⟦58b50a172⟧ Wang Wps File

    Length: 3753 (0xea9)
    Types: Wang Wps File
    Notes: CPS/AUX/020               
    Names: »1986A «

Derivation

└─⟦780c36067⟧ Bits:30006094 8" Wang WCS floppy, CR 0146A
    └─ ⟦this⟧ »1986A « 

WangText




…02…CPS/AUX/020

…02…JHO/830725…02…  …02…#
CAMPS MASTER PLAN
…02…ISSUE 4…02…  CAMPS








U̲P̲D̲A̲T̲E̲ ̲O̲F̲ ̲T̲H̲E̲ ̲C̲A̲M̲P̲S̲ ̲M̲A̲S̲T̲E̲R̲ ̲P̲L̲A̲N̲ ̲T̲O̲ ̲I̲S̲S̲U̲E̲ ̲2̲.̲1̲.̲8̲ ̲D̲A̲T̲E̲D̲ ̲8̲3̲0̲7̲2̲5̲

Ref 1):  Site Verification Inspection Schedule. Camps
         Log 1167, dated 15. April 1983.

Ref 2):  Camps Log no 1301 dated 7 July 83: CAMPS SPA
         Schedule.

Ref 3):  Camps Installation Schedule. CR tlx CPS/101/Tlx/0910
         dated 830722.

Ref 4):  CAMPS Installation Schedule dated 830615, handed
         out at P.M. no. 18.

Ref 5):  CAMPS FAT Schedule dated 830616, handed out
         at P.M. no. 18.

Ref 6):  Camps Log 1294. PMOM 18, Item 8 and item 18.
         Detailed Assessment of SW Status.

Ref 7):  MOM 30, item 6 dated 830131 and PMOM 15 item
         7, dated 830301. Rescheduling of training courses.


In order to reflect the activities completed between
 830527 and 830725 and the schedule corrections given
 in the referenced documents the following updates are
 made:



L̲I̲ ̲1̲ ̲P̲r̲o̲g̲r̲a̲m̲ ̲M̲a̲n̲a̲g̲e̲m̲e̲n̲t̲

-    LI 1.1.5    Progress Reports and Progress Meetings
                 are completed
 and 1.1.6   from May to July.



L̲I̲ ̲2̲ ̲S̲y̲s̲t̲e̲m̲ ̲E̲n̲g̲i̲n̲e̲e̲r̲i̲n̲g̲

-    LI 2.1 and  Update issues of baseline documents
                 have been added
 2.2         to the Master Schedule.


L̲I̲ ̲4̲ ̲S̲o̲f̲t̲w̲a̲r̲e̲ ̲D̲e̲v̲e̲l̲o̲p̲m̲e̲n̲t̲

-    LI 4.3.7    Users Manual - final version will be
                 delivered when the application SW is
                 completed and can be used for verification
                 of the text by practical excercises.
                 Rescheduled in accordance with SW Rescheduling.


-    LI 4.4:     Application SW Package Development.
                 The packages Logging and Camps System
                 Functions have been completed in July
                 83. The remaining packages will be
                 completed August 83.


-    LI 4.6.6    Application SW test and integration.
                 Build 3 is                                      &
                                                                 
                                                                 4.6.7 rescheduled
                                                                       in
                                                                       accordance
                                                                       with
                                                                       ref
                                                                       6),
                                                                       for
                                                                       completion
                                                                       in
                                                                       September
                                                                       83.

-    LI 5.4.6    240 hours Software Test is rescheduled
                 in accordance with ref 6). It means
                 start 1st September 83 and completion
                 14th December, 83 at the latest.


L̲I̲ ̲5̲.̲F̲a̲b̲r̲i̲c̲a̲t̲i̲o̲n̲,̲ ̲I̲n̲t̲e̲g̲r̲a̲t̲i̲o̲n̲ ̲a̲n̲d̲ ̲T̲e̲s̲t̲.̲


-    LI 5.16     FAT at site 12 completed in July 83.


-    LI 5.3 -    FAT at sites 3,13,10,16,7, 9, 4 and
                 11
 5.19        have been rescheduled from one to two months
             in accordance with ref 5). The rescheduling
             will not effect the installation schedule.


L̲I̲ ̲6̲ ̲S̲i̲t̲e̲ ̲P̲r̲e̲p̲a̲r̲a̲t̲i̲o̲n̲ ̲a̲n̲d̲ ̲I̲n̲s̲t̲a̲l̲l̲a̲t̲i̲o̲n̲

-    LI 6.5  ATBB drawings for sites 3, 4, 11, 9 have
             been delivered to and approved by SHAPE.
             


-    LI 6.6  Site Verifications of Site 15 and 3 have
             been completed successfully.


         Site Verification Inspection Schedule has been
         corrected in accordance with ref 1) for the
         remaining sites.

-    LI 6.8  Site 6 Installation has started in June
             83.


-    LI 6.9- Site Installation dates have been corrected
             in
     6.22    accordance with ref 3) and ref 4). The
             completion date of the last site remains
             unchanged.
         The rescheduling of installation is an attempt
         to avoid that sites are non-operational sites
         during a long period.


L̲I̲ ̲7̲ ̲S̲i̲t̲e̲ ̲A̲c̲c̲e̲p̲t̲a̲n̲c̲e̲

- LI 7.1 Functional and Operational Test has been rescheduled
         to take place 5 months later in accordance
         with ref 6).


- LI 7.2 -   Site Provisional Acceptance has been rescheduled
             in
  7.16       accordance with ref 2).  The aim is that
             three independent teams are to perform
             the spa' tests.
         The last spa date remains unchanged.


L̲I̲ ̲8̲ ̲L̲o̲g̲i̲s̲t̲i̲c̲s̲ ̲S̲u̲p̲p̲o̲r̲t̲

-    LI 8.1      SW Warranty period is corrected in
                 accordance with the SPA1-date.


-    LI 8.2.5    First RST - course has been completed.
                 The remaining courses have been corrected
                 in accordance with ref 7).


-    LI 8.4.6 &  Spare Parts and as-built documentation
                 will be
 9.3         delivered together with CAMPS-systems to
             the sites at SPA.