DataMuseum.dk

Presents historical artifacts from the history of:

CR80 Wang WCS documentation floppies

This is an automatic "excavation" of a thematic subset of
artifacts from Datamuseum.dk's BitArchive.

See our Wiki for more about CR80 Wang WCS documentation floppies

Excavated with: AutoArchaeologist - Free & Open Source Software.


top - download

⟦415c0b7c5⟧ Wang Wps File

    Length: 3143 (0xc47)
    Types: Wang Wps File
    Notes: Spelunked
    Names: »~ORPHAN61.08«

Derivation

└─⟦03f37a045⟧ Bits:30006227 8" Wang WCS floppy, CR 0138A
    └─ ⟦this⟧ »~ORPHAN61.08« 

WangText








CROSS FOX
MESSAGE PROCESSING FACILITY
                       
  1983-02-25
PRICE PROPOSAL, VOLUME
 V                     
       Page #









                         VOLUME V

                      PRICE PROPOSAL



                        CROSS FOX

               MESSAGE PROCESSING FACILITY




                  CHRISTIAN ROVSING A/S

                    Ballerup, Denmark

                   Dated: FEB 25, 1983


1.       I̲N̲T̲R̲O̲D̲U̲C̲T̲I̲O̲N̲ ̲

         This volume presents a fixed price proposal for the
         equipment and services specified: in the Christian
         Rovsing A/S supplied:

                    CROSSFOX PROPOSAL:

         Vol. II     Crporate Capabilities
         Vol. III    Contractual Information and Project
                     Implementation Plan
         Vol. IV     Technical Proposal


         The price proposal consists of the following sections

         Section 2   provides summary of the price in Nodeca
                     formt

         Section 3   provides a summary of the price in WBS
                     format

         Section 4   provides a price breakdown

         Section 5   provides the price provisions

         Section 6   provides the contractual provisions…86…1  
                           …02…   …02…   …02…   …02…                       
                                        
2.       P̲R̲I̲C̲E̲ ̲S̲U̲M̲M̲A̲R̲Y̲ ̲N̲O̲D̲E̲C̲A̲ ̲F̲O̲R̲M̲A̲T̲



2.1      S̲i̲t̲e̲ ̲1̲0̲1̲

         Item 1      Line MOdems                 Prime Contractor
                                                 furnished(P.C.)

         Item2       MCU for 4 ch. (4)
                     Software included
                     under Item 8                   284,400

         Item 3                                  PC furnished

         Item 4                                  PC furnished

         Item 5      Operator work station
                     VDU's (4)                      189,600

         Item 6      Hardcopy printer 200
                     char/s (2)                      85,320

         Item 7      Messae Processor,
                     including specifica-
                     tion                         4,033,352

         Item 8      MPF software specs.
                     and integration              5,509,494

         Item 9      Misc. Equipment             N/A

                                                  ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

…05……05……05…         Sub total   10,102,166
                                                  ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲…86…1
                                                         …02…  
                                                 …02…   …02…   …02…    
                                                           
                                                           
                                                 …02…          
                                                         
                     Total from previous page    10,102,166



         Item 21     Installation                   387,146

         Item 22     Transportation and
                     Insurance                       63,602

         Item 23     Documentation                  344,639

         Item 2      Maintenance Plan                62,253

         Item 25     Spare Parts and
                     Codification                   460,695

         Item 26     Training                       325,078

         Item 27     Tools and Test
                     Equipment including:        Not provided
                     Special-to-type
                     Tools and Test              by CR
                     Equipment,Common Tols
                     and Test Equipment

         Item 28     Testing and Acceptance       1,803,735

         Item 29     Contractors System
                     Engineering Cost             1,527,505

         Item 30     Other Equipment and
                     Services not listed
                     above: Management            1,345,425

                                                  ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
                                                 ̲ ̲ ̲ ̲ ̲

                                      TOTAL      16,422,244
                                     \            ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
                 ̲ ̲ ̲ ̲


2.2      S̲i̲t̲e̲ ̲3̲0̲1̲



         Item 1      Line Modems                 PC furnished

         Item 2      MCU for 4 channels (4)         284,400
                     software included in 8.

         Item 3                                  PC furnished

         Item 4                                  PC furnished

         Item5       Operator work station,
                     VDUS(4)                        189,600

         Item 6      Hardcopy Printer 200
                     char/s (7)                      85,320

         Item 7      Message Processor
                     including Specification      4,033,352

         Item 8      MPF softare and integra-
                     tion                         5,509,494

         Item 9      Misc. Equi