1984-07-18 knn/bko
to: shnmo division
att.: mr. david levy, contracting officer
cc.: ltc becker
fm: christian rovsing a/s, denmark
kurt nybroe-nielsen
our ref: cms/101/tlx/017
subject: tds, sms and pc documentation
--------------------------------------
below are updates to the draft statement of work as agreed
between mr a gardiner and mr k nybroe-nielsen.
changes are made to page 73a/b, 58, 59, 60, and 61.
CR takes the opportunity to remind shape that unless a
letter of intent is issued within this week cr will escalate
prices 0.8 percent per month by 1st july 1984.
APPENDIX C-4
PC AMOS DEVELOPMENT SYSTEM UTILITY PROGRAMS
1) The following utility programs and associated user
manuals shall be provided.
2) Design documentation shall be delivered as and if
existing at the time of equipment delivery, except
where specifically stated otherwise.
--------------------------------------------------------
UTILITY FUNCTION ACRONYM
--------------------------------------------------------
SWELL Compiler SWELL
--------------------------------------------------------
Source Code Editor EDIT
--------------------------------------------------------
File Copying Programs COPY,DCOPY,RCOPY
--------------------------------------------------------
List Utility Programs LIST,LISTDIR
--------------------------------------------------------
AMOS Linker LINK
--------------------------------------------------------
Print File Inspection INSPECT
--------------------------------------------------------
Binary to Hexadecimal File BINHEX
Conversion
--------------------------------------------------------
Printing Files PRINT
--------------------------------------------------------
Concatenation of Object Files SYSGEN
--------------------------------------------------------
Insertion of Boot Headers BOOT
--------------------------------------------------------
PROM Formatting Program PROMGEN
--------------------------------------------------------
Large File Editor CEDIT
--------------------------------------------------------
Get File Attributes ATTR
--------------------------------------------------------
Program for concatenation of two CONCAT
or more files
--------------------------------------------------------
COMPILER PASCAL
--------------------------------------------------------
PROGRAM to allow conversion of CONVSYS
the boot deck from SMD to floppy
--------------------------------------------------------
Design documentation and user LSAP
manual will be PPIP
delivered and reviewed BID 1000 PROTOCOL
(NO USERS MANUAL
PROVIDED FOR BID
1000 PROTOCOL)
--------------------------------------------------------
M and D programs: For AMOS systems M and D
the following is delivered:
- documentation including
special switch settings
and operation manuals
- PC maintenance mode M and D pro-
grams including tests of CPU,
RAM, EPROM, LTUs.
- AMU test facilities (part of
floppy disk bootloader)
- CPU-test boot module + RAM
test boot module
- Disc test (css/708)
--------------------------------------------------------
APPENDIX A-5
Design User SMS TDS Review
Manual and Approved
----------------------------------------------------------------------
SPECIFIC SOFTWARE
-----------------
DIAG. 1) X X X X
CAMPS Utility
Program SPY 1) X X X
STIMULATOR 1) X X X
TEST Command Language 1) X X X X
TEST Command
Language (expanded) 1) X X X X
TDP X X X X
TDS X X X X
SYSTEM Generation
Tool 1) X X X X
DAMOS System SW 2) 2) X
Note 1
------
Design documentation shall be delivered as and if existing at the time of
equipment delivery unless another delivery date is stated in the compact schedule
of events and documentation deliverables.
Note 2
------
Design documentation and user manuals shall be delivered as and if existing
at the time of equipment delivery.
APPENDIX A-5
Design User SMS TDS
Manual
-----------------------------------------------------------
DAMOS UTILITIES
---------------
Language Processors
-------------------
SWELL COMPILER 1) X USM/048 X
MAXSWELL COMPILER 1) X USM/048 X
LARGE SWELL COMPILER 1) X USM/048 X
PASCAL COMPILER 1) X USM/082 X
Pascal Cross
Reference Generator 1) X USM/082 X
ASSEMBLER 1) X USM/005 X
Assembler Cross
Reference Generator 1) X USM/005 X
Pretty Pascal N/A X
Pretty Swell N/A X
Parsing System N/A X
Test Processors
---------------
Editor 1) X USM/021 X
Batch Editor (CEDIT) 1) X USM/051 X
Text Formatting (Format) N/A X USM/044 X
Text File Merge (Merge) N/A X USM/029 X
File Concatenator
(Concat) N/A X
Make Lines N/A X
Make Large/Make smalL N/A X
Note 1
------
Design documentation shall be delivered as and if existing at the time of
equipment delivery unless another delivery date is stated in the compact schedule
of events and documentation deliverables.
APPENDIX A-5
Design User SMS TDS Review
Manual
-----------------------------------------------------------
Development and Test Tools
--------------------------
- LINKERS 1) X USM/048 X
- Debugger (swell) X PSP/050 X USM/060 X
- PATCH 1) X USM/030 X
- DISASSEMBLER 1) X X
- Hexdump N/A X X
- VDUDUMP N/A X X
- Boot Module Gene-
ration Utilities 1) X X
- DAMU X PSP/029 X USM/040 X
- TRACE UTILITIES 1)
File Manipulation
-----------------
- COPY 1) X USM/032 X
- Directory File
Utilities 1) X USM/036 X
- COMPARE N/A X
- Binhex N/A X USM/027 X
- Hexbin N/A X USM/028 X
- File Inspection N/A X USM/054 X
RCOPY X USM/110 X
Printer Utilities
-----------------
- Print, File and Queue 1) X USM/077 X
Management
Note 1
------
Design documentation shall be delivered as and if existing at the time of
equipment delivery unless another delivery date is stated in the compact schedule
of events and documentation deliverables.
APPENDIX A-5
Design User SMS TDS Review
Manual
-----------------------------------------------------------------
Disk Manipulation
-----------------
Disk initialization 1) X USM/024 X
and Disk Formatting
Disk salvation 1) X USM/035 X
Disk PATCH 1) X USM/085 X
Disk Copy 1) X X
Backup and Compare 1) X USM/073 X
Utilities (AMOS)
Development Operating
Systems
---------------------
TOS X PSP/052 X USM/026 X
(AMOS)
Command interpretor 1) X USM/037 X
PASCAL RUNTIME SYSTEM 1) X RFM/001 X
General Utilities
-----------------
- FLAP N/A X
- BITMAP N/A X
- EDIT LOG X PSP/030 X X
- FINGER PRINT N/A X
------------------------------------------------------------------
For all other CAMPS and System Software, documentation is delivered as it
exists and in the latest issue pertaining at the time of delivery.
Note 1
------
Design documentation shall be delivered as and if existing at the time of
equipment delivery unless otherwise stated in the compact schedule of events
and documentation deliverables.
N/A = not available.
Kind regards,
CHRISTIAN ROVSING A/S
Kurt Nybroe-Nielsen
D̲E̲P̲A̲R̲T̲M̲E̲N̲T̲ ̲M̲A̲N̲A̲G̲E̲R̲
We are looking for a Department Manager to our Special
Projects Department, which has 10 employees.
The activities include implementation of smaller communications
systems based on turnkey systems.
The department manager is responsible for the results
of the department as regards economy, performance of
projects, and contact to the customers.
The person shall be objective and co-operative, and
be experienced in management.
The applicants must have an engineer's background,
supplemented with a businness economic education.
The applicants must be able to negotiate in English,
and express oneself clearly verbally as well as in
writing.
A̲D̲M̲I̲N̲I̲S̲T̲R̲A̲T̲I̲V̲E̲ ̲S̲U̲P̲P̲O̲R̲T̲
We are looking for an administrative employee to the
Systems Division.
The applicant must be able to perform the following
tasks:
- Devlopment of business and administrative procedures.
- Implementation of data registration and reporting
systems on PCs.
- Participation in the current planning and reporting.
- Managing and coordination of purchasing of goods
from sub-contractors for the projects in the division.
We expect
Applicants who have an education as Production-engineer,
HA, merconom or a similar education, and at least have
2 - 3 years of experience in a similar job.
The person in question shall be initiative, independent,
and be able to co-operate with the other employees
in the division.
We offer a challenging job in a young dynamic milieu
including great possiblities for personal development.
Salary after qualifications. (Individual salary negotiation).
For further information please contact Division Manager
Kurt Nybroe-Nielsen on telephone 02 65 11 44 extension
383/381.
R̲E̲P̲O̲R̲T̲I̲N̲G̲ ̲A̲N̲D̲ ̲C̲O̲N̲T̲R̲O̲L̲
The management team wants much stronger reporting and
control systems and believes that the future operator
will be able to help the company substantially in the
implementation of such systems.
One of the major factors that caused the bankruptcy
of the Christian Rovsing company was the lack of a
reporting and control system that in time could show
to the management the financial development of the
company.
Reporting procedures shall be implemented in the new
organization to provide the necessary visibility for
management control and decision making.
Management believe that the company must have a new
accounting system which must be able without major
delay to produce profit and loss statements, balance
sheets, lists about project status, debtors and creditors.
The management team reports directly to the board of
directors.
The planning and budget procedures should be more formalized,
homogenous and coordinated. Common EDP-tools should
be used in budget calculations, consolidation and budget
review.
Provided that a business plan has been established
for the new company the management team shall provide
budgets on a quarterly basis. Budget control shall
take place on a monthly basis and a management report
shall be issued on a quarterly basis.
Budgets and actual results should be commented on by
the responsible managers and be an integrated part
of the management information system and decision process.
Reporting is based on financial results as well as
progress statements for the various projects and activities.
The management believe that Christian Rovsing Systems
to a high degree can use the know-how, experience and
system in the operators company. Procedures and control
systems can of course not be transferred directly and
uncritically. The procedures and system must of course
be adapted to the size, structure and culture in the
new company. By doing this, management believe that
the reporting system will increase effenciency without
decreasing entrepreneurship.
S̲Y̲S̲T̲E̲M̲ ̲D̲E̲V̲E̲L̲O̲P̲M̲E̲N̲T̲ ̲H̲A̲N̲D̲B̲O̲O̲K̲
1̲ ̲ ̲I̲N̲T̲R̲O̲D̲U̲C̲T̲I̲O̲N̲
2̲ ̲ ̲S̲Y̲S̲T̲E̲M̲ ̲D̲E̲V̲E̲L̲O̲P̲M̲E̲N̲T̲ ̲M̲O̲D̲E̲L̲
2.1 BASIC PHASE MODEL
2.2 REFINED PHASE MODEL
2.3 SUPPORT DISCIPLINES
2.3.1 Configuration Management
2.3.2 Verification and Validation
2.3.3 Quality Assurance
2.4 USER INVOLVEMENT
3̲ ̲ ̲P̲R̲O̲G̲R̲A̲M̲ ̲M̲A̲N̲A̲G̲E̲M̲E̲N̲T̲
3.1 PROJECT PLANNING
3.1.1 Planning Overview
3.1.2 Work Breakdown Structure
3.1.3 Organization
3.1.4 Plans
3.1.5 Scheduling
3.1.6 Budgetting
3.2 PROJECT MONITORING AND CONTROL
3.2.1 Work Package Reporting
3.2.2 Cost Performance Reporting
3.2.3 Quantified Milestones
4̲ ̲ ̲D̲E̲T̲A̲I̲L̲E̲D̲ ̲D̲E̲F̲I̲N̲I̲T̲I̲O̲N̲ ̲O̲F̲ ̲D̲E̲V̲E̲L̲O̲P̲M̲E̲N̲T̲…01…P̲H̲A̲S̲E̲S̲ ̲A̲N̲D̲ ̲A̲C̲T̲I̲V̲I̲T̲I̲E̲S̲
4.1 OVERALL OBJECTIVES PER PHASE
4.2 ACTIVITIES AND DOCUMENTATION PER PHASE
5̲ ̲ ̲V̲E̲R̲I̲F̲I̲C̲A̲T̲I̲O̲N̲ ̲A̲N̲D̲ ̲V̲A̲L̲I̲D̲A̲T̲I̲O̲N̲ ̲V̲&̲V̲
5.1 INTRODUCTION
5.2 V&V ACTIVITIES
5.3 V&V TOOLS/METHODS
5.3.1 Verification Control Document
5.3.2 Software Interface Control Document
and Database Design Document
5.3.3 Automated V&V Tools
5.3.4 V&V Contractors
6̲ ̲ ̲T̲E̲S̲T̲I̲N̲G̲
6.1 TESTING PRINCIPLES
6.1.1 Test Phases
6.1.2 Types/Levels Testing
6.1.3 Test Methods
6.2 TEST PLANNING
6.3 INCREMENTAL TESTING
6.4 SYSTEM AND ACCEPTANCE TESTING
7̲ ̲ ̲S̲O̲F̲T̲W̲A̲R̲E̲ ̲C̲O̲N̲F̲I̲G̲U̲R̲A̲T̲I̲O̲N̲ ̲M̲A̲N̲A̲G̲E̲M̲E̲N̲T̲
7.1 INTRODUCTION
7.1.1 System Development Process
and Life Cycle
7.1.2 Software Life Cycle Documentation
7.1.3 Computer Program Hierarchy
7.2 WHAT IS SOFTWARE CONFIGURATION MANAGEMENT
7.2.1 Configuration Identification
7.2.2 Configuration Change Control
7.2.3 Configuration Status Accounting
8̲ ̲ ̲U̲N̲I̲T̲ ̲D̲E̲V̲E̲L̲O̲P̲M̲E̲N̲T̲ ̲F̲O̲L̲D̲E̲R̲
8.1 90% SYNDROME
8.2 UDF OBJECTIVES
8.3 UDF IN THE DEVELOPMENT PROCESS
8.4 DEFINITION OF UNIT
8.5 UDF STRUCTURE
9̲ ̲ ̲S̲O̲F̲T̲W̲A̲R̲E̲ ̲D̲E̲V̲E̲L̲O̲P̲M̲E̲N̲T̲ ̲E̲C̲O̲N̲O̲M̲I̲C̲S̲
9.1 SOFTWARE COST ESTIMATION
9.2 SOFTWARE PLANNING AND CONTROL
9.3 HISTORICAL PROJECT COST DATABASE
9.3.1 Project Characteristics
(Cost Drivers)
9.3.2 Standard Project Break-Down
9.4 INTEGRATED SOFTWARE COST SYSTEM
A̲N̲N̲E̲X̲:̲ ̲P̲R̲O̲J̲E̲C̲T̲ ̲D̲O̲C̲U̲M̲E̲N̲T̲A̲T̲I̲O̲N̲
A: PLANS
B: SPECIFICATIONS
C: DESIGN DOCUMENTS
D: TEST DOCUMENTATION
E: CONFIGURATION CONTROL
S Y S T E M I M P L E M E N T A T I O N
S Y S T E M I M P L E M E N T A T I O N
S Y S T E M I M P L E M E N T A T I O N
S Y S T E M I M P L E M E N T A T I O N
S Y S T E M I M P L E M E N T A T I O N
******************************************************
******************************************************
******************************************************
******************************************************
******************************************************
Tasks related to project systems implementation can
be divided into three groups:
- Program Management
o Planning
o Control
o Organizing
- Doing Disciplines
o Analysis
o Design
o Programming
o Production
o Testing
o Installation
o Documentation
o Training
- Technical Management
o Verification and validation
o Test and evaluation
o Configuration Management
o Quality Assurance
Especially through implementation of large projects
Christian Rovsing A/S has proved that capabilities
exist within the organization leading a successful
project implementation.
However, in most of the above system implementation
areas manual procedures and methods are used. Specific
examples are provided in annex to the section. It is,
therefore, our belief that implementation of automated
procedures can improve our productivity and thereby
the overall cost-effectiveness.
Another aspect of cost-effectiveness is related to
re-use of software. One reason for a low degree of
re-use of software is that we have been in the customizing
market. The other is that too little effort has been
spent on establishing company-wide software libraries.
We believe that through a better coordination with
CR marketing and sales a higher degree resale and thereby
of software re-use can be accomplished. Furthermore,
we believe that a strong emphasis on company wide software
libraries as well as common software development can
increase our cost effectiveness.
A U T O M A T I O N O F
A U T O M A T I O N O F
A U T O M A T I O N O F
A U T O M A T I O N O F
A U T O M A T I O N O F
P R O J E C T O F F L I N E P R O C E D U R E S
P R O J E C T O F F L I N E P R O C E D U R E S
P R O J E C T O F F L I N E P R O C E D U R E S
P R O J E C T O F F L I N E P R O C E D U R E S
P R O J E C T O F F L I N E P R O C E D U R E S
*********************************************************
*********************************************************
*********************************************************
*********************************************************
*********************************************************
In relation to financial project budgetting a number
of underlying procedures should be automated and integrated
into the financial budgetting computer program and
these are:
- External/Internal Equipment Purchase
o Order schedule
o Order status
o Payments schedule
o Invoice Control
- Project Manpower
o Effect/schedule per activity
- Other Project Costs
o S&D
o G&A
- Project Invoice Schedule
Futhermore a inventory and configuration management
system is needed.
The inventory system should be integrated with order/purchase
system.
The configuration management system shall also be integrated
with the inventory system.
ANS@TTES IGEN ANS@TTES
EJ
IGEN
Balser Jesper X
Berthold Bjarne X
Chin Mark X
Hansen Ole Krag X
Hass Birgitte X
Hermansen B]rge X
Holm Jan X
Holst Uffe R]nnenkamp X
Hoy Niels X
Johansen Ib X
Juhl Keld Dandanell X
Kongshammer Betty X
Pagh Bent X
Plesner Kenneth X
Porotnikoff Michael X
Rischel Hans X
Serup Jens J]rgen X
Simonsen Flemming X
S]nder Finn X
Tind Gunvor X
Urban Michael X
Villadsen Carsten X
Zyskind Maciek X
Petersen Kurt Skj]dt X
M…19…ller Richard X
Hansen Flemming X
Madsen Henning Senius X
The following positions must be filled as soon as possible:
- System Division Administrative Support
- Department Manager Special Projects
- Department Manager MEDS
- 1 Secretary
- CAMPS
- 3 SW Engineers (System Software)
- 5 SW Engineers (Application Software)
- 1 HW Manager
- 2 System I&T Engineer
- 1 HW Engineer
- XFOX
- 4 SW Engineers
- 3 System Engineers
- MEDS
- 6 SW Engineers
- 1 System Engineer