Preliminary Equipment Data for CAMPS
Remote Terminals
…02……02…CAMPS
T̲A̲B̲L̲E̲ ̲O̲F̲ ̲C̲O̲N̲T̲E̲N̲T̲S̲
1 INTRODUCTION .................................
4
2 GENERAL DESCRIPTION ...........................
4
2.1 SYSTEM CONCEPT ............................
4
2.2 SITE PREPARATION AND INSTALLATION PLANNING
8
3 SITE PREPARATION AND INSTALLATION
REQUIRMENTS ..................................
8
3.1 EQUIPMENT AT MAIN SITES ...................
8
3.2 EQUIPMENT AT REMOTE LOCATIONS .............
9
4 EQUIPMENT CHARACTERISTICS .....................
11
4.1 MAIN SITES ...............................
11
4.2 REMOTE SITES ..............................
14…86…1 …02… …02… …02… …02…
1̲ ̲ ̲I̲N̲T̲R̲O̲D̲U̲C̲T̲I̲O̲N̲
This document contains preliminary equipment data and
requirements, which should support Host Nation's preliminary
site design of CAMPS Remote Terminal installtions.
2̲ ̲ ̲G̲E̲N̲E̲R̲A̲L̲ ̲D̲E̲S̲C̲R̲I̲P̲T̲I̲O̲N̲
2.1 S̲Y̲S̲T̲E̲M̲ ̲C̲O̲N̲C̲E̲P̲T̲
The CAMPS Remote Terminal (CRT) concept provides a
V24 connection between the main CAMPS site and a remote
site. Of the 8 channel connections available at each
remote site, 4 are usedto support 2 VDUs and 2 MSPs,
one is used for an OCR connection and 3 are auxiliary
channels.
The equipment associated with the CRT is depicted in
figure 2.1. Eight channels of the main site are transmitted
over a single communications line by uing statistical
multiplexers (Stat.mux) in each end of the crypto/modem
lines.
At the main sites, the CRT line connections are made
in the CRT Line termination racks which contain the
LTUXs, crates etc. (see figure 2.1, sheet 2).
At the remote ites, connections to the terminals are
made by opto-links while connections to the auxiliary
channels and the OCR are V28(L) links. (See figure
2.1, sheet 3).…86…1 …02… …02… …02… …02…
Figure 2.1 (Sheet 1 of 3)
Typical CRT Line Configuration…86…1 …02… …02… …02… …02…
Figure 2.1 (Sheet 2 of 3)
TYPICAL CRT CONFIGURATION AT MAIN SITES…86…1 …02… …02… …02… …02…
FIGURE 2.1 (SHEET 3 of 3)
TYPICAL CRT CONFIGURATION OF REMOTE SITE…86…1 …02… …02… …02… …02…
2.2 S̲I̲T̲E̲ ̲P̲R̲E̲P̲A̲R̲A̲T̲I̲O̲N̲ ̲A̲N̲D̲ ̲I̲N̲S̲T̲A̲L̲L̲A̲T̲I̲O̲N̲ ̲P̲L̲A̲N̲N̲I̲N̲G̲
a) The CRT equipment for both the main and remote
locations will be installed by CR at the same time
they install the main CAMPS eq