents
         of the technical descriptions will be evaluated later.
          However     unquote.





10.      P̲a̲g̲e̲ ̲2̲4̲,̲ ̲p̲a̲r̲a̲ ̲2̲.̲3̲.̲2̲

         CR suggests no change.  Refer to meeting at AFCENT
         on May 25th.



11.      P̲a̲g̲e̲ ̲2̲6̲,̲ ̲p̲a̲r̲a̲ ̲2̲.̲3̲.̲3̲

         During the visit at AFCENT, it was stated that the
         usual turn-around time is 1-2 weeks.  This is so short
         that it will not influence on the total amount of spares.
          Consequently, an analysis of the turn-around time
         will not be necessary.  Refer also to para 4.4.



12.      P̲a̲g̲e̲ ̲2̲7̲,̲ ̲p̲a̲r̲a̲ ̲2̲.̲3̲.̲4̲

         The following will be added quote Software failure
         reporting will be covered by the same failure reporting
         system.  The failure reporting form (refer to fig.
         2.3.4-1) will be used as a cover sheet, but additional
         information may be enclosed.



13.      P̲a̲g̲e̲ ̲5̲5̲,̲ ̲p̲a̲r̲a̲ ̲3̲.̲4̲.̲4̲

         The following sentence will be added quote The modules
         shall normally be tested in the OFF-line configuration
         unquote.



14.      P̲a̲g̲e̲ ̲5̲7̲,̲ ̲p̲a̲r̲a̲ ̲3̲.̲5̲.̲1̲

         CR suggests no change.  The suggested scenario will
         be part of the troubleshooting tree in the maintenance
         documentation.



15.      P̲a̲g̲e̲ ̲5̲8̲,̲ ̲f̲i̲g̲.̲ ̲3̲.̲5̲-̲1̲

         CR suggests no change.  The decision that a specific
         error is a software failure is usually a logical conclusion
         based on the fact that a hardware error cannot be found.
          At this point a memory dump may be requested and an
         analysis performed.



         To incorporate the demand for S/W troubleshooting fig.
         3.5-1 will be implemented with a decision block after
         the "dump memory" operation containing quote S/W failure
         indicated? unquote.  If yes, an exit block will be
         indicated.



16a.     P̲a̲g̲e̲ ̲6̲0̲,̲ ̲p̲a̲r̲a̲ ̲3̲.̲5̲.̲2̲

         CR suggests no change. S/W failures cannot be isolated
         to assemblies.  See also response to item 15.



16b.     P̲a̲g̲e̲ ̲6̲0̲,̲ ̲p̲a̲r̲a̲ ̲3̲.̲5̲.̲2̲

         CR agrees that the log book should display the effective
         downtime of the equipment.  The logbook will be changed
         to indicate the time-of-day when the equipment failed
         and was restored respectively as an additional column
         in the left hand side.  The time-of-day to be filled
         in will always appear in connection with an error print-out
         at the maintenance position.



17.      P̲a̲g̲e̲ ̲6̲2̲,̲ ̲p̲a̲r̲a̲ ̲3̲.̲5̲.̲2̲.̲2̲

         The closing paranthesis is placed incorrect.  The text
         will be changed to quote (e.g. parity, instruction
         type, memory location, etc.) unquote.



18.      P̲a̲g̲e̲ ̲6̲9̲,̲ ̲p̲a̲r̲a̲ ̲3̲.̲5̲.̲2̲.̲7̲

         The whole para will be reworded to quote Tests continuously
         being performed in the stand-by PU will detect errors
         eventually resulting in an error print-out at the maintenance
         position unquote.



19.      P̲a̲g̲e̲ ̲7̲2̲,̲ ̲p̲a̲r̲a̲ ̲3̲.̲5̲.̲6̲

         Last sentence will be changed to quote When the equipment
         returns to normal operation a time-of-day print-out
         appears at the maintenance position. unquote.





20.      P̲a̲g̲e̲ ̲7̲3̲,̲ ̲p̲a̲r̲a̲ ̲3̲.̲6̲.̲1̲

         It is assumed that when appropriate, a copy of the
         logbook is attached the failure report.  The copy may
         be photocopied or in handwriting.



21.      P̲a̲g̲e̲ ̲8̲4̲ ̲a̲n̲d̲ ̲8̲5̲,̲ ̲f̲i̲g̲.̲ ̲6̲.̲3̲.̲3̲ ̲-̲ ̲1̲ ̲a̲n̲d̲ ̲2̲

         NAMSA will be incorporated in the spare flow figures.



22.      P̲a̲g̲e̲ ̲9̲2̲,̲ ̲p̲a̲r̲a̲ ̲6̲.̲5̲.̲2̲.̲3̲

         The text will be changed to quote Patches of a size
         up to 50 instructions  unquote.



23.      P̲a̲g̲e̲ ̲9̲3̲,̲ ̲f̲i̲g̲.̲ ̲6̲.̲5̲.̲3̲.̲1̲

         CR suggests that the failure report is being used as
         a cover sheet for documentation, but the methods of
         requesting service must be decided by SHAPE.



24.      P̲a̲g̲e̲ ̲7̲,̲ ̲p̲a̲r̲a̲ ̲6̲.̲5̲.̲2̲.̲2̲

         Will be corrected as proposed.



25.      P̲a̲g̲e̲ ̲9̲,̲ ̲p̲a̲r̲a̲ ̲1̲.̲3̲

         Change Control Board is correct.  Page 24 will be corrected.



26.      P̲a̲g̲e̲ ̲1̲1̲,̲ ̲p̲a̲r̲a̲ ̲1̲.̲4̲

         The sentence will be reworded to quote consists of
         unquote, but the whole contents will be changed according
         to item 7.





27.      P̲a̲g̲e̲ ̲1̲3̲,̲ ̲f̲i̲g̲.̲ ̲1̲.̲4̲-̲1̲

         Opto modems will be included.



28a.     P̲a̲g̲e̲ ̲1̲8̲,̲ ̲f̲i̲g̲.̲ ̲2̲.̲2̲.̲1̲

         Document symbol will be deleted.  However, contents
         may change according to item 7.



28b.     P̲a̲g̲e̲ ̲1̲8̲,̲ ̲f̲i̲g̲.̲ ̲2̲.̲2̲.̲1̲

         Will be corrected as proposed.



29.      P̲a̲g̲e̲ ̲3̲1̲,̲ ̲p̲a̲r̲a̲ ̲2̲.̲4̲.̲1̲

         will be changed as proposed.



30.      P̲a̲g̲e̲ ̲3̲8̲,̲ ̲p̲a̲r̲a̲ ̲2̲.̲4̲.̲4̲.̲3̲.̲5̲,̲ ̲1̲0̲

         Will be changed to quote loop-back unquote.



31.      P̲a̲g̲e̲ ̲4̲9̲,̲ ̲p̲a̲r̲a̲ ̲2̲.̲6̲

         Will be changed as proposed.



32.      P̲a̲g̲e̲ ̲7̲0̲,̲ ̲p̲a̲r̲a̲ ̲3̲.̲5̲.̲3̲.̲2̲

         Will be changed as proposed.



33.      P̲a̲g̲e̲ ̲7̲2̲,̲ ̲p̲a̲r̲a̲ ̲3̲.̲5̲.̲6̲

         Will be changed as proposed.





34.      P̲a̲g̲e̲ ̲8̲5̲,̲ ̲f̲i̲g̲.̲ ̲6̲.̲3̲.̲3̲-̲2̲

         Flow from depot to site will be changed as proposed.



35.      P̲a̲g̲e̲ ̲9̲1̲,̲ ̲p̲a̲r̲a̲ ̲6̲.̲5̲.̲1̲

         Will be changed as proposed.



36a.     P̲a̲g̲e̲ ̲3̲4̲ ̲a̲n̲d̲ ̲3̲5̲,̲ ̲f̲i̲g̲.̲ ̲2̲.̲4̲.̲4̲.̲3̲.̲1̲-̲1̲,̲ ̲p̲a̲r̲a̲ ̲2̲.̲4̲.̲4̲.̲3̲.̲1̲

         The general approach is that only one module can be
         on extender board at a time.



36b.     It is felt that with the present updates, the various
         aspects of S/W maintenance has been integrated adequately
         throughout in the maintenance plan.