DataMuseum.dk

Presents historical artifacts from the history of:

CR80 Wang WCS documentation floppies

This is an automatic "excavation" of a thematic subset of
artifacts from Datamuseum.dk's BitArchive.

See our Wiki for more about CR80 Wang WCS documentation floppies

Excavated with: AutoArchaeologist - Free & Open Source Software.


top - download

⟦55d13556d⟧ Wang Wps File

    Length: 22400 (0x5780)
    Types: Wang Wps File
    Notes: CPS/TPR/046               
    Names: »4746A «

Derivation

└─⟦ce4ce986f⟧ Bits:30006193 8" Wang WCS floppy, CR 0449A
    └─ ⟦this⟧ »4746A « 

WangText



7…0b…7…00…7…05……1e……0b……86…1 
      
      
      
      
      
      
      
  …02…    
      
 …02…   …02…  
      

…02…CPS/TPR/046

FACTORY
 ACCEPTANCE
 TEST SPECIFICATION
 AND…02…FS[/840320…02……02…#
PROCEDURES,
 VDUs AND
 PRINTERS
 FOR SITE
5, 7,
 14, AND
 15…02……02…CAMPS








                    T̲A̲B̲L̲E̲ ̲O̲F̲ ̲C̲O̲N̲T̲E̲N̲T̲S̲



   1 GENERAL ....................................... 
      4

     1.1 PURPOSE ....................................
            4
     1.2 APPLICABLE DOCUMENTS .......................
            4
     1.3 INSPECTION AND TEST PROCEDURES .............
            4

   2 TEST SPECIFICATION AND EVALUATION ..............
        5

     2.1 TEST SPECIFICATION .........................
            5
       2.1.1 Test Purpose ...........................
                5

     2.2 TEST METHODS AND CONSTRAINTS ...............
            5
       2.2.1 Test Conditions ........................
                5
       2.2.2 Data Recording .........................
                6
       2.2.3 System Test Constraints ................
                6
       2.2.4 Test Location ..........................
                6

     2.3 TEST EVALUATION ............................
            6

   3 TEST DESCRIPTION AND PROCEDURES ................
        7

     3.1 Testgroup No. 1 ............................
            7
       3.1.1 General Description ....................
                7
       3.1.2 Test Procedure .........................
                7
         3.1.2.1 Test Initialization ................
                    7
         3.1.2.2 Test Steps .........................
                    7

     3.2 TESTGROUP NO. 2 ............................
           10
       3.2.1 General Description ....................
               10
       3.2.2 Test Procedure .........................
               10
         3.2.2.1 General Description ................
                   10
           3.2.2.1.1 Test Set Up ....................
             11
           3.2.2.1.2 Test Initialization ............
             11
           3.2.2.1.3 Test Steps .....................
             11
           3.2.3.1.4 Test Termination ...............
             17

     Appendix A .....................................
       18

     Appendix B .....................................
       25

     Appendix C .....................................
       43


                        1̲ ̲ ̲G̲E̲N̲E̲R̲A̲L̲



1.1      P̲U̲R̲P̲O̲S̲E̲

         The purpose of this document is:

         a)  to identify:

             1)  the test object
             2)  the requirements to be verified

         b)  to define:

             1)  the test methods and constraints
             2)  the test evaluation criteria
             3)  the detailed procedure for test execution



1.2      A̲P̲P̲L̲I̲C̲A̲B̲L̲E̲ ̲D̲O̲C̲U̲M̲E̲N̲T̲S̲

         The following documents are applicable to the extent
         specified herein:

         a)  CAMPS System Requirements Specification,
             CPS/210/SYS/0001

         b)  CAMPS Acceptance Test Specification Overview,
             CPS/TSS/001

         c)  CAMPS Hardware Assembly Breakdown/Hardware Tree
             CPS/SDS/017, Issue 3

         d)  CAMPS System Design Specification
             CPS/SDS/001

         e)  Additional configuration list for site 5, 7, 14,
             and 15.

         f)  Factory Acceptance Test Specificaton and Procedures,
             Site 7.



1.3      I̲N̲S̲P̲E̲C̲T̲I̲O̲N̲ ̲A̲N̲D̲ ̲T̲E̲S̲T̲ ̲P̲R̲O̲C̲E̲D̲U̲R̲E̲S̲

         1)  Inspection and Test Procedure for Tracor MSP Model
             8000, CPS/TPR/019 (1) 820225.

         2)  Inspection and Test Procedures for Delta Data Terminal
             7260TC, CPS/TPR/012 (1) 810910.


           2̲ ̲ ̲T̲E̲S̲T̲ ̲S̲P̲E̲C̲I̲F̲I̲C̲A̲T̲I̲O̲N̲ ̲A̲N̲D̲ ̲E̲V̲A̲L̲U̲A̲T̲I̲O̲N̲



2.1      T̲E̲S̲T̲ ̲S̲P̲E̲C̲I̲F̲I̲C̲A̲T̲I̲O̲N̲



2.1.1    T̲e̲s̲t̲ ̲P̲u̲r̲p̲o̲s̲e̲

         The purpose of this test is to provide a Factory Acceptance
         on Tracor Printers and Delta Data Terminals for site
         5, 7, 14, and 15. These sites are Factory Accepted
         without or with too few printers and VDUs. The test
         is carried out by use of CAMPS site 7 system.



2.2      T̲E̲S̲T̲ ̲M̲E̲T̲H̲O̲D̲S̲ ̲A̲N̲D̲ ̲C̲O̲N̲S̲T̲R̲A̲I̲N̲T̲S̲



2.2.1    T̲e̲s̲t̲ ̲C̲o̲n̲d̲i̲t̲i̲o̲n̲s̲

         This test is a hardware qualification test, and the
         verification methods to be applied will consist of:

         -   examination

         -   analysis

         -   demonstration/test

         a)  Examination

             This method is a non-functional verification such
             as visual inspection of the physical characteristics
             of the item or of the documentation associated
             with the item.

         b)  Analysis

             This method is a non-functional verification, such
             as reductions or translation of data, review of
             analytical data, or review of performances from
             a detailed test. Data may be brought forward from
             previous tests.



         c)  Test/Demonstration

             This method of testing is to functionally exercise
             the equipment such that measurements and observations
             of correct operation can be made. Elements not
             directly measured or observed are demonstrated
             by implication.



2.2.2    D̲a̲t̲a̲ ̲R̲e̲c̲o̲r̲d̲i̲n̲g̲

         All test results or indication of compliance with expected
         results shall be recorded in a report by CR's test
         engineer in charge of test execution.

         Test executions must be witnessed by CR's QA and the
         purchaser's QAR.

         The Test Report shall be signed by CR's test engineer
         and the test witnesses.

         The original test reference copy will be filed by CR
         QA.



2.2.3    S̲y̲s̲t̲e̲m̲ ̲T̲e̲s̲t̲ ̲C̲o̲n̲s̲t̲r̲a̲i̲n̲t̲s̲

         The basic functional capabilities of the hardware and
         the related system firmware will be verified.

         Requirements specifying CAMPS functions provided by
         both software, application firmware, and hardware will
         be verified during the functional software test.



2.2.4    T̲e̲s̲t̲ ̲L̲o̲c̲a̲t̲i̲o̲n̲

         When the CAMPS hardware has been integrated at the
         factory, a functional test will be performed.  The
         location for execution of the test is a CR decision.



2.3      T̲E̲S̲T̲ ̲E̲V̲A̲L̲U̲A̲T̲I̲O̲N̲

         Evaluation of the test results will be performed by
         comparison of test results with expected results or
         by assurance of compliance between requirements and
         the referenced documentation.





            3̲ ̲T̲E̲S̲T̲ ̲D̲E̲S̲C̲R̲I̲P̲T̲I̲O̲N̲ ̲A̲N̲D̲ ̲P̲R̲O̲C̲E̲D̲U̲R̲E̲S̲



3.1      T̲e̲s̲t̲g̲r̲o̲u̲p̲ ̲N̲o̲.̲ ̲1̲

         

3.1.1    G̲e̲n̲e̲r̲a̲l̲ ̲D̲e̲s̲c̲r̲i̲p̲t̲i̲o̲n̲

         This testgroup will give a verification of the site
         configuration.



3.1.2    T̲e̲s̲t̲ ̲P̲r̲o̲c̲e̲d̲u̲r̲e̲



3.1.2.1  T̲e̲s̲t̲ ̲I̲n̲i̲t̲i̲a̲l̲i̲z̲a̲t̲i̲o̲n̲

         The testengineers and testwitnesses are in the testroom
         and ready to perform and supervise the test.



3.1.2.2  T̲e̲s̲t̲ ̲S̲t̲e̲p̲s̲

         The teststeps for testgroup no. 1 are given in the
         following, with an overview description and the teststeps
         to follow.






T̲E̲S̲T̲ ̲O̲V̲E̲R̲V̲I̲E̲W̲                          T̲E̲S̲T̲ ̲N̲O̲.̲ ̲1̲ ̲ ̲ ̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲S̲i̲t̲e̲ ̲C̲o̲n̲f̲i̲g̲u̲r̲a̲t̲i̲o̲n̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Test Case                              Action       SRS Refence
R̲e̲f̲e̲r̲e̲n̲c̲e̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲


  1      Verification of the site      N/A
         Configuration




T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲                                                           T̲E̲S̲T̲
                                                                     ̲N̲O̲.̲
                                                                     ̲1̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲S̲i̲t̲e̲ ̲C̲o̲n̲f̲i̲g̲u̲r̲a̲t̲i̲o̲n̲

S̲P̲S̲ ̲R̲e̲f̲e̲r̲e̲n̲c̲e̲:̲ ̲ ̲N̲/̲A̲

 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Case.    Test      Action                      Expected Results
Step no. Station
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

 1.1               Verify, for the actual
                   equipment to be tested, that
                   the configuration is in
                   accordance with that
                   specified in document C and
                   E. Use the checklist in 
                   Appendix C, for result 
                   recordings.
                                               Verification
                                               OK

                   Check Document E to ensure
                   that all applicable ECOs
                   have been implemented.

                   For each connected periphe-
                   ral check the associated
                   Certificate Of Conformance
                   (COC) to verify that each
                   connected peripheral has
                   been certified.             Verification
                                               OK






 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
COMMENTS:






                                               T̲E̲S̲T̲
                                               ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲

                                               TEST
                                                QA 
                                               QAR


3.2      T̲E̲S̲T̲G̲R̲O̲U̲P̲ ̲N̲O̲.̲ ̲2̲



3.2.1    G̲e̲n̲e̲r̲a̲l̲ ̲D̲e̲s̲c̲r̲i̲p̲t̲i̲o̲n̲

         The purpose of this test group is to verify basic functional
         capabilities of the CAMPS MSP and VDU

         The test will be performed for four links at a time
         by sending 24 lines of alphanumeric characters to the
         VDUs/ MSPs connected. In case of connected VDUs, command
         setting the VDUs in transmit mode is sent to the VDUs.
         The 24 lines previously received by the VDUs are tranmitted
         back to the System. Output data and input data are
         compared for equality. In case of connected MSPs verification
         of the transmitted data are performed by visual inspection
         of the print out.

         To ease identification of terminals connected to the
         TDX system via signal adapters and LTUX-Ss, each terminal
         and the link between the terminal and the signal adapter
         is given a three digit identifier. Each digit is a
         hexadecimal number. The format of the identifier is
         …08…XYZ…08… and the terminal having this identification is
         connected via link (opto or V24) XYZ to channel Z (1-4)
         of LTUX-S X (1-2) in TDX Unit (TU) Y (1-E). E.g.: a
         MSP has the identifier 2A3 that the MSP is connected
         via link 2A3 to channel 3 of LTUX-S no. 2 in TDX Unit
         10.



3.2.2    T̲e̲s̲t̲ ̲P̲r̲o̲c̲e̲d̲u̲r̲e̲



3.2.2.1  G̲e̲n̲e̲r̲a̲l̲ ̲D̲e̲s̲c̲r̲i̲p̲t̲i̲o̲n̲

         This testprocedure serves to verify functional capabilities
         of the MSPs and VDUs.





3.2.2.1.1    T̲e̲s̲t̲ ̲S̲e̲t̲ ̲U̲p̲

         Ref: Factory Acceptance Test Specification and Procedures,
         Site 7.

         The substituted OPTO transceiver from Rack C adaptor
         crate is moved to channel 244. Disconnect the V24 cable
         connected to J4 on the BP-8 panel in TDX unit 4.



3.2.2.1.2    C̲o̲n̲n̲e̲c̲t̲i̲o̲n̲ ̲o̲f̲ ̲M̲S̲P̲s̲ ̲a̲n̲d̲ ̲V̲D̲U̲s̲

         8 printers are connected to TDX unit 4. 4 printers
         are connected to the remote terminal, 2 in each adaptor
         crate. The last printer is connected to channel 131.

         The 6 VDUs are connected to TDX unit 2 together with
         2 test VDUs.



3.2.2.1.3    T̲e̲s̲t̲ ̲I̲n̲i̲t̲i̲a̲l̲i̲z̲a̲t̲i̲o̲n̲

         The test engineers and testwitnesses are in the testroom
         and ready to perform and supervise the test.

         Power up the system as follows:

         a)  Power up the connected MSPs and VDUs

         b)  Power up the site 7 system, ref. document f.



3.2.2.1.4    T̲e̲s̲t̲ ̲S̲t̲e̲p̲s̲

         The teststeps for testgroup no. 2 are given in the
         following preceded by a testoverview.




T̲E̲S̲T̲ ̲O̲V̲E̲R̲V̲I̲E̲W̲                          T̲E̲S̲T̲ ̲N̲O̲.̲ ̲1̲ ̲ ̲ ̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲S̲i̲t̲e̲ ̲C̲o̲n̲f̲i̲g̲u̲r̲a̲t̲i̲o̲n̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Test Case                              Action       SRS Refence
R̲e̲f̲e̲r̲e̲n̲c̲e̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲


  1      LTUX-S Link 12X-22X           N/A

  2      LTUX-S Link 14X               N/A

  3      LTUX-S Link 24X               N/A

  4      LTUX-S Link 2BX               N/A

  5      LTUX-S Link 131               N/A




T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲                                                           T̲E̲S̲T̲
                                                                     ̲N̲O̲.̲:̲
                                                                     ̲2̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲a̲l̲ ̲T̲e̲s̲t̲

S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲S̲e̲c̲s̲.̲3̲.̲4̲.̲5̲.̲1̲.̲o̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲4̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲7̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Case     Test
Step No. Station     Action                    Expected Results
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

1.1      OC          Examine printout on OC    OC print out
                                               as specified
                                               in Appendix B,
                                               Sec. 1.1

1.2      OC          Boot the TDX1 test        OC print out
                                               as spe-
                     programs as follows:      cified in appendix
                                               B,
                                               section 1.2
                     BA 1025 (CR)
                     BM 140 (CR)
                     BO 62F (CR)

1.3      OC          Activate the link 12X-22X
                     LTUX-S test as follows:

                     Enter from the OC:
                     DO OPEN2 (CR)
                     (Appendix A, sec. 2.4a)
                     DO VDU8(CR)               OC print out
                                               as
                     (Appendix A, sec. 2.3)    specified in
                                               appen-
                     DO CLOSE2 (CR)            dix B, section
                                               1.3
                     (Appendix A, sec. 2.4b)







 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:





                  ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
                 T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲

                 TEST QA   QAR



T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲                                                           T̲E̲S̲T̲
                                                                     ̲N̲O̲.̲:̲
                                                                     ̲2̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲a̲l̲ ̲T̲e̲s̲t̲

S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲S̲e̲c̲s̲.̲ ̲3̲.̲4̲.̲5̲.̲1̲.̲o̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲4̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲7̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Case     Test
Step No. Station     Action                    Expected Results
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

1.4      OC          Activate the link 14x
                     LTUX-S test as fol-
                     lows:

                     Enter from the OC:        MSP 14X print
                                               out as
                     DO OPEN14(CR)             Specified in
                                               appendix
                     (Appendix A, sec. 2.5a)   B, sec. 2
                     DO MSP(CR)
                     (Appendix A, sec. 2.1)    OC print out
                                               as
                     DO CLOSE14(CR)            specified in
                                               Appen-
                     (Appendix A, sec. 2.5b)   dix B, sec. 1.4.

1.5      OC          Activate the link 24x
                     LTUX-S test as fol-
                     lows:

                     Enter from the OC:        MSP 24x print
                                               out
                     DO OPEN24(CR)             as specified
                                               in appen-
                     (Appendix A, sec. 2.6a)   dix B, Section
                                               2
                     DO MSP(CR)
                     (Appendix A, sec. 2.1)    OC print out
                                               as
                     DO CLOSE24(CR)            specified in
                                               Appen-
                     (Appendix A, sec. 2.6b)   dix B, sec. 1.5

1.6      OC          Quit the test program by  OC print out
                                               as spe-
                     entering from the OC:     cified in appendix
                                               B,
                     QUIT (CR)                 sec. 1.6


 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:





                                                ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
                                               ̲ ̲
                                               T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲

                                               TEST QA   QAR



T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲                                                           T̲E̲S̲T̲
                                                                     ̲N̲O̲.̲:̲
                                                                     ̲2̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲a̲l̲ ̲T̲e̲s̲t̲

S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲S̲e̲c̲s̲.̲ ̲3̲.̲4̲.̲5̲.̲1̲.̲o̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲4̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲7̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Case     Test
Step No. Station     Action                    Expected Results
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

1.7      OC          Boot the TDX2 test 
                     program as follows:
                     BA 1025 (CR)
                     BM 140 (CR)               Refer to Appendix
                                               B
                     BO 631 (CR)               sec. 1.7

1.8      OC          Activate the link 2Bx
                     LTUX-S test as fol-
                     lows:

                     Enter from the OC:        MSP 2BX print
                                               out
                     DO OPEN2B(CR)             as specified
                                               in ap-
                     (Appendix A, sec.2.7a)    pendix B, sec.
                                               2
                     DO MSP (CR)               
                     (Appendix A, sec.2.1)     OC print out
                                               as
                     DO CLOSE2B(CR)            specified in
                                               appen-
                     (Appendix A, sec.2.7b)    dix B sec. 1.8









 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:





                                                ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
                                               ̲ ̲
                                               T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲

                                               TEST QA   QAR



T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲                                                           T̲E̲S̲T̲
                                                                     ̲N̲O̲.̲:̲
                                                                     ̲2̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲a̲l̲ ̲T̲e̲s̲t̲

S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲S̲e̲c̲s̲.̲ ̲3̲.̲4̲.̲5̲.̲1̲.̲o̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲4̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲7̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Case     Test
Step No. Station     Action                    Expected Results
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

1.9      OC          Quit the test program by  OC print out
                                               as spe-
                     entering from the OC:     cified in appendix
                                               B,
                     QUIT (CR)                 sec. 1.9

         OC          Boot the TDX3 test as
                     follows:

                     BA 1025 (CR)
                     BM 140 (CR)
                     BO 623 (CR)               Refer to Appendix
                                               B Section 1.10.

                     Enter from the OC:        MSP 131 print
                                               out
                     DO OPEN131(CR)            as specified
                                               in ap-
                     (Appendix A, sec. 2.8a)   pendix B, sec.
                                               2
                     DO MSP(CR)
                     (Appendix A, sec. 2.2)    OC print out
                                               as
                     DO CLOSE131(CR)           specified in
                                               appen-
                     (Appendix A, sec. 2.86)   dix B sec. 1.11

                     Quit the TDX3 test by
                     entereing from the OC:
                     QUIT(CR)                  Refer to Appendix
                                               B sec. 1.12



 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:




                                                ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
                                               ̲ ̲
                                               T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲

                                               TEST QA   QAR



3.2.3.1.4    T̲e̲s̲t̲ ̲T̲e̲r̲m̲i̲n̲a̲t̲i̲o̲n̲

         Power down the system as follows:

         a)  Power down the connected MSPs and VDUs

         b)  Power down the site 7 system, ref. document f.





               A  P  P  E  N  D  I  X    A
             ********************************


                        1̲ ̲G̲E̲N̲E̲R̲A̲L̲


During the Factory Acceptance test a number of inputcommands
 of the type:

                        DO (BODY)

are used.

This commandtype is used to activate a testsequence resident
 in main memory, i.e the actual testprogram now accepts testcommands
 from this testsequence and not from the OC. When the activated
 testsequence has finished, commandinputs are again taken from
 the OC. Testsequences used in the testprocedures are explained
 in the following.


            2̲ ̲ ̲L̲T̲U̲X̲-̲S̲ ̲T̲E̲S̲T̲ ̲S̲E̲Q̲U̲E̲N̲C̲E̲S̲,̲ ̲V̲D̲U̲,̲ ̲M̲S̲P̲


         These test sequences consist of a common test sequence
         (common to all link tests) and for each link to be
         tested two specific link sequences.

2.1      M̲S̲P̲ ̲C̲O̲M̲M̲O̲N̲ ̲T̲E̲S̲T̲S̲E̲Q̲U̲E̲N̲C̲E̲,̲ ̲D̲O̲ ̲M̲S̲P̲

         DEFINE  (1,'(:13:)(:10:)THE QUICK BROWN FOX JUMPS OVER
                 THE LAZY DOGS BACK 0123456789')
         DEFINE(2,#481B #000D)
         GENERATE(1,1,31)
         GENERATE(2,2,2)
         REPEAT 60
         BEGIN
             TDX.WRITE(1,1,62)
             TDX.WRITE(2,1,62)
             TDX.WRITE(3,1,62)
             TDX.WRITE(4,1,62)
         END
         TDX.WRITE(1,2,3)
         TDX.WRITE(2,2,3)
         TDX.WRITE(3,2,3)
         TDX.WRITE(4,2,3)





2.2      M̲S̲P̲ ̲T̲E̲S̲T̲S̲E̲Q̲U̲E̲N̲C̲E̲,̲ ̲D̲O̲ ̲M̲S̲P̲

         REPORTLEVEL = 2

         DEFINE  (1, 'THE QUICK BROWN FOX JUMPS OVER THE LAZY
                 DOGS BACK 0123456789(:13:)(:10:)')
         DEFINE(2,#521B,#000D)
         DEFINE(3,#107F)
         DEFINE(4,# 481B,#000D)
         GENERATE(1,1,31)
         GENERATE(2,2,2)
         GENERATE(3,3,1)
         GENERATE(4,4,2)
         TDX WRITE(1,4,3)
         REPEAT 60 TDX.WRITE(1,1,62)
         TDX.WRITE(1,4,3)
         CLEAR(5)



2.3      V̲D̲U̲ ̲C̲O̲M̲M̲O̲N̲ ̲T̲E̲S̲T̲ ̲S̲E̲Q̲U̲E̲N̲C̲E̲,̲ ̲D̲O̲ ̲V̲D̲U̲8̲

         REPORTLEVEL = 2
         DEFINE  (1,'THE QUICK BROWN FOX JUMPS OVER THE LAZY
                 DOGS BACK 0123456789(:10:(13:)')
         DEFINE(2,#520E #6D0E)
         DEFINE(3,#440E #630E #0E0B #0063)
         DEFINE(4,#630E #0E0B #0063)
         DEFINE(5,#3B0E)
         GENERATE(1,1,31)
         GENERATE(2,2,2)
         GENERATE(3,3,4)
         GENERATE(4,4,3)
         GENERATE(5,5,1)
         TDX.WRITE(1,2,4)
         TDX.WRITE(2,2,4)
         TDX.WRITE(3,2,4)
         TDX.WRITE(4,2,4)
         TDX.WRITE(5,2,4)
         TDX.WRITE(6,2,4)
         TDX.WRITE(7,2,4)
         TDX.WRITE(8,2,4)
         REPEAT 24


         BEGIN
             TDX.WRITE(1,1,62)
             TDX.WRITE(2,1,62)
             TDX.WRITE(3,1,62)
             TDX.WRITE(4,1,62)
             TDX.WRITE(5,1,62)
             TDX.WRITE(6,1,62)
             TDX.WRITE(7,1,62)
             TDX.WRITE(8,1,62)
         END
         TDX.WRITE(1,3,7)
         TDX.WRITE(2,3,7)
         TDX.WRITE(3,3,7)
         TDX.WRITE(4,3,7)
         TDX.WRITE(5,3,7)
         TDX.WRITE(6,3,7)
         TDX.WRITE(7,3,7)
         TDX.WRITE(8,3,7)
         CLEAR(6)
         TDX.WRITE(1,5,2)
         TDX.READ(1,6,62)
         COMPARE(1,6,30)
         CLEAR(6)
         TDX.WRITE(2,5,2)
         TDX.READ(2,6,62)
         COMPARE(1,6,30)
         CLEAR(6)
         TDX.WRITE(3,5,2)
         TDX.READ(3,6,62)
         COMPARE(1,6,30)
         CLEAR(6)
         TDX.WRITE(4,5,2)
         TDX.READ(4,6,62)
         COMPARE(1,6,30)
         CLEAR(6)
         TDX.WRITE(5,5,2)
         TDX.READ(5,6,62)
         COMPARE(1,6,30)
         CLEAR(6)
         TDX.WRITE(6,5,2)
         TDX.READ(6,6,62)
         COMPARE(1,6,30)
         CLEAR(6)
         TDX.WRITE(7,5,2)
         TDX.READ(7,6,62)
         COMPARE(1,6,30)
         CLEAR(6)
         TDX.WRITE(8,5,2)
         TDX.READ(8,6,62)
         COMPARE(1,6,30)
         REPEAT 23


         BEGIN
             TDX.WRITE(1,4,5)
             TDX.WRITE(2,4,5)
             TDX.WRITE(3,4,5)
             TDX.WRITE(4,4,5)
             TDX.WRITE(5,4,5)
             TDX.WRITE(6,4,5)
             TDX.WRITE(7,4,5)
             TDX.WRITE(8,4,5)
             TDX.WRITE(1,5,2)
             TDX.WRITE(2,5,2)
             TDX.WRITE(3,5,2)
             TDX.WRITE(4,5,2)
             TDX.WRITE(5,5,2)
             TDX.WRITE(6,5,2)
             TDX.WRITE(7,5,2)
             TDX.WRITE(8,5,2)
             CLEAR(6)
             TDX.READ(1,6,62)
             COMPARE(1,6,30)
             CLEAR(6)
             TDX.READ(2,6,62)
             COMPARE(1,6,30)
             CLEAR(6)
             TDX.READ(3,6,62)
             COMPARE(1,6,30)
             CLEAR(6)
             TDX.READ(4,6,62)
             COMPARE(1,6,30)
             CLEAR(6)
             TDX.READ(5,6,62)
             COMPARE(1,6,30)
             CLEAR(6)
             TDX.READ(6,6,62)
             COMPARE(1,6,30)
             CLEAR(6)
             TDX.READ(7,6,62)
             COMPARE(1,6,30)
             CLEAR(6)
             TDX.READ(8,6,62)
             COMPARE(1,6,30)
         END





2.4      L̲I̲N̲K̲ ̲1̲2̲X̲-̲2̲2̲X̲ ̲S̲P̲E̲C̲I̲F̲I̲C̲ ̲T̲E̲S̲T̲ ̲S̲E̲Q̲U̲E̲N̲C̲E̲S̲

         a)  O̲p̲e̲n̲,̲ ̲D̲O̲ ̲O̲P̲E̲N̲2̲

             TDX.INITIALIZE(#32,1)
             TDX.OPEN ̲BUS(#32,0)
             TDX.OPEN ̲SUBDEVICE(#32,0,#12,8)
             TDX.OPEN ̲SUBDEVICE(#32,0,#22,8)
             TDX.OPEN ̲VDU(#32,0,#12,2,8,1)
             TDX.OPEN ̲VDU(#32,0,#12,2,8,2)
             TDX.OPEN ̲VDU(#32,0,#12,2,8,3)
             TDX.OPEN ̲VDU(#32,0,#12,2,8,4)
             TDX.OPEN ̲VDU(#32,0,#22,2,8,5)
             TDX.OPEN ̲VDU(#32,0,#22,2,8,6)
             TDX.OPEN ̲VDU(#32,0,#22,2,8,7)
             TDX.OPEN ̲VDU(#32,0,#22,2,8,8)

         b)  C̲l̲o̲s̲e̲,̲ ̲D̲O̲ ̲C̲L̲O̲S̲E̲2̲

             TDX.CLOSE ̲VDU(1)
             TDX.CLOSE ̲VDU(2)
             TDX.CLOSE ̲VDU(3)
             TDX.CLOSE ̲VDU(4)
             TDX.CLOSE ̲VDU(5)
             TDX.CLOSE ̲VDU(6)
             TDX.CLOSE ̲VDU(7)
             TDX.CLOSE ̲VDU(8)
             TDX.CLOSE ̲SUBDEVICE(#32,0,#12)
             TDX.CLOSE ̲SUBDEVICE(#32,0,#22)
             TDX.CLOSE ̲BUS(#32,0)
             TDX.SHUTDOWN(#32)



2.5      L̲I̲N̲K̲ ̲1̲4̲X̲ ̲S̲P̲E̲C̲I̲F̲I̲C̲ ̲T̲E̲S̲T̲ ̲S̲E̲Q̲U̲E̲N̲C̲E̲S̲

         a)  O̲p̲e̲n̲,̲ ̲D̲O̲ ̲O̲P̲E̲N̲1̲4̲

             TDX.INITIALIZE(#32,1)
             TDX.OPEN ̲BUS(#32,0)
             TDX.OPEN ̲SUBDEVICE(#32,0,#14,8)
             TDX.OPEN ̲VDU(#32,0,#14,2,8,1)
             TDX.OPEN ̲VDU(#32,0,#14,3,8,2)
             TDX.OPEN ̲VDU(#32,0,#14,4,8,3)
             TDX.OPEN ̲VDU(#32,0,#14,5,8,4)



         b)  C̲l̲o̲s̲e̲,̲ ̲D̲O̲ ̲C̲L̲O̲S̲E̲1̲4̲

             TDX.CLOSE ̲VDU(1)
             TDX.CLOSE ̲VDU(2)
             TDX.CLOSE ̲VDU(3)
             TDX.CLOSE ̲VDU(4)
             TDX.CLOSE ̲SUBDEVICE(#32,0,#14)
             TDX.CLOSE ̲BUS(#32,0)
             TDX.SHUTDOWN(#32)



2.6      L̲I̲N̲K̲ ̲2̲4̲X̲ ̲S̲P̲E̲C̲I̲F̲I̲C̲ ̲T̲E̲S̲T̲ ̲S̲E̲Q̲U̲E̲N̲C̲E̲S̲

         a)  O̲p̲e̲n̲,̲ ̲D̲O̲ ̲O̲P̲E̲N̲2̲4̲

             TDX.INITIALIZE(#32,1)
             TDX.OPEN ̲BUS(#32,0)
             TDX.OPEN ̲SUBDEVICE(#32,0,#24,8)
             TDX.OPEN ̲VDU(#32,0,#24,2,8,1)
             TDX.OPEN ̲VDU(#32,0,#24,3,8,2)
             TDX.OPEN ̲VDU(#32,0,#24,4,8,3)
             TDX.OPEN ̲VDU(#32,0,#24,5,8,4)

         b)  C̲l̲o̲s̲e̲,̲ ̲D̲O̲ ̲C̲L̲O̲S̲E̲2̲4̲

             TDX.CLOSE ̲VDU(1)
             TDX.CLOSE ̲VDU(2)
             TDX.CLOSE ̲VDU(3)
             TDX.CLOSE ̲VDU(4)
             TDX.CLOSE ̲SUBDEVICE(#32,0,#24)
             TDX.CLOSE ̲BUS(#32,0)
             TDX.SHUTDOWN(#32)



2.7      L̲I̲N̲K̲ ̲2̲B̲X̲ ̲S̲P̲E̲C̲I̲F̲I̲C̲ ̲T̲E̲S̲T̲ ̲S̲E̲Q̲U̲E̲N̲C̲E̲S̲

         a)  O̲p̲e̲n̲,̲ ̲D̲O̲ ̲O̲P̲E̲N̲2̲B̲

             TDX.INITIALIZE(#32,1)
             TDX.OPEN ̲BUS(#32,0)
             TDX.OPEN ̲SUBDEVICE(#32,0,#2B,8)
             TDX.OPEN ̲VDU(#32,0,#2B,2,8,1)
             TDX.OPEN ̲VDU(#32,0,#2B,3,8,2)
             TDX.OPEN ̲VDU(#32,0,#2B,4,8,3)
             TDX.OPEN ̲VDU(#32,0,#2B,5,8,4)



         b)  C̲l̲o̲s̲e̲,̲ ̲D̲O̲ ̲C̲L̲O̲S̲E̲2̲B̲

             TDX.CLOSE ̲VDU(1)
             TDX.CLOSE ̲VDU(2)
             TDX.CLOSE ̲VDU(3)
             TDX.CLOSE ̲VDU(4)
             TDX.CLOSE ̲SUBDEVICE(#32,0,#2B)
             TDX.CLOSE ̲BUS(#32,0)
             TDX.SHUTDOWN(#32)



2.8      L̲I̲N̲K̲ ̲2̲3̲1̲ ̲S̲P̲E̲C̲I̲F̲I̲C̲ ̲T̲E̲S̲T̲ ̲S̲E̲Q̲U̲E̲N̲C̲E̲S̲

         a)  O̲p̲e̲n̲,̲ ̲D̲O̲ ̲O̲P̲E̲N̲1̲3̲1̲

             TDX.INITIALIZE(#32,1)
             TDX.OPEN ̲BUS(#32,0)
             TDX.OPEN ̲SUBDEVICE(#32,0,#13,8)
             TDX.OPEN ̲VDU(#32,0,#13,2,8,1)

         b)  C̲l̲o̲s̲e̲,̲ ̲D̲O̲ ̲C̲L̲O̲S̲E̲1̲3̲1̲

             TDX.CLOSE ̲VDU(1)
             TDX.CLOSE ̲SUBDEVICE(#32,0,#13)
             TDX.CLOSE ̲BUS(#32,0)
             TDX.SHUTDOWN(#32)





A  P  P  E  N  D  I  X     B…01…********************************




A  P  P  E  N  D  I  X     C…01…********************************




1.1      G̲E̲N̲E̲R̲A̲L̲

         Check list used for Verification of the Configuration.
         In the check list the specified quantity for each item
         is tabulated. Further, a inspected quantity column,
         to be used for result recording, exists to ensure the
         compliance between the specified and inspected configuration.


         MEDIUM SPEED PRINTER   SPEC.   INSPEC   COMPLIANCE
                                QTY     QTY

         MSP SITE 14            8

         MSP SITE 14A           2

         MSP SITE 7A            2

         MSP SITE 7A Spare      1

         Visual Display Unit SPEC.   INSPEC   COMPLIANCE
                                QTY     QTY

         VDU Site 5A spare      1

         VDU Site 15A spare     1

         VDU Site 15B spare     1

         VDU Site 14A Spare     1

         VDU Site 7A            2