top - download
⟦3c1a9ca48⟧ Wang Wps File
Length: 3968 (0xf80)
Types: Wang Wps File
Notes: Telex/ITC-McLean
Names: »2654A «
Derivation
└─⟦2a5bfc292⟧ Bits:30006223 8" Wang WCS floppy, CR 0221A
└─ ⟦this⟧ »2654A «
WangText
To: ITC-McLean
Attn: Don Iverson
Fm: Christian Rovsing A/S
ref: OCR/Doc. 2654A/tlx/0001
Subj: List of content for OCR proposal.
After the review of the OCR IFB we propose, as we agreed at
our last meeting, the following list of content for our combined
bid. If you wish to modify certain sections, please let us know.
For the sections marked with ITC, we expect to include your
input. Sections marked with (ITC) is expected to be combined
effort. Other sections to be completed by CR.
P̲a̲r̲t̲ ̲1̲:̲ ̲T̲E̲C̲H̲N̲I̲C̲A̲L̲ ̲P̲R̲O̲P̲O̲S̲A̲L̲
Vol. I: PIP
Vol. II: Certificates and Contract appreciation
Vol. III: Technical Specification
Vol. IV: Corporate Capabilities
P̲a̲r̲t̲ ̲2̲:̲ ̲P̲R̲I̲C̲E̲ ̲P̲R̲O̲P̲O̲S̲A̲L̲
1. Project Management and Organization CR A/S
1.1 Overall Project Approach
1.2 Management and Organization
1.3 Implementation Procedures
1.3.1 Work Breakdown Structure
1.3.2 Operation Procedures
1.3.3 Cost Control
1.3.4 Contracts Management and Administration
1.3.5 Problem recognition and Resolution
2. Project Implementation Schedule CR
2.1 Master Work Breakdown Structure (WBS)(ITC)
2.2 Detailed WBS (ITC)
2.3 Time and Milestone schedule
3. Technical Implementation Approach CR/ITC
3.1 System Engineering Plan
3.1.1 Requirements Specification
3.1.2 Design/Procurement Specification
3.1.3 Test Specification
4. Reliability and Maintainability ITC
4.1 Reliability/Maintainability Model
4.2 Availability Verification
5. T̲E̲S̲T̲I̲N̲G̲
5.1 Test Philosophy
5.2 Test Plan and Procedures
5.3 Factory Acceptance Test
(Phase I) - General (ITC)
5.4 Factory Acceptance Test
(Phase I) - Specific (ITC)
5.5 Site Functional Test (Phase II)
5.6 Site Operational Test (Phase III)
6. D̲E̲L̲I̲V̲E̲R̲Y̲ ̲A̲N̲D̲ ̲I̲N̲S̲T̲A̲L̲L̲A̲T̲I̲O̲N̲ CR
7 QUALITY CONTROL/QUALITY ASSURANCE
7.1 QC/QA Philosophy CR
7.2 HW Manufactoring MQA ITC
7.3 SW Development QA ITC
8 T̲R̲A̲I̲N̲I̲N̲G̲ CR
9 M̲A̲I̲N̲T̲E̲N̲A̲N̲C̲E̲ ̲P̲H̲I̲L̲O̲S̲O̲P̲H̲Y̲ ̲ ̲A̲N̲D̲
S̲P̲A̲R̲E̲ ̲P̲R̲O̲V̲I̲S̲I̲O̲N̲I̲N̲G̲ (ITC)
9.1 Maintenance Philosophy
9.1.1 Site Level Maintenance
9.1.2 Depot Level Maintenance
9.2 Spare Provisions
9.2.1 Site Level
9.2.2 Depot Level
10 D̲O̲C̲U̲M̲E̲N̲T̲A̲T̲I̲O̲N̲
10.1 Documentation Philosophy
10.2 Operators Manual ITC
10.3 Users Guide ITC
10.4 Site Technical Manual ITC
10.5 Depot Technical Manual ITC
10.6 Inventory ITC
V̲O̲L̲U̲M̲E̲ ̲ ̲I̲I̲:̲ ̲ ̲C̲E̲R̲T̲I̲F̲I̲C̲A̲T̲E̲S̲ ̲C̲O̲M̲P̲L̲I̲A̲N̲C̲E̲ ̲S̲H̲E̲E̲T̲S̲.̲
C̲O̲N̲T̲R̲A̲C̲T̲U̲A̲L̲ ̲A̲P̲P̲R̲E̲C̲I̲A̲T̲I̲O̲N̲
1. Certificate of Origin ITC
2. List of NATO Nation Users ITC
3. Bid guarantee CR
4. Compliance Sheets (ITC)
5. Contractual Appreciation CR
V̲O̲L̲ ̲I̲I̲I̲:̲ ̲T̲E̲C̲H̲N̲I̲C̲A̲L̲ ̲S̲P̲E̲C̲I̲F̲I̲C̲A̲T̲I̲O̲N̲
1. Introduction
2. System Overview
3. Hardware Specifications
(Dimension, Characteristics, Drawings etc.)
4. Software Specification
5. Installation Requirements
6. Environment Specification
6.1 EMP Sysceptibility
6.2 Shock and Vibration Specificatin
6.3 Heat Dissipation
6.4 Dust
6.5 (Other Requirements your System may have)
7. Tools and Test Equipment
8.1 Priced List of Tools and Test Equipment
V̲O̲L̲U̲M̲E̲ ̲I̲V̲:̲ ̲C̲O̲R̲P̲O̲R̲A̲T̲E̲ ̲C̲A̲P̲A̲B̲I̲L̲I̲T̲I̲E̲S̲
1. Introduction
2. Christian Rovsing A/S
3. ITC/COMPUSCAN
3.1 Coporate History
3.2 Relevant Experience
3.2.1 Involvement in OCR
3.2.2 Involvement in Tempert
3.3 Manufacturing Facilities
3.4 QA/QC Provisions
Best Regards
Christian Rovsing A/S
Jens Peter Ringgaard