FACTORY ACCEPTANCE TEST SPECIFICATION
AND PROCEDURE…02…ISSUE 1…02…CRT
4.1.19 T̲e̲s̲t̲ ̲o̲f̲ ̲S̲i̲t̲e̲ ̲4̲A̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲
4.1.19.1 T̲e̲s̲t̲ ̲S̲e̲t̲-̲U̲p̲
1 Connect the equipment under test with the supporting
equipment as shown in figure 4.1.19-1.
2.1 Check the LTUX-S configuration. The correct configuration
is described in Appendix A para. 3.1.1.
The device no. of LTUX-S no. 1 shall be set to
13…0f…H…0e… and for LTUX-S no. 2 to 14…0f…H…0e….
2.2 Check that the Stat. Mux. configuration is in accordance
with the description of Appendix E.
3 Set the Mode select switch on the BSM-X no. 1 to
"MAN" and the Bus select switch to "1". On BSM-X
no. 2 and no. 3 the switches shall be set to "MAN"
and "OFF".
4 Turn power on supporting equipment.
5 Turn power on equipment under test.
6 Boot test drive system as described in Appendix
F, part I.
4.1.19.2 T̲e̲s̲t̲ ̲I̲n̲i̲t̲i̲a̲l̲i̲z̲a̲t̲i̲o̲n̲
Perform initialization as described in Appendix F,
Part II.
FIGURE 4.1.19-1
TEST CONFIGURATION SITE 4A (SHEET 1 OF 2)
FIGURE 4.1.19-1
TEST CONFIGURATION SITE 4A (SHEET 2 OF 2)
4.1.19.3 T̲e̲s̲t̲ ̲S̲t̲e̲p̲s̲
G̲R̲O̲U̲P̲/̲T̲E̲S̲T̲ ̲N̲O̲.̲:̲ 1/19
F̲U̲N̲C̲T̲I̲O̲N̲:̲ Interface to TDX-bus, CRT channels,
and Crypto/Modem, and Stat. Mux. Multiplexing
Traffic flow control
R̲E̲F̲.̲ ̲S̲D̲S̲ ̲P̲A̲R̲A̲:̲ 3.2.1.1, 3.2.1.2, and 3.2.3
D̲A̲T̲E̲:̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
PROC. ACTION EXPECTED RESULT
STEP
NO.
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
1 Start up the test by Print out on the Line
writing: Pinter identical with
DO DELTA.TEST ̲4 CR the print out in Appendix
on the console D, apart from the time
indication
COMMENTS
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
TEST WITNESSES
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
TEST QA GQAR
4.1.19.4 T̲e̲s̲t̲ ̲T̲e̲r̲m̲i̲n̲a̲t̲i̲o̲n̲
1 When the line printer connected to the test drive
system has stopped, the print out is ready for
comparison with the listing of Appendix D.
2 Close-down by
2.1 Remove the discettes from the floppy-drive.
2.2 Turn power off the equipment under test.
2.3 Turn power off the supporting equipment.
4.1.20 T̲e̲s̲t̲ ̲o̲f̲ ̲S̲i̲t̲e̲ ̲4̲B̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲
4.1.20.1 T̲e̲s̲t̲ ̲S̲e̲t̲-̲U̲p̲
1 Connect the equipment under test with the supporting
equipment as shown in figure 4.1.20-1.
2.1 Check the LTUX-S configuration. The correct configuration
is described in Appendix A para. 3.1.1.
The device no. of LTUX-S no. 2 shall be set to
13…0f…H…0e… and for LTUX-S no. 1 to 14…0f…H…0e….
2.2 Check that the Stat. Mux. configuration is in accordance
with the description of Appendix E.
3 Set the Mode select switch on the BSM-X no. 1 to
"MAN" and the Bus select switch to "1". On BSM-X
no. 2 and no. 3 the switches shall be set to "MAN"
and "OFF".
4 Turn power on supporting equipment.
5 Turn power on equipment under test.
6 Boot test drive system as described in Appendix
F, part I.
4.1.20.2 T̲e̲s̲t̲ ̲I̲n̲i̲t̲i̲a̲l̲i̲z̲a̲t̲i̲o̲n̲
Perform initialization as described in Appendix F,
Part II.
FIGURE 4.1.20-1
TEST CONFIGURATION SITE 4B (SHEET 1 OF 2)
FIGURE 4.1.20-1
TEST CONFIGURATION SITE 4B (SHEET 2 OF 2)
4.1.20.3 T̲e̲s̲t̲ ̲S̲t̲e̲p̲s̲
G̲R̲O̲U̲P̲/̲T̲E̲S̲T̲ ̲N̲O̲.̲:̲ 1/20
F̲U̲N̲C̲T̲I̲O̲N̲:̲ Interface to TDX-bus, CRT channels,
and Crypto/Modem, and Stat. Mux. Multiplexing
Traffic flow control
R̲E̲F̲.̲ ̲S̲D̲S̲ ̲P̲A̲R̲A̲:̲ 3.2.1.1, 3.2.1.2, and 3.2.3
D̲A̲T̲E̲:̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
PROC. ACTION EXPECTED RESULT
STEP
NO.
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
1 Start up the test by Print out on the Line
writing: Pinter identical with
DO DELTA.TEST ̲4 CR the print out in Appendix
on the console D, apart from the time
indication
COMMENTS
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
TEST WITNESSES
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
TEST QA GQAR
4.1.20.4 T̲e̲s̲t̲ ̲T̲e̲r̲m̲i̲n̲a̲t̲i̲o̲n̲
1 When the line printer connected to the test drive
system has stopped, the print out is ready for
comparison with the listing of Appendix D.
2 Close-down by
2.1 Remove the discettes from the floppy-drive.
2.2 Turn power off the equipment under test.
2.3 Turn power off the supporting equipment.
4.1.21 T̲e̲s̲t̲ ̲o̲f̲ ̲S̲i̲t̲e̲ ̲4̲C̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲
4.1.21.1 T̲e̲s̲t̲ ̲S̲e̲t̲-̲U̲p̲
1 Connect the equipment under test with the supporting
equipment as shown in figure 4.1.21-1.
2.1 Check the LTUX-S configuration. The correct configuration
is described in Appendix A para. 3.1.1.
The device no. of LTUX-S no. 3 shall be set to
13…0f…H…0e… and for LTUX-S no. 4 to 14…0f…H…0e….
2.2 Check that the Stat. Mux. configuration is in accordance
with the description of Appendix E.
3 Set the Mode select switch on the BSM-X no. 2 to
"MAN" and the Bus select switch to "1". On BSM-X
no. 1 and no. 3 the switches shall be set to "MAN"
and "OFF".
4 Turn power on supporting equipment.
5 Turn power on equipment under test.
6 Boot test drive system as described in Appendix
F, part I.
4.1.21.2 T̲e̲s̲t̲ ̲I̲n̲i̲t̲i̲a̲l̲i̲z̲a̲t̲i̲o̲n̲
Perform initialization as described in Appendix F,
Part II.
FIGURE 4.1.21-1
TEST CONFIGURATION SITE 4C (SHEET 1 OF 2)
FIGURE 4.1.21-1
TEST CONFIGURATION SITE 4C (SHEET 2 OF 2)
4.1.21.3 T̲e̲s̲t̲ ̲S̲t̲e̲p̲s̲
G̲R̲O̲U̲P̲/̲T̲E̲S̲T̲ ̲N̲O̲.̲:̲ 1/21
F̲U̲N̲C̲T̲I̲O̲N̲:̲ Interface to TDX-bus, CRT channels,
and Crypto/Modem, and Stat. Mux. Multiplexing
Traffic flow control
R̲E̲F̲.̲ ̲S̲D̲S̲ ̲P̲A̲R̲A̲:̲ 3.2.1.1, 3.2.1.2, and 3.2.3
D̲A̲T̲E̲:̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
PROC. ACTION EXPECTED RESULT
STEP
NO.
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
1 Start up the test by Print out on the Line
writing: Pinter identical with
DO DELTA.TEST ̲4 CR the print out in Appendix
on the console D, apart from the time
indication
COMMENTS
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
TEST WITNESSES
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
TEST QA GQAR
4.1.21.4 T̲e̲s̲t̲ ̲T̲e̲r̲m̲i̲n̲a̲t̲i̲o̲n̲
1 When the line printer connected to the test drive
system has stopped, the print out is ready for
comparison with the listing of Appendix D.
2 Close-down by
2.1 Remove the discettes from the floppy-drive.
2.2 Turn power off the equipment under test.
2.3 Turn power off the supporting equipment.
4.1.22 T̲e̲s̲t̲ ̲o̲f̲ ̲S̲i̲t̲e̲ ̲4̲D̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲
4.1.22.1 T̲e̲s̲t̲ ̲S̲e̲t̲-̲U̲p̲
1 Connect the equipment under test with the supporting
equipment as shown in figure 4.1.22-1.
2.1 Check the LTUX-S configuration. The correct configuration
is described in Appendix A para. 3.1.1.
The device no. of LTUX-S no. 5 shall be set to
13…0f…H…0e…, for LTUX-S no. 4 to 14…0f…H…0e…, for LTUX-S no. 3
to 15…0f…H…0e… and for LTUX-S no. 6 to 16…0f…H…0e….
2.2 Check that the Stat. Mux. configuration is in accordance
with the description of Appendix E.
3 Set the Mode select switch on the BSM-X no. 2 and
no. 3 to "MAN" and the Bus select switch to "1".
On BSM-X no. 1 the switches shall be set to "MAN"
and "OFF".
4 Turn power on supporting equipment.
5 Turn power on equipment under test.
6 Boot test drive system as described in Appendix
F, part I.
4.1.22.2 T̲e̲s̲t̲ ̲I̲n̲i̲t̲i̲a̲l̲i̲z̲a̲t̲i̲o̲n̲
Perform initialization as described in Appendix F,
Part II.
FIGURE 4.1.22-1
TEST CONFIGURATION SITE 4D, (SHEET 1 OF 2)
FIGURE 4.1.22-1
TEST CONFIGURATION SITE 4D, (SHEET 2 OF 2)
4.1.22.3 T̲e̲s̲t̲ ̲S̲t̲e̲p̲s̲
G̲R̲O̲U̲P̲/̲T̲E̲S̲T̲ ̲N̲O̲.̲:̲ 1/22
F̲U̲N̲C̲T̲I̲O̲N̲:̲ Interface to TDX-bus, CRT channels,
and Crypto/Modem, and Stat. Mux. Multiplexing
Traffic flow control
R̲E̲F̲.̲ ̲S̲D̲S̲ ̲P̲A̲R̲A̲:̲ 3.2.1.1, 3.2.1.2, and 3.2.3
D̲A̲T̲E̲:̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
PROC. ACTION EXPECTED RESULT
STEP
NO.
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
1 Start up the test by Print out on the Line
writing: Pinter identical with
DO DELTA.TEST ̲4 CR the print out in Appendix
on the console D, apart from the time
indication
COMMENTS
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
TEST WITNESSES
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
TEST QA GQAR
4.1.22.4 T̲e̲s̲t̲ ̲T̲e̲r̲m̲i̲n̲a̲t̲i̲o̲n̲
1 When the line printer connected to the test drive
system has stopped, the print out is ready for
comparison with the listing of Appendix D.
2 Close-down by
2.1 Remove the discettes from the floppy-drive.
2.2 Turn power off the equipment under test.
2.3 Turn power off the supporting equipment.
4.1.23 T̲e̲s̲t̲ ̲o̲f̲ ̲S̲i̲t̲e̲ ̲4̲D̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲,̲ ̲V̲2̲8̲ ̲(̲L̲/̲L̲)̲ ̲L̲i̲n̲e̲s̲
This section has been incorporated in 4.1.22.
These pages are intentionally left blank.
4.1.24 T̲e̲s̲t̲ ̲o̲f̲ ̲S̲i̲t̲e̲ ̲4̲E̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲
4.1.24.1 T̲e̲s̲t̲ ̲S̲e̲t̲-̲U̲p̲
1 Connect the equipment under test with the supporting
equipment as shown in figure 4.1.24-1.
2.1 Check the LTUX-S configuration. The correct configuration
is described in Appendix A para. 3.1.1.
The device no. of LTUX-S no. 6 shall be set to
13…0f…H…0e… and for LTUX-S no. 5 to 14…0f…H…0e….
2.2 Check that the Stat. Mux. configuration is in accordance
with the description of Appendix E.
3 Set the Mode select switch on the BSM-X no. 3 to
"MAN" and the Bus select switch to "1". On BSM-X
no. 1 and no. 2 the switches shall be set to "MAN"
and "OFF".
4 Turn power on supporting equipment.
5 Turn power on equipment under test.
6 Boot test drive system as described in Appendix
F, part I.
4.1.24.2 T̲e̲s̲t̲ ̲I̲n̲i̲t̲i̲a̲l̲i̲z̲a̲t̲i̲o̲n̲
Perform initialization as described in Appendix F,
Part II.
FIGURE 4.1.24-1
TEST CONFIGURATION SITE 4E (SHEET 1 OF 2)
FIGURE 4.1.24-1
TEST CONFIGURATION SITE 4E (SHEET 2 OF 2)
4.1.24.3 T̲e̲s̲t̲ ̲S̲t̲e̲p̲s̲
G̲R̲O̲U̲P̲/̲T̲E̲S̲T̲ ̲N̲O̲.̲:̲ 1/23
F̲U̲N̲C̲T̲I̲O̲N̲:̲ Interface to TDX-bus, CRT channels,
and Crypto/Modem, and Stat. Mux. Multiplexing
Traffic flow control
R̲E̲F̲.̲ ̲S̲D̲S̲ ̲P̲A̲R̲A̲:̲ 3.2.1.1, 3.2.1.2, and 3.2.3
D̲A̲T̲E̲:̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
PROC. ACTION EXPECTED RESULT
STEP
NO.
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
1 Start up the test by Print out on the Line
writing: Pinter identical with
DO DELTA.TEST ̲4 CR the print out in Appendix
on the console D, apart from the time
indication
COMMENTS
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
TEST WITNESSES
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
TEST QA GQAR
4.1.24.4 T̲e̲s̲t̲ ̲T̲e̲r̲m̲i̲n̲a̲t̲i̲o̲n̲
1 When the line printer connected to the test drive
system has stopped, the print out is ready for
comparison with the listing of Appendix D.
2 Close-down by
2.1 Remove the discettes from the floppy-drive.
2.2 Turn power off the equipment under test.
2.3 Turn power off the supporting equipment.
4.2 T̲E̲S̲T̲G̲R̲O̲U̲P̲ ̲2̲
The tests in this testgroup are performed to verify
the ability of the Stat. Mux. to recover from a transmission
error.
The test is performed with remote site 4C equipment
and main site equipment normally used for site 4C and
4D.
Compared to the tests in testgroup 1 the following
additional capabilities are demonstrated with this
test:
Recovery from transmission errors (SDS para. 3.2.1.1
b.2)).
The transmission error is introduced on the mux-line
by inverting a single databit. This enables read-out
of the number of retransmissions from the Stat.
Mux.
4.2.1 T̲e̲s̲t̲ ̲o̲f̲ ̲N̲o̲r̲m̲a̲l̲ ̲C̲o̲n̲n̲e̲c̲t̲i̲o̲n̲ ̲t̲o̲ ̲8̲ ̲c̲h̲a̲n̲n̲e̲l̲s̲
This section has intentionally been deleted.
These pages intentionally left blank.
4.2.2 T̲e̲s̲t̲ ̲o̲f̲ ̲R̲e̲c̲o̲v̲e̲r̲y̲ ̲f̲r̲o̲m̲ ̲T̲r̲a̲n̲s̲m̲i̲s̲s̲i̲o̲n̲ ̲E̲r̲r̲o̲r̲s̲
4.2.2.1 T̲e̲s̲t̲ ̲S̲e̲t̲-̲U̲p̲
1 Connect the equipment under test with the supporting
equipment as shown in figure 4.2.2-1. Note
the special wiring within rack H.
2.1 Check the LTUX-S configuration. The correct
configuration is described in Appendix A para.
3.1.1.
The device no. of LTUX-S no. 3 shall be set
to 13…0f…H…0e… and for LTUX-S no. 4 to 14…0f…H…0e….
2.2 Check that the Stat. Mux. configuration is
in accordance with the description of Appendix
E.
3 Set the Mode select switch on the BSM-X no.
2 to "MAN" and the Bus select switch to "1".
On BSM-X no. 1 and no. 3 the switches shall
be set to "MAN" and "OFF".
4 Turn power on supporting equipment.
5 Turn power on equipment under test.
6 Boot test drive system as described in Appendix
F, part I.
4.2.2.2 T̲e̲s̲t̲ ̲I̲n̲i̲t̲i̲a̲l̲i̲z̲a̲t̲i̲o̲n̲
Perform initialization as described in Appendix F,
Part II.
FIGURE 4.2.2-1
TESTGROUP 2, TEST CONFIGURATION
(SHEET 1 OF 2)
FIGURE 4.2.2-2
TESTGROUP 2, TEST CONFIGURATION
(SHEET 2 OF 2)
4.2.2.3 T̲e̲s̲t̲ ̲S̲t̲e̲p̲s̲
G̲R̲O̲U̲P̲/̲T̲E̲S̲T̲ ̲N̲O̲.̲:̲ 2/1
F̲U̲N̲C̲T̲I̲O̲N̲:̲ Recovery from transmission error.
R̲E̲F̲.̲ ̲S̲D̲S̲ ̲P̲A̲R̲A̲:̲ 3.2.1.1, 3.2.1.2, and 3.2.3
D̲A̲T̲E̲:̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
PROC. ACTION EXPECTED RESULT
STEP
NO.
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
1. Start up the test by Print out on the Line
writing: Pinter identical with
DO DELTA.TEST ̲4 CR the print out in Appendix
on the console D, apart from the time
indication.
1.2 While the MSPs are
printing, push the On the MSPs a print
out
button on the "bit- of "FOX" messages will
printer" appear.
1.3 Read the number of One transmission shall
retransmissions by have taken place
aid of a data ter-
minal connected to
the Stat. Mux.
Command Port.
COMMENTS
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
TEST WITNESSES
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
TEST QA GQAR
4.2.2.4 T̲e̲s̲t̲ ̲T̲e̲r̲m̲i̲n̲a̲t̲i̲o̲n̲
1 When the line printer connected to the test drive
system has stopped, the print out is ready for
comparison with the listing of Appendix D.
2 Close-down by
2.1 Remove the discettes from the floppy-drive.
2.2 Turn power off the equipment under test.
2.3 Turn power off the supporting equipment.
A P P E N D I X A
---------------------------------
TEST DRIVE SYSTEM
A̲ ̲ ̲T̲e̲s̲t̲ ̲D̲r̲i̲v̲e̲ ̲S̲y̲s̲t̲e̲m̲
The Test Drive System is described in
CRT TEST PACKET USERS MANUAL
FIX/0000/USM/0005
A P P E N D I X B
---------------------------------
TERMINAL EQUIPMENT
B̲.̲ ̲ ̲T̲e̲r̲m̲i̲n̲a̲l̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲
1. E̲q̲u̲i̲p̲m̲e̲n̲t̲
1.1 V̲D̲U̲ ̲w̲i̲t̲h̲ ̲O̲p̲t̲o̲ ̲I̲n̲t̲e̲r̲f̲a̲c̲e̲
The VDU with Opto Interface is a Delta Data
VDU model 7260T with OMDT module type OM-1
installed.
1.2 V̲D̲U̲ ̲w̲i̲t̲h̲ ̲V̲2̲8̲ ̲I̲n̲t̲e̲r̲f̲a̲c̲e̲
The VDU with V28 Interface is a Delta Data
VDU model 7260T.
1.3 M̲S̲P̲ ̲w̲i̲t̲h̲ ̲V̲2̲8̲ ̲I̲n̲t̲e̲r̲f̲a̲c̲e̲
The MSP is a TRACOR MSP model 8000 RO.
2. D̲a̲t̲a̲ ̲S̲p̲e̲e̲d̲s̲
The Terminal Equipment shall be set to 1200 bit/s
operation.
A P P E N D I X C
---------------------------------
INTERFACE EQUIPMENT
C̲.̲ ̲I̲N̲T̲E̲R̲F̲A̲C̲E̲ ̲E̲Q̲U̲I̲P̲M̲E̲N̲T̲
1. C̲r̲y̲p̲t̲o̲
The Crypto is a SHAPE supplied BID 1000.
2. M̲o̲d̲e̲m̲
The Modem is a SHAPE supplied synchronuos modem
for 2400 and 4800 bit/s operation.
A P P E N D I X D
---------------------------------
Print out for 8 channel test
A P P E N D I X E
---------------------------------
Statistical Multiplexer…01……01…Configuration for Factory Acceptance Test
E̲.̲ ̲S̲t̲a̲t̲.̲ ̲M̲u̲x̲'̲s̲ ̲-̲ ̲C̲o̲n̲f̲i̲g̲u̲r̲a̲t̲i̲o̲n̲ ̲f̲o̲r̲ ̲F̲a̲c̲t̲o̲r̲y̲ ̲A̲c̲c̲e̲p̲t̲a̲n̲c̲e̲
T̲e̲s̲t̲
1. Set all stat. mux's switches "open"
2. Select a Master stat. mux.
3. Set master-mux switches as follows:
B̲a̲s̲e̲ M̲o̲d̲u̲l̲e̲ S̲w̲i̲t̲c̲h̲ ̲1̲
Pos 1 Open Not used
Pos 2 Closed Normal Operation (Modem
Clock)
Pos 3 Closed Down line load enabled
Pos 4 Open Flow Control by CTS
Pos 5 Open Data Compression Disabled
Pos 6 Open Echoplex Disabled
Pos 7 Closed EIA Controls enabled
Pos 8 Closed Master Unit
B̲a̲s̲e̲ M̲o̲d̲u̲l̲e̲ S̲w̲i̲t̲c̲h̲ ̲2̲
Pos 1 Closed Synchronous operation
Pos 2 Closed Modem clock
Pos 3 Open
Pos 4 Open
Pos 5 Open Not used
Pos 6 Open
Pos 7 Open Terminal Control Disabled
Pos 8 Open Sync loss Disconnect Disabled
4. All Other Switches, Base module S3, S4, Exp. Module
S1, S2.
B̲a̲s̲e̲ M̲o̲d̲u̲l̲e̲ S̲w̲i̲t̲c̲h̲ ̲2̲
Pos 1 Open
Pos 2 Closed 1200 bps/8 bit data/
1 bit-step
Pos 3 Open
Pos 4 Closed
Pos 5 Open
Pos 6 Closed 1200 bps/8 bit data/
1 bit-step
Pos 7 Open
Pos 8 Closed
5. Set slave-mux switches as follows:
B̲a̲s̲e̲ M̲o̲d̲u̲l̲e̲ S̲w̲i̲t̲c̲h̲ ̲1̲
Pos 1 Open
Pos 2 Open
Pos 3 Closed Down line load enabled
Pos 4 Open
Pos 5 Open
Pos 6 Open
Pos 7 Open
Pos 8 Open Slave unit
B̲a̲s̲e̲ M̲o̲d̲u̲l̲e̲ S̲w̲i̲t̲c̲h̲ ̲2̲
Pos 1 Closed Sync. operation
Pos 2 Closed Modem Clock
Pos 3 Open
Pos 4 Open
Pos 5 Open
Pos 6 Open
Pos 7 Open
Pos 8 Open
All other switches shall be "open" in all positions
A P P E N D I X F…01…--------------------------------
Part I: Boot of Test Driver System
Part II: Test Initialization