top - download
⟦48b6069ad⟧ Wang Wps File
Length: 10199 (0x27d7)
Types: Wang Wps File
Notes: DIVERSE
Names: »4291A «
Derivation
└─⟦daa99b8e3⟧ Bits:30006185 8" Wang WCS floppy, CR 0401A
└─ ⟦this⟧ »4291A «
WangText
…0c……00……00…#…02……86…1 …02… …02… …02… …02…
CPS/IM/1140
…02…FIF/851202 …02…#
INTERN MEDDELELSE
…02……02…ECC
4291A/DHH
851003
F E R I E O V E R S I G T
F E R I E O V E R S I G T
F E R I E O V E R S I G T
F E R I E O V E R S I G T
F E R I E O V E R S I G T
1985/1986
P̲L̲A̲N̲L̲A̲G̲T̲ ̲F̲E̲R̲I̲E̲:
I̲N̲I̲T̲.
AAP
BGM
DHH
DL 20/12 - 5/1
EHO
EK
EPW
FNJ
FIF 24/12 - 5/1
HAV
HDK
JAA
JAL
JBS
JHH
J[F
LN
LRS
OJG
PEW
PFM
POL * 23,27,30/12
PU
SHAPE Host Nation Management Office
Contracts Section
Att.: Contracting Officer
B-7010 SHAPE
B̲e̲l̲g̲i̲u̲m̲
1985-09-23 JAL/dhh/LET/818
Gentlemen,
S̲u̲b̲j̲e̲c̲t̲:̲ ̲R̲e̲q̲u̲e̲s̲t̲ ̲f̲o̲r̲ ̲L̲o̲a̲n̲ ̲o̲f̲ ̲H̲a̲r̲d̲w̲a̲r̲e̲
The following is a list of hardware which CR84 requests to loan
from SHAPE to use to make a test drive system in Ballerup operationable.
The equipment will be taken from the stockroom in RO5 basement:
Tracor S/N 189 Tracor S/N 207
Tracor S/N 191 Tracor S/N 208
Tracor S/N 196 Tracor S/N 212
Tracor S/N 197 Tracor S/N 215
Tracor S/N 201 Tracor S/N 226
The requested loan period is from 4 September 1985 to 1 October
1985.
Kind regards,
CHRISTIAN ROVSING A/S af 1984
Jan Lauridsen
Accepted and agreed:
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
for SHAPE Host Nation Management Office
GQAR, Thorvald [strup
To: RWP, GJ
Fm: JAL
S̲u̲b̲j̲e̲c̲t̲:̲ ̲E̲C̲C̲-̲T̲e̲a̲m̲ ̲t̲a̲s̲k̲ ̲a̲s̲s̲i̲g̲n̲m̲e̲n̲t̲
Ref. a) Operating plan for department 3032, CPS/BUD/002.
In order to keep the know-how concerning governmental
systems and defence contracts, it is essential that
the ECC-team is kept together as I have described in
ref. a).
Currently 23 persons are employed in department 3032.
Due to the uncertainty of the ECC-contract, I have
worked out a temporary assignment plan for the ECC-team
as follows:
(MM per month)
U̲n̲t̲i̲l̲ ̲8̲5̲1̲2̲3̲1̲ A̲f̲t̲e̲r̲ ̲8̲6̲0̲1̲0̲1̲
1̲.̲ ̲Q̲T̲ 2̲.̲
̲Q̲T̲
Management + Secr. 1 1/2 1 1/2
3
PC 2 1/2 2 1/2
2
1/2
Study contracts:
Esprit 0 1
1
Lockheed 0 0
0
-
4
FIKS 1 1
Proposals/sales support 2 2
1
(TAFICS, ARMY COMINT,
LLAD, ANA, EDS, GENADGE)
ECC 8 8
8
-
12
+
Project "X" 0 0
(one of the proposals)
ACDN 1 0
0
AADN 1 1
0
PROD 4 4
0
QA 1/2 0
0
SFEP support ̲1̲ ̲1̲/̲2̲ ̲2̲
̲0̲
Total 23 23 23+
== == ===
I look forward to your comments.
Kind regards,
Jan Lauridsen
Til:
Fra: JAL
Activities Overview for the Period 851101 to 860701
̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲f̲o̲r̲ ̲D̲e̲p̲a̲r̲t̲m̲e̲n̲t̲ ̲3̲0̲3̲2̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲
1. G̲E̲N̲E̲R̲A̲L̲
Because of no ECC contract in November 1985 an alternative
proposal for the use of the manpower resources in the
department is prepared.
2. A̲S̲S̲U̲M̲P̲T̲I̲O̲N̲S̲
The departments know-how is keeped intact and the team
remained physical in the department (see Operating
Plan 1986).
ECC contract award April 1986 and the ECC project will
be 100% named in July 1986.
3. E̲C̲C̲ ̲A̲C̲T̲I̲V̲I̲T̲I̲E̲S̲
The proposal includes activities to complete.
Activities overview:
- Stabil baseline: Developing a stabil system baseline
by closing several Problem Reports.
- Prefix 9: Developing of prefix 9, which includes
preparing of max. connectivity and database opdating.
- NICS TARE interface: Enhancement of the firmware
with variable buffer size, better resynchronization,
and make the FW useable for NICSMA NICS TARE certification
test.
- Integration test of 4. split: Improved message
presentation on Visual Display Unit. The first
page of a message will be displayed in a stabel
form on the screen.
- Overload/spooling: The system will be able to receive
over 600 incoming messages in a buzy hour by means
of a buffer function (spooling).
- Documentation: Completion of the As Built documentation.
ECC product improvement activities, which are not included
in the proposal ??? (og hvad s>!!). The activities
are primary prestudies including report writing.
Activities overview:
1. Standardization and reuse of SW, HW, and documentation
(MX2, a.s.o.)
2. Flexibility to make the system device independent
so that it is possible to use ...?.. advance (PC)
and tempest VDU.
3. Performance/functions, improve performance by ........
and redesign, and improvement of the system by
new functions.
4. System development tools to design, code, test,
ECC fault finding, and ECC maintenance.
4. P̲C̲ ̲A̲C̲T̲I̲V̲I̲T̲I̲E̲S̲
The PC project is manned with 2 1/2 men in 1986.
5. N̲O̲N̲ ̲E̲C̲C̲ ̲A̲N̲D̲ ̲P̲C̲ ̲A̲C̲T̲I̲V̲I̲T̲I̲E̲S̲
6. C̲O̲N̲C̲L̲U̲S̲I̲O̲N̲
Appendix A: Manpower specification on the project.
Appendix B: ECC effort Nov. 1985 - July 1986.
Appendix C: Non ECC effort Nov. 1985 - July 1986.
Kind regards,
Jan Lauridsen
CPS/IM/1151
…02…HHF/851209 …02…1
INTERN MEDDELELSE
…02……02…ECC
Til: GJ, FE, FDY, PBH, JAL, OH
Fra: JAL, HHF
A̲n̲g̲>̲e̲n̲d̲e̲:̲ ̲G̲e̲n̲n̲e̲m̲g̲a̲n̲g̲ ̲a̲f̲ ̲b̲u̲d̲g̲e̲t̲t̲e̲r̲
Deltagere: Per Mortensen, Bent H]gh, JAL, HHF, PBH,
OH, FE
Gennemgangen af dept. budgetter blev opdelt i manpower
og expenses.
D̲e̲p̲t̲.̲ ̲3̲0̲0̲1̲
M̲a̲n̲p̲o̲w̲e̲r̲:
2 heads i kategori 1: GJ, HHF
2 heads i kategori 6: AM[, LR
1 head i kategori 7: MIA
Konklusion: Ingen reduktion.
D̲e̲p̲a̲r̲t̲m̲e̲n̲t̲ ̲e̲x̲p̲e̲n̲s̲e̲s̲:
Se specifikation af samme dateret 851121.
GJ's rejser er ikke reduceret.
1 stk ITT-XTRA PC fjernes. Den anden, som er l>net
fra Finance, overf]res til investeringsbudgettet for
3001. SW-pakke reduceret til 25.000.
Vedligeholdelse af Wang anl`gget u`ndret 156.000 (efter
regning). Vedligeholdelseskontrakt blev diskuteret.
D̲e̲p̲t̲.̲ ̲3̲0̲2̲0̲
M̲a̲n̲p̲o̲w̲e̲r̲:
Ingen yderligere reduktioner i henhold til FDY's statements
i uge 48.
D̲e̲p̲a̲r̲t̲m̲e̲n̲t̲ ̲e̲x̲p̲e̲n̲s̲e̲s̲:
591 - Teknisk service 51.500 udg>et.
CPS/IM/1151
…02…HHF/851209 …02…2
INTERN MEDDELELSE
…02……02…ECC
D̲e̲p̲t̲.̲ ̲3̲0̲3̲1̲
M̲a̲n̲p̲o̲w̲e̲r̲:
Se vedlagte MP-plan for PBH. Tilbudsomkostninger anvendes
som regulerbar, s>ledes at summen er lig med 4.
D̲e̲p̲a̲r̲t̲m̲e̲n̲t̲ ̲e̲x̲p̲e̲n̲s̲e̲s̲:
PBH rejser til USA 40.000
- - ̲ Indonesien 40.000
Jfr. internt memo 57 dateret 851205.
D̲e̲p̲t̲.̲ ̲3̲0̲3̲2̲
M̲a̲n̲p̲o̲w̲e̲r̲:
Ingen `ndringer.
D̲e̲p̲a̲r̲t̲m̲e̲n̲t̲ ̲e̲x̲p̲e̲n̲s̲e̲s̲:
JAL reviderer.
Testudstyr til X-projekt kan l>nes fra AC og CAMPS.
Investering nulstilles.
D̲e̲p̲t̲.̲ ̲3̲0̲4̲0̲
M̲a̲n̲p̲o̲w̲e̲r̲:
Ingen `ndringer.
D̲e̲p̲a̲r̲t̲m̲e̲n̲t̲ ̲e̲x̲p̲e̲n̲s̲e̲s̲:
Jfr. notat budget 1986, afd. 3040 dateret 851205.
Venlig hilsen
Hans Henrik Fester
CPS/IM/1152
…02…JAL/851210 …02…1
INTERN MEDDELELSE
…02……02…ECC
To: GJ
Fm: JAL
S̲u̲b̲j̲e̲c̲t̲:̲ ̲B̲o̲d̲y̲-̲S̲h̲o̲p̲p̲i̲n̲g̲
1̲.̲ ̲ ̲O̲b̲j̲e̲c̲t̲i̲v̲e̲
Use available manpower during periods with valeyes
on the manpower curve due to not yet received contracts.
2̲.̲ ̲ ̲S̲c̲o̲p̲e̲
Approx. 10 engineers in 3 quarters of 1986.
3̲.̲ ̲ ̲P̲o̲s̲s̲i̲b̲l̲e̲ ̲C̲u̲s̲t̲o̲m̲e̲r̲s̲
FMK SHAPE SEK P&T
HMAK RC JTAS
STK KTAS
4̲.̲ ̲ ̲M̲a̲r̲g̲i̲n̲
Cost on divisional level:
10 P x 9M x 50 KDKK/MM = 4.5 MDKK
Sales price:
10 P x 9M x 80% usage x 75 KDKK/MM = 5̲.̲4̲ ̲M̲D̲K̲K̲
Margin 0.9 MDKK
(20% shop cost)
Kind regards,
Jan Lauridsen
HOW TO UPDATE CPS ̲PREFIX, CPS ̲DATA AND CPS ̲TEST
U̲p̲d̲a̲t̲i̲n̲g̲ ̲o̲f̲ ̲p̲r̲e̲f̲i̲x̲e̲s̲
Work Directory: *PREFIX*GEN.D*GEN ̲CPS ̲PREFIX.D*CPS ̲PREFIX.D
(Ref. fig. 1)
Step 1: Backup of prefix disc
Step 2: (The contents of the Work Directory
J U L E F R O K O S T
J U L E F R O K O S T
J U L E F R O K O S T
J U L E F R O K O S T
J U L E F R O K O S T
L]rdag d. 14. december kl. 13.00 samles vi - ialt 27
personer - til julefrokost med hjemmelavede l`kkerier.
De retter, vi skal behage vore maver med, skal medbringes
pyntede og klar til servering. Pris pr. ret: kr. 50
x antal personer, der deltager i tilberedningen.
Hvis det skulle blive dyrere, vil der ikke blive klaget
og der vil heller ikke finde nogen refundering sted.
Duge, lys, br]d, sm]r, kaffe, sm>kager og lign. er
der s]rget for.
Drikkevarer skal du selv medbringe - s> f>r du ogs>,
hvad du har lyst til.
M̲e̲n̲u̲e̲n̲ ̲e̲r̲ ̲s̲o̲m̲ ̲f̲]̲l̲g̲e̲r̲: K̲o̲k̲k̲e̲:
Hjemmelavede hvide sild m. l]g Lars, Anne Mette
Hjemmelavede karrysild m. `g Jan C., Bente
T`rter m. gr]ntsager Djon, Anne Mette
Frikadeller m. surt Bent, Bente
R]get laks Henning, Vivi
R]dvinsmarineret skinke Jan L., Marianne
Tunfiskesalat Peter U., Britta
Roastbeef m. remoulade/stegte l]g Hans, Finn F., Anni
Fl`skesteg m. r]dk>l Erik, Birthe, Dorte
Pork pie m. perlel]g Janet, Lise
Frugtsalat Peter, Heidi
Ost m. druer/gr]n peber Finn J., Poul, Eva
Velbekommen !!!
Julenisserne
P.S. Vedh`ftet f]lger plan over, hvordan du n>r frem til julefrokosten.