WangText
…00……00……00……00……00…A…0a…A…0b…A…0c…@…09…@…0d…@ ?…09…?…0e…? >…08…>…0a…>…0d…>…0e…>…00…>…01…>
>…86…1 …02… …02… …02…
CR TRACOR
QUANTITY QUANTITY
Pr. Site accum. date per shipm. accum. ship
date
--------------------------------------------------------
1. Site 11 11 f]r 14 14 Oct.
82
2. Site 10 21 17/11
3. Site 11 32 82
4. Site 13 41 6/12 82
Training
(note) 4(9) 49 15/12 82
5. Site 12 61 20/12 82 32…0e…1)…0f… 46 17/12
82
6. Site 10 71 17/1 83 21 67 15/1
83
7. Site 6 77 28/3 83 6 73 28/3
83
8. Site 10 87 25/4 83 24 97 15/4
83
9. Site 11 98 16/15 83
10. Site 9 107 13/6 83 30 127 31/5
83
11. Site 11 118 11/7 83 30 157 30/6
83
12. Site 11 129 1/8 83 29 186 30/7
83
13. Site 12 141 22/8 83
14. Site 10 151 19/9 83 14 200 31/8
83
15. Site 20 171 17/10 83
16. Site 12 183 14/11 83
Note: Totalt 9 printere p> training site, men 5 kan tages
fra non-tempest shipment (14 printere).
1) Tracor vil fors]ge at fremskynde delleverance p> enten
7 ell. 18 printere til shipment 8/12-82.
Bjarne Berthold
Det Reiensenske Fond
Christian d. IX's Gade 3
1111 K]benhavn K
1983-02-09
Undertegnede tillader sig hermed at ans]ge om st]tte til studier
ved INSEAD, Fontainebleau, Frankrig.
Kurset der har min interesse er et syv ugers kursus med betegnelsen
"Executive Programme". Kurset afvikles i april/maj 1984 og tilmelding
skal foreg> inden oktober 1983.
Det er ovenn`vnte tilmeldingsfrist, som g]r, at jeg s]ger st]tte
p> nuv`rende tidspunkt og ikke afventer en senere uddeling af
fondets midler.
Nedenfor g]res rede for f]lgende forhold:
- Personlige data
- Teoretisk uddannelse
- Anvendelse af st]tte
- St]rrelse af ans]gte st]tte
- Andre ans]gninger
- Baggrund for ans]gning
- Eksamensbeviser/udtalelser
Med venlig hilsen
Kurt Nybroe-Nielsen
a: P̲e̲r̲s̲o̲n̲l̲i̲g̲e̲ ̲d̲a̲t̲a̲
Kurt Nybroe-Nielsen
Civilingeni]r, HD
Mosevangen 11
2860 S]borg
F]dt: 30. oktober 1948, K]benhavn
Tlf. privat: 01 67 90 84
Tlf. arbejde: 02 65 11 44 (395/381)
b: T̲e̲o̲r̲e̲t̲i̲s̲k̲ ̲u̲d̲d̲a̲n̲n̲e̲l̲s̲e̲
Civilingeni]r 1974, Svagstr]m
HD 1977, Organisation
c: A̲n̲v̲e̲n̲d̲e̲l̲s̲e̲ ̲a̲f̲ ̲s̲t̲]̲t̲t̲e̲
En eventuel st]tte vil blive brugt til syv ugers
studie ved
INSEAD, Fontainebleau, Frankrig
"Executive Programme"
Prisen for det kursus er ca. kr. 80.000, hvilket
d`kker alle udgifter eksklusiv rejseudgifter.
d: S̲t̲]̲r̲r̲e̲l̲s̲e̲ ̲a̲f̲ ̲a̲n̲s̲]̲g̲t̲e̲ ̲s̲t̲]̲t̲t̲e̲:̲
Idet jeg endnu ikke har modtaget st]tte fra anden
side ]nskes st]rst mulig st]tte til delvis d`kning
af oven- st>ende kursusudgifter.
e: A̲n̲d̲r̲e̲ ̲a̲n̲s̲]̲g̲n̲i̲n̲g̲e̲r̲
Det skal oplyses at jeg har s]gt st]tte fra Arbejds-
giverforeningens Jubil`umsfond. Herfra foreligger
der imidlertid endnu ikke nogen afg]relse om st]tte.
f: B̲a̲g̲g̲r̲u̲n̲d̲ ̲f̲o̲r̲ ̲a̲n̲s̲]̲g̲n̲i̲n̲g̲ ̲o̲m̲ ̲s̲t̲]̲t̲t̲e̲
Siden april 1977 har jeg v`ret ansat hos Christian
Rovsing A/S.
Baggrunden for ]nsket om en videreg>ende uddannelse
inden- for ledelses- og forretningsm`ssige metoder
skal dels ses i de ledelseskrav min nuv`rende stilling
indeb`rer og dels i ]nsket om fremover at besk`ftige
mig med ledelse p> et mere generelt niveau.
For n`rv`rende er jeg afdelingsleder for et projekt,
der best>r af 50 ingeni]rer, 8 teknikere og 5 sekret`rer.
Ar- bejdsomr>der er salg, udvikling og levering
af st]rre EDB systemer til udenlandske kunder.
Alle ansatte i afdelingen er i ]jeblikket besk`ftiget
med udvikling af et kommunika- tionssystem, hvor
kontraktv`rdien er 230 mill. kr.
g: E̲k̲s̲a̲m̲e̲n̲s̲b̲e̲v̲i̲s̲e̲r̲/̲u̲d̲t̲a̲l̲e̲l̲s̲e̲r̲
1) Civilingeni]r
2) HD
3) Firmaudtalelse
Til: BHB, BHB, KM, OE, SRA, PMS
Fra: KNN
CC: URH, JAL, GJ
V̲e̲d̲r̲.̲:̲ ̲S̲i̲t̲e̲ ̲1̲ ̲D̲e̲l̲i̲v̲e̲r̲y̲
Den 21. Januar 1983 blev der afholdt et m]de for at
f> identificeret og planlagt de aktiviteter, der er
n]dvendige for at f> Site 1 afleveret hos SHAPE.
Der blev fokuseret p> 5 faser, som skal genneml]bes
inden den funktionelle test finder sted. Disse faser
er:
- F`rdigg]relse af udest>ende hardware-opgaver inden
nedpakning
- Readyness inspection 26/1 1983
- Transport 11/2 eller
14/2 1983
- Installation 15/2 1983
- Perioden mellem installation og functional Main
CAMPS equipment software test p> site 1.
- Build 1 demo preparation/presentation 3/3-7/3,
14/3-17/3 1983
Derudover blev maintenance and diagnostic programmerne
debateret.
Resultatet af m]det er beskrevet i det f]lgende.
1. F̲@̲R̲D̲I̲G̲G̲[̲R̲E̲L̲S̲E̲ ̲A̲F̲ ̲H̲A̲R̲D̲W̲A̲R̲E̲-̲A̲K̲T̲I̲V̲I̲T̲E̲T̲E̲R̲ ̲F̲[̲R̲ ̲S̲H̲I̲P̲M̲E̲N̲T̲
a) PU
ECO opdatering
b) CU
ECO opdatering
c) TDX
ECO opdatering
d) WATCHDOG
Ingen aktiviteter
e) TERMINALER
- VDU: opdateres til PROM version 1.B
Afklar software-konfigurationen i de nye prommer
Skift MICRO-fuses
Indf]r filter omkring Key-locks
- MSP
Ingen aktiviteter
- PAPER TAPE READER/PUNCH
Ingen aktiviteter
2. R̲E̲A̲D̲Y̲N̲E̲S̲S̲-̲I̲N̲S̲P̲E̲C̲T̲I̲O̲N̲
a) Inventory-listen bestemmer hvilket udstyr, der
skal KM/BHB
v`re til r>dighed umiddelbart inden nedpakning.
b) Configurationsloggen bestemmer hvilke serienumre,
der BHB
indg>r i configurationen.
Peripheral-configurationen b]r nu checkes. Dette BHB
b]r g]res i samarbejde med ILS
.
c) Det er Tove Nielsen, som har ansvaret for nedpakningen,
derfor b]r Kurt Mikkelsen sikre sig, at Tove Nielsen
har det forn]dne kendskab til opgaven.
d) Tidsplan (Se appendix A)
e) Forsikring
Der skal tegnes forsikring omkring montage og trans- KM
port. Ligeledes b]r det unders]ges om brand- og
tyveriforsikring er n]dvendig, efter at udstyret
er
ankommet hos SHAPE.
f) Software (M&D, LOAD, SCRATCH) BHB/KM
g) Software (COMSEC TESTING) BHB/KM
3. T̲R̲A̲N̲S̲P̲O̲R̲T̲
a) Transport-procedurerne er beskrevet i detaljer
i KM
dokumentet CPS/AUX/026.
b) Udpakningen og den interne transport p> site nr.
1 KM
bliver udf]rt i henhold til CPS/AUX/026 udvidet
med
MOM med titlen Site verification nr. 1.
4. I̲N̲S̲T̲A̲L̲L̲A̲T̲I̲O̲N̲
Omkring installation g`lder installations-procedurerne
CPS/AUX/026.
a) Den fysiske installation varetages af KM KM
b) Systemet aftestes efter installation. Dette foreg>r KM
ved hj`lp af de nuv`rende Factory Acceptance
Procedurer for Site nr. 1.
c) COMSEC test
P> den test anvendes de modificerede M&D programmer KM/BHB
for at kunne repetere input/output p> en enkelt
ter-
minal.
d) Tr`ning af installationsteknikere
Det blev identificeret, at det er n]vdendigt at
tr`ne
installationsteknikerne. Dette g]res p> Site nr.
6 Det er
planlagt at k]re FAT 6 procedurerne og at S]ren
Rasmussen skal supervisere.
e) Retrofit (MSP, KAU, LTUX, CCA, TIA) BHB
f) Retrofit af tidligere leveret VDU/Voodruff BHB/KM
5. P̲E̲R̲I̲O̲D̲E̲N̲ ̲M̲E̲L̲L̲E̲M̲ ̲I̲N̲S̲T̲A̲L̲L̲A̲T̲I̲O̲N̲ ̲O̲G̲ ̲F̲U̲N̲C̲T̲I̲O̲N̲A̲L̲ ̲S̲O̲F̲T̲W̲A̲R̲E̲
̲T̲E̲S̲T̲
Umiddelbart inden k]rslen af den funktionelle software
test, er det n]dvendigt at opdatere hardware. Listen
nedenfor udg]r den ]jeblikkelige status, som den kendes
i dag.
a) PU
STI: 2 - 3 udest>ende problemer mapped TDX support BHB/KM
TIA: Som STI BHB/KM
CCA: Skal skiftes BHB/KM
RAM: @ndres til 512K moduler BHB/KM
b) CU
CUCB: @ndres (fylder for meget) BHB/KM
CCA: Skal skiftes BHB/KM
c) TDX
STI og TIA er beskrevet under pkt. a) PU BHB/KM
LTUX-s: Den ny hardware-hybride skal indf]res og
systemsoftwareapplikationen skal br`ndes i prommerne BHB/KM
d) WATCHDOG
Ingen `ndringer
e) TERMINALER
- VDU: Man skal p>regne endnu en `ndring af
prommer BHB
- DELTA DATA skal udsende en ECO p> micro fuses BHB/KM
- MSP: PCBerne skal p>regnes `ndret, muligvis BHB
skal pyntelisten omkring vinduet s`ttes
p>.
- PTR/P: Ingen `ndringer.
6. S̲C̲H̲E̲D̲U̲L̲E̲
Tidsplanen for shipment af den f]rste site er 11/2
eller 14/2 1983.
7. M̲&̲D̲ ̲P̲R̲O̲G̲R̲A̲M̲ ̲@̲N̲D̲R̲I̲N̲G̲
M&E programmet for TDX systemet skal `ndres. BHB/OE
S U M M A R Y…01…---------------
o Adjustment of Master Schedule by three months,
except for the SHAPE Site
o Delivery of CAMPS Software in two increments
o Rescheduling of BALTAP From installation Sequence
No. 2 to 10.
A D V A N T A G E S…01…----------------------
- Increased likelihood that interfaces to TARE, SCARS/CCIS,
and OCR will be available at the various sites
- Early shipment to SHAPE supports
o Presentation to future users
o Verification of test planning and environments
o Incremental verification of the system
o Correction of equipment if damaged during transportation
o Pressure on the CAMPS development team
o Increased credibility in the system within
NATO. Thus increasing user acceptance of the
system.
- BALTAP installation can take place based on a site
which is completely ready
D I S A D V A N T A G E S…01…-----------------------------
o CR cashflow problem due to increase in costs
and delayed payments.
V A L U E O F C A M P S R E L E A S E 1…01…-----------------------------------------------------
Percentage of total code: 81%
Percentage of total functions: 77%
P A Y M E N T S…01…------------------
CAMPS Release 1: 80% of SPA payment
CAMPS Final: 20% of SPA payment
A C C E P T A N C E…01…-----------------------
CAMPS release 1 shall be accepted as follows:
- 160 hours in-plant test
- 20 days functional test
- 40 days operational test
CAMPS final release shall be accepted as follows:
- 80 hours in-plant test
- 10 days functional test
- 20 days operational test
T E S T S C H E D U L E…01…----------------------------
CAMPS Release 1 Start Date
-------------------- ----------------
- in-plant test 14/4 - 31/4 1983
- functional test 1/5 - 20/5 1983
- operational test 20/5 - 31/6 1983
CAMPS Final Start Date
-------------------- ----------------
- in-plant test 1/7 - 7/7 1983
- functional test 8/7 - 20/7 1983
- operational test 21/7 - 15/8 1983
C O N T R A C T U A L C O N S I D E R A T I O N S…01…----------------------------------------------------------
The following areas in the contract shall be changed
if the subject implementation adjustment is agreed.
a) Installation sequence and dates Spec. Prov. {8,
{9.
b) Software implementation and acceptance, Spec. Prov.
{14, {17, {18.
c) Bank guarantee
Appendix B, D, and C shall be updated accordingly.
1̲ ̲ ̲I̲N̲T̲R̲O̲D̲U̲C̲T̲I̲O̲N̲
With reference to the quality issue on the 128K RAM
module raised by SHAPE (FAT 1 discrepancy issue 2.2a,
MOM no. 20) as concluded in MOM no. 23, CR hereby submit
a Firm Fixed Proposal for updating the RAM module used
in CAMPS PUs.
The document "Summary Report of CAMPS Software Memory
Sizing", CPS/REP/004 (1) has been delivered to SHAPE.
The memory budget estimate presented in this document
is a little lower than 512K per PU.
The recent budget estimates, at the same design baseline
as presented in CPS/REP/004 (1), indicates a memory
requirement above 512K.
As standardization of memory modules only to include
one module type has been agreed, Christian Rovsing
A/S hereby submits a Firm Fixed Proposal for exchanging
128K RAM modules with 512K RAM modules.
The total number of modules to be exchanged is 88:
a) 16 x 4 = 64 modules for sites
b) 24 spare modules
2̲ ̲ ̲P̲R̲I̲C̲E̲ ̲Q̲U̲O̲T̲A̲T̲I̲O̲N̲
2.1 The following cost elements are related to this ECP.
2.1.1 Development and Qualification of
updated module: Dkr. 540.000
2.1.2 Production start-up Dkr. 193.000
2.1.3 Replacement cost: a)- b) Dkr. 6.463.160
The cost calculation is based on the assumption, that
the CAMPS project will be able to sell the 40 128K
RAM modules already ordered and delivered to the project.
a) 88 512 K RAM modules
price each: Dkr 138.668
total Dkr. 12.202.784
b) 88 128 K RAM modules
price each: Dkr 65.223
total Dkr. 5.739.624
2.1.4 Documentation update Dkr. 131.215
2.1.5 Total 2.1.1+2.1.2+2.1.3+2.1.4 Dkr. 6.787.375
2.2 Sharing of cost (2.1 above) between SHAPE and Christian
Rovsing A/S is to be negotiated.
3̲ ̲ ̲S̲C̲H̲E̲D̲U̲L̲E̲ ̲A̲N̲D̲ ̲S̲C̲H̲E̲D̲U̲L̲E̲ ̲I̲M̲P̲A̲C̲T̲
Final delivery schedule will be established after received
order.
Primary planning tells that the first 512K RAM modules
can be available from CR's production 4-6 months after
received order.
The 512K modules will be integrated and tested as part
of the CAMPS systems through 1983.
The current FAT-schedule is included in Appendix A.
After having passed FAT at CR, the modules will be
integrated in the Site-systems on the sites, which
have passed FAT.
4̲ ̲ ̲B̲I̲D̲D̲I̲N̲G̲ ̲P̲R̲O̲V̲I̲S̲I̲O̲N̲S̲
4.1 V̲A̲L̲I̲D̲I̲T̲Y̲
This proposal is open for acceptance until February
14, 1983.
4.2 D̲E̲L̲I̲V̲E̲R̲Y̲
Refer to paragraph 3. The modules need to be integrated
in the sites prior to SPA.
4.3 A̲C̲C̲E̲P̲T̲A̲N̲C̲E̲ ̲C̲R̲I̲T̲E̲R̲I̲A̲
The 512K modules will be tested using CPS/TPR/006,
Factory Acceptance Test Specification and Procedure,
issue 1.1, test no. 2/1, Test case 3.
4.4 T̲Y̲P̲E̲ ̲O̲F̲ ̲P̲R̲O̲P̲O̲S̲A̲L̲
Prices given are firm fixed prices.
4.5 P̲A̲Y̲M̲E̲N̲T̲ ̲P̲L̲A̲N̲
a) At acceptance of proposal: 30% of overall
costs
b) At first FAT: 70% of non-recurring
costs
c) At every FAT 60% of recurrent
cost
d) At SPA 10% of recurrent
cost
5̲ ̲ ̲E̲N̲G̲I̲N̲E̲E̲R̲I̲N̲G̲ ̲C̲H̲A̲N̲G̲E̲ ̲D̲E̲S̲C̲R̲I̲P̲T̲I̲O̲N̲
5.1 Total 88 512 K RAM modules shall be delivered to replace
88 128 K RAM Modules,
Sites: 16 x 4 = 64 modules
Spares: 24 modules
5.2 T̲E̲C̲H̲N̲I̲C̲A̲L̲ ̲S̲P̲E̲C̲I̲F̲I̲C̲A̲T̲I̲O̲N̲S̲
Please refer to appendix B, where the required updates
for CPS/SDS/001 are included.
5.3 A̲F̲F̲E̲C̲T̲E̲D̲ ̲B̲A̲S̲E̲L̲I̲N̲E̲ ̲D̲O̲C̲U̲M̲E̲N̲T̲S̲
a) CE-80-9009-INF Main CAMPS Contract
b) CPS/SDS/001 CAMPS System Design Specification
c) CPS/SDS/017 Main CAMPS, Assy. Breakdown
d) Test Reports for Sites having
passed FAT
e) Inventory lists for shipped sites
f) CPS/AUX/003 CAMPS ASPL
g) CPS/AUX/029
CPS/AUX/030 CAMPS Spare Parts list for Repair
Depot
h) CPS/TCM/005 Maintenance Manual for CAMPS Sites
i) RAM, technical manual
j) Instructors Manual, MT/RST course,
week no. 2
k) Instructors Manual, RST course,
week no. 8
A P P E N D I X A…01…----------------------------------
A P P E N D I X B…01…----------------------------------
1̲ ̲ ̲I̲N̲T̲R̲O̲D̲U̲C̲T̲I̲O̲N̲
1.1 This document has the following objectives:
a) Provide status for the quantity of equipment delivered
from PDI to CAMPS prior to 821228.
b) Provide status for the quantity of equipment to
be delivered in 1983, including Additional CAMPS
Modules (ref e).
1.2 Two systems were delivered in 1982, which were not
identified in the matrices of the original contract
(ref a1, a2, a3), namely:
(i) System 0
(ii) Training (Comsec) System
The updated matrices assumes that the delivery situation
is corrected and updated as follows:
a) The training system is the 17th system with the
configuration as delivered.
(This system is currently Systems Division property).
b) System 0 will be used for Site No. 11 (last in
sequence).
As system 0 is a maximum configuration system,
too much equipment has been delivered on a few
items.
PDI action: CAMPS proposes, that the discrepancy is eliminated
by
Confirm reducing the 2nd last delivery (site 4) accordingly.
c) The site no. 4 (2nd last in sequence) shall be
equipped based on items from the DSMT-system, currently
used by DD. The updated matrices identifies the
additional quantities of items required for the
update, as well as the quantity of items available
from the DSMT-system are identified.
1.3 Thus, the following sites are still to be delivered:
Sequence No. 6 Site 14
Sequence No. 7 Site 3
Sequence No. 8 Site 13
Sequence No. 9 Site 10
Sequence No. 10 Site 16
Sequence No. 11 Site 8
Sequence No. 12 Site 7
Sequence No. 13 Site 12
Sequence No. 14 Site 9
Sequence No. 15 Site 4 (DSMT retrofitted)
2̲ ̲ ̲T̲O̲T̲A̲L̲ ̲O̲R̲D̲E̲R̲E̲D̲ ̲Q̲U̲A̲N̲T̲I̲T̲Y̲
The latest update of total ordered quantity of Equipment
to be delivered from PDI to CAMPS according to ref
a1) (=ref a2) and ref e) are identified as the sum
of the following appended matrices:
(i) Appendix A: Main Locations
(ii) Appendix B: Changes to Remote Terminals, Main
Sites
(iii) Appendix C: Changes to Remote Terminals, Remote
Sites
(iv) Appendix D: Remote Tare, Remote Site
(v) Appendix E: Training System
The only group of deliverable items not included in
App. A-D above is the first lots of equipment delivered
for CAMPS REMOTE TERMINALS. (This equipment is listed
in CAMPS Equipment Matrix, CPS/TCN/041, Issue 3 and
later).
Appendix A includes all changes on CAMPS Main Sites.
Apppendices B and C identifies changes on Remote Terminals
compared to the original baseline of equipment already
delivered (in 1981).
3̲ ̲ ̲E̲Q̲U̲I̲P̲M̲E̲N̲T̲ ̲D̲E̲L̲I̲V̲E̲R̲E̲D̲ ̲P̲R̲I̲O̲R̲ ̲T̲O̲ ̲ ̲8̲2̲1̲2̲2̲3̲
3.1 The following sites have been delivered 821223:
Site 1 (ref d1)
Site 2 (ref d2)
Site 6 (ref d3)
Site 5 (ref d4)
Site 15 (ref d5)
In addition two early systems have been delivered:
"System 0"
"Comsec System".
"System 0" shall be retrofit to be site 11 (No. 16
in sequence)
Ccc-log shall be delivered accordingly.
"Comsec System" shall be retrofit to be training system,
i.e. the 17th system to be delivered according to ref
a1).
3.2 The columns of appendices A, B, C, and D, which are
named:
Site 1
Site 2
Site 6
Site 5
Site 15
Training System
Site 11
identify the equipment already delivered except for
discrepancies identified in the following comments:
3.2.1 S̲i̲t̲e̲ ̲1̲
PDI Action a) Final Ccc-log missing (ref d1)
b) Delivered Quantity OK.
3.2.2 S̲i̲t̲e̲ ̲2̲
PDI Action a) Delivered Quantity OK (ref d2), except for
2 TIAs missing.
3.2.3 S̲i̲t̲e̲ ̲6̲
a) Delivered Quantity OK (ref d3).
3.2.4 S̲i̲t̲e̲ ̲5̲
PDI Action a) Delivered Quantity OK (ref d4), except for
2 128K Ram's missing (See 3.2.8 below).
3.2.5 S̲i̲t̲e̲ ̲1̲5̲
PDI Action a) Delivered Quantity OK (ref d5) except for 3
128K Ram's missing (See 3.2.8 below).
JRD Action The site equipment has just been delivered. Quantity
is not checked by incoming inspection.
3.2.6 S̲i̲t̲e̲ ̲1̲1̲ ̲(̲S̲y̲s̲t̲e̲m̲ ̲0̲)̲
PDI Action a) Ccc-log dedicated for site 11 missing
b) Delivered Quantity OK, except for the e̲x̲c̲e̲e̲d̲i̲n̲g̲
quantities identified in appendix G.
3.2.7 T̲r̲a̲i̲n̲i̲n̲g̲ ̲S̲y̲s̲t̲e̲m̲ ̲(̲C̲o̲m̲s̲e̲c̲ ̲S̲y̲s̲t̲e̲m̲)̲
PDI Action a) Ccc-log missing
b) Delivered Quantity according to Appendix E OK.
3.2.8 1̲2̲8̲K̲ ̲R̲a̲m̲ ̲M̲o̲d̲u̲l̲e̲s̲
No more 128K Ram Modules shall be delivered.
Missing 128K Ram modules are only mentioned in the
sections above for invoice control purposes.
3.2.9 C̲C̲A̲ ̲M̲o̲d̲u̲l̲e̲s̲
All CCA-modules delivered have been non-conforming
(P/N 4.04221-01).
Modules, P/N 4.04221-03 shall be delivered for replacement.
PDI action A separate schedule for retrofitting -01 with -03
shall be established.
4̲ ̲ ̲E̲Q̲U̲I̲P̲M̲E̲N̲T̲ ̲T̲O̲ ̲B̲E̲ ̲D̲E̲L̲I̲V̲E̲R̲E̲D̲ ̲A̲F̲T̲E̲R̲ ̲8̲2̲1̲2̲2̲3̲
The following sites shall be delivered during the first
7 months of 1983:
Site 14
Site 3
Site 13
Site 10
Site 16
Site 8
Site 7
Site 12
Site 9
Site 4*
* Site 4 is based on retrofit of the DSMT-system.
A list of available equipment from the DSMT is
provided in Appendix G).
PDI Action Appendix H contains the delivery schedule wanted
by SD/CAMPS. Please confirm prior to 830214.
Bjarne Berthold
A P P E N D I X A:…01…**********************
Equipment Matrix, CAMPS Main Sites
1. This matrix must be added with the matrices of
appendices B, C, D, and E to provide the total
deliverable quantity of equipment.
2. The difference between the Appendix A-matrix and
the matrix of "Intern Meddelelse 309/365" can be
found in appendix F of this IM.
A P P E N D I X B:…01…***********************
Equipment Matrix: Changes to CAMPS Remote Terminals/Main
Sites compared to already delivered equipment (del.
in 1981).
1. This matrix must be added with the matrices of
appendices A, C, D, and E to provide the total
deliverable quantity of equipment.
A P P E N D I X C:…01…***********************
Equipment Matrix: Changes to CAMPS Remote Terminals/Remote
Sites compared to already delivered equipment (del.
in 1981).
1. This matrix must be added with the matrices of
appendices A, B, D, and E to provide the total
deliverable quantity of equipment.
A P P E N D I X D:…01…***********************
Equipment Matrix: Remote Tare/Remote Sites.
1. This matrix must be added with the matrices of
appendices A, B, C, and E to provide the total
deliverable quantity of equipment.
A P P E N D I X E:…01…***********************
Equipment List: CAMPS Training System.
1. This matrix must be added with the matrices of
appendices A, B, C, and D to provide the total
deliverable quantity of equipment.
A P P E N D I X F:…01…***********************
CAMPS, Main Sites: Matrix for changes to update the
matrix of "Intern meddelelse nr. 309/365" to the matrix
of Appendix A of this IM.
A P P E N D I X G:…01…***********************
Matrix showing:
a) Additional equipment required to update the DSMT-equipment
to Site 4:
b) Too much delivered equipment, when "system 0" is
retrofit to Site 11.
A P P E N D I X H:…01…**********************
Proposed Delivery Schedule
PLANL@GNINGSM[DE…01……01…8. Februar 1983
Tilstede: KNN, KM, PMS, IJO, BHB, JHO
A̲C̲T̲I̲O̲N̲E̲E̲
1̲.̲ ̲M̲a̲n̲g̲e̲l̲ ̲p̲>̲ ̲V̲D̲U̲'̲e̲r̲
6 SW-udviklingssystemer og tr`ningssystemet kr`ver
6/16 af VDU'erne. Dvs. de 6 sidste systemer mangler
VDU'er. Med nuv`rende schedule bliver det et problem
pr. 1/6. Hvis S-systemer kr`ver yderligere 20 VDU'er
bliver det et problem 1. maj.
L]sning:
a) De VDU'er der er pakket ned efter FAT tages ud
igen til brug. Dette udskyder problemet til 7.
sidste shipment, dvs. 1. december 1983.
b) Der indk]bes yderligere Delta VDU'er. Der afventes
SW maintenance system ordre.
KNN/JHO c) Der indk]bes non-tempest VDU'er. Relevant for 4
S-maskiner og 2 D-maskiner.
JHO laver plan for benyttelsen af VDUer.
2̲.̲ ̲M̲a̲n̲g̲e̲l̲ ̲p̲>̲ ̲p̲r̲i̲n̲t̲e̲r̲e̲ ̲o̲g̲ ̲S̲M̲D̲-̲d̲i̲s̲k̲s̲
JHO Det b]r unders]ges om der bliver problemer med printere
(Tracor) eller disks.
3̲.̲ ̲H̲W̲-̲b̲e̲m̲a̲n̲d̲i̲n̲g̲
Tidsplanen og bemandingen for HW tager ikke h]jde for
arbejdskraft til maintenance af SW-systemer, eller
st]rre ECO-opdateringer hen ad vejen. BHB foresl>r
en arbejdsmand som aflastning for teknikerne ved
BHB samlearbejde m.v. BHB skaffer arbejdsmand/praktikant
til samlearbejde.
4̲.̲ ̲A̲r̲b̲e̲j̲d̲s̲d̲e̲l̲i̲n̲g̲ ̲p̲a̲k̲k̲e̲h̲o̲l̲d̲/̲H̲W̲ ̲g̲r̲u̲p̲p̲e̲
HW-gruppen skiller racks fra hinanden, hvorefter ILS
KM pakkeansvarlige overtager systemet. ILS skal udpege
en pakkeansvarlig for hvert system.
5̲.̲ ̲O̲p̲t̲o̲-̲c̲a̲b̲l̲e̲s̲
Der skal indk]bes opto-cables til test kabler til 3
FAT-systemer, 5 SW-udviklingssystemer, 8 s`t til
BHB/KM installationshold. L`ngder skal specificeres og termineringsarbejdskraft
allokeres inden yderligere
KM/JHO indk]b foretages.
JHO Der bliver formentlig leveringsproblemer fra CAMPS
lager da shipment af opto-cables sker tidligt. Desuden
rekvirerer SHAPE 30% mere end planlagt. En ekstra ordre
er sandsynlig.
6̲.̲ ̲@̲n̲d̲r̲e̲t̲ ̲F̲A̲T̲-̲s̲e̲k̲v̲e̲n̲s̲
For at spare flyttearbejde af SW-udviklingssystemer
skal det unders]ges, om man kan flytte FAT-sekvensen.
JHO F]rst skal det unders]ges, om det er tilladeligt rent
kontraktuelt. Dern`st skal det unders]ges, om der er
KM sites, der er kandidater til en af SHAPE for>rsaget
SPA-
BHB uds`ttelse. Sluttelig skal det unders]ges, hvilke sites
det er praktisk muligt for HW-gruppen at fremskynde.
7̲.̲ ̲A̲s̲-̲b̲u̲i̲l̲t̲ ̲d̲r̲a̲w̲i̲n̲g̲s̲
Med en to m>neders installationsperiode vil det muligvis
blive et problem at f> udgivet final as-built drawings
ved SPA'en. Planen er at m]de op med prelimin`re As-built
ved installation og levere h>ndrettede ved SPA, og
endelig version 6 uger efter.
KNN/KM KNN og KM kontrollerer, om det er kontraktuelt tilladeligt.
8̲.̲ ̲A̲T̲B̲B̲
SHAPE foretager hele tiden omplaceringer af brugerterminaler.
KM's holdning er at det efter site verification kun
sker mod betaling. Det b]r overvejes
KNN om CR ikke b]r afkr`ve betaling p> et tidligere tidspunkt.
9̲.̲ ̲D̲i̲s̲c̲ ̲P̲a̲c̲k̲s̲
JHO Det skal kontrolleres, at der er nok til shipment efter
nuv`rende plan.
1̲0̲.̲ ̲I̲n̲v̲e̲n̲t̲o̲r̲y̲ ̲L̲i̲s̲t̲
KM leverer input til inventory list. HW-gruppe opdaterer
og leverer til KM.
Problem-punkter ved site 1 er:
KM - tr`hylder
KM - CRT-kontraktens VDU'er og MSP'er skal leveres,
hvorn>r?
(CR skal komme med udspil)
BHB - Spares ikke leveret til CAMPS
- Kun 128K Ram sendes nu. F]rst senere sendes 512K
Ram.
- Comsec test programmer
KM,KNN Der skal foretages en verificering af at listen er
JHO,BHB komplet.
KM Kopi af mangelliste til KNN
1̲1̲.̲ ̲B̲r̲a̲n̲d̲s̲l̲u̲k̲n̲i̲n̲g̲s̲h̲o̲l̲d̲
KNN Der skal defineres 1 SW-, 1 HW- og 1 systemmand, der
er beh]rigt clearede til at klare "brandsluknings"-opgaver
ved SPA'er. Kjeld Alfast er pr. 1/4 allokeret til field
support for installationsholdene.
ILS planl`gger dog med at K. Alfast skal have en afl]ser.
CAMPS' holdning er: Endnu er KJAs afl]ser i starten
p> CAMPS (1/2 >r) eller ogs> er KJA fuld tid p> CAMPS
hele perioden.
1̲2̲.̲ ̲E̲C̲O̲-̲o̲p̲d̲a̲t̲e̲r̲i̲n̲g̲
ECO-opdatering (HW) foretages som f]lger:
- inden FAT: HW-gruppe
- fra FAT til shipment: HW-gruppe
- fra shipment til SPA: ILS-installationshold
- fra SPA til under waranty: ILS ved hj`lp af RST-tekniker
hos SHAPE
ILS vil internt diskutere denne problemstilling (omkostninger,
investeringer, CR udstyr/OEM udstyr). Repair at CR
equipment foretages indtil shipment af HW-gruppe. Repair
af OEM equipment foretages indtil shipment af ILS-gruppe.
1̲3̲.̲ ̲I̲n̲-̲H̲o̲u̲s̲e̲ ̲R̲e̲p̲a̲i̲r̲ ̲C̲e̲n̲t̲e̲r̲
PMS ILS ans`tter nu en extra mand pr 1/4 til leder af ILS
repair center. ILS vil da kunne reparere
- SW-udviklingssystemer
- CAMPS-Hardware (VDUer, disc drives, MSP)
ILS vil sende alle reparationer af moduler retur til
fabrikanterne.
1̲4̲.̲ ̲M̲ ̲&̲ ̲D̲ ̲P̲r̲o̲g̲r̲a̲m̲m̲e̲r̲
De nuv`rende programmer er gode nok til intern test.
Der mangler 8-10 m>neders arbejde i at f> dem op p>
et stade, man kan bygge videre p> (dokumentation, manglende
program dele). Derefter kan de udbygges i brugervenlighed.
KNN,OE,KM Det skal afg]res om dette b]r ske.
ILS kommer med et tekniker-hold til at k]re FAT-test
for derved at l`re M+D programmer at kende.
HW-gruppens MD-programmer benyttes indtil videre af
ILS installations-team.
1̲5̲.̲ ̲E̲C̲O̲-̲f̲i̲l̲e̲
ILS efterlyste en centralisering af ECO'er for b>de
CR og OEM-udstyr. BHB oplyste at en s>dan allerede
fandtes (CPS/TCN/057).
KNN CAMPS vil p> godkendelseslisten for CR ECO'er, idet
ECO-opdatering i h]jere grad b]r styres ud fra ]konomiske
kriterier.
PMS Maintenance-planen opdateres, s>ledes at den reflekterer,
at SHAPE foretager ECO-opdatering af moduler til reparation
i garantiperioden.
KNN,BHB KNN og BHB pr]ver at oprette et Configurations Control
Board for CAMPS via QA (medlemmer: BHB, KNN, PMS, EV).
Underleverand]r-koordinator skal ogs> med i CCB.
1̲6̲.̲ ̲S̲W̲-̲u̲d̲v̲i̲k̲l̲i̲n̲g̲s̲s̲y̲s̲t̲e̲m̲
SW-gruppen f>r tildelt 3 store CAMPS-systemer og 2
sm>.
6 x 2 SMD'er skal der v`re p> disse CAMPS-systemer.
JHO JHO kontrollerer om det er muligt.
JHO JHO bestiller str]m og k]ling p> 1. sal til 3 ekstra
systemer, samt indl`gger PAM p> stue-etage.
1̲7̲.̲ ̲D̲i̲v̲e̲r̲s̲e̲
JHO JHO skaffer tekniker til samling af PTR/P
KM KM skaffer mand til opto-cable-terminering
KNN, BHB Spare part leverancer kontrolleres af KNN, BHB.
KNN,BHB Indretningsplan til HW mv. leveres af KNN, BHB, JHO.
JHO
1̲8̲.̲ ̲R̲e̲p̲a̲r̲a̲t̲i̲o̲n̲s̲ ̲S̲t̲a̲t̲u̲s̲
PMS Der udarbejdes status for udstyr til reparationen PAW
inddrages til reparationsarbejde.
1̲9̲.̲ ̲R̲u̲p̲p̲e̲r̲t̲s̲w̲e̲i̲l̲e̲r̲-̲t̲e̲r̲m̲i̲n̲a̲l̲e̲r̲
Ruppertsweiler 17 VDU'er og 7 MSP'er leveres til SHAPE
KM site. Tages fra Site 2-lager. De skal v`re halvt opto-
og halvt metallic forbundne.
URH URH er dog actionee p> at afg]re dette med SHAPE.
Terminalerne skal leveres for at kunne reproducere
SW-fejl. SHAPE har ansvar for flytning til Ruppertsweiler.
2̲0̲.̲ ̲"̲S̲i̲t̲e̲ ̲N̲u̲m̲b̲e̲r̲i̲n̲g̲ ̲a̲n̲d̲ ̲S̲e̲q̲u̲e̲n̲c̲e̲"̲
KM Dette dokument b]r opdateres af KM efter ny schedule
pr. januar 83.
2̲1̲.̲ ̲S̲W̲-̲W̲a̲r̲r̲a̲n̲t̲y̲
Leif Larsen og Carsten Pedersen udg]r SW-warranty team
hos ILS fra juli 83.
2̲2̲.̲ ̲M̲a̲n̲u̲a̲l̲e̲r̲-̲T̲C̲M̲
Technical Manuals vil f]rst blive leveret til SHAPE
i 11. time. Flere manualer fra CR er i dag i ynkelig
stand.
KNN,BHB KNN og BHB rykker Mogens B. Jacobsen. 3 TCN om V24
SRA leveres til SHAPE efter omskrivning af HW-gruppe (SRA).
KNN Tr`ning og dokumentation gennemg>s ved KNN. BL.a. vurderes
SHAPE's kommentarer til Technical Manuals.
CR har forpligtiget sig til overfor SHAPE at levere
blokdiagrammer og printdiagrammer svarende til de forskellig
ECO-levels.
Til: GJ, JKZ, KM[
CC.: HEL, KNN
Fra: BHB
A̲c̲t̲i̲o̲n̲:
E̲m̲n̲e̲:̲ ̲O̲E̲D̲-̲S̲D̲/̲8̲0̲1̲2̲1̲8̲,̲ ̲i̲n̲k̲l̲.̲ ̲A̲m̲e̲n̲d̲m̲e̲n̲t̲ ̲1̲,̲2̲ ̲o̲g̲ ̲3̲
ref.: a) Intern faktura nr. 107 (JKZ/GB 821122)
b) CAMPS Intern Meddelelse nr. 452 (BHB/830128)
c) PDI/035, Intern Meddelelse (LSJ/830201)
d) Intern Meddelelse nr. 98 (JKZ/830131)
e) CAMPS Intern Meddelelse Nr. 462 (BHB/830203)
1. Det kan i dag konstateres, at leverance til CAMPS
iflg. ovenn`vnte kontrakt sker via PDI.
Det m> derfor konkluderes, at kontrakten er overdraget
fra ED til PD.
2. Der er imidlertid problemer m.h.t. status af leverancen
af DSMT-systemets H/W, ref. a)-d).
3. Et andet problem vedr]rer muligheden for en fornuftig
anvendelse af DSMT-HW, ref e):
- Visse moduler er `ldre end den baseline, der
er godkendt for CAMPS
- Visse moduler er d]mt uanvendelige af QA
GJ 4. For at kunne disponere produktion af de sidste
KM[ CAMPS systemer, er det kritisk nu at f> afklaret:
JKZ
a) Status p> overdragelse af kontrakten OED-SD/801218,
specielt med hensyn til DSMT-HW.
b) Hvem ejer p.t. DSMT-HW?
BHB 5. For at undg> forsinkelser i CAMPS leveringsplan,
KNN vil der senest 14/3-83, blive afgivet bestilling
p> erstatningsmoduler til produktionen.
Bjarne Berthold
830318/URH
C A M P S…01……01…W E E K L Y S T A T U S R E P O R T…01……01…F O R…01……01…S Y S T E M I N T E G R A T I O
N & T E S T
2̲ ̲ ̲S̲T̲A̲T̲U̲S̲
(DEVIATIONS FROM SCHEDULE)
LI DESCRITPION COMMENT
-------------------------------------------------------------------
2.4.1 PERF. TESTS Timing analysis performed on THP.
2.5.2.7.1 SCRIPT GEN. Will start appr. 830401.
Delay due to ACCESS
activities.
2.5.2.10 SITE 2-16 SW Deferred until completion of 240-hour
VER. PROCEDURES test.
4.6.5.8 SYST. GEN Activities planned until 830515.
4.6.5.9 DATABASE GEN. The following tables are completed.
PRGMS. DEV. - SCD
- SDL
- LO.PLA
- GL.PLA
- LO.RI
- GL.RI
- AIG
The only remaining table is the SIC
table wihich should be completed
on 830328.
4.6.7.2 STIMULATOR New functions requested + refinements
FOLLOW-UP
4.6.7 SYSTEM I&T Scheduled activities
- SAR2: not ready
- SSC2: not ready
- THP1: not ready
- THP2: not ready
System I&T of above items has not
been initiated due to missing coordination
and delays in SW development.