DataMuseum.dk

Presents historical artifacts from the history of:

CR80 Wang WCS documentation floppies

This is an automatic "excavation" of a thematic subset of
artifacts from Datamuseum.dk's BitArchive.

See our Wiki for more about CR80 Wang WCS documentation floppies

Excavated with: AutoArchaeologist - Free & Open Source Software.


top - download

⟦56bd764df⟧ Wang Wps File

    Length: 48937 (0xbf29)
    Types: Wang Wps File
    Notes: CPS/TPR/049               
    Names: »5113A «

Derivation

└─⟦2b0f97947⟧ Bits:30006199 8" Wang WCS floppy, CR 0496A
    └─ ⟦this⟧ »5113A « 

WangText

…00……00……00……00……00…$…0a……00……00…$…0b…$…00…$…01…$…06…#…0b…#…00…#…06…#…07…"…0b…"…0e…"…02…"…06…!…0a…!…0e…!…02…!…07… …0c… …86…1                                             …02…           …02…   …02…  
      

…02…CPS/TPR/049

FACTORY ACCEPTANCE TEST SPECIFICATION…02…840630…02……02…
AND PROCEDURES, SITE 11
…02……02…CAMPS








3.2.3.2  T̲e̲s̲t̲ ̲P̲r̲o̲c̲e̲d̲u̲r̲e̲ ̲2̲

         This testprocedure serves to verify functional capabilities
         of PU#2, the associated part of the CU and the connected
         TDX#2 system as identified in the VCRI. 



3.2.3.2.1    T̲e̲s̲t̲ ̲S̲e̲t̲ ̲U̲p̲

         The test is performed via an Operator Console (OC)
         which is a printer and keyboard.

         The OC is connected to the system as follows:

             1.  Substitute the leftmost OPTO transceiver in
                 the rack C Adapter crate with a V24/V28(L/L)
                 adapter (1 channel), and connect the OC to
                 the V24 connector on the front panel of the
                 adaptor.

             2.  Remove the two V24 cables from J2 and J3 located
                 on the front panel of the WCA (rear crate of
                 the Watchdog Processor crate).

             3.  Connect the two V24 cables.

         The OC is now connected to the V24 port on the MIA
         in the rear crate of PU#2 (ref. fig. 3.2.3.2.1-1).

         Carry out/control the following:

         a)  OC Set up:

             The communication part of the OC is set to:

             1)  Asynchronous communication
             2)  7 bit character length
             3)  Even parity check/generation
             4)  1 stop bit
             5)  1200 Baud communication speed
















































                    FIGURE 3.2.3.2.1-1

            C̲o̲n̲n̲e̲c̲t̲i̲o̲n̲ ̲o̲f̲ ̲t̲h̲e̲ ̲O̲p̲e̲r̲a̲t̲o̲r̲ ̲C̲o̲n̲s̲o̲l̲e̲


         b)  Switch settings in PU#1 and PU#2 front crate modules:

             1)  The NRM/MAIN switch on the MAP module front
                 panel is set to NRM.

             2)  The EN/DIS switch on the MAP module front panel
                 is set to EN.

             3)  The host number switch (S1) on the PU#2 STI
                 is set to #01 as follows:

                 S1,4 : CLOSED
                 S1,3 : CLOSED
                 S1,2 : CLOSED
                 S1,1 : OPEN

         c)  Switch settings in PU#1 and PU#2 rear crate modules:

             1)  The Baudrate select switches 1-4 (S1) on the
                 MAP Interface Adapter (MIA) Printed Circuit
                 Board (PCB) is set to #7 which corresponds
                 to a transmission speed of 1200 Baud:

                 Switch 1:  OPEN
                 Switch 2:  OPEN
                 Switch 3:  OPEN
                 Switch 4:  CLOSE

             2)  The RESET switch on the Configuration Control
                 Adaptor (CCA) front panel is set to RESET.

         d)  Switch settings in CU front crate modules:

             1)  Switches on the Channel Unit Control Panel
                 (CUCP) front panel is set as:

                 a)  The CU Bus A Switch DIS/AUTO is set to
                     AUTO

                 b)  The CU Bus B switch DIS/AUTO is set to
                     AUTO

                 c)  The Disk Ctrl. No. 1 switch AAEN/AUTO/BAEN
                     is set to AUTO



                 d)  The Disk Ctrl. No. 2 switch AAEN/AUTO/BAEN
                     is set to AUTO

                 e)  The Disk Ctrl. No. 3 switch AAEN/AUTO/BAEN
                     is set to AUTO

                 f)  The LTU No. 1 switch AAEN/AUTO/BAEN is
                     set to AUTO

                 g)  The LTU No. 2 switch AAEN/AUTO/BAEN is
                     set to AUTO

                 h)  The LTU No. 3 switch AAEN/AUTO/BAEN is
                     set to AUTO

                 i)  The LTU No. 4 switch AAEN/AUTO/BAEN is
                     set to AUTO

                 k)  The LTU No. 5 switch AAEN/AUTO/BAEN is
                     set to AUTO

                 l)  The SD.FD.CTRL switch AAEN/AUTO/BAEN is
                     set to AUTO

         e)  Switch settings in CU rear crate modules:

             1)  The RESET switch on the CCA module front panel
                 is set to RESET

         f)  Switch settings in TU modules

             1)  All BSM-Xs:

                 a)  The AUTO/MAN/OFF switch is set to MAN

                 b)  The BUS 1/Bus 2 switch is set to BUS 2.

             2)  All LTUX-Ss:

                 a)  The CH 1 switch ON/OFF is set to ON

                 b)  The CH 2 switch ON/OFF is set to ON

                 c)  The CH 3 switch ON/OFF is set to ON

                 d)  The CH 4 switch ON/OFF is set to ON

         g)  Switch settings on frequency stabilizer rack:



             1)  The input power switch on all three stabilizers
                 are set to off.

             2)  The three rotary switches on the By-Pass panel
                 are all set to the Frequency Stabilizer position.

         h)  Setting of power switches in Computer racks:

             1)  Power switch (2) on each Mains switch is set
                 to OFF.

             2)  Power switch (2) on the Disk Drive rear panel
                 is set to "ON"

             3)  Power switch (1) on the Floppy Disk Drive rear
                 panel is set to "ON".

             4)  Power switch (1) on the Watchdog Processor
                 Unit rear panel is set to "OFF".

             5)  Power switch (2) in the rear crate of PU#1
                 is set to "ON"

             6)  Power switch (2) in the rear crate of the CU
                 is set to "ON"

             7)  Power switch (2) in the rear crate of the PU#2
                 is set to "ON".

             8)  Power switch (2) in the rear panel of each
                 80D fan unit is set to "ON".

             9)  Power switch (2) in the rear crate of the Adaptor
                 Crate is set to "ON"

             10) Power switch (1) in the rear panel of the 80S
                 Blower Unit is set to "ON"

             11) Power switch (1) on each CR80D Power supply
                 (6 front crate mounted modules) is set to "ON".

         i)  Setting of Power Switche in Line Termination racks:

             1)  Power Switch (2) on each Mains Switch is set
                 to "OFF".



             2)  Power Switch (1) on the rear panel of each
                 80S Blower Unit is set to "ON".

             3)  Power Switch (2) in the rear crate of each
                 TU is set to "ON".

             4)  Power Switch (1) on each CR80S Power Supply
                 (1 in the front crate of each TU) is set to
                 "ON".

         k)  PU#2 cable interchanges

         Interchange the TIA#1 (rear crate, slot 15) TDX connection
         and the TIA#2 (rear crate, slot 16) TDX connection.

3.2.3.2.2    T̲e̲s̲t̲ ̲I̲n̲i̲t̲i̲a̲l̲i̲z̲a̲t̲i̲o̲n̲

         The testengineers and testwitnesses are in the testroom
         and ready to perform and supervise the test.

         Power Up the System as follows 

         a)  Power Up all connected terminals i.e. VDUs, MSPs,
             OC, PTP/PTR, OCR as applicable.

         b)  The input Power Switch on the front panel of each
             Frequency Stabilizer is set to "ON".

         c)  The power switch (2) on Mains switch no. 1 is set
             to "ON" wait 15 secs.

         d)  The power switch (2) on each of the remaining Mains
             Switches is set to "ON".

         e)  Mount a Disk Pack with the test software in Disk
             Drive no. 2, close the lid and push the drive back
             in rack B. Activate the WRITE PROTECT pushbutton.

         f)  Activate "START" push button on Disk Drive No.
             2 and wait until the "READY" indicator stays "ON".

         g)  Insert a scratch Floppy Disk in each of the two
             drives in the Floppy Disk drive of rack B, and
             close the lids.


3.2.3.2.3    T̲e̲s̲t̲ ̲S̲t̲e̲p̲s̲

         The teststeps for testgroup no. 2, testprocedure no.
         2 (2/2), are given in the following preceded by a testoverview.




T̲E̲S̲T̲ ̲O̲V̲E̲R̲V̲I̲E̲W̲                                  T̲E̲S̲T̲ ̲N̲O̲.̲:̲ ̲2̲/̲2̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲a̲l̲ ̲C̲a̲p̲a̲b̲i̲l̲i̲t̲i̲e̲s̲                                 
    

 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲

Test Case/
Reference        Action                        SRS Reference
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲

1.               CPU test                      N/A

2.               MAP test                      N/A

3.               RAM test                      N/A

4.               Disk/Floppy Disk              N/A
                 test

5.1              LTU #1                        N/A

5.2              LTU #2                        N/A

5.3              LTU #3                        N/A

6.               Load Test                     N/A

7.2              LTUX-S Link 11x-21x           N/A

7.3              LTUX-S Link 12x-22x           N/A

7.4              LTUX-S Link 13x-23x           N/A

7.5              LTUX-S Link 14x-24x           N/A

7.6              LTUX-S Link 15x               N/A

7.7              LTUX-S Link 25x               N/A


                                            /Continued....…86…1        
         …02…                             …02…                     

T̲E̲S̲T̲ ̲O̲V̲E̲R̲V̲I̲E̲W̲                                  T̲E̲S̲T̲ ̲N̲O̲.̲:̲ ̲2̲/̲2̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲a̲l̲ ̲C̲a̲p̲a̲b̲i̲l̲i̲t̲i̲e̲s̲  (Continued)                    
    

 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲

Test Case/
Reference        Action                        SRS Reference
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲

7.8              LTUX-S TELETYPE TEST          N/A

7.9              LTUX-S Link 254               N/A

7.10             LTUX-S Link 231               N/A

7.11             LTUX-S Link 171, 271          N/A

7.12             LTUX-S Link 1B-2B,            N/A
                 Resyne Module Test

All              Power line filtering          sec. 3.4.5.1.o

All              CPU instruction set           sec. 3.4.5.7.a.4

All              Hardware addressing           sec. 3.4.5.7.a.7




T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲                                                           T̲E̲S̲T̲
                                                                     ̲N̲O̲.̲:̲
                                                                     ̲2̲/̲2̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲2̲/̲C̲U̲/̲T̲D̲X̲#̲2̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲a̲l̲ ̲T̲e̲s̲t̲

S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲S̲e̲c̲s̲.̲3̲.̲4̲.̲5̲.̲1̲.̲0̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲4̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲7̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Case     Test
Step No. Station     Action                    Expected Results
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

1.1      OC          Examine printout on OC    Refer to Appendix
                                               B sec. 1.1

1.2      OC          Boot the CPU test pro-
                     gram as follows:

                     Enter from the OC:
                     BA 1025(CR)
                     BM 140(CR)
                     BO 621(CR)                Refer to Appendix
                                               B sec. 1.2

1.3      OC          Enter from the OC
                     REPORTLEVEL = 0(CR)
                     ACTIVATE CPU 0(CR)
                     ACTIVATE CPU 1(CR)
                     ACTIVATE CPU 2(CR)
                     TEST CPU 0 1 2(CR)        Refer to Appendix
                                               B section 1.3.

1.4      OC          Quit the CPU test by en-
                     tering from the OC:
                     QUIT(CR)                  Refer to Appendix
                                               B section 1.4




 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:





                                                ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
                                               ̲ ̲
                                               T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲

                                               TEST QA   QAR



T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲                                                           T̲E̲S̲T̲
                                                                     ̲N̲O̲.̲:̲
                                                                     ̲2̲/̲2̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲2̲/̲C̲U̲/̲T̲D̲X̲#̲2̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲a̲l̲ ̲T̲e̲s̲t̲

S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲S̲e̲c̲s̲.̲ ̲3̲.̲4̲.̲5̲.̲1̲.̲0̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲4̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲7̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Case     Test
Step No. Station     Action                    Expected Results
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

2.1      OC          Boot the MAP test pro-
                     gram as follows:

                     Enter from the OC:
                     BA 1025(CR)
                     BM 140(CR)
                     BO 61F(CR)                Refer to Appendix
                                               B sec. 2.1

2.2      OC          Enter from the OC:

                     REPORTLEVEL = 0(CR)
                     TEST ALL(CR)              Refer to Appendix
                                               B section 2.2

2.3      OC          Quit the MAP test by en-
                     tering from the OC:
                     QUIT(CR)                  Refer to Appendix
                                               B section 1.4









 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:





                                                ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
                                               ̲ ̲
                                               T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲

                                               TEST QA   QAR



T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲                                                           T̲E̲S̲T̲
                                                                     ̲N̲O̲.̲:̲
                                                                     ̲2̲/̲2̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲2̲/̲C̲U̲/̲T̲D̲X̲#̲2̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲a̲l̲ ̲T̲e̲s̲t̲

S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲S̲e̲c̲s̲.̲ ̲3̲.̲4̲.̲5̲.̲1̲.̲0̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲4̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲7̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Case     Test
Step No. Station     Action                    Expected Results
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

3.1      OC          Boot the RAM test pro-
                     gram as follows:

                     Enter from the OC:
                     BA 1025(CR)
                     BM 140(CR)
                     BO 620(CR)                Refer to Appendix
                                               B sec. 3.1

3.2      OC          Enter from the OC:

                     REPORTLEVEL = 0(CR)
                     TEST ALL(CR)              Refer to Appendix
                                               B section 3.2

3.3      OC          Quit the RAM test by en-
                     tering from the OC:
                     QUIT(CR)                  Refer to Appendix
                                               B section 3.3









 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:





                                                ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
                                               ̲ ̲
                                               T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲

                                               TEST QA   QAR



T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲                                                           T̲E̲S̲T̲
                                                                     ̲N̲O̲.̲:̲
                                                                     ̲2̲/̲2̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲2̲/̲C̲U̲/̲T̲D̲X̲#̲2̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲a̲l̲ ̲T̲e̲s̲t̲

S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲S̲e̲c̲s̲.̲ ̲3̲.̲4̲.̲5̲.̲1̲.̲0̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲4̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲7̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Case     Test
Step No. Station     Action                    Expected Results
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

3.4      OC          Enter from the OC:
                     IR 1A23(CR)
                     IR 1A25(CR)
                     IR 1A26(CR)
                     IR 1A07(CR)
                     IR 1A08(CR)
                     IR 1A0B(CR)
                                               Refer to Appendix
                                               B 
                                               section 3.4

3.5      OC          Enter from the OC:
                     ZP(CR)                    Either:
                                               ZP
                                               Or:
                                               ZP
                                               Parity error(s)
                                               X












 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:





                                                ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
                                               ̲ ̲
                                               T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲

                                               TEST QA   QAR



T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲                                                           T̲E̲S̲T̲
                                                                     ̲N̲O̲.̲:̲
                                                                     ̲2̲/̲2̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲2̲/̲C̲U̲/̲T̲D̲X̲#̲2̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲a̲l̲ ̲T̲e̲s̲t̲

S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲S̲e̲c̲s̲.̲ ̲3̲.̲4̲.̲5̲.̲1̲.̲0̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲4̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲7̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Case     Test
Step No. Station     Action                    Expected Results
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

3.6      OC          Enter from the OC:
                     ZP1(CR)                   Either:
                                               ZP1
                     ZP8(CR)                   Or:
                                               ZP1
                                               Parity error(s)
                                               X
3.7      OC          Enter from the OC:
                     IR 1823(CR)
                     IR 1825(CR)
                     IR 1826(CR)
                     IR 1807(CR)
                     IR 1808(CR)
                     IR 180B(CR)
                                               Refer to Appendix
                                               B 
                                               section 3.5

                     The steps from 3.4
                     to 3.7 incl. have reset
                     possible parity errors
                     in the CU memories








 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:





                                                ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
                                               ̲ ̲
                                               T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲

                                               TEST QA   QAR



T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲                                                           T̲E̲S̲T̲
                                                                     ̲N̲O̲.̲:̲
                                                                     ̲2̲/̲2̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲2̲/̲C̲U̲/̲T̲D̲X̲#̲2̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲a̲l̲ ̲T̲e̲s̲t̲

S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲S̲e̲c̲s̲.̲ ̲3̲.̲4̲.̲5̲.̲1̲.̲0̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲4̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲7̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Case     Test
Step No. Station     Action                    Expected Results
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

4.1      OC          Boot the Disk test-
                     program as follows:
                     Enter from the OC:
                     BA 1025(CR)
                     BM 140(CR)
                     BO 634(CR)                Refer to Appendix
                                               B 
                                               sec. 4.1

4.2      N/A         Depress the "START"       N/A.
                     pushbutton on disk
                     drive #2 and wait un-
                     til the "START"and
                     "READY" indicators are
                     "OFF". Replace the test
                     software disk pack in
                     Disk Drive # 2 with a
                     scratch disk pack.
                     Push the drive back
                     into rack B.
                     Activate the "START"
                     pushbutton on Drive #2
                     and wait until the
                     "READY"indicator stays
                     "ON". Depress the
                     WRITE PROTECT push-
                     button. (WRITE PROTECT
                     indicator is 'OFF')
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:





                                                ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
                                               ̲ ̲
                                               T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲

                                               TEST QA   QAR



T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲                                                           T̲E̲S̲T̲
                                                                     ̲N̲O̲.̲:̲
                                                                     ̲2̲/̲2̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲2̲/̲C̲U̲/̲T̲D̲X̲#̲2̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲a̲l̲ ̲T̲e̲s̲t̲

S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲S̲e̲c̲s̲.̲ ̲3̲.̲4̲.̲5̲.̲1̲.̲0̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲4̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲7̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Case     Test
Step No. Station     Action                    Expected Results
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

4.3      OC          Activate the Disk test
                     as follows:

                     Enter from the OC:        Refer to Appendix
                                               B 
                     DO TEST                   sec. 4.2
                     (Appendix A, sec. 2.1)

4.4      OC          Quit the Disk test
                     by entering from the OC:  Refer to Appendix
                                               B 
                     QUIT(CR)                  sec. 1.4

4.5      N/A         Depress the "START"       N/A.
                     pushbutton on disk
                     drive #2 and wait un-
                     til the "START"and
                     "READY" indicators are
                     "OFF". Replace the
                     scratch disk pack in
                     Disk Drive # 2 with the
                     test software disk pack.
                     Push the drive back
                     into rack B.
                     Activate the "START"
                     pushbutton on Drive #2
                     and wait until the
                     "READY"indicator stays
                     "ON". Activate the WRITE
                     PROTECT pushbutton.
                     (WRITE PROTECT indicator 'ON')
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:





                                                ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
                                               ̲ ̲
                                               T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲

                                               TEST QA   QAR



T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲                                                           T̲E̲S̲T̲
                                                                     ̲N̲O̲.̲:̲
                                                                     ̲2̲/̲2̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲2̲/̲C̲U̲/̲T̲D̲X̲#̲2̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲a̲l̲ ̲T̲e̲s̲t̲

S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲S̲e̲c̲s̲.̲ ̲3̲.̲4̲.̲5̲.̲1̲.̲0̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲4̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲7̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Case     Test
Step No. Station     Action                    Expected Results
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

5.1.1    OC          Boot the LTU test-
                     program as follows:
                     Enter from the OC:
                     BA 1025(CR)
                     BM 140(CR)                Refer to Appendix
                                               B 
                     BO 635(CR)                sec. 5.1

5.1.2    N/A         Connect the TEST VDU      N/A
                     to J30 in the V24 fil-
                     ter box via testcable A.

5.1.3    OC          Activate the LTU#1
                     channel 1 test as follows:

                     Enter from the OC:        Refer to Appendix
                                               B 
                     DO LTU11(CR)              sec. 5.2
                     (Appendix A, sec. 3.1)

5.2.1    N/A         Connect the TEST VDU      N/A
                     to J31 in the V24 fil-
                     ter box via testcable A.

5.2.2    OC          Activate the LTU#2
                     channel 1 test as follows:

                     Enter from the OC:        Refer to Appendix
                                               B 
                     DO LTU21(CR)              sec. 5.3
                     (Appendix A, sec. 3.2)
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:





                                                ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
                                               ̲ ̲
                                               T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲

                                               TEST QA   QAR



T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲                                                           T̲E̲S̲T̲
                                                                     ̲N̲O̲.̲:̲
                                                                     ̲2̲/̲2̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲2̲/̲C̲U̲/̲T̲D̲X̲#̲2̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲a̲l̲ ̲T̲e̲s̲t̲

S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲S̲e̲c̲s̲.̲ ̲3̲.̲4̲.̲5̲.̲1̲.̲0̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲4̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲7̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Case     Test
Step No. Station     Action                    Expected Results
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

5.2.3    OCA         Quit the LTU test pro-
                     gram by entering from     Refer to Appendix
                                               B
                     OC: QUIT(CR)              section 3.3

5.3.1                Connect 4 loop-back
                     connectors in LIA-N #3,
                     J1 to J4. Insert LTU64
                     test in the floppy disk
                     drive 0.



















 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:





                                                ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
                                               ̲ ̲
                                               T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲

                                               TEST QA   QAR


         …06…1         …02…           …02…                         …02…    
                         
T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲           T̲E̲S̲T̲ ̲N̲O̲.̲:̲ ̲2̲/̲2̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲2̲/̲C̲U̲/̲T̲D̲X̲#̲2̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲a̲l̲ ̲T̲e̲s̲t̲

S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲S̲e̲c̲s̲.̲ ̲3̲.̲4̲.̲5̲.̲1̲.̲0̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲4̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲7̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Case     Test
Step No. Station Action                                          Expected
                                                                 Results
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

5.3.2    OC  Boot the 64K test program
             as follows. Enter from the
             OC:
             BA 1001(CR)
             BT FD500(CR)                                        Refer
                                                                 to
                                                                 Appendix
                                                                 B
             BE (CR) sec. 5.4.

5.3.3    OC  Enter from OC:
             REPORTLEVEL = 2(CR)
             LTU.LOOP ̲BACK ̲TEST
             (#100B #420 2400                                    Refer
                                                                 Appendix
                                                                 B
             1 1 1 1)(CR)                                        sec.
                                                                 5.5

5.3.4    OC  Quit the LTU 64K test
             by entering from the OC:                            Refer
                                                                 Appendix
                                                                 B
             QUIT(CR)                                            sec.
                                                                 3.3.












 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:





                  ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
                 T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲

                 TEST QA   QAR



T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲                                                           T̲E̲S̲T̲
                                                                     ̲N̲O̲.̲:̲
                                                                     ̲2̲/̲2̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲2̲/̲C̲U̲/̲T̲D̲X̲#̲2̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲a̲l̲ ̲T̲e̲s̲t̲

S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲S̲e̲c̲s̲.̲ ̲3̲.̲4̲.̲5̲.̲1̲.̲0̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲4̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲7̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Case     Test
Step No. Station     Action                    Expected Results
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

6.1      N/A         Connect a TEST VDU        N/A
                     via testcable A to
                     J30 (LTU#11) in the
                     filter box. VDU set-up:
                        9600 Baud
                        Echo Mode

6.2      N/A         Swop Disk Controllers in  N/A
                     CU pos. 18 and 20
6.3                  Push the Master Clear     Refer to Appendix
                                               B sec. 1.1
6.3.1                Depress the WRITE PROTECT
                     push button on Drive#2
                     (WRITE PROTECT indicator
                     is 'OFF')
6.4      OC          Enter from the OC:        OC print out:
                     IR1A23 (CR)               IR1A23
                                               FFFF
                     ZP                         ZP
                                               Parity error(s)
                                               X
                     ZP1                        ZP1
                     ZP8(CR)                   Parity error(s)
                                               X

6.5      OC          BO 610                    Refer to Appendix
                                               B sec. 6.1



 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:





                                                ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
                                               ̲ ̲
                                               T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲

                                               TEST QA   QAR



T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲                                                           T̲E̲S̲T̲
                                                                     ̲N̲O̲.̲:̲
                                                                     ̲2̲/̲2̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲2̲/̲C̲U̲/̲T̲D̲X̲#̲2̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲a̲l̲ ̲T̲e̲s̲t̲

S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲S̲e̲c̲s̲.̲ ̲3̲.̲4̲.̲5̲.̲1̲.̲0̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲4̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲7̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Case     Test
Step No. Station     Action                    Expected Results
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

6.6      OC          Enter time and date       Refer to Appendix
                                               B sec. 6.2

6.7      OC          Enter from the OC
                     OPEN SYS                  Refer to Appendix
                                               B 
                     DO CONFIG1                sec. 6.3

6.8      OC          Enter from the OC:
                     PRINTER ̲TASK L: Y
                     P:   TMS*TERM0(CR)        Refer to Appendix
                                               B sec 6.4

6.9      OC          Enter from the OC:
                     PRINT PRI                 Refer to Appendix
                                               B sec. 6.5

6.10     OC          Enter from the OC:
                     DO HCLF20                 Refer to Appendix
                                               B sec. 6.6

6.11     OC          To terminate the
                     test enter
                     from the OC:
                     KILL SYS00(CR).
                     If not terminated the     Refer to Appendix
                                               B
                     test runs app. 1/2 hour.  sec. 6.7


 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:





                                                ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
                                               ̲ ̲
                                               T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲

                                               TEST QA   QAR



T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲                                                           T̲E̲S̲T̲
                                                                     ̲N̲O̲.̲:̲
                                                                     ̲2̲/̲2̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲2̲/̲C̲U̲/̲T̲D̲X̲#̲2̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲a̲l̲ ̲T̲e̲s̲t̲

S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲S̲e̲c̲s̲.̲ ̲3̲.̲4̲.̲5̲.̲1̲.̲0̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲4̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲7̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Case     Test
Step No. Station     Action                    Expected Results
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

6.12     OC          To terminate the
                     system s/w enter          Refer to Appendix
                                               B
                     from the OC:              sec. 6.8
                     CLOSE(CR)

6.13     N/A         Swop the Disk Control-    N/A                     lers
                                                                       in
                                                                       CU
                                                                       pos.18
                                                                       and
                     20.

6.14     N/A         Activate Master Clear     Refer to Appendix
                                               B Sec. 1.1

6.15     OC          Enter from the OC         OC print out
                     IR1A25                    IR1A25
                                               FFFF
                     ZP1                        ZP1
                                               Parity error(s)
                                               X











 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:





                                                ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
                                               ̲ ̲
                                               T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲

                                               TEST QA   QAR



T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲                                                           T̲E̲S̲T̲
                                                                     ̲N̲O̲.̲:̲
                                                                     ̲2̲/̲2̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲2̲/̲C̲U̲/̲T̲D̲X̲#̲2̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲a̲l̲ ̲T̲e̲s̲t̲

S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲S̲e̲c̲s̲.̲ ̲3̲.̲4̲.̲5̲.̲1̲.̲0̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲4̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲7̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Case     Test
Step No. Station     Action                    Expected Results
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

6.16     N/A         Activate the              N/A
                     WRITE PROTECT push-
                     button on Drive#2.
                     (WRITE PROTECT indica-
                     tor is 'ON')

6.17     N/A         Activate Master Clear.    Refer to Appendix
                                               B sec. 1.1




















 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:





                                                ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
                                               ̲ ̲
                                               T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲

                                               TEST QA   QAR



T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲                                                           T̲E̲S̲T̲
                                                                     ̲N̲O̲.̲:̲
                                                                     ̲2̲/̲2̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲2̲/̲C̲U̲/̲T̲D̲X̲#̲2̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲a̲l̲ ̲T̲e̲s̲t̲

S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲S̲e̲c̲s̲.̲ ̲3̲.̲4̲.̲5̲.̲1̲.̲0̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲4̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲7̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Case     Test
Step No. Station     Action                    Expected Results
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

7.1      OC          Boot the TDX1 test pro-
                     gram as follows:
                     BA 1025(CR)
                     BM 140(CR)                Refer to Appendix
                                               B 
                     BO 62F(CR)                sec 7.1

7.2      OC          Activate the link 11x-21x
                     LTUX-S test as fol-
                     lows:

                     Enter from the OC:
                     DO OPEN1(CR)
                     (Appendix A, sec. 4.7a)
                     DO VDU8(CR)
                     (Appendix A, sec. 4.1)    OC print out
                                               as
                     DO CLOSE1(CR)             specified in
                                               appen-
                     (Appendix A, sec. 4.7b)   dix B, sec. 7.2

7.3      OC          Activate the link 12x-22x
                     LTUX-S test as fol-
                     lows:

                     Enter from the OC:
                     DO OPEN2(CR)
                     (Appendix A, sec. 4.8a)
                     DO VDU8(CR)
                     (Appendix A, sec. 4.1)    OC print out
                                               as
                     DO CLOSE2(CR)             specified in
                                               appen-
                     (Appendix A, sec. 4.8b)   dix B, sec. 7.3
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:





                                                ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
                                               ̲ ̲
                                               T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲

                                               TEST QA   QAR



T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲                                                           T̲E̲S̲T̲
                                                                     ̲N̲O̲.̲:̲
                                                                     ̲2̲/̲2̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲2̲/̲C̲U̲/̲T̲D̲X̲#̲2̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲a̲l̲ ̲T̲e̲s̲t̲

S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲S̲e̲c̲s̲.̲ ̲3̲.̲4̲.̲5̲.̲1̲.̲0̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲4̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲7̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Case     Test
Step No. Station     Action                    Expected Results
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

7.4.1                Powerdown TU#3            N/A
                     Connect 3 test VDU's
                     to J32 in the CRT-A
                     V24 filterbox and to
                     J32, J28 in the CRT-B
                     filterbox. All via
                     testcable A
                     Power up TU#3

7.4.2    OC          Activate the link 13x
                     LTUX-S test as fol-
                     lows:

                     Enter from the OC:
                     DO OPEN13(CR)
                     (Appendix A, sec. 4.9a)
                     DO VDU4(CR)
                     (Appendix A, sec. 4.2)    OC print out
                                               as
                     DO CLOSE13(CR)            specified in
                                               Appen-
                     (Appendix A, sec. 4.9b)   dix B, sec. 7.4





 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:





                                                ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
                                               ̲ ̲
                                               T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲

                                               TEST QA   QAR



T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲                                                           T̲E̲S̲T̲
                                                                     ̲N̲O̲.̲:̲
                                                                     ̲2̲/̲2̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲2̲/̲C̲U̲/̲T̲D̲X̲#̲2̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲a̲l̲ ̲T̲e̲s̲t̲

S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲S̲e̲c̲s̲.̲ ̲3̲.̲4̲.̲5̲.̲1̲.̲0̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲4̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲7̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Case     Test
Step No. Station     Action                    Expected Results
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

7.5.1    N/A         Power down TU#4           N/A

         N/A         Connect 1 test MSP to     N/A
                     J31 in the CRT-A
                     filterbox
                     Power up TU#4

7.5.2    OC          Activate the link 14x
                     LTUX-S test as fol-
                     lows:

                     Enter from the OC:
                     DO OPEN14(CR)             MSP 14X print
                                               out
                     (Appendix A, sec. 4.12a)  as specified
                                               in ap-
                     DO MSP (CR)               pendix B, sec.8.1
                     (Appendix A, sec.4.3)     
                     DO CLOSE14(CR)            OC print out
                                               as
                     (Appendix A, sec. 4.12b)  specified in
                                               Appen-
                                               dix B, sec. 7.6








 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:





                                                ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
                                               ̲ ̲
                                               T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲

                                               TEST QA   QAR



T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲                                                           T̲E̲S̲T̲
                                                                     ̲N̲O̲.̲:̲
                                                                     ̲2̲/̲2̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲2̲/̲C̲U̲/̲T̲D̲X̲#̲2̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲a̲l̲ ̲T̲e̲s̲t̲

S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲S̲e̲c̲s̲.̲ ̲3̲.̲4̲.̲5̲.̲1̲.̲0̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲4̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲7̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Case     Test
Step No. Station     Action                    Expected Results
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

7.5.3    OC          Activate the link 24x
                     LTUX-S test as fol-
                     lows:

                     Enter from the OC:
                     DO OPEN24(CR)             MSP24X print
                                               out as
                     (Appendix A, sec. 4.13a)  specified in
                                               appen-
                     DO MSP (CR)               dix B, sec. 8.1
                     (Appendix A, sec. 4.3)    
                     DO CLOSE24(CR)            OC print out
                                               as
                     (Appendix A, sec. 4.13b)  specified in
                                               Appen-
                                               dix B, sec. 7.7

7.5.4    N/A         Power down TU#4.          N/A
                     Disconnect test MSP
                     Power up TU#4

7.5.5                Quit the test program
                     by entering from the
                     OC: QUIT(CR)              Refer to Appendix
                                               A sec. 1.4
7.6                  Boot the TDX2 test 
                     program as follows:
                     BA 1025 (CR)
                     BM 140 (CR)               Refer to Appendix
                                               B
                     BO 630                    sec. 7.8


 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:





                                                ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
                                               ̲ ̲
                                               T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲

                                               TEST QA   QAR



T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲                                                           T̲E̲S̲T̲
                                                                     ̲N̲O̲.̲:̲
                                                                     ̲2̲/̲2̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲2̲/̲C̲U̲/̲T̲D̲X̲#̲2̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲a̲l̲ ̲T̲e̲s̲t̲

S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲S̲e̲c̲s̲.̲ ̲3̲.̲4̲.̲5̲.̲1̲.̲0̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲4̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲7̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Case     Test
Step No. Station     Action                    Expected Results
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

7.6.1    N/A         Power down TU#5           N/A
                     Connect the 4 test VDUs
                     to J1-4 in the V24 fil-
                     ter box via test cables.
                     Power up TU#5

7.6.2    OC          Activate the link 15x
                     LTUX-S test as fol-
                     lows:

                     Enter from the OC:        OC print out
                                               as
                     DO OPEN15(CR)             specified in
                                               appen-
                     (Appendix A, sec.4.14a)   dix B sec. 7.9
                     DO VDU4 (CR)              
                     (Appendix A, sec.4.2)     
                     DO CLOSE15(CR)            
                     (Appendix A, sec.4.14b)   

7.7.1    N/A         Power down TU#5           N/A
                     Disconnect 2 test
                     VDU's from J1 and 4 in the
                     V24 filter box and connect
                     the 2 test VDU's to J5 and 
                     via test cable A to J25.
                     Disconnect W202 and W203
                     from ch 2 and 3 on the V24
                     L/L in pos. 7 and connect
                     then to ch 2 and 3 respectively
                     on the V24 L/L pos 15 
                     Power up TU#5

 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:





                                                ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
                                               ̲ ̲
                                               T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲

                                               TEST QA   QAR



T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲                                                           T̲E̲S̲T̲
                                                                     ̲N̲O̲.̲:̲
                                                                     ̲2̲/̲2̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲2̲/̲C̲U̲/̲T̲D̲X̲#̲2̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲a̲l̲ ̲T̲e̲s̲t̲

S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲S̲e̲c̲s̲.̲ ̲3̲.̲4̲.̲5̲.̲1̲.̲0̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲4̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲7̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Case     Test
Step No. Station     Action                    Expected Results
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

7.7.2    OC          Activate the link 25x
                     LTUX-S test as fol-
                     lows:

                     Enter from the OC:        OC print out
                                               as
                     DO OPEN25(CR)             specified in
                                               appen-
                     (Appendix A, sec. 4.15a)  dix B sec. 7.10
                     DO VDU4 (CR)
                     (Appendix A, sec. 4.2)    
                     DO CLOSE25(CR)            
                     (Appendix A, sec. 4.15b)  

7.7.3    N/A         Power down TU#5           N/A
                     Disconnect the 4 test
                     VDU's from J5, J2, J3 and
                     J25 in the V24 filter box.
                     Power up TU#5











 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:





                                                ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
                                               ̲ ̲
                                               T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲

                                               TEST QA   QAR




T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲                                                           T̲E̲S̲T̲
                                                                     ̲N̲O̲.̲:̲
                                                                     ̲2̲/̲2̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲2̲/̲C̲U̲/̲T̲D̲X̲#̲2̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲a̲l̲ ̲T̲e̲s̲t̲

S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲S̲e̲c̲s̲.̲ ̲3̲.̲4̲.̲5̲.̲1̲.̲0̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲4̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲7̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Case     Test
Step No. Station     Action                    Expected Results
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲


7.7.4    OC          Quit the TDX2 test by
                     entering from the OC:     Refer to Appendix
                                               B
                     QUIT(CR)                  sec. 1.4


















 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:





                                                ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
                                               ̲ ̲
                                               T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲

                                               TEST QA   QAR


T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲                                                           T̲E̲S̲T̲
                                                                     ̲N̲O̲.̲:̲
                                                                     ̲2̲/̲2̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲2̲/̲C̲U̲/̲T̲D̲X̲#̲2̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲a̲l̲ ̲T̲e̲s̲t̲

S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲S̲e̲c̲s̲.̲ ̲3̲.̲4̲.̲5̲.̲1̲.̲0̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲4̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲7̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Case     Test
Step No. Station     Action                    Expected Results
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

7.8                  Boot the TDX5 test as
                     follows:

                     BA 1025(CR)
                     BM 140(CR)                Refer to Appendix
                     BO 633(CR)                B sec. 7.21























 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:





                                                ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
                                               ̲ ̲
                                               T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲

                                               TEST QA   QAR



T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲                                                           T̲E̲S̲T̲
                                                                     ̲N̲O̲.̲:̲
                                                                     ̲2̲/̲2̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲2̲/̲C̲U̲/̲T̲D̲X̲#̲2̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲a̲l̲ ̲T̲e̲s̲t̲

S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲S̲e̲c̲s̲.̲ ̲3̲.̲4̲.̲5̲.̲1̲.̲0̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲4̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲7̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Case     Test
Step No. Station     Action                    Expected Results
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

7.8.1    N/A         Power down TU#5
                     Connect the TTY to J1
                     in the V24 filter box.
                     Set switch S2 on LTUX-S
                     #15 to:
                     1: CLOSED
                     2: OPEN
                     3: OPEN
                     4: OPEN
                     Power up TU#5             N/A

7.8.2    OC          Activate the link 151
                     LTUX-S test as follows:
                     
                     Enter from the OC:        OC print out
                                               as
                     DO OPEN151(CR)            specified in
                                               appen-
                     (Appendix A, sec.4.40a)   dix B sec. 7.22.
                     DO TTY(CR)                TTY print out
                     (Appendix A, sec.4.6)     as specified
                                               in ap-
                     DO CLOSE151(CR)           pendix B, sec.8.2
                     (Appendix A,sec.4.40b)

7.8.3    N/A         Power down TU#5. Set      N/A
                     switch S2 on LTUX-S
                     #15 to:
                     1: CLOSED
                     2: CLOSED
                     3: CLOSED
                     4: CLOSED
                     Power up to TU#5
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:





                                                ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
                                               ̲ ̲
                                               T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲

                                               TEST QA   QAR



T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲                                                           T̲E̲S̲T̲
                                                                     ̲N̲O̲.̲:̲
                                                                     ̲2̲/̲2̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲2̲/̲C̲U̲/̲T̲D̲X̲#̲2̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲a̲l̲ ̲T̲e̲s̲t̲

S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲S̲e̲c̲s̲.̲ ̲3̲.̲4̲.̲5̲.̲1̲.̲0̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲4̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲7̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Case     Test
Step No. Station     Action                    Expected Results
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

7.8.4    OC          Quit the TDX test by
                     entering from the OC:     Refer to Appendix
                     QUIT(CR)                  B, sec. 1.4

7.9      OC          Boot the TDX4 test
                     program as follows        Refer to Appendix
                     BA 1025(CR)               B, sec. 7.18
                     BM 140(CR)
                     BO 632(CR)



















 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:





                                                ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
                                               ̲ ̲
                                               T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲

                                               TEST QA   QAR



T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲                                                           T̲E̲S̲T̲
                                                                     ̲N̲O̲.̲:̲
                                                                     ̲2̲/̲2̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲2̲/̲C̲U̲/̲T̲D̲X̲#̲2̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲a̲l̲ ̲T̲e̲s̲t̲

S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲S̲e̲c̲s̲.̲ ̲3̲.̲4̲.̲5̲.̲1̲.̲0̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲4̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲7̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Case     Test
Step No. Station     Action                    Expected Results
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

7.9.1    N/A         Powerdown PU#5
                     Connect the PTP/R to      N/A
                     J25 in the V24 fil-
                     ter box. Set switch S2
                     on LTUX-S #25 to:
                     1: Closed
                     2: Closed
                     3: Open
                     4: Closed
                     Power up TU#5.

7.9.2    OC          Activate the link 254
                     LTUX-S test as follows:

                     Enter from the OC:
                     DO OPEN254(CR)
                     (Appendix A, sec.4.36a)
                     DO PTP(CR)                A piece of tape
                                               is
                     (Appendix A, sec.4.4a)    punched. Tear
                                               it off and feed
                                               it into the 
                                               reader with the
                                               reader switch
                                               load/run in position
                                               load.





 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:





                                                ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
                                               ̲ ̲
                                               T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲

                                               TEST QA   QAR


T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲                                                           T̲E̲S̲T̲
                                                                     ̲N̲O̲.̲:̲
                                                                     ̲2̲/̲2̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲2̲/̲C̲U̲/̲T̲D̲X̲#̲2̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲a̲l̲ ̲T̲e̲s̲t̲

S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲S̲e̲c̲s̲.̲ ̲3̲.̲4̲.̲5̲.̲1̲.̲0̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲4̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲7̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Case     Test
Step No. Station     Action                    Expected Results
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

7.9.3    OC          Enter from the OC:
cont.
                     DO PTR(CR)                The load/run
                                               switch
                     (Appendix A, sec. 4.4b)   is set to run.
                                               OC print out
                                               as specified
                                               in app. B sec.
                                               7.20
                     DO CLOSE 254(CR)
                     Appendix A, sec. 4.36b)

7.9.4    N/A         Power down TU#5.
                     Remove PTP/R from J25.
                     Set switch S2 on LTUX-S
                     #25 to 1: CLOSED
                            2: CLOSED
                            3: CLOSED
                            4: CLOSED
                     Power up TU#5.











 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:





                                                ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
                                               ̲ ̲
                                               T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲

                                               TEST QA   QAR



T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲                                                           T̲E̲S̲T̲
                                                                     ̲N̲O̲.̲:̲
                                                                     ̲2̲/̲2̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲2̲/̲C̲U̲/̲T̲D̲X̲#̲2̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲a̲l̲ ̲T̲e̲s̲t̲

S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲S̲e̲c̲s̲.̲ ̲3̲.̲4̲.̲5̲.̲1̲.̲0̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲4̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲7̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Case     Test
Step No. Station     Action                    Expected Results
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

7.10.1   N/A         Power down TU#3           N/A
                     Connect the test VDU to 
                     J32in the V24 filter box
                     via test cable A.
                     Test VDU set up:
                        2400 Baud
                        even parity check/generation
                        1 stop bit
                        7 bit character length
                      Power up TU#3

7.10.2   OC          Activate the Link 231
                     LTUX-S test as follows:
                     
                     Enter from the OC:
                     DO OPEN231(CR)
                     (Appendix A, sec.4.30a)
                     DO OCR(CR)
                     (Appendix A, sec.4.5)     OC print out
                                               as
                     DO CLOSE231(CR)           specified in
                                               appen-
                     (Appendix A, sec.4.30b)   dix B, sec.7.19
                                               a

7.10.3   N/A         Power down TU#3           N/A
                     Disconnect the test VDU 
                     from J32 in the V24 filter
                     box.


 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:





                                                ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
                                               ̲ ̲
                                               T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲

                                               TEST QA   QAR



T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲                                                           T̲E̲S̲T̲
                                                                     ̲N̲O̲.̲:̲
                                                                     ̲2̲/̲2̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲2̲/̲C̲U̲/̲T̲D̲X̲#̲2̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲a̲l̲ ̲T̲e̲s̲t̲

S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲S̲e̲c̲s̲.̲ ̲3̲.̲4̲.̲5̲.̲1̲.̲0̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲4̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲7̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Case     Test
Step No. Station     Action                    Expected Results
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

7.11.1   N/A         Power down TU#7           N/A
                     Connect 2 test VDU's via
                     test cable A to J27 in
                     RCT-A and J27 in RCT-B
                     V24 filterbox
                     Test VDU set up:
                        2400 Baud
                        even parity check/generation
                        1 stop bit
                        7 bit character length
                      Power up TU#7

7.11.2   OC          Activate the Link 171
                     LTUX-S test as follows:
                     
                     Enter from the OC:
                     DO OPEN171(CR)
                     (Appendix A, sec.4.33a)
                     DO OCR(CR)
                     (Appendix A, sec.4.5)     OC print out
                                               as
                     DO CLOSE171(CR)           specified in
                                               appen-
                     (Appendix A, sec.4.33b)   dix B, sec.7.19
                                               B






 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:





                                                ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
                                               ̲ ̲
                                               T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲

                                               TEST QA   QAR



T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲                                                           T̲E̲S̲T̲
                                                                     ̲N̲O̲.̲:̲
                                                                     ̲2̲/̲2̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲2̲/̲C̲U̲/̲T̲D̲X̲#̲2̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲a̲l̲ ̲T̲e̲s̲t̲

S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲S̲e̲c̲s̲.̲ ̲3̲.̲4̲.̲5̲.̲1̲.̲0̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲4̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲7̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Case     Test
Step No. Station     Action                    Expected Results
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

7.11.3   OC          Activate the Link 271
                     LTUX-S test as follows:
                     
                     Enter from the OC:
                     DO OPEN271(CR)
                     (Appendix A, sec.4.34a)
                     DO OCR(CR)
                     (Appendix A, sec.4.5)     OC print out
                                               as
                     DO CLOSE271(CR)           specified in
                                               appen-
                     (Appendix A, sec.4.34b)   dix B, sec.7.19
                                               C

7.11.4   N/A         Power down TU#7           N/A
                     Disconnect test VDU's
                     from J27 in RCT-A and
                     RCT-B V24 filterbowex.
                     Power up TU#7.

7.11.5   OC          Quit the test entering 
                     from the OC:
                     QUIT(CR)








 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:





                                                ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
                                               ̲ ̲
                                               T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲

                                               TEST QA   QAR



T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲                                                           T̲E̲S̲T̲
                                                                     ̲N̲O̲.̲:̲
                                                                     ̲2̲/̲2̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲2̲/̲C̲U̲/̲T̲D̲X̲#̲2̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲a̲l̲ ̲T̲e̲s̲t̲

S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲S̲e̲c̲s̲.̲ ̲3̲.̲4̲.̲5̲.̲1̲.̲0̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲4̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲7̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Case     Test
Step No. Station     Action                    Expected Results
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

7.12.1   OC          Boot the TDX3 test as
                     follows:
                     BA 1025(CR)
                     BM 140(CR)                Refer to Appendix
                                               B
                     BO 631(CR)                sec. 7.14

7.12.2   N/A         Power down the main site  N/A
                     stat. mux.#1
                     and Remote site A stat.
                      mux.
                     Remove the testcable be-
                     tween the main site fil-
                     terbox J33 and the Remo-
                     te site A filterbox J40.
                     On the main site A and the
                     Remote site A stat. mux.
                     set S1 and S2 on the ba-
                     se board switch group 2
                     to the CLOSED position
                     (extern clock). Power up
                     the main site stat.mux #1
                     and Remote site A
                     stat. mux.

7.12.3   N/A         Connect the CRYPTO/MODEM  N/A
                     link between main site
                     filterbox J33 and Remo-
                     te site A filterbox J40.



  ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:





                                                ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
                                               ̲ ̲
                                               T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲

                                               TEST QA   QAR



T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲                                                           T̲E̲S̲T̲
                                                                     ̲N̲O̲.̲:̲
                                                                     ̲2̲/̲2̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲2̲/̲C̲U̲/̲T̲D̲X̲#̲2̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲a̲l̲ ̲T̲e̲s̲t̲

S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲S̲e̲c̲s̲.̲ ̲3̲.̲4̲.̲5̲.̲1̲.̲0̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲4̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲7̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Case     Test
Step No. Station     Action                    Expected Results
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

7.12.4   N/A         Power up both MODEMs and  N/A
                     CRYPTOs. If identical
                     keystores on both CRYPTOs
                     are on then proceed from
                     7.24.5 else load the
                     cryptokey into keystore 1
                     on both cryptos.

7.12.5   N/A         CRYPTO synchronization    CRYPTOs are
                     should be initiated. If   synchronized
                     not CH1.ERR on the
                     RESYNC MODULE is on.
                     Activate the RESET push-
                     button on the RESYNC MO-
                     DULE.

7.12.6   N/A         Set switch S1 on the      RTS on the main
                     MODEM link to OFF         site modem goes
                                               off
                     (MODEM link open circuit) for 1.5 secs
                                               and then on again
                                               for 3 secs.

                     When RTS on the main site CRYPTOS synchronize.
                     goes off the second time
                     set switch S1 to ON.




  ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:





                                                ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
                                               ̲ ̲
                                               T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲

                                               TEST QA   QAR



T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲                                                           T̲E̲S̲T̲
                                                                     ̲N̲O̲.̲:̲
                                                                     ̲2̲/̲2̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲2̲/̲C̲U̲/̲T̲D̲X̲#̲2̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲a̲l̲ ̲T̲e̲s̲t̲

S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲S̲e̲c̲s̲.̲ ̲3̲.̲4̲.̲5̲.̲1̲.̲0̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲4̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲7̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Case     Test
Step No. Station     Action                    Expected Results
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

7.12.7   N/A         Set switch S1 to OFF      After 13.5 secs.
                                               the CH1.ERR indicator
                                               goes on

                     Set switch S1 to ON       No synchronization
                                               is initiated

7.12.8   N/A         Activate the RESET push-  After 1.5secs
                                               the
                     button on the RESYNC      CRYPTOS synchronize.
                     MODULE

7.12.9   N/A         Set switch S2 on the      RTS on the main
                     MODEM link to OFF         site modem goes
                                               off
                     (MODEM link open circuit) for 1.5 secs
                                               and then on again
                                               for 3 secs.

                     When RTS on the main site CRYPTOS synchronize.
                     goes off the second time
                     set switch S2 to ON.

7.12.10  N/A         Set switch S2 to OFF      After 13.5 secs.
                                               the CH1.ERR indicator
                                               goes on

                     Set switch S2 to ON       No synchronization
                                               is initiated


 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:





                                                ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
                                               ̲ ̲
                                               T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲

                                               TEST QA   QAR



T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲                                                           T̲E̲S̲T̲
                                                                     ̲N̲O̲.̲:̲
                                                                     ̲2̲/̲2̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲2̲/̲C̲U̲/̲T̲D̲X̲#̲2̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲a̲l̲ ̲T̲e̲s̲t̲

S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲S̲e̲c̲s̲.̲ ̲3̲.̲4̲.̲5̲.̲1̲.̲0̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲4̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲7̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Case     Test
Step No. Station     Action                    Expected Results
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

7.12.11  N/A         Activate the RESET push-  After 1.5secs
                                               the
                     button on the RESYNC      CRYPTOS synchronize.
                     MODULE

7.12.12  OC          Activate the link 1BX
                     LTUX-S test as fol-
                     lows:

                     Enter from the OC:
                     DO OPEN1B(CR)
                     (Appendix A,sec. 4.24a)
                     DO VDU4(CR)
                     (Appendix A, sec.4.2)

                     When a couple of lines    Output stops.
                     have been transmitted to
                     the remote VDUs set switch
                     S1 to OFF.










 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:





                                                ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
                                               ̲ ̲
                                               T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲

                                               TEST QA   QAR



T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲                                                           T̲E̲S̲T̲
                                                                     ̲N̲O̲.̲:̲
                                                                     ̲2̲/̲2̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲2̲/̲C̲U̲/̲T̲D̲X̲#̲2̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲a̲l̲ ̲T̲e̲s̲t̲

S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲S̲e̲c̲s̲.̲ ̲3̲.̲4̲.̲5̲.̲1̲.̲0̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲4̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲7̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Case     Test
Step No. Station     Action                    Expected Results
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

7.12.13  N/A         When the CH1.ERR. indica- CRYPTOs synchronize
                     tor goes on set S1 to ON  and output is
                                               resumed.
                     and activate the RESET    OC print out
                                               as speci-
                     pushbutton on the RESYNC  fied in appendix
                                               B,
                     module. Let the testse-   sec. 7.23
                     quence finish normally

7.12.14  OC          Enter from the OC:
                     DO VDU4(CR)
                     (Appendix A, sec.4.2)

                     When a couple of lines    Output stops.
                     have been transmitted to
                     the remote VDUs set switch
                     S2 to OFF.

7.12.15  N/A         When the CH1.ERR. indica- CRYPTOs synchronize
                     tor goes on set S2 to ON  and output is
                                               resumed.
                     and activate the RESET    OC print out
                                               as speci-
                     pushbutton on the RESYNC  fied in appendix
                                               B,
                     module. Let the testse-   sec. 7.23
                     quence finish normally

                     Enter from the OC:
                     DO CLOSE1B (CR)
                     (Appendix A, sec.4.24b)


 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:





                                                ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
                                               ̲ ̲
                                               T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲

                                               TEST QA   QAR



T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲                                                           T̲E̲S̲T̲
                                                                     ̲N̲O̲.̲:̲
                                                                     ̲2̲/̲2̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲2̲/̲C̲U̲/̲T̲D̲X̲#̲2̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲a̲l̲ ̲T̲e̲s̲t̲

S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲S̲e̲c̲s̲.̲ ̲3̲.̲4̲.̲5̲.̲1̲.̲0̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲4̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲7̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Case     Test
Step No. Station     Action                    Expected Results
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

                     Power down the main site
                     stat. max. 1, stat. max. 2
                     and PU#B. Disconnect 
                     W233, W234, W238, W239 on
                     the desync. module.
                     Conect W233 to J4, W234
                     to J2, W238 to J3 and 
                     W239 to J1.
                     Power up the main site
                     stat. max. 1, stat. max. 2
                     and PU#B.

7.12.15  N/A         CRYPTO synchronization    CRYPTOs are
                     should be initiated. If   synchronized
                     not CH1.ERR on the
                     RESYNC MODULE is on.
                     Activate the RESET push-
                     button on the RESYNC MO-
                     DULE.

7.12.16  N/A         Set switch S1 on the      RTS on the main
                     MODEM link to OFF         site modem goes
                                               off
                     (MODEM link open circuit) for 1.5 secs
                                               and then on again
                                               for 3 secs.

                     When RTS on the main site CRYPTOS synchronize.
                     goes off the second time
                     set switch S1 to ON.

  ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:





                                                ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
                                               ̲ ̲
                                               T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲

                                               TEST QA   QAR



T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲                                                           T̲E̲S̲T̲
                                                                     ̲N̲O̲.̲:̲
                                                                     ̲2̲/̲2̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲2̲/̲C̲U̲/̲T̲D̲X̲#̲2̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲a̲l̲ ̲T̲e̲s̲t̲

S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲S̲e̲c̲s̲.̲ ̲3̲.̲4̲.̲5̲.̲1̲.̲0̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲4̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲7̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Case     Test
Step No. Station     Action                    Expected Results
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

7.12.18  N/A         Set switch S1 to OFF      After 13.5 secs.
                                               the CH1.ERR indicator
                                               goes on

                     Set switch S1 to ON       No synchronization
                                               is initiated

7.12.19  N/A         Activate the RESET push-  After 1.5secs
                                               the
                     button on the RESYNC      CRYPTOS synchronize.
                     MODULE

7.12.20  N/A         Set switch S2 on the      RTS on the main
                     MODEM link to OFF         site modem goes
                                               off
                     (MODEM link open circuit) for 1.5 secs
                                               and then on again
                                               for 3 secs.

                     When RTS on the main site CRYPTOS synchronize.
                     goes off the second time
                     set switch S2 to ON.

7.12.21  N/A         Set switch S2 to OFF      After 13.5 secs.
                                               the CH1.ERR indicator
                                               goes on

                     Set switch S2 to ON       No synchronization
                                               is initiated


 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:





                                                ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
                                               ̲ ̲
                                               T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲

                                               TEST QA   QAR



T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲                                                           T̲E̲S̲T̲
                                                                     ̲N̲O̲.̲:̲
                                                                     ̲2̲/̲2̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲2̲/̲C̲U̲/̲T̲D̲X̲#̲2̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲a̲l̲ ̲T̲e̲s̲t̲

S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲S̲e̲c̲s̲.̲ ̲3̲.̲4̲.̲5̲.̲1̲.̲0̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲4̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲7̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Case     Test
Step No. Station     Action                    Expected Results
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

7.12.22  N/A         Activate the RESET push-  After 1.5secs
                                               the
                     button on the RESYNC      CRYPTOS synchronize.
                     MODULE

7.12.23  OC          Activate the link 1BX
                     LTUX-S test as fol-
                     lows:

                     Enter from the OC:
                     DO OPEN2B(CR)
                     (Appendix A,sec. 4.25a)
                     DO MSP(CR)
                     (Appendix A, sec.4.3)

                     When a couple of lines    Output stops.
                     have been transmitted to
                     the remote MSPs set switch
                     S1 to OFF.










 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:





                                                ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
                                               ̲ ̲
                                               T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲

                                               TEST QA   QAR



T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲                                                           T̲E̲S̲T̲
                                                                     ̲N̲O̲.̲:̲
                                                                     ̲2̲/̲2̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲2̲/̲C̲U̲/̲T̲D̲X̲#̲2̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲a̲l̲ ̲T̲e̲s̲t̲

S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲S̲e̲c̲s̲.̲ ̲3̲.̲4̲.̲5̲.̲1̲.̲0̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲4̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲7̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Case     Test
Step No. Station     Action                    Expected Results
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

7.12.24  N/A         When the CH1.ERR. indica- CRYPTOs synchronize
                     tor goes on set S1 to ON  and output is
                                               resumed.
                     and activate the RESET    OC print out
                                               as speci-
                     pushbutton on the RESYNC  fied in appendix
                                               B,
                     module. Let the testse-   sec. 7.24
                     quence finish normally

7.12.25  OC          Enter from the OC:
                     DO MSP(CR)
                     (Appendix A, sec.4.3)

                     When a couple of lines    Output stops.
                     have been transmitted to
                     the remote VDUs set switch
                     S2 to OFF.

7.12.26  N/A         When the CH1.ERR. indica- CRYPTOs synchronize
                     tor goes on set S2 to ON  and output is
                                               resumed.
                     and activate the RESET    OC print out
                                               as speci-
                     pushbutton on the RESYNC  fied in appendix
                                               B,
                     module. Let the testse-   sec. 7.24
                     quence finish normally

                     Enter from the OC:
                     DO CLOSE2B (CR)
                     (Appendix A, sec.4.25b)


 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:





                                                ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
                                               ̲ ̲
                                               T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲

                                               TEST QA   QAR



T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲                                                           T̲E̲S̲T̲
                                                                     ̲N̲O̲.̲:̲
                                                                     ̲2̲/̲2̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲2̲/̲C̲U̲/̲T̲D̲X̲#̲2̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲a̲l̲ ̲T̲e̲s̲t̲

S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲S̲e̲c̲s̲.̲ ̲3̲.̲4̲.̲5̲.̲1̲.̲0̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲4̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲7̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Case     Test
Step No. Station     Action                    Expected Results
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

7.12.27  N/A         Power down the CRYPTOs,   N/A
                     the MODEMs and the main
                     site stat. mux #1
                     and Remote site A stat.
                     mux. Remove the CRYPTO/
                     MODEM link. Connect the
                     testcable between J33 in
                     the main site filterbox
                     and J40 in the Remote site A
                     filterbox.
                     On the main site stat.mux #1
                     and the Remote site A stat. mux.
                     set S1 on the ba-
                     se board switch group 2
                     to the OPEN position
                     (intern clock). Power up
                     the main site stat.mux #1
                     and Remote site A stat. mux.












 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:





                                                ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
                                               ̲ ̲
                                               T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲

                                               TEST QA   QAR


3.2.3.1.4    T̲e̲s̲t̲ ̲T̲e̲r̲m̲i̲n̲a̲t̲i̲o̲n̲

         Power Down the system as Follows:

         a)  Depress "START" push button on Disk Drive # 2 and
             wait until the "START" and "READY" indicators are
             "OFF".

         b)  Remove the Disk Pack from Disk Drive # 2, close
             the lid and push the drive back in rack B

         c)  The two scratch Floppy Disks are removed from the
             Floppy Disk drive in rack C. Close the lids.

         d)  The Power Switch (2) on each Mains Switch is set
             to "OFF".

         e)  The input power switch on each Frequency Stabilizer
             is set to "OFF"

         f)  Power Down all connected Terminals i.e. VDUs, MSPs,
             OC, PTP/PTR, as applicable.

         g)  Disconnect the OC from the leftmost V24/V28(L/L)
             adaptor in the Adaptor crate of rack C, and replace
             this adaptor with the originally mounted OPTO transceiver.

         h)  Disconnect the two V24 cables (at the WDP rear
             crate), remove the short extension cable and reconnect
             the two cables to J1 and J3 respectively.