WangText
…02…
…02… /820430…02……02…#
RESPONSE TO DISCREPANCY LIST
REF. TJH -AP82-011…02……02…ALPHA
D̲i̲s̲c̲r̲e̲p̲a̲n̲c̲i̲e̲s̲ ̲
PAGE ITEM DECISION COMMENTS
13 1.2 para 3 X Subparagraph removed
21 G) X Ref. sec. 4.1.3 (note:not
page 22)
25 1.4.1 X
42 2.9 X Last 2 paragraphs interchanged
47 3.1.11 X Clarified in referenced
para 3.6.1.1
50 3.2.2 X Ref. editorial to this
page
62 E) X
69 Fig.3.4.2-5 X Clarification inserted
on page 63
73 Fig.3.4.3-1 X
98 Fig.3.6.1.1 X Paragraph rewarded
111 EQ.M. X
114 4.2.1 X Reworded
120 4.2.1.1.2 D X The confidence levels
are used for
warnings refer p.121.
Also refer p.220 for calculation
of character confidence
131 D) Inserted reference to
section 4.2.1.2.1.g where
explanation is found.
146 7) P155 2) concerns the automatic
retransmission of messages
which were originally
transmitted within a time
window in the past. The
supervisor option of forcing
the transmission of a
s̲p̲e̲c̲i̲f̲i̲c̲ message from
store at any time (ref.
IFB 5.1.2.2.7.8.c) has
been forgotten, unfortunately,
but is now inserted on
p.146, item C.2. The bulk
retransmission of all
expired messages or all
messages as dependent
on precedence is reflected
on p.145, item b.
148 G) X Automatic Text added.
148 4.2.2.3 X Proposals are in answer
to the IFB requirements
for minimizing transmission
(5.1.2.2.7.4) and Channel
Allocation (5.1.2.2.7.1)
154 D) X Have changed the text
to preferred way of implementation.
165 1'st par X One or more channels may
use the same CD, but then
also a common serial number
sequence, in which case
the system will have a
common queue for these
channels. This problem
is considered to be subject
for detailed discussions
incase of contract award
169 B) X Reference to clarifying
annexes has been inserted
188 B) X Ref. sec. 4.1.3
190 D) X Reworded
194 4th item X
202 4.3.1 X Sentence deleted. (Note:
not page 201)
204 Equip.list X
225 4.4.4 X Refer 4.4.2.2, p221 and
4.4.2, p.219 for dif.
and use of confidence
level. Also refer p.
120. Loading, initialization
and diagnosing the MCU
is a matter of design.
227 4.5.1 X List sentence reworded
285 X Explanation inserted concerning
File Management System
285 X 2 CPUs. The reason explained
on p. 287.
288 Tables X Explanation inserted on
page 286. Resource consumptions
figures are based on CAMPS
figures for the same (or
similar) tasks.
298 4.7.3 X May be a trip wire in
reverse, but it is also
an attempt to be compliant
on a vital print.
303 X Mainly editorial. Figures
are derived on the same
page.
312 6 X also corrections on pages
313, 314, 315, 316, 317,
and 321
312 6.1.1 X
318 F X (Note:not p.317).Corrected
to "package No.
323 E) X Yes, it is an implied
requirement to the power
equipment supplied by
you. However, this requirement
is probably not anyway.
330 3) X (Note: Not 329) Changed
to "will". Though, it
is, in fact, a requirements
list.
330 3) X (Note: Not 329) SPA kept
as it is, but with an
explanation of its meaning.
Also corrected on page
356, ref. list of editorials.
336 2) X It i̲s̲ actually a contractual
requirement
338 TAB 6.4-1 X The last item covers both
types of disks (ref. previous
page) and according to
vendor's recommendations.
341 6.5.3.3 X
348 3) X As for various other spare
parts and test tools,
this item has not been
proposed but not yet priced.
354 7.2.5.1 X 2'nd sentence of last
item on this page has
been deleted.
E̲d̲i̲t̲o̲r̲i̲a̲l̲s̲
PAGE ITEM DECISION COMMENTS
10 THIRD X
10 3 1 X
13 1 1 X
14 2'nd X
14 5'th
22 J 1 X
32 2.2.1 X
33 1 2 X
40 2 X
41 1 2 X
44 A 1 X Anodised, Alkydic
45 D 1 X ..... do not need a ....
47 C 2 X Reworded-Ref Discrepancy
not to page 47
48 1 2 X
48 3.1.13 X
4 3.1.14 X
50 1 1 X ..alarming the operator
in the event of an abnormal
environmental condition
54 C 2 X
61 C X
63 E X
73 X
74 4 1 X
80 3 1 X
98 3.6.1.1 X Paragraph has been reworded
98 3.6.1.2 X
100 3.6.3.1 X ..the IFG, paragraph 4.7.3.1
with the following...
101 B 4 X
102 F 3 X
111 1 1 X "fulfil" is the correct
spelling
114 last 2 X last 2 sentences have
been reworded (ref.DN
to page 114)
116 2 1 X
118 B 1 X
123 1 1 X
136 Table X
140 Table X
146 B6 2 X Deactivated
147 D2 X
148 G 1 ..automatically sectioned...
148 Last X
150 B3 2 X
150 B5 4 X
151 B7 3 X
155 F 1 X
159 A X
160 3 1 X
160 4 1 X
167 B 2 X
170 2 1 "specifies" not capitalized
170 2 1 X operators
170 8 1 (der skal ikke komma her)
170 9 1 X Der skal punktum her
172 4 1 Ikke komma her
172 5 1 X Der skal punktum her
174 A 2 X
182 4.2.4.9 X
186 4.2.6.4 X
187 4.2.7 X
188 B X
188 A X
190 D 1 "or" deleted
190 D 2 X Covered by both Discrepancy
and Editorial
190 E 2 X
192 4.2.8.3 Initialization
192 4.2.8.3 X
194 4th X
196 2 1 X
196 2 2 X
206 3 2 X
207 1 1 X
207 4 4 X
227 A 1 X
238 4.6.2.3 X
242 4.6.2.6 X The abbreviation, SSC,
is appended to the headline
of sec.4.6.2.6
243 B X
246 2 1 X
248 4.6.2.7 X --(e.g.Plain ̲Language
̲Address (PLA) tables
251 2 1 X
255 4.6.3.2.1 X
261 4.6.3.3.1.1 X
262 4.6.3.3.1.3
262 4.6.3.3.1.3 X
262 4.6.3.3.1.4 X
262 4.6.3.3.2 X
264 1 1 X
269 4 3 X
269 5 1 X
269 7 1 X
269 7 3 X
270 3 1 X
270 4.6.3.5.4 X
287 X
310 Last Item X
312 X
315 B, 2/3/5 X
317 Last Par X
318 F X package
322 C 2 X Accepted, but actually
Kiloponds is a force whereas
Kilograms is a mass.
323 F 2 X
330 6.3.1 Site Provisional Acceptance
331 6.3.2.1 X "fulfil" is the correct
spelling
333 B 3 X
334 1 1 X
350 3 2 X
351 7.1.2 X
356 7.4.1 Site Provisional Acceptance
Test (ref.page 330)
356 7.4.2 X
356 7.4.2 Removal of circle (bullet)
358 3 1 X
359 8.1 X 1817 eller