…00……00……00……00……00……86…1 …02… …02… …02…
…02…CPS/TSS/002
…02…820301…02……02…#
IN-PLANT COMSEC VERIFICATION
…02……02…CAMPS
T̲A̲B̲L̲E̲ ̲O̲F̲ ̲C̲O̲N̲T̲E̲N̲T̲S̲
1 GENERAL ......................................
3
1.1 PURPOSE ..................................
3
1.2 APPLICABLE DOCUMENTS .....................
3
2 TEST SPECIFICATION AND EVALUATION ............
4
2.1 TEST SPECIFICATION .......................
4
2.1.1 Test Purpose .........................
4
2.1.2 Test Objective .......................
4
2.1.3 Requirements .........................
4
2.2 TEST METHODS AND CONSTRAINTS .............
4
2.3 TEST EVALUATION ..........................
6
2.3.1 Examination ........................
6
2.3.2 Test ...............................
6
3 TEST DESCRIPTION AND PROCEDURES ..............
7
3.1 TEST ......................................
7
3.1.1 General Description .................
7
3.1.2 Test Control .........................
7
3.1.3 Test Procedure .......................
7
1̲ ̲ ̲G̲E̲N̲E̲R̲A̲L̲
1.1 P̲U̲R̲P̲O̲S̲E̲
The purpose of this document is:
a) to identify:
1) the test objective
2) the requirements to be verified
b) to define:
1) the test methods and constraints
2) the test evaluation criteria
3) test procedure execution
1.2 A̲P̲P̲L̲I̲C̲A̲B̲L̲E̲ ̲D̲O̲C̲U̲M̲E̲N̲T̲S̲
1) CAMPS System Requirements,
CPS/210/SYS/0001
2) EMC Report
CPS/REP/003
3) CAMPS Site Design Concept
CPS/TCN/023
4) As To Be Built Drawing
PAB/CPS/ATB/001
5) EMI Feature QA Plan
CPS/QAP/002
6) COMSEC Test System Facility Layout
CPS/TCN/039
7) DSMT HW Test Specification and Procedures
CPS/TPR/005
8) CAMPS Installation Material
CPS/TCN/040
9) ASMG 719 B
2̲ ̲ ̲T̲E̲S̲T̲ ̲S̲P̲E̲C̲I̲F̲I̲C̲A̲T̲I̲O̲N̲ ̲A̲N̲D̲ ̲E̲V̲A̲L̲U̲A̲T̲I̲O̲N̲
2.1 T̲E̲S̲T̲ ̲S̲P̲E̲C̲I̲F̲I̲C̲A̲T̲I̲O̲N̲
2.1.1 T̲e̲s̲t̲ ̲P̲u̲r̲p̲o̲s̲e̲
It is the purpose of this test to verify that the CAMPS
System Hardware complies with the COMSEC Requirements
for CAMPS as specified in para. 2.1.3..
2.1.2 T̲e̲s̲t̲ ̲O̲b̲j̲e̲c̲t̲i̲v̲e̲
The test objective is to verify that the CAMPS Test
Installation as described in appendix A, meets the
COMSEC Requirements.
2.1.3 R̲e̲q̲u̲i̲r̲e̲m̲e̲n̲t̲s̲
With reference to CAMPS Acceptance Test Specification
Overview, para. 3.2.2.4, the following CAMPS System
Requirements will be verified.
3.4.5.1 TEMPEST Acceptance
3.5.2.10 Electromagnetic Compability
2.2 T̲E̲S̲T̲ ̲M̲E̲T̲H̲O̲D̲S̲ ̲A̲N̲D̲ ̲C̲O̲N̲S̲T̲R̲A̲I̲N̲T̲S̲
This test will be conducted at the factory, on the
standard configuration as given in appendix A.
In table 2.2-1 the verification method is mapped on
each requirement. The examination testing will be supported
by documentation supplied in the table.
REQUIREMENT VERIFICATION METHOD
N/A EXAM TEST APPL. DOCUMENT
-------------------------------------------------------------------
3.4.5.1 1) X 6)
2) X 6)
3) X 6)
a) X X 3), 6)
b) X 2), 5)
b) 1) X
b) 2) X X Provided
by SHAPE
b) 3) X
c) X 3), 4)
d) X 7) Test
no. 5/2
e) X Note: All
Elec-
e) 1) X trical signal
e) 2) X cable is
pro-
e) 3) X vided by
SHAPE
e) 4) X
e) 5) X
e) 6) X
e) 7) X
f) X 3), 4)
g) X
h) X Appendix
A
i) X
j) X
k) X 3), 6)
l) X
m) X X 7) Test
No. 5/3
n) X X 7) Test
No. 5/3
o) X X 6)
p) 1) X 6)
p) 2) X 6)
3.5.10.2 X
TABLE 2.2-1
2.3 T̲E̲S̲T̲ ̲E̲V̲A̲L̲U̲A̲T̲I̲O̲N̲
2.3.1 E̲x̲a̲m̲i̲n̲a̲t̲i̲o̲n̲
The COMSEC Authorities will examine the documentation
and inspect the physical installation and evaluate
if all requirements are met.
2.3.2 T̲e̲s̲t̲
The test results will be analysed and evaluated by
the COMSEC Authorities.
After Analysis the recommendations and test results
will be notified to Christian Rovsing A/S by the appropriate
channels.
3̲ ̲ ̲T̲E̲S̲T̲ ̲D̲E̲S̲C̲R̲IP̲T̲I̲O̲N̲ ̲A̲N̲D̲ ̲P̲R̲O̲C̲E̲D̲U̲R̲E̲S̲
3.1 T̲E̲S̲T̲
3.1.1 G̲e̲n̲e̲r̲a̲l̲ ̲D̲e̲s̲c̲r̲i̲p̲t̲i̲o̲n̲
The COMSEC Authorities shall perform the test according
to the System Hardware Configuration and test operation
as described in the following.
3.1.2 T̲e̲s̲t̲ ̲C̲o̲n̲t̲r̲o̲l̲
The test is controlled from the Maintenance Position
so the COMSEC Authorities can select the Test Operation.
3.1.3 T̲e̲s̲t̲ ̲P̲r̲o̲c̲e̲d̲u̲r̲e̲
Test Operation will consist of a continuous stream
of traffic on one of the following connections:
a) Configuration Control Bus (Figure 3.1.3-1). This
is the Watchdog communication to the Processor
Units.
b) CPU to Memory. (Figure 3.1.3-1).
c) Memory to Disk, Disk to Memory (Figure 3.1.3-2)
d) PU to TDX (Figure 3.1.3-3). This test will consist
of the following cases.
1) Traffic to a single VDU
2) Traffic to a single MSP
3) Traffic to a single LSP
4) Traffic to a single combination of VDU, LSP,
and MSP.
5) Traffic to a single VDU via the OCR interface.
6) Traffic through the statistical multiplexer
with loopback.
7) Traffic to PTP.
e) TDX to Memory (Figure 3.1.3-3). This test will
consist of the following cases:
1) Traffic from a single VDU
2) Traffic from several VDUs
3) Traffic from a single VDU via the OCR interface
4) Traffic from PTR
f) LTU To Crypto (Figure 3.1.3-4). A modem is connected
to the Crypto.
The traffic on the connections described above will
consist of a bit-pattern which is transmitted repeatedly.
This allows for the COMSEC Authorities to search for
the transmitted data pattern on any electromagnetic
radiation from the equipment.
PROCESSOR UNIT…01…FIGURE 3.1.3-1
DISK STORAGE…01…FIGURE 3.1.3-2
TDX SYSTEM…01…FIGURE 3.1.3-3
LTU SYSTEM
FIGURE 3.1.3-4