CAMPS ISSC, CONTRACT
1983-10-24
PART I
Page
#
C O N T R A C T…01……01……01…between…01……01……01…Supreme Headquarters Allied Powers Europe…01……01…(in the following referred to as SHAPE)…01……01……01…and…01……01……01…Christian Rovsing A/S…01…2, Lautrupvang…01…DK-2750 Ballerup…01…Denmark…01……01……01…(in
the following referred to as CR)…01……01……01…on…01……01……01……01…ISSC Development and Test
Drive System
P̲A̲R̲T̲ ̲I̲
ARTICLE 3
-----------
3.1 TEST DRIVE SYTEM (TDS)
Item Nomenclature Qty. Unit
Price Total
Price
No. D.Kr. D.Kr.
----------------------------------------------------------------------
1 Program Management 985,181
(75% of items below)
2 System Engineering 582,704
2.1 System Integration 442,028
2.2 In Plant System Acceptance
Test 140,676
3 Hardware Development 281,352
3.1 Hardware Assembly Breakdown 281,352
4 Software Development - -
5 Hardware Fabrication 10,103,457
5.1 Hardware Cost
(Appendix A-3, Part II) 8,195,697
5.2 Hardware Integration and Test 1,696,747
5.3 Hardware Factory Acceptance
Test Procedure and Final
Report 211,013
6. Site Installation 1,023,845
6.1 Site Preparation Requirement 277,107
6.2 Site ATBB Drawing 184,738
6.3 Transportation of Equipment
to Site 62,000
6.4 Site Installation 500,000
Item Nomenclature Qty. Unit Price Total
Price
No. D.Kr. D.Kr.
----------------------------------------------------------------------
7. Site Acceptance Testing 184,738
184,738
8. Logistics Support
678,297
8.1 Hardware Warranty
(3 months) 238,297
8.2 On-Call services up to a
maximum of 12 calls. Each call
shall consist of a minimum
of 5 days 440,000
9 Documentation
9.1 TDX Operator Manual 281,352
̲
̲
̲2̲8̲1̲,̲3̲5̲2̲
Total 14,120,925
3.2 D̲E̲V̲E̲L̲O̲P̲M̲E̲N̲T̲ ̲S̲Y̲S̲T̲E̲M̲
Item Nomenclature Qty. Unit Price Total
Price
No. D.Kr. D.Kr.
----------------------------------------------------------------------
1 Program Management
527,006
(75% of items below)
2 System Engineering
184,738
3 Hardware Assembly Breakdown
184,738
4 Software Development - 1,688,106
4.1 Package Integration, Test, and
Utilities 844,053
4.2 System Generation Tools 844,053
5 Hardware Fabrication 4,337,984
5.1 Hardware Cost
(Appendix B-3, Part II) 3,565,448
5.2 Hardware Integration and Test 631,860
5.3 Factory Accepance Test and
Report 140,676
6. Site Installation
465,000
6.1 Site Preparation Requirement 175,000
6.2 As to be built Drawing 70,000
6.3 Transportation 40,000
6.4 Site Installation 200,000
7 Site Acceptance Testing 46,185
46,185
8 Logistics Support
70,000
8.1 Hardware Warranties 70,000
9 Documentation 50,000
50,000
Stimulator and Test Command
Interpreter Manual
̲
̲
̲
̲
̲
̲
̲
̲
̲
1,553,757
Total 7,026,751
A̲P̲P̲E̲N̲D̲I̲X̲ ̲ ̲ ̲t̲o̲ ̲P̲A̲R̲T̲ ̲1̲ ̲o̲f̲
O̲R̲D̲E̲R̲ ̲N̲O̲.̲ ̲S̲H̲N̲M̲O̲ ̲8̲3̲-̲9̲3̲1̲7̲/̲I̲N̲F̲
D̲E̲V̲E̲L̲O̲P̲M̲E̲N̲T̲ ̲S̲Y̲S̲T̲E̲M̲
C̲O̲M̲P̲A̲C̲T̲ ̲S̲C̲H̲E̲D̲U̲L̲E̲ ̲O̲F̲ ̲E̲V̲E̲N̲T̲S̲ ̲A̲N̲D̲ ̲D̲O̲C̲U̲M̲E̲N̲T̲A̲T̲I̲O̲N̲ ̲D̲E̲L̲I̲V̲E̲R̲A̲B̲L̲E̲S̲
A. PERIOD NUMBER 1 EVENTS
ITEM TYPE DATE
1. HW Assembly Breakdown D Jan.
83
2. Equipment Characteristics and
Typical Facility Requirements D CED +
2 months
3. Functional and Reconfig.
Test
Procedure D CED +
4 months
4. Factory Acceptance
Test
Procedures D CED +
9 months
5. Hardware Factory Acceptance
Test D CED +
12 months
6. Function and Reconfig Test
(In Plant System Acceptance
Test) E CED +
13 months
7. CAMPS Stimulator and
Test
Command Interpreter Manual D
Preliminary CED +
3 months
Final CED +
6 months
D: DOCUMENT
E: EVENT
A̲P̲P̲E̲N̲D̲I̲X̲ ̲ ̲ ̲t̲o̲ ̲P̲A̲R̲T̲ ̲1̲ ̲o̲f̲
O̲R̲D̲E̲R̲ ̲N̲O̲.̲ ̲S̲H̲N̲M̲O̲ ̲8̲3̲-̲9̲3̲1̲7̲/̲I̲N̲F̲
D̲E̲V̲E̲L̲O̲P̲M̲E̲N̲T̲ ̲S̲Y̲S̲T̲E̲M̲
C̲O̲M̲P̲A̲C̲T̲ ̲S̲C̲H̲E̲D̲U̲L̲E̲ ̲O̲F̲ ̲E̲V̲E̲N̲T̲S̲ ̲A̲N̲D̲ ̲D̲O̲C̲U̲M̲E̲N̲T̲A̲T̲I̲O̲N̲ ̲D̲E̲L̲I̲V̲E̲R̲A̲B̲L̲E̲S̲
B. PERIOD NUMBER 2 EVENTS
ITEM TYPE DATE
3. Site Nomination and
Survey Site
1
SPA
+
3
months
4. Site Preparation Requirements D Site
1
SPA
+
5.5
months
5. Site ATBB Drawings D Site
1
SPA
+
8
months
6. Notification of Equipment
Ready
to ship D Site 1
SPA +
9 months
7. Site Acceptance Test
Procedure D Site
1
SPA
+
6
months
8. Site Installation Start E Site
1
SPA
+
10
months
9. Site Acceptance Tests E Site
1
SPA
+
12
months
11. Updated ATBB Drawings D Site
1
SPA
+
13
months
D: DOCUMENT
E: EVENT
A̲P̲P̲E̲N̲D̲I̲X̲ ̲ ̲ ̲t̲o̲ ̲P̲A̲R̲T̲ ̲1̲ ̲o̲f̲
O̲R̲D̲E̲R̲ ̲N̲O̲.̲ ̲S̲H̲N̲M̲O̲ ̲8̲3̲-̲9̲3̲1̲7̲/̲I̲N̲F̲
C̲O̲M̲P̲A̲C̲T̲ ̲S̲C̲H̲E̲D̲U̲L̲E̲ ̲O̲F̲ ̲T̲D̲S̲ ̲E̲V̲E̲N̲T̲S̲ ̲A̲N̲D̲ ̲D̲O̲C̲U̲M̲E̲N̲T̲A̲T̲I̲O̲N̲ ̲D̲E̲L̲I̲V̲E̲R̲A̲B̲L̲E̲S̲
A. PERIOD NUMBER 1 EVENTS
ITEM TYPE DATE
1. HW Assembly Breakdown D Jan.
83
2. Equipment Characteristics and
Typical Facility Requirements D CED +
2 months
3. Functional and Reconfig.
Test
Procedure D CED +
4 months
4. Factory Acceptance
Test
Procedures D CED +
9 months
5. Hardware Factory Acceptance
Test D CED +
12 months
6. Function and Reconfig Test
(In Plant System Acceptance
Test) E CED +
13 months
7. CAMPS TDS Operators
Manual D
Preliminary CED +
3 months
Final CED +
6 months
D: DOCUMENT
E: EVENT
A̲P̲P̲E̲N̲D̲I̲X̲ ̲ ̲ ̲t̲o̲ ̲P̲A̲R̲T̲ ̲1̲ ̲o̲f̲
O̲R̲D̲E̲R̲ ̲N̲O̲.̲ ̲S̲H̲N̲M̲O̲ ̲8̲3̲-̲9̲3̲1̲7̲/̲I̲N̲F̲
C̲O̲M̲P̲A̲C̲T̲ ̲S̲C̲H̲E̲D̲U̲L̲E̲ ̲O̲F̲ ̲T̲D̲S̲ ̲E̲V̲E̲N̲T̲S̲ ̲A̲N̲D̲ ̲D̲O̲C̲U̲M̲E̲N̲T̲A̲T̲I̲O̲N̲ ̲D̲E̲L̲I̲V̲E̲R̲A̲B̲L̲E̲S̲
B. PERIOD NUMBER 2 EVENTS
ITEM TYPE DATE
3. Site Nomination and
Survey Site
1
SPA
+
3
months
4. Site Preparation Requirements D Site
1
SPA
+
5.5
months
5. Site ATBB Drawings D Site
1
SPA
+
8
months
6. Notification of Equipment
Ready
to ship D Site 1
SPA +
9 months
7. Site Acceptance Test
Procedure D Site
1
SPA
+
6
months
8. Site Installation Start E Site
1
SPA
+
11
months
9. Site Acceptance Tests E Site
1
SPA
+
13
months
11. Updated ATBB Drawings D Site
1
SPA
+
13
months
D: DOCUMENT
E: EVENT