⟦446aa210d⟧ Wang Wps File

    Length: 6968 (0x1b38)
    Types: Wang Wps File
    Notes: ISSC Kontrakt Part 1      
    Names: »4206A «

Derivation

└─⟦e9ca1be93⟧ Bits:30006183 8" Wang WCS floppy, CR 0382A
    └─ ⟦this⟧ »4206A « 

WangText






CAMPS ISSC, CONTRACT
              
              
   1983-10-24
PART I       
              
              
          Page
  #






















C O N T R A C T…01……01……01…between…01……01……01…Supreme Headquarters Allied Powers Europe…01……01…(in the following referred to as SHAPE)…01……01……01…and…01……01……01…Christian Rovsing A/S…01…2, Lautrupvang…01…DK-2750  Ballerup…01…Denmark…01……01……01…(in
 the following referred to as CR)…01……01……01…on…01……01……01……01…ISSC Development and Test
 Drive System



                          P̲A̲R̲T̲ ̲I̲



                        ARTICLE 3
                       -----------



3.1      TEST DRIVE SYTEM (TDS)

Item                                   Nomenclature     Qty.        Unit
                                                                    Price Total
                                                                          Price
No.                                         D.Kr.       D.Kr.
----------------------------------------------------------------------
1   Program Management                                  985,181
    (75% of items below)

2   System Engineering                                  582,704

    2.1 System Integration                    442,028

    2.2 In Plant System Acceptance
        Test                                  140,676

3   Hardware Development                                281,352

    3.1 Hardware Assembly Breakdown           281,352

4   Software Development                    -           -

5   Hardware Fabrication                             10,103,457

    5.1 Hardware Cost
        (Appendix A-3, Part II)             8,195,697

    5.2 Hardware Integration and Test       1,696,747

    5.3 Hardware Factory Acceptance
        Test Procedure and Final
        Report                                211,013

6.  Site Installation                                 1,023,845

    6.1 Site Preparation Requirement          277,107

    6.2 Site ATBB Drawing                     184,738

    6.3 Transportation of Equipment 
        to Site                                62,000

    6.4 Site Installation                     500,000




Item    Nomenclature                   Qty. Unit Price  Total
                                                        Price
No.                                    D.Kr.            D.Kr.
----------------------------------------------------------------------
7.  Site Acceptance Testing                   184,738   
                                                        
                                                        
                                                        184,738

8.  Logistics Support                                   
                                                        
                                                        
                                                        678,297

    8.1 Hardware Warranty
        (3 months)                            238,297

    8.2 On-Call services up to a 
        maximum of 12 calls. Each call
        shall consist of a minimum
        of 5 days                             440,000

9   Documentation

    9.1 TDX Operator Manual                   281,352   
                                                        ̲
                                                        ̲
                                                        ̲2̲8̲1̲,̲3̲5̲2̲

        Total                                           14,120,925



3.2 D̲E̲V̲E̲L̲O̲P̲M̲E̲N̲T̲ ̲S̲Y̲S̲T̲E̲M̲

Item    Nomenclature                   Qty. Unit Price  Total
                                                        Price
No.                                    D.Kr.            D.Kr.
----------------------------------------------------------------------

1   Program Management                                  
                                                        
                                                        527,006
    (75% of items below)

2   System Engineering                                  
                                                        
                                                        184,738

3   Hardware Assembly Breakdown                         
                                                        
                                                        184,738

4   Software Development                    -           1,688,106

    4.1 Package Integration, Test, and
        Utilities                             844,053

    4.2 System Generation Tools               844,053

5   Hardware Fabrication                                4,337,984

    5.1 Hardware Cost
        (Appendix B-3, Part II)             3,565,448

    5.2 Hardware Integration and Test         631,860

    5.3 Factory Accepance Test and
        Report                                140,676

6.  Site Installation                                   
                                                        
                                                        465,000

    6.1 Site Preparation Requirement          175,000

    6.2 As to be built Drawing                 70,000

    6.3 Transportation                         40,000

    6.4 Site Installation                     200,000

7   Site Acceptance Testing                    46,185   
                                                        
                                                        
                                                        46,185

8   Logistics Support                                   
                                                        
                                                        
                                                        70,000

    8.1 Hardware Warranties                    70,000

9   Documentation                              50,000   
                                                        
                                                        
                                                        50,000
    Stimulator and Test Command
    Interpreter Manual                                  
                                                        ̲
                                                        ̲
                                                        ̲
                                                        ̲
                                                        ̲
                                                        ̲
                                                        ̲
                                                        ̲
                                                        ̲
                                                        1,553,757

    Total                                               7,026,751



A̲P̲P̲E̲N̲D̲I̲X̲ ̲ ̲ ̲t̲o̲ ̲P̲A̲R̲T̲ ̲1̲ ̲o̲f̲
O̲R̲D̲E̲R̲ ̲N̲O̲.̲ ̲S̲H̲N̲M̲O̲ ̲8̲3̲-̲9̲3̲1̲7̲/̲I̲N̲F̲


                D̲E̲V̲E̲L̲O̲P̲M̲E̲N̲T̲ ̲S̲Y̲S̲T̲E̲M̲


C̲O̲M̲P̲A̲C̲T̲ ̲S̲C̲H̲E̲D̲U̲L̲E̲ ̲O̲F̲ ̲E̲V̲E̲N̲T̲S̲ ̲A̲N̲D̲ ̲D̲O̲C̲U̲M̲E̲N̲T̲A̲T̲I̲O̲N̲ ̲D̲E̲L̲I̲V̲E̲R̲A̲B̲L̲E̲S̲


A. PERIOD NUMBER 1 EVENTS

  ITEM                            TYPE         DATE

 1.                               HW Assembly Breakdown          D Jan.
                                                                   83

 2. Equipment Characteristics and
  Typical Facility Requirements   D            CED +
                                               2 months

 3.                               Functional and Reconfig.
                                  Test
  Procedure                       D            CED +
                                               4 months

 4.                               Factory Acceptance
                                  Test
  Procedures                      D            CED +
                                               9 months

 5.                               Hardware Factory Acceptance
  Test                            D            CED +
                                               12 months

 6. Function and Reconfig Test
  (In Plant System Acceptance
  Test)                           E            CED +
                                               13 months

 7.                               CAMPS Stimulator and
                                  Test
  Command Interpreter Manual      D

     Preliminary                               CED +
                                               3 months
     Final                                     CED +
                                               6 months


D:                                DOCUMENT

E:                                EVENT



A̲P̲P̲E̲N̲D̲I̲X̲ ̲ ̲ ̲t̲o̲ ̲P̲A̲R̲T̲ ̲1̲ ̲o̲f̲
O̲R̲D̲E̲R̲ ̲N̲O̲.̲ ̲S̲H̲N̲M̲O̲ ̲8̲3̲-̲9̲3̲1̲7̲/̲I̲N̲F̲

                D̲E̲V̲E̲L̲O̲P̲M̲E̲N̲T̲ ̲S̲Y̲S̲T̲E̲M̲

C̲O̲M̲P̲A̲C̲T̲ ̲S̲C̲H̲E̲D̲U̲L̲E̲ ̲O̲F̲ ̲E̲V̲E̲N̲T̲S̲ ̲A̲N̲D̲ ̲D̲O̲C̲U̲M̲E̲N̲T̲A̲T̲I̲O̲N̲ ̲D̲E̲L̲I̲V̲E̲R̲A̲B̲L̲E̲S̲


B. PERIOD NUMBER 2 EVENTS

  ITEM                            TYPE         DATE


 3.                               Site Nomination and
                                  Survey                         Site
                                                                 1
                                                                 SPA
                                                                 +
                                                                 3
                                                                 months

 4.                               Site Preparation Requirements  D Site
                                                                   1
                                                                   SPA
                                                                   +
                                                                   5.5
                                                                   months

 5.                               Site ATBB Drawings             D Site
                                                                   1
                                                                   SPA
                                                                   +
                                                                   8
                                                                   months

 6.                               Notification of Equipment
                                  Ready
  to ship                         D            Site 1
                                               SPA +
                                               9 months

 7.                               Site Acceptance Test
                                  Procedure    D                 Site
                                                                 1
                                                                 SPA
                                                                 +
                                                                 6
                                                                 months

 8.                               Site Installation Start        E Site
                                                                   1
                                                                   SPA
                                                                   +
                                                                   10
                                                                   months

 9.                               Site Acceptance Tests          E Site
                                                                   1
                                                                   SPA
                                                                   +
                                                                   12
                                                                   months

11.                               Updated ATBB Drawings          D Site
                                                                   1
                                                                   SPA
                                                                   +
                                                                   13
                                                                   months

D:                                DOCUMENT

E:                                EVENT




A̲P̲P̲E̲N̲D̲I̲X̲ ̲ ̲ ̲t̲o̲ ̲P̲A̲R̲T̲ ̲1̲ ̲o̲f̲
O̲R̲D̲E̲R̲ ̲N̲O̲.̲ ̲S̲H̲N̲M̲O̲ ̲8̲3̲-̲9̲3̲1̲7̲/̲I̲N̲F̲



C̲O̲M̲P̲A̲C̲T̲ ̲S̲C̲H̲E̲D̲U̲L̲E̲ ̲O̲F̲ ̲T̲D̲S̲ ̲E̲V̲E̲N̲T̲S̲ ̲A̲N̲D̲ ̲D̲O̲C̲U̲M̲E̲N̲T̲A̲T̲I̲O̲N̲ ̲D̲E̲L̲I̲V̲E̲R̲A̲B̲L̲E̲S̲


A. PERIOD NUMBER 1 EVENTS

  ITEM                            TYPE         DATE

 1.                               HW Assembly Breakdown          D Jan.
                                                                   83

 2. Equipment Characteristics and
  Typical Facility Requirements   D            CED +
                                               2 months

 3.                               Functional and Reconfig.
                                  Test
  Procedure                       D            CED +
                                               4 months

 4.                               Factory Acceptance
                                  Test
  Procedures                      D            CED +
                                               9 months

 5.                               Hardware Factory Acceptance
  Test                            D            CED +
                                               12 months

 6. Function and Reconfig Test
  (In Plant System Acceptance
  Test)                           E            CED +
                                               13 months

 7.                               CAMPS TDS Operators
                                  Manual       D

     Preliminary                               CED +
                                               3 months
     Final                                     CED +
                                               6 months


D:                                DOCUMENT

E:                                EVENT



A̲P̲P̲E̲N̲D̲I̲X̲ ̲ ̲ ̲t̲o̲ ̲P̲A̲R̲T̲ ̲1̲ ̲o̲f̲
O̲R̲D̲E̲R̲ ̲N̲O̲.̲ ̲S̲H̲N̲M̲O̲ ̲8̲3̲-̲9̲3̲1̲7̲/̲I̲N̲F̲


C̲O̲M̲P̲A̲C̲T̲ ̲S̲C̲H̲E̲D̲U̲L̲E̲ ̲O̲F̲ ̲T̲D̲S̲ ̲E̲V̲E̲N̲T̲S̲ ̲A̲N̲D̲ ̲D̲O̲C̲U̲M̲E̲N̲T̲A̲T̲I̲O̲N̲ ̲D̲E̲L̲I̲V̲E̲R̲A̲B̲L̲E̲S̲


B. PERIOD NUMBER 2 EVENTS

  ITEM                            TYPE         DATE

 3.                               Site Nomination and
                                  Survey                         Site
                                                                 1
                                                                 SPA
                                                                 +
                                                                 3
                                                                 months

 4.                               Site Preparation Requirements  D Site
                                                                   1
                                                                   SPA
                                                                   +
                                                                   5.5
                                                                   months

 5.                               Site ATBB Drawings             D Site
                                                                   1
                                                                   SPA
                                                                   +
                                                                   8
                                                                   months

 6.                               Notification of Equipment
                                  Ready
  to ship                         D            Site 1
                                               SPA +
                                               9 months

 7.                               Site Acceptance Test
                                  Procedure    D                 Site
                                                                 1
                                                                 SPA
                                                                 +
                                                                 6
                                                                 months

 8.                               Site Installation Start        E Site
                                                                   1
                                                                   SPA
                                                                   +
                                                                   11
                                                                   months

 9.                               Site Acceptance Tests          E Site
                                                                   1
                                                                   SPA
                                                                   +
                                                                   13
                                                                   months

11.                               Updated ATBB Drawings          D Site
                                                                   1
                                                                   SPA
                                                                   +
                                                                   13
                                                                   months

D:                                DOCUMENT

E:                                EVENT