DataMuseum.dk

Presents historical artifacts from the history of:

CR80 Wang WCS documentation floppies

This is an automatic "excavation" of a thematic subset of
artifacts from Datamuseum.dk's BitArchive.

See our Wiki for more about CR80 Wang WCS documentation floppies

Excavated with: AutoArchaeologist - Free & Open Source Software.


top - download

⟦504b84d25⟧ Wang Wps File

    Length: 3067 (0xbfb)
    Types: Wang Wps File
    Notes: ECP No. 009               
    Names: »1043A «

Derivation

└─⟦d10d3ed68⟧ Bits:30006014 8" Wang WCS floppy, CR 0055A
    └─ ⟦this⟧ »1043A « 

WangText





…02…CPS/ECP/009

…02…BHB/810611…02……02…#
OPTION FOR EXCEEDING 1 MA ON CAMPS I/F CABLES
…02……02…CAMPS








                   1̲ ̲ ̲P̲R̲O̲P̲O̲S̲E̲D̲ ̲C̲H̲A̲N̲G̲E̲:̲



         Extend the worthing of CPS/210/SYS/0001 Section 3.4.5.1
         d) to include the following:

         In special cases where a line current of more than
         one milli-ampere is felt necessary then the ontractor
         must submit his specific proposal for approval by ACE
         COMSEC.

         The revised section 3.4.5.1 d) will then be (including
         proposed change):

3.4.5.1  d)  All electrical interconnections for data between
             the equipment will use low level keying systems,
             i.e. 6-0-6 volts at currents less than one milli-ampere.
             All the remaining control lines should conform
             to CCITT Recommendation V28.

             In special cases where a line current of more than
             one milli-ampere is felt necessary then the contractor
             must submit his specific proposal for approval
             by ACE COMSEC.

         In the following a short summary of the discussions
         between CR and SHAPE leading to the ECP, is presented:

         1)  The CR proposal is based on the IFB requirement
             that the electrical specification on channels to
             terminals and external circuits shall be according
             to CCITT recommendation V24/V28. The recommendation
             V28 is used for cable lengths up to 50 feet.

         2)  During the early CAMPS Progress meetings it occurred
             that the cable lengths would exceed 50 feet in
             a number of cases in the sites. It was pointed
             out by CR that here we had a problem area. The
             problem was discussed, and no solution was found
             to eliminate the problem.

             References:

             a)  CAMPS PMOM 2 (19/20 June 1980 Section 14)

             b)  CAMPS Site Equipment, drawing No. 1-152, Issue
                 1.



         3)  In the meeting at CR in October 80, where the Tempest
             Solution including the use of EMI-racks was discussed,
             it was pointed out by Mr. Philip Becker from CR's
             Tempest Consultant (Atlantic Research Corporation,
             ARC) that a driver/receiver circuit allowing for
             cable lengths exceeding 50 feet (up to 900 feet)
             was known by ARC. ARC's experience was that this
             circuit could be used in Tempest installations,
             even if it could not meet the 1 mA-requirement
             of the CMAPS SRS (see above).

             It was decided that CR/ARC should furnish ACE COMSEC
             with a rational on this driver/receiver concept
             in order to make it possible for ACE COMSEC to
             judge if this was a way to eliminate the 50 feet
             problem area.

             Reference:

             a)  CAMPS MOM, CAMPS Meeting No. 2 30-31 Oct. 1980.

         4)  On a meeting at SHAPE, Mr. Philip Becker turned
             over to ACE COMSEC the promised rational in INTERIM
             Report No. 3.

             This report was reviewed by ACE COMSEC, and it
             was decided that CR should request for this actual
             ECP in order to open for the improved design.

             The immediate reaction of ACE COMSEC was that they
             would be able to accept the design proposed in
             INTERIM report No. 3 based on the revised 1 mA-requirement.

             References:

             a)  MOM, meeting at SHAPE 810512