⟦3b007979c⟧ Wang Wps File

    Length: 4945 (0x1351)
    Types: Wang Wps File
    Notes: Spelunked
    Names: »~ORPHAN39.08«

Derivation

└─⟦c36200119⟧ Bits:30006003 8" Wang WCS floppy, CR 0038A
    └─ ⟦this⟧ »~ORPHAN39.08« 

WangText

…00……00……00……00…'…0a……00……00…'…0b…'…02…'…06…&…0b…%…08…%…09…%…00…%…86…1                                              …02…           …02…   …02…         


…02…CPS/PLN/005

…02…KM/810707…02……02…#
CAMPS INSTALLATION PLAN
…02…Issue 2…02…CAMPS







                 T̲A̲B̲L̲E̲ ̲O̲F̲ ̲C̲O̲N̲T̲E̲N̲T̲S̲



   1   SCOPE AND PURPOSE ............................
        5 

   2   ORGANIZATION ................................ 
       5 
     2.1 INSTALLATION ...............................
          5 
       2.1.1 CAMPS Site Preparation .................
              6 
       2.1.2 CAMPS Site Installation ................
              8 
       2.1.3 CAMPS Site Transportation ..............
              9 

   3   CR/SHPE RESPONSIBILITIES .................... 
       9 
     3.1 SITE PREPARATION AND VERIFICATION ..........
          9 
       3.1.1 Site Surveys ...........................
             10 
       3.1.2 Civil Works Requirements ...............
             10 
       3.1.3 As-To-Be-Built Drawings and As-uilt 
             Drawings ...............................
             11 
       3.1.4 Delivery of Signal Cables ..............
             12 
       3.1.5 As-Built Drawings ......................
             12 
       3.1.6 Site Verification ......................
             12

     3.2 INSTALLATION .............................. 12
         
       3.2.1 Main Sites .............................
             13 
       3.2.2 Remote Tares ...........................
             14 
       3.2.3 Remote Terminals .......................
             14 

   4   SITE IMPLEMENTATION MILESTONES ...............
       19 
     4.1SITE SURVEYS ............................... 19
     
     4.2 CIVIL WORKS REQUIREMENTS (CWR) .............
         19
     4.3 AS-TO-BE-BUILT DRAWINGS ....................
         19 
     4.4 DELIVERY OF SIGNAL CABLES ..................
         21
     4.5 SITE VERIFICATION ......................... 21
     4.6 SITE INSTALLATION ..........................
         21

   5  SITE PREPARATION AND INSTALLATION TASKS .......
   21
     5.1 SITE PREPARATION ...........................
         21
     5.2 SITE VERIFICATION ..........................
         26



     5.2 INSTALLATION TASKS .........................
         27 
       5.2.1 Preparation of Installation ............
             27 
       5.2.2 Installation Task Schedule .............
             27 
       5.2.3 Shipmen of Equipment .................. 28
             
       5.2.4 Installation at Remote Locations .......
             28 
       5.2.5 Installation Phase Activities ..........
             28 



                  L̲I̲S̲T̲ ̲O̲F̲ ̲F̲I̲G̲U̲R̲E̲S̲



     2.1 CAMPS INSTALLATION ORGANIZATION ............
          7 

     3.1 TYPICAL CAMPS ROOMLAYOUT .................. 15
         
     3.2 CABLE CONNECTIONS AT A TYPICAL MAIN SITE ...
         16 
     3.3 COLLOCATED TARE, TYPICAL COMMUNICATION
         LINK .......................................
         17 
     3.4 REMOTE TARE, TYPICAL COMMUNICATION LINK ....
         18 

     4.1 SIT IMPLEMENTATION MILESTONES ............. 20
         

     6.1 INSTALLATION PHASE ACTIVITY AT A 
         TYPICAL SITE ...............................
         32 


                   1̲ ̲ ̲S̲C̲O̲P̲E̲ ̲A̲N̲D̲ ̲P̲U̲R̲P̲O̲S̲E̲



         This plan outlines the various tasks to be accomplished
         concerning site preparation and installation.  It describes
         how CR intends to manage and perform te job and outlines
         the responsibilities of CR and SHAPE/host nation concerning
         installation.  Milestones of the site implementation
         schedule have been identified and an analysis of the
         site installation task is performed.









                     2̲ ̲ ̲O̲R̲G̲A̲N̲I̲Z̲A̲T̲I̲O̲N̲


2.1      I̲N̲S̲T̲A̲L̲L̲A̲T̲I̲O̲N̲ ̲S̲E̲C̲T̲I̲O̲N̲

         a)  The Installation Section is the section within
             the Logistic Department responsible for CAMPS site
             preparation and installation.  The Installation
             Section Manager will report directly to the Logistic
             Department Manage.  The Logistic Department Manager
             will coordinate the Installation Section activities
             with the CAMPS Project Office.  See Figure 2.1.

         b)  The Installation Section is responsible for the
             interface between PAB and the CAMPS Site Installation
             Subsecion.




2.1.1    C̲A̲M̲P̲S̲ ̲S̲i̲t̲e̲ ̲P̲r̲e̲p̲a̲r̲a̲t̲i̲o̲n̲

         a)  The Systems Division has contracted with a Norwegian
             company, Ingeni]r P.A. Bakkejord A/S (PAB) to perform
             the following tasks on the CAMPS progra:

             1.  Perform Site Survey
             2.  Prepare Site Civil Works Requirements
             3.  Prepare As-To-Be-Built Drawings
             4.  Perform Site Verification
             5.  Prepare As-Built Drawings

         b)  PAB is the contractor representative for CR and
             should be treated as suchby SHAPE when performing
             the above tasks.  CR will maintain overall responsibility
             for completion of these tasks and will review PAB's
             work prior to its submission to SHAPE.

             PAB will perform the work under supervision and
             control of the installaion section.

         c)  Communication between PAB-CR-SHAPE will be as follows:

             1)  PAB will transmit all documentation and correspondance
                 intended for SHAPE to CR for approval.  CR
                 will, by return telex, issue approval to PAB.
                  PAB will then transmit dcumentation or correspondace
                 to SHAPE.

             2)  SHAPE will transmit documentation and correspondance
                 to CR.  Only if CR explicitly express so SHAPE
                 will transmit to PAB directly.