DataMuseum.dk

Presents historical artifacts from the history of:

CR80 Wang WCS documentation floppies

This is an automatic "excavation" of a thematic subset of
artifacts from Datamuseum.dk's BitArchive.

See our Wiki for more about CR80 Wang WCS documentation floppies

Excavated with: AutoArchaeologist - Free & Open Source Software.


top - download

⟦43903d129⟧ Wang Wps File

    Length: 4785 (0x12b1)
    Types: Wang Wps File
    Notes: CPS/TCN/041               
    Names: »1925A «

Derivation

└─⟦780c36067⟧ Bits:30006094 8" Wang WCS floppy, CR 0146A
    └─ ⟦this⟧ »1925A « 

WangText



;…86…1   
      
      
      
      
      
      
      …02…
      
     …02… 
  …02…    
    

…02…CPS/TCN/041

…02…CV/821214…02……02…#
CAMPS
 EQUIPMENT
 MATRIX
…02……02…CAMPS








                    T̲A̲B̲L̲E̲ ̲O̲F̲ ̲C̲O̲N̲T̲E̲N̲T̲S̲



   1   INTRODUCTION .....................................
         6

   2.  BASELINE .........................................
         7

   3   EQUIPMENT MATRIX .................................
         8
     3.1 EQUIPMENT MATRIX, CAMPS MAIN SITE ..............
           9
     3.2 EQUIPMENT MATRIX, REMOTE TARE, REMOTE SITE .....
          13
     3.3 EQUIPMENT MATRIX, REMOTE TERMINAL, MAIN SITE
         ...  14
     3.4 EQUIPMENT MATRIX, REMOTE TERMINAL, REMOTE SITE
         .  16
     3.5 EQUIPMENT NATRIX, DEVELOPMENT SYSTEMS ..........
          18
     3.6 EQUIPMENT MATRIX, SPARE PARTS ..................
          21





                     1̲ ̲ ̲I̲N̲T̲R̲O̲D̲U̲C̲T̲I̲O̲N̲



         This document lists the CR supplied CAMPS hardware
         used on the 16 main sites, 2 depots, 5 Remote TARE
         sites and on the 24 Remote Terminal Sites.

         The Matrix contains all equipment except standard assembly
         items such as screws, nuts and cable ties.



                       2̲ ̲ ̲B̲A̲S̲E̲L̲I̲N̲E̲ 



         Baseline for the Equipment Matrix is:

         a)  CAMPS SYSTEM DESIGN SPECIFICATION; CPS/SDS/001
             (fig. 4.1.1.2-5), issue 1,

         b)  Changes to a) based on the following ECP's and
             additions:

             ECP  4
             ECP  9
             ECP 11
             ECP 12
             ECP 14
             ECP 17
             ECP 18
             ECP 20
             ECP 22

         Add. LTUX-S on MEDNOREAST, Ref.:      MOM 18, AI 1

         1VDU + 1MSP from NCS to SHAPE, Ref.:  PMOM 13, Sec.
                                               14

         CRT training rack on NCS, Ref.:       CAMPS LOG 757
                                               CPS/101/TLX/0526

         CSSI at SHAPE site, Ref.:             CAMPS LOG 621
                                               CPS/101/TLX/0487

         Remote TARE Location, Ref.:           PMOM 13, Sec.
                                               8

         Resync. Module, Ref.:                 MOM 18, AI 7

         Remote OCR, Ref.:                     CAMPS LOG 813
                                               MOM 19, AT 2

         PROTO expansion, Ref.:                CAMPS LOG 771
                                               

         The CPS/SDS/001 is the current baseline document for
         the CAMPS H/W configuration (ref.: CPS/tlx/0105 and
         CAMPS log no. 525).


                   3̲ ̲ ̲E̲Q̲U̲I̲P̲M̲E̲N̲T̲ ̲M̲A̲T̲R̲I̲X̲ 























































                 TABLE 3.1 (Sheet 1 of 4)
               EQUIPMENT MATRIX, MAIN SITE


















































   TABLE 3.1 (SHEET 2 of 4)…01…EQUIPMENT MATRIX, MAIN SITE


















































   TABLE 3.1 (SHEET 3 of 4)…01…EQUIPMENT MATRIX, MAIN SITE


















































   TABLE 3.1 (SHEET 4 of 4)…01…EQUIPMENT MATRIX, MAIN SITE


















































   TABLE 3.2…01…EQUIPMENT MATRIX, REMOTE TARE, REMOTE SITE




















































                 TABLE 3.3 (SHEET 1 of 2)
       EQUIPMENT MATRIX, REMOTE TERMINAL, MAIN SITE




















































                    3.3 (SHEET 2 of 2)
       EQUIPMENT MATRIX, REMOTE TERMINAL, MAIN SITE



















































                 TABLE 3.4 (SHEET 1 of 2)
      EQUIPMENT MATRIX, REMOTE TERMINAL, REMOTE SITE




















































                    3.4 (SHEET 2 of 2)
      EQUIPMENT MATRIX, REMOTE TERMINAL, REMOTE SITE



















































                 TABLE 3.5 (SHEET 1 of 3)
          EQUIPMENT MATRIX, DEVELOPMENT SYSTEMS



















































                 TABLE 3.5 (SHEET 2 of 3)
          EQUIPMENT MATRIX, DEVELOPMENT SYSTEMS




















































                 TABLE 3.5 (SHEET 3 of 3)
          EQUIPMENT MATRIX, DEVELOPMENT SYSTEMS



















































                 TABLE 3.6 (SHEET 1 of 2)
              EQUIPMENT MATRIX, SPARE PARTS



















































                 TABLE 3.6 (SHEET 2 of 2)
              EQUIPMENT MATRIX, SPARE PARTS