1983-08-26
PROPOSAL FOR CAMPS DEVELOPMENT SYSTEM Page #
PROPOSAL FOR CAMPS DEVELOPMENT SYSTEM
Dated August 26, 1983
2…01…Submitted to
SUPREME HEADQUARTERS ALLIED POWERS EUROPE
B-7010 SHAPE, Belgium
Prepared by:
CHRISTIAN ROVSING A/S
Lautrupvang 2,
DK-2750 Ballerup, Denmark.
T̲A̲B̲L̲E̲ ̲O̲F̲ ̲C̲O̲N̲T̲E̲N̲T̲S̲
Page
0 SCOPE ..........................................
2
1 BIDDING PROVISIONS .............................
3
1.1 CONTRACT ...................................
3
1.2 VALIDITY ...................................
3
1.3 TYPE OF PROPOSAL ...........................
3
1.4 PAYMENT PLAN ...............................
3
1.5 PAYMENT IN US DOLLARS ......................
4
1.6 DELIVERY SCHEDULE ..........................
4
2 PRICE PROPOSAL .................................
5
3 HARDWARE CONFIGURATION .........................
6
3.1 HARDWARE ...................................
6
4 SYSTEM/SOFTWARE ENGINEERING ....................
8
4.1 SYSTEM INTEGRATION .........................
8
4.2 SOFTWARE ...................................
8
5 FABRICATION ....................................
9
5.1 HARDWARE ASSEMBLY BREAKDOWN ................
9
5.2 FAT ........................................
9
6 LOGISTICS SUPPORT ..............................
9
6.1 TRANSPORTATION AND INSTALLATION ............
9
6.2 TRAINING AND DOCUMENTATION .................
9
6.3 MAINTENANCE ................................
10
6.4 SPARES .....................................
10
APPENDIX A
Equipment Matrix for Development System...........
11
APPENDIX B
RSPL for Development System ......................
14
S̲C̲O̲P̲E̲
This proposal for "CAMPS Development System" is forwarded
in response to:
Telex camps log no 1341: CAMPS Development and test
drives system dated 10. Aug 83.
The proposal covers item (1) a CAMPS development system.
Proposals for item (2): a protocol converter and a
development system and item (3): a CAMPS test drive
system are not included, but will be forwarded separately.
The CAMPS development system is quoted in a tempest
version and a non-tempest version.
1̲ ̲ ̲B̲I̲D̲D̲I̲N̲G̲ ̲P̲R̲O̲V̲I̲S̲I̲O̲N̲S̲
1.1 C̲O̲N̲T̲R̲A̲C̲T̲
It is assumed that this proposal will result in a separate
contract between CR and SHAPE if the latter should
accept this proposal.
1.2 V̲A̲L̲I̲D̲I̲T̲Y̲
This proposal including the options is valid for acceptance
until October 1, 1983. For the period from October
1, 1983 to January 1, 1984 a monthly escalation of
0.8% will be added to the price.
1.3 T̲Y̲P̲E̲ ̲O̲F̲ ̲P̲R̲O̲P̲O̲S̲A̲L̲
Firm, fixed price proposal.
1.4 P̲A̲Y̲M̲E̲N̲T̲ ̲P̲L̲A̲N̲
30 percent on order or letter of intent.
70 percent of OEM equipment cost to be paid on presentation
of certificate of conformance.
10 percent of all other costs to be paid on SPA.
The balance to be paid by monthly payments between
1-0-i and FAT.
1.5 P̲A̲Y̲M̲E̲N̲T̲ ̲I̲N̲ ̲U̲S̲ ̲D̲O̲L̲L̲A̲R̲S̲
Of the quoted price for Camps Development System
Dkr. 2,924,673 and Dkr. 2,512,895 represent cost incurred
in US dollars for the Tempest and the Non-Tempest solution
respectively. This amount may be payable in US Dollars
at an exchange rate of Dkr. 960,- to 100 US Dollars.
1.6 D̲E̲L̲I̲V̲E̲R̲Y̲ ̲S̲C̲H̲E̲D̲U̲L̲E̲
The price proposal is made on the assumption that the
hardware production and the installation can take place
immediately after all other CAMPS systems have been
respectively produced and installed. It means, that
the factory acceptance test will be completed 1st July,
1984, and the site provisional acceptance will be completed
1st January, 1985 or eight months after SPA at SHAPE,
whichever comes later. As some HW-items have a long
lead time, CR need a L-o-i 9 months before the FAT
to be able to keep the schedule as stated.
…01…2̲ ̲ ̲P̲R̲I̲C̲E̲ ̲P̲R̲O̲P̲O̲S̲A̲L̲
T̲e̲m̲p̲e̲s̲t̲ N̲o̲n̲-̲T̲e̲m̲p̲e̲s̲t̲
1. Program Management ........Dkr. 1,075,842 Dkr.
1,075,842
2. System/Software Eng. ......Dkr. 184,738 Dkr.
184,738
2.1 System Integration ..... Dkr. 184,738 Dkr.
184,738
3. Hardware Development ......Dkr. 184,738 Dkr.
184,738
3.1 HW Assembly Breakdown Dkr. 184,738 Dkr.
184,738
4. Software Development ......Dkr. 1,688,106 Dkr.
1,688,106
4.1 Package Integration
tests and utility........Dkr. 844,053 Dkr.
844,053
4.2 System Generation tools..Dkr. 844,053 Dkr.
844,053
5. Hardware Fabrication ......Dkr. 4,931,207 Dkr.
4,400,166
5.1 HW cost ................ Dkr. 4,158,671 Dkr.
3,696,296
5.2 HW Integration + Test .. Dkr. 631,860 Dkr.
562,594
5.3 Factory Acc. Test Proc.
and Report ............. Dkr. 140,676
Dkr. 140,676
6. Site Installation .........Dkr. 574,197 Dkr.
446,690
6.1 Site Preparation Req. .. Dkr. 175,845 Dkr.
140,676
6.2 Site ATBB Drawing ...... Dkr. 70,338 Dkr.
70,338
6.3 Transportation ......... Dkr. 70,338 Dkr.
70,338
6.4 Site Installation ...... Dkr. 257,676 Dkr
165,338
7. Site Acceptance ...........Dkr. 46,185 Dkr.
46,185
8. Logistics Support .........Dkr. 1,802,357 Dkr.
1,802,357
8.1 Warranty ................Dkr. 562,704 Dkr.
562,704
8.1.1 SW Warranty .......... Dkr. 281,352 Dkr.
281,352
8.1.2 HW Warranty .......... Dkr. 281,352 Dkr.
281,352
8.2 Training ............... Dkr. 554,213 Dkr.
554,213
8.2.1 CAMPS utilities
course.............. Dkr. 554,213 Dkr.
554,213
8.4 Maintenance ............ Dkr. 685,440 Dkr.
685,440
8.4.1 Spares ............. Dkr. 685,440 Dkr.
685,440
9. Documentation ............ Dkr. 1,200,797 Dkr.
1,200,797
9.1 SW maintenance Manual .. Dkr. 1,108,428 Dkr.
1,108,428
9.2 HW documentation
non-CAMPS .............. Dkr. 92,369 Dkr.
92,369
Total .........................Dkr. 11,688,167 Dkr.
11,029,619
3̲ ̲ ̲H̲A̲R̲D̲W̲A̲R̲E̲ ̲C̲O̲N̲F̲I̲G̲U̲R̲A̲T̲I̲O̲N̲
3.1 H̲A̲R̲D̲W̲A̲R̲E̲
The hardware configuration required is shown in figure
3.1.
It consists of non-dualised Equipment in tempest or
non-tempest racks.
To the main equipment the following will be connected
:
5 VDUs CR quotes for Delta-Data due to
the logistic back-up problems.
1 LINE Parallel interface high speed
PRINTER printer of type used in CAMPS development.
Type Dataproducts B 600(600 lines
per minute) only exists as non-tempest.
1 TAPE UNIT FT 9000 Pertec (1600 Bpi)
1 DUAL STATION Identical to the floppy station
in
FLOPPY CAMPS main equipment.
2 SMD Disk unit 80MB, identical to Mains
CAMPS SMD.
2 KEYBOARD/ For use as a console. Texas TI
820
PRINTER KSR only exists as non-tempest
printer.
In appendix A is shown the equipment matrix for the
system.
Note: * Tape station in EMI-racks has not been
tempest qualified.
* The proposed high speed printer and Operator
Console are not designed for Tempest and
not
tempest approved.
CAMPS DEVELOPMENT SYSTEM
Figure 3.1
4̲ ̲ ̲S̲Y̲S̲T̲E̲M̲/̲S̲O̲F̲T̲W̲A̲R̲E̲ ̲E̲N̲G̲I̲N̲E̲E̲R̲I̲N̲G̲
4.1 S̲Y̲S̲T̲E̲M̲ ̲I̲N̲T̲E̲G̲R̲A̲T̲I̲O̲N̲
The System SW and the DAMOS utilities will be installed
on the reference system, together with the additional
SW mentioned in 4.2.
4.2 S̲O̲F̲T̲W̲A̲R̲E̲
The system SW and the DAMOS utilities deliverable under
the CAMPS contract will be installed.
In addition CAMPS package integration tests and test
utilities will be documented and delivered.
All System Generation tools to cover Data Base generation,
capabilities entries, boot module creation to enable
a new and consistent system to be generated will be
delivered.
No software for firmware development will be delivered.
Protocol Converter development is not included in this
proposal.
5̲ ̲ ̲F̲A̲B̲R̲I̲C̲A̲T̲I̲O̲N̲
5.1 H̲A̲R̲D̲W̲A̲R̲E̲ ̲A̲S̲S̲E̲M̲B̲L̲Y̲ ̲B̲R̲E̲A̲K̲D̲O̲W̲N̲
A HW assembly breakdown will be delivered, as the basis
for fabrication of the system.
5.2 F̲A̲C̲T̲O̲R̲Y̲ ̲A̲C̲C̲E̲P̲T̲A̲N̲C̲E̲ ̲T̲E̲S̲T̲
The system will be factory tested prior to shipment.
6̲ ̲ ̲L̲O̲G̲I̲S̲T̲I̲C̲S̲ ̲S̲U̲P̲P̲O̲R̲T̲
6.1 T̲R̲A̲N̲S̲P̲O̲R̲T̲A̲T̲I̲O̲N̲ ̲A̲N̲D̲ ̲I̲N̲S̲T̲A̲L̲L̲A̲T̲I̲O̲N̲
Site preparation requirements and ATBB-drawings will
be produced as on the main CAMPS contract. CR assumes
that a site survey can be conducted at the latest 5
months before SPA.
It means that the SPR will be delivered 4 months before
SPA, and the ATBB-drawings 2 months before. The site
verification is completed 2 months before, and the
installation can start 1 month before SPA.
The system will be installed on a site in Belgium.
The price proposal assumes that the development system
is installed independently of the reference system.
6.2 T̲R̲A̲I̲N̲I̲N̲G̲ ̲A̲N̲D̲ ̲D̲O̲C̲U̲M̲E̲N̲T̲A̲T̲I̲O̲N̲
A two week course for 6 students on the use of the
CAMPS-specific development and test utilities is quoted,
in addition to the training for the reference system,
which covers the standard utilities.
The course is scheduled for late 84, to be held at
CR or in Belgium, if the necessary computer equipment
is available.
A Software Maintenance manual is developed. It gives
an overview of all development tools, how they are
used during development, how changes of different kinds
may be made using the tools, how testing is carried
out etc.
HW-documentation not delivered under the main CAMPS
contract, will be delivered as commercial off-the-shelf
documentation (Tape Unit, Line Printer, Operator Console).
No other documentation will be delivered, as CR understands
that copies of the CAMPS site documentation will be
delivered directly from SHAPE to ISSC.
6.3 M̲A̲I̲N̲T̲E̲N̲A̲N̲C̲E̲
The costs of HW-and SW-warranty on the conditions as
in the main CAMPS contract during the one year warranty
period from the site delivery are included in the proposal.
If a shorter warranty period is requested, the costs
can be cut proportionally.
6.4 S̲P̲A̲R̲E̲S̲
To ensure that spares for 90 days are available CR
recommends SHAPE to purchase spares to a value of 15%
of the HW-cost.
In Appendix B the spare parts list is given under that
assumption.
The recommended spares will cost Dkr. 685,440 for the
development system.
If only a part of the money is available, CR recommends
that parts covering the non-CAMPS equipment are purchased.
The spare part cost for this option is Dkr. 276,874.
APPENDIX A
----------
Temp. N-T
CR-Number. Name Unit T. N-T Total Total OEM
Price Sys Sys Price Price
Dkr. ea. ea Dkr. Dkr.
-------------------------------------------------------------------------
2 CR80 PROCESSOR UNIT
MODULES
------------------------------
21 CR8003M/040PC/00 CPU/CACHE 116,059
1 1 116,059 116,059
25 CR8020M/000PC/00 MAP
89,181
1 1
89,181
89,181
26 CR8071M/010--/00 MIA
40,486
1 1
40,486
40,486
29 CR8016M/512PC/00 512
K RAM 162,840 3 3 488,520 488,520
3 CR80 CHANNEL UNIT MODULES
----------------------------
31 CR8081M/010A-/00 CIA-A
25,020
1 1
25,020
25,020
33 CR8044M/041AB/00 DISC
CTL/32K 64,194 1 1
64,194
64,194
34 CR8084M/010--/00 DCA
10,465
1 1
10,465
10,465
35 CR8047M/040AB/00 ST
FD CTLR 38,742 1 1
38,742
38,742
36 CR8087M/010--/00 SFA
5,124
1 1
5,124
5,124
37 CR8066M/010AB/00 LTU,SYNC/16K
34,688
2 2
69,376
69,376
38 CR8082M/010--/00 LIA-N
3,731
2 2
7,462
7,462
39 CR8045M/040AB/00 TAPE
CTRL 49,235 1 1
49,235
49,235
3A CR8046M/040AB/00 PAR
CTRL 37,796 1 1
37,796
37,796
3B CR8085M/010--/00 TCA
9,040
1 1
9,040
9,040
3D CR8086M/010--/XX PCA
10,877
1 1
10,877
10,877
5 TDX SYSTEM MODULES
---------------------
5A CR80109/000--/00 V28
ADAP 4C 26,511 2 0
53,022
0 X
5B CR80110/000--/00 V28L
ADAP 1C 29,428 1 0
29,428
0 X
5E CR8105S/010--/00 FAN
UNIT,CTX 5,190
2 0
10,380
0
5F CR1104S/000--/00 ADAP
CRATE 15,656 2 0
31,312
0
5G CR1102S/000--/00 ADAP POW SUP 28,104 2 0
56,208
0 X
5L CR1100S/000--/00 BP-8
2,771
3 0
8,313
0
Temp. N-T
CR-Number. Name Unit T. N-T Total Total OEM
Price SYS SYS Price Price
Dkr. ea. ea Dkr. Dkr.
-------------------------------------------------------------------------
7 CR80 RACK, CRATES, ACCESSORIE
--------------------------------
73 RACK,EMI,1,(LE,RH)
)
74 RACK,EMI,1,(LE,LH)
)
75 RACK,EMI,2,(RE,RH)
) 121,021 )3 0 363,063
0 X
76 RACK,EMI,2,(RE,LH)
)
77 RACK,EMI,3,( I,RH)
)
78 RACK,EMI,3,( I,LH)
)
7B CR8108-/220--/00 MAINS
SWITCH 7,885 3 3
23,655
23,655
7D CR8107-/010--/00 POW
DIST PAN 3,114
4 4
12,456
12,456
7E CR8050M/010--/00 POW
SUPPLY 20,350 2 2
40,700
40,700
7G CR8125M/225PC/00 PU
CRATE 58,081 1 1
58,081
58,081
7H CR8125M/425AB/00 CU
CRATE 68,077 1 1
68,077
68,077
7J CR8105M/020--/00 FAN
UNIT 16,118 2 2
32,236
32,236
7K CR8055M/020--/00 MBT(PU)
3,250
6 6
19,500
19,500
7L CR8211M/738--DATA CHAN
TERM 3,483 1 1
3,483
3,483
RACK 19" 0 3
0 168,039 X
7P FILTER BOX 55,920
1 0
55,920
0 X
7Q POWER LINE FILTER 7,631
1 1
7,631
7,631 X
8 CR80 CABLES
--------------
81 CR8201D DATA CHAN CABLE
1,682
1 1
1,682 1,682
86 CABLE, FLOPPY DISK
631
1 1
631
631
8A CR8201S POW CABLE 0,5M )
)
8D CR8201S POW CABLE 2,5M )
)
8E CR8201S POW CABLE 3,5M )
542
)
9 9
4,878 4,878
8F CR8201D POW CABLE 0,5M )
)
8G CR8201D POW CABLE l,0M )
)
8H CR8201D POW CABLE 1,5M )
)
8W POWER CABLE l,0MM l,0M
)
8X POWER CABLE l,0MM l,5M
542
4 4
2,168 2,168
8Y POWER CABLE l,0MM 2,5M
)
CABLE, MAG TAPE 625 1 1
625
625
CABLE, LINE PRINTER 625 1 1
625
625
Temp. N-T
CR-Number. Name Unit T. N-T Total Total OEM
Price SYS SYS Price Price
Dkr. ea. ea Dkr. Dkr.
-------------------------------------------------------------------------
9 V24 SIGNAL CABLES
--------------------
91 V24 CABLE 9A/240
92 V24 CABLE 9A/270
93 V24 CABLE 9A/300
94 V24 CABLE 9A/330
95 V24 CABLE 10A/360
96 V24 CABLE 9A/390
97 V24 CABLE 17A/270
656 27 27 17,712 17,712
98 V24 CABLE 17A/300
99 V24 CABLE 17A/330
9A V24 CABLE 17A/360
9B V24 CABLE 10B/240
9C V24 CABLE 10E/150
9D V24 CABLE -TARE
9U FILTERED CONN 10 POL
2,464
9
0 22,176
0 X
G MECHANICS
------------
GW LUMP SUM PER RACK 1,947
3
3
5,841
5,841
H PERIPHERAL EQUIPMENT
-----------------------
H1 VDU, TEMPEST
179,426 5
5 897.130 897,130 X
H2 MSP, TEMPEST
195,727 3
3 587,181 587,181 X
H9 HIGH SPEED LINE PRINTER
1
1 122,012 122,012 X
H10 OPERATOR CONSOLE 1 1 40,474
40,474 X
J MASS STORAGES
----------------
J1 CR8300-/080--/00
DISK DRV SMD 175,780 2 2 351,560 351,560 X
J6 CR8308-/216--/00
FD ST 2xSGL 28,522 1 1 28,522
28,522 X
J8 MAG TAPE UNIT
140,420 1
1 140,420 140,420 X
APPENDIX B
----------
S̲p̲a̲r̲e̲ ̲P̲a̲r̲t̲s̲ ̲L̲i̲s̲t̲:
ITEMNAME DESCRIPTION MANU- UNIT
PRICE
RSPL
…02…SPL
FACT.
DKR. …02…NON-CAMPS
MODULES
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
CPU/CACH CR8003M/040PC/00 CR 116,059 1
RAM 512K CR8016M/512PC/00 - 162,840 1
MAP CR8020M/000PC/00 -
89,181 1
MIA CR8071M/010--/00 -
40,486 1
CIA-A CR8081M/010A-/00 -
25,020 0
DISKCTRL CR8044M/040AB/00 -
64,194 0
DCA CR8084M/010--/00 -
10,465 0
TAPE CT CR8045M/0XXAX/00 -
49,235 1 1
PAR CTR CR8046M/0XXAX/00 -
37,796 1 1
TCA CR8085M/010--/00 -
9,040 1 1
PCA CR8086M/010--/00 -
10,877 1 1
CTX FAN CR8105S/010--/00 -
5,190 0
ADPWRSUP CR1102S/000--/00 -
28,104 0
PWRSUP M CR8050M/010--/00 -
20,350 0
FANUNITM CR8105M/020--/00 -
16,118 0
CARD JRVV CDC
5,207 0
CARD 6SGV -
8,476 0
CARD FLPV -
8,222 0
CARD JLQV -
8,006 0
CARD ELUV -
7,791 0
CARD MLVV -
6,088 0
ASSY POWER SUPPLY SHUGART
9,692 0
PCP PCB SA801-2 -
10,124 0
KTT DDSC SITE KIT DDSC
72,702 0
UNIT MSP MODEL 8000 TRACOR 195,727 0
PART FAN FOR M-CRATE CR
1,045 0
KIT FT9000 TAPE
DRIVE 132,646 1 1
KIT B600 PRINTER
24,855 1 1
KIT TEXAS KSR820
12,425 1 1
̲
̲ ̲
̲ ̲
̲ ̲
̲ ̲
̲ ̲
̲ ̲
̲ ̲
̲ ̲
̲ ̲
̲ ̲
̲
TOTAL DKR. 685,440