⟦5d0f0ac99⟧ Wang Wps File

    Length: 91827 (0x166b3)
    Types: Wang Wps File
    Notes: LKSAA - management prop.  
    Names: »4235A «

Derivation

└─⟦91ced00d4⟧ Bits:30006032 8" Wang WCS floppy, CR 0384A
    └─ ⟦this⟧ »4235A « 

WangText

…00……00……00……00……00……1d……0a……00……00……1d……0c……1a……0a……1a…
…1a……07……19……0f……18……08……18……0e……18……0f……18……07……17……0d……17……01……17……02……17……06……16……0b……16……00……16……01……16……07……15……08……15……0d……15……0e……15…
…15… …15……05……14……0e……14…
…14… …13……0c……13……02……13…
…12……0c……12……05……11……0b……11…
…11… …11……05……10……0c……10… …10……05……0f……0b……0f……0c……0f…
…0e……0a……0e……86…1         …02…   …02…   …02…   …02…                                           



                                                       Issue 1.5
LKSAA - VOLUME I                                       SYS/84-06-15
      
MANAGEMENT AND COST PROPOSAL                           Page  #











                          LKSAA

                LOCAL COMMUNICATION SYSTEM

                         for the

   FOREIGN MINISTRY OF THE FEDERAL REPUBLIC OF GERMANY


          DOC. NO. LKSAA/8017/PRP/001  ISSUE 1.3



                         VOLUME I

               MANAGEMENT AND COST PROPOSAL



         SUBMITTED TO:        AUSWARTIGES AMT
                              REFERAT 114-40
                              ADENAUERALLE 99-103
                              5300 BONN 1

         IN RESPONSE TO:      RFP 114-40-240.20 (4000)

         PREPARED BY:         CHRISTIAN ROVSING A/S
                              SYSTEMS DIVISION
                              LAUTRUPVANG 2
                              2750  BALLERUP
                              DENMARK

         PRINCIPLE CONTACTS:  Gert Jensen, Systems Division
                              Manager
                              Telex Denmark 35111 cr dk
                              Telephone: 02 65 11 44

                              …0e…c…0f…Christian Rovsing A/S - 1983

         This document contains information proprietary to Christian
         Rovsing A/S. The information, whether in the form of
         text, schematics, tables, drawings or illustrations,
         must not be duplicated or used for purposes other than
         evaluation, or disclosed outside the recipient company
         or organisation without the prior, written permission
         of Christian Rovsing A/S.

         This restriction does not limit the recipient's right
         to use information contained in the document if such
         information is received from another source without
         restriction, provided such source is not in breach
         of an obligation of confidentiality towards Christian
         Rovsing A/S.







                    T̲A̲B̲L̲E̲ ̲O̲F̲ ̲C̲O̲N̲T̲E̲N̲T̲S̲

                                                        Page

   1 INTRODUCTION ...................................
        3   
     1.1 DECISION TO BID ............................
            3

   2 CORPORATE BACKGROUND ...........................
        7
     2.1 CHRISTIAN ROVSING A/S COMPANY INFORMATION ..
            7
       2.1.1 History of Christian Rovsing A/S .......
                7
       2.1.2 Employee Profile .......................
                8
       2.1.3 Facilities .............................
                8
       2.1.4 Financial Information ..................
               11
       2.1.5 Company Organization ...................
               12
         2.1.5.1 Systems Division ...................
                   15
         2.1.5.2 Development Division ...............
                   17
         2.1.5.3 Production Division ................
                   19

     2.2 RELEVANT EXPERIENCE ........................
           22
       2.2.1 Introduction ...........................
               22
       2.2.2 CR Computer Technology .................
               22
       2.2.3 Systems Experience .....................
               26

       2.2.4 Relevant Contracts .....................
               30
         2.2.4.1 Major Contracts at Christian 
                 Rovsing A/S ........................
                   30

   3 PRICE PROPOSAL ................................ 
     72

     3.1  PRICING PRINCIPLES AND SUMMARY ............
       72
       3.1.1 Principles of the Price Proposal .......
               72
       3.1.2 Price Summary in WBS Format ............
               72

     3.2 BIDDING CONDITIONS .........................
           75
       3.2.1 Validity ...............................
               75
       3.2.2 Taxes and Duties .......................
               75
       3.2.3 Patent Rights ..........................
               75
       3.2.4 Government Restrictions ................
               75
       3.2.5 Specifications .........................
               76



     3.3 DETAILED PRICE BREAKDOWN ...................
           77
       3.3.1 Program Management .....................
               77
       3.3.2 System Engineering .....................
               78
       3.3.3 Hardware ...............................
               78
       3.3.4 Software ...............................
               78
       3.3.5 System Integration and Test ............
               78
       3.2.6 Installation ...........................
               78
       3.3.7 Maintenance ............................
               78
       3.3.8 Training ...............................
               80
       3.3.9 Documentation ..........................
               80
       3.3.10  Option for Radio Control System ......
                 80

     3.4 HARDWARE EQUIPMENT MATRIX ..................
           81

   4 CONTRACTUAL PROVISIONS .........................
       83            

   APPENDIX 1 .......................................
    85-109 


1        I̲N̲T̲R̲O̲D̲U̲C̲T̲I̲O̲N̲



1.1      D̲E̲C̲I̲S̲I̲O̲N̲ ̲T̲O̲ ̲B̲I̲D̲ ̲L̲K̲S̲A̲A̲

         The decision to bid LKSAA as Prime Contractor represents
         a definite commitment on the part of Christian Rovsing
         to devote its resources and technical talents to the
         successful implementation and performance of the sytem.
         The decision was taken at top-
         level after thorough discussions with the staff of
         marketing, administration, and engineering at Christian
         Rovsing.

         Considerable experience in the field of data communication
         combined with experience as prime manager of major
         computer system projects provide a solid basis for
         our participation in this project. Prime contractor
         responsibility, particularly for military customers
         such as NATO-SHAPE, has demanded a professional approach
         to turn-key project management with particular emphasis
         on planning and documentation in all phases from system
         design and development to production, integration,
         installation, training, and maintenance. The contracts
         awarded to the company have been typically worth from
         several to tens of millions of DM.

         To provide the necessary talent and facilities, the
         LKSAA project will be staffed by experts from all divisions
         at Christian Rovsing. Thus, exceptionally strong capabilities
         will be available in computing and data communication.

         Participating entities at Christian Rovsing are:

         o   The Systems Division - structured in 1979 to consolidate
             management of major computer system projects. The
             CAMPS project for NATO is the responsibility of
             the Systems Divisions.

         o   The Development Division - responsible for the
             design of the CR80 Computer product line of which
             more than 200 systems are currently on order from
             major customers such as NATO, ICL and L.M. Ericsson.

         o   The Production Division - responsible for manufacturing
             of the CR80 Computer product line.


         The LKSAA Project Group will be supported by the Christian
         Rovsing, Integrated Logistics Support Group, which
         provides services including site surveys, installation,
         training, documentation preparation, maintenance, spares
         and other necessary support services.

         Product quality will be ensured by the Quality Assurance
         Department, which reports directly to company management.

         An administratively distinct Project Office will be
         established to manage the LKSAA Project. This project
         office will have total system responsibility and authority
         to coordinate in-house activities and to provide close
         liaison with the customer throughout the duration of
         the project.

         In summary, the decision to bid is based on the confidence
         that Christian Rovsing A/S, supported by sub-contractors,
         has all the necessary qualifications for the successful
         design, implementation and maintenance of the LKSAA.

         The message handling and communication system for LKSAA
         is based on Christian Rovsing standard concept for
         message switching. Thereby it is possible that only
         about a third of the software for the LKSAA has to
         be newly developed. This highly efficient Communications
         Processor has previously been used in the NATO CAMPS
         program and is also to be used in extensive airline
         communication systems like Air Canada's and American
         Airlines', where up to 65,000 terminals will be connected
         to various host computers.

         The host computer proposed for the LKSAA is a fully
         dualized CR80 computer system, with automatic switch-over
         from active to the standby in the event of failure.
         Manual switch-over is also possible to accomplish "on-line"
         maintenance, i.e. maintenance without loss of function
         by using the standby unit for processing while the
         formerly active unit is serviced. In addition to fault
         tolerant operation and ease of maintenance, the CR80
         is characterized by high performance, high system availability,
         and growth by simple addition of standard modules.



         Christian Rovsing A/S's experience in developing and
         implementing crypto system is based on various military
         projects conducted in the past. Especially in the Integrated
         Danish Military Communication System, FIKS, Christian
         Rovsing A/S has - in close cooperation with the customer
         - designed a unique, very cost effective and secure
         crypto system. Christian Rovsing A/S believes that
         a similar approach can be taken on the LKSAA based
         on the outline from the Ministry of Foreign Affairs.

         The LKSAA system design will benefit from experience
         gained in the CAMPS program as well as the NICS-TARE
         Front End Processors, which have been supplied by the
         Christian Rovsing A/S and fully accepted by NICSMA.
         These elements will provide an important no-risk aspect
         to the proposed LKSAA system design. Figure 1.1-1 gives
         an overview of the LKSAA system design, showing both
         data paths and control signals vis …1a… vis system functions
         and equipments. 

         The proposed system is composed of standard terminal
         equipment, which is available on the german market,
         and of equipment developed by Christian Rovsing A/S,
         which is used for military systems, which also have
         been used in Germany. Therefore the proposed equipment
         fulfills german requirements and specifications.


















































          Figure 1.1-1…01…Hardware System Overview


2        C̲O̲R̲P̲O̲R̲A̲T̲E̲ ̲B̲A̲C̲K̲G̲R̲O̲U̲N̲D̲



2.1      C̲H̲R̲I̲S̲T̲I̲A̲N̲ ̲R̲O̲V̲S̲I̲N̲G̲ ̲A̲/̲S̲ ̲C̲O̲M̲P̲A̲N̲Y̲ ̲I̲N̲F̲O̲R̲M̲A̲T̲I̲O̲N̲

         The subsections to follow describe the history of CR,
         give a profile of CR employees, and summarize the financial
         status of the company.



2.1.1    H̲i̲s̲t̲o̲r̲y̲ ̲o̲f̲ ̲C̲h̲r̲i̲s̲t̲i̲a̲n̲ ̲R̲o̲v̲s̲i̲n̲g̲ ̲A̲/̲S̲

         Christian Rovsing A/S was founded in 1963. Initially
         the company worked mainly in a consulting and advisory
         capacity within the EDP field. Activities developed
         rapidly, and the business gradually changed character
         from consultancy to supplier of systems.

         Around 1971, a deliberate commitment was made by the
         company to apply its resources to the European Space
         Program. It has since participated in most major programs,
         and the successful participation has broadened the
         company's capabilities. The high degree of performance
         which these programs demand has been met by applying
         up-to-date technology, specialized hardware and software
         engineering expertise, and modern management methods.

         For the design and production of switching power supplies
         to the European Space Program, the company developed
         an advanced technology and sophisticated design philosophy
         which can be applied to the solution of complex power
         supply problems. Several patents are held by the company
         relating to power supply circuit design.

         Based on experience gained from engagement in the European
         Space Program the company entered the demanding military
         market. An important contract with Delco Electronics
         Inc. to co-produce the Fire Control Computer as part
         of the 4-nation European F-16 Program was won. The
         Fire Control Computer is the only "end-item" co-produced
         in Denmark and is delivered directly to the F-16 assembly
         lines in Europe and the U.S.A.




         In the mid-seventies the company entered the data communications
         market. It has since participated in exacting computer
         communications-oriented programs for both commercial
         and defense customers, with such projects as CAMPS
         (NATO), FIKS (Danish MOD), and LME-Network (commercial).
         Christian Rovsing A/S believes that it has developed
         exceptional professional resources dedicated to advanced
         data communication. Furthermore, the company excels
         in applying current technology to modular equipment
         design and has a product line that leads the state-of-the-art.

         In short, Christian Rovsing has acquired extensive
         experience in the design, development, and manufacture
         of computer and aerospace electronics.




2.1.2    E̲m̲p̲l̲o̲y̲e̲e̲ ̲P̲r̲o̲f̲i̲l̲e̲

         The group employs approximately 1200 persons.

         Approximate staffing levels by functional groupings
         are as follows:

         o   Engineering and/or Scientific Professionals   
             500

         o   Technicians                                   
             235

         o   Assembly/Production Workers                   
             175

         o   Q.A. & Inspection                             
              30

         o   Administrative and clerical                   
             260



2.1.3    F̲A̲C̲I̲L̲I̲T̲I̲E̲S̲


         The company has 2 major facilities:

         o   A 5500 sq. metre (59,000 sq.ft.) leased facility
             in Herlev, near Copenhagen.

         o   A 20,000 sq. metre (215,000 sq.ft.) leased facility
             in Ballerup, near Copenhagen.



         A separate, dedicated facility (1,000 sq. m./10,700
         sq.ft.) has been established for the co-production
         of the F-16 FCC (computer). This facility is located
         in Valby, which is about 10 Km from Ballerup.

         To meet demands for increased deliveries a 7080 sq.
         meter (76,000 sq.ft.) production facility is under
         construction, and will be available in the second quarter
         of 1984.



         Approximate break-down of floor area by function in
         the 2 major facilities is as follows:

             C̲a̲t̲e̲g̲o̲r̲y̲                  S̲q̲.̲ ̲M̲e̲t̲r̲e̲s̲         S̲q̲.̲f̲t̲.̲

         o   General Manufacturing       2,500           26,900
             (to be trebled in 1984)

         o   "Space Qualified"
             clean room                    200            2,200

         o   Test & Integration Areas    2,500           26,900

         o   Laboratories                3,000           32,000

         o   Engineering and
             Administration              9,300           99,500




         The new production facility is shown in FIGURE 2.1.3-1.























































                 NEW PRODUCTION FACILITY
                      FIGURE 2.1.3-1


2.1.4    F̲i̲n̲a̲n̲c̲i̲a̲l̲ ̲I̲n̲f̲o̲r̲m̲a̲t̲i̲o̲n̲ (1)

         Annual Report 1982 (Summary)

         Statement of Net Assets 31st December 1981:

         Fixed Assets                  56.6 million Dkr

         Current Assets               235.3   "      "

         Net Proceeds from
         Share Issue (2)              1̲0̲7̲.̲0̲ ̲ ̲ ̲"̲ ̲ ̲ ̲ ̲ ̲ ̲"̲

         Total Assets                 398.9 million Dkr

         Current Liabilities          1̲7̲6̲.̲2̲ ̲ ̲ ̲"̲ ̲ ̲ ̲ ̲ ̲ ̲"̲

         Net Assets less
         Current Liabilities          222.7   "      "

         Long-term Liabilities         ̲4̲5̲.̲6̲ ̲ ̲ ̲"̲ ̲ ̲ ̲ ̲ ̲ ̲"̲

         Shareholder's Equity         177.1 million Dkr
                                      =================

         (1)  The 1982 Annual Report is provided for more 
              detailed reference in APPENDIX A.

         (2)  On 3 MAY 1983 Christian Rovsing A/S issued shares
              with net proceeds of 107 million Dkr.




2.1.5    C̲o̲m̲p̲a̲n̲y̲ ̲O̲r̲g̲a̲n̲i̲z̲a̲t̲i̲o̲n̲



         Management of the Company is in the hands of Messrs.
         Christian F. Rovsing, Claus Jepsen, and Lars Stig Nielsen.

         Mr. Rovsing is the President and the founder of the
         company. He is a member of many governmental and industrial
         committees as well as professional societies related
         to research and data processing.

         Today, there are five major divisions within the company
         - FIGURE 2.1.5-1

         o   Data Processing Division
         o   Electronics Division
         o   Systems Division
         o   Production Division
         o   Development Division

         and three wholly owned subsidiaries:

         o   Christian Rovsing Corporation (Thousand Oaks, California)
             supports the mother company in major contracts
             with North American customers and has its own software
             development center. 

         o   Christian Rovsing International located in Copenhagen
             delivers computer systems for communication networks
             and process control, and contracts staff to large
             international customers.

         o   CR Card System located in Copenhagen delivers electronic
             systems for the automation of gasoline stations.





         The Data Processing Division is located in a 5,000
         sq. meter leased facility in Herlev, near Copenhagen.

         The Electronics and Systems Divisions are based in
         a newly constructed 12,000 sq. meter facility in Ballerup,
         also near Copenhagen.

         The Administration and General Management are located
         in the Ballerup facility.

         The Ballerup location houses development laboratories,
         the main production and test department, a model shop
         and special "clean room" facilities for the production
         of space-qualified hardware, as well as engineering
         and administrative offices.

         A separate, dedicated facility has also been established
         for the co-production of the airborne FCC computer
         for the European F-16 program. It is located about
         10 Km from the main Ballerup facility.

         Military data communication systems are the responsibility
         of the Systems Division.

         More details about the five divisions of Christian
         Rovsing A/S and Christian Rovsing International are
         given in the sections to follow.

         For further financial information, the company annual
         report is given in APPENDIX A.























































                   COMPANY ORGANIZATION
                      FIGURE 2.1.5-1


2.1.5.1  S̲y̲s̲t̲e̲m̲s̲ ̲D̲i̲v̲i̲s̲i̲o̲n̲

         The Systems Division, FIGURE 2.1.5.1-1, was structured
         late in 1979 when systems-related activities were consolidated
         to improve the handling of large, integrated hardware/software
         data communications programs. The division is organized
         on a project basis including CAMPS and FIKS, two major
         military communication projects. Each major project
         is under the cognizance of a dedicated Project Office
         with total system responsibility and control authority
         to co-ordinate in-house activities, and to provide
         close liaison with the customer throughout the duration
         of the Project.

         Projects are supported by the Integrated Logistics
         Department. Its services include site surveys, installation,
         training, documentation, maintenance, spares and other
         support.

         Advanced system development projects are assigned to
         the Computer Systems Engineering Group. Current projects
         include satellite image-data handling systems and miscellaneous
         consulting services.

         The Systems Division is also responsible for contract
         performance in conjunction with Danish Industrial Group
         One for the production and delivery of some 400 military-qualified
         computers for the F-16 project. A complete computer
         is produced each workday.

         Quality Assurance reports directly to top-level management.
         Emphasis is placed on the quality of the hardware and
         of the software, both of which affect system performance.

























































                   THE SYSTEMS DIVISION
                     FIGURE 2.1.5.1-1


2.1.5.2  D̲e̲v̲e̲l̲o̲p̲m̲e̲n̲t̲ ̲D̲i̲v̲i̲s̲i̲o̲n̲

         The Development Division FIGURE 2.1.5.2-1 has 5 departments,
         which are Product Design, Divisional Support, Electronic
         Design, CR80 System Software, and Micro Systems Software.
         The Product Design Group is responsible for the preliminary
         definition of new projects and the decision to start
         development as well as high level system policy and
         continuous evaluation of divisional development efforts.

         Department heads are responsible for carrying out division
         plans for development, and together with the divisional
         manager resources are allocated to ensure meeting divisional
         goals.  Department heads also participate in budget
         preparation and are responsible for meeting them.

         As development demands efforts from all departments,
         projects are staffed accordingly.  Each project, or
         task, is led by a task manager with responsibility
         for weekly progress reporting to ensure meeting schedules;
          a uniform, computer based reporting system, started
         in 1982, simplifies this task.
















































                 THE DEVELOPMENT DIVISION
                     FIGURE 2.1.5.2-1


2.1.5.3  P̲r̲o̲d̲u̲c̲t̲i̲o̲n̲ ̲D̲i̲v̲i̲s̲i̲o̲n̲

         The Production Division FIGURE 2.1.5.3-1 has three
         major functions, which are Module Production, Integration
         and Test, and Test Engineering.  There are 100 employees
         and 2000 sq.m. of production area with a present capacity
         of 7000 modules per year.  Production capacity growth
         is planned to be from 40 to 60% per year in the coming
         years, and a new, 7080 sq.m. facility will be taken
         in use in the second quarter of 1984.

         There are two production lines:

         o   Medium volume, complex modules - CR80 modules

         o   Large volume products - power supplies and local
             area networks.

         Quality Assurance is ensured by a separate group, reporting
         directly to top-level management.  Production meets
         NATO AQAP-1 standards.

         At present, production is semi-automatic with laser
         guided mounting of module components and automatic
         test equipment.  By 1985, production is expected to
         be fully automated - an overview of the planned Electronic
         Factory is shown in FIGURE 2.1.5.3-2.


















































                 THE PRODUCTION DIVISION
                    FIGURE 2.1.5.3-1.


















































                  THE ELECTRONIC FACTORY
                    FIGURE 2.1.5.3-2.


2.2      R̲E̲L̲E̲V̲A̲N̲T̲ ̲E̲X̲P̲E̲R̲I̲E̲N̲C̲E̲



2.2.1    I̲n̲t̲r̲o̲d̲u̲c̲t̲i̲o̲n̲

         Christian Rovsing has considerable experience in the
         field of data communication, reliable and flexible
         computer systems, and management of significant computer
         system projects. These skills and know-how have been
         developed over many years, and during the last 6 years
         extensive programs in the field of data communication
         have been carried out.

         We believe that we have available exceptional, professional
         talent dedicated to advanced computerized information
         techniques. Furthermore, the company excels in applying
         current technology to modular equipment design.  We
         have no outdated product lines to support; our hardware
         is the latest LSI technology.



2.2.2    C̲o̲m̲p̲u̲t̲e̲r̲ ̲T̲e̲c̲h̲n̲o̲l̲o̲g̲y̲

         Several years of rapid evolution of computer technology
         are reflected in the development of the CR80 computer
         product line at Christian Rovsing. This computer family,
         a collection of units architecturally structured in
         an innovative way, allows configuring powerful multiprocessor
         systems. Through a high degree of parallelism and redundancy,
         the configurations offer nearly unlimited operating
         power and outstanding system reliability.

         From the outset, system architects at Christian Rovsing
         recognized that micro-electronics was the driving force
         behind modern computer technology. The CR80 product
         line is based on functional modularity made feasible
         by low-cost LSI complemented by an advanced distributed
         architecture and a multiprocessing configuration. Though
         they appear to be minicomputers, the CR80 systems in
         the larger configurations are competitive with and
         challenge the power of large mainframes, but with far
         superior operational characteristics and heretofore
         unrealizable advantages. The CR80 building-block modules
         allow a system configuration flexibility previously
         unachievable; this has led to the definition of the
         CR80 Computer Family depicted in summary block diagrams
         in FIGURE 2.2.2-1.



         The standard CR80 models are divided into two classes
         - unmapped and mapped - supported respectively by the
         AMOS and DAMOS software operating systems.

         The standard unmapped systems are the 

         -   CR80 MINI, a multiprocessor system with up to 4
             CPU's and 256 K words of memory with an operating
             range of 0.6 to 1.3 million instructions/second;
             
         
             and the

         -   CR80 TWIN, a fully-dualized version of the MINI
             with twin multiprocessors and a dual bused peripheral
             subsystem.

         The standard mapped systems are the

         -   CR80 MAXIM, a multiprocessor system with up to
             5 CPU's and 16 megawords of memory with an operating
             range of 0.6 to 2.0 million instructions/second
             and a Data Channel with a megabyte/sec. transfer
             rate interfacing up to 15 channel units for control
             of up to 960 peripheral modules 

             and the

         -   CR80 FATOM, a fault-tolerant system comprising
             as many as 16 multiprocessors interconnected through
             a 512 megabit message transport; each multiprocessor
             has the same capabilities as a CR80 MAXIM, but
             with 256 megawords of memory capacity and an operating
             range up to 30 million instructions/second.






















































                      FIGURE 2.2.2-1
             THE CR80 FAMILY OF MINICOMPUTERS



         These standard configurations offer a broad range of
         physical characteristics to meet requirements from
         the smaller stand-alone user up to those of the largest
         multi-installation network applications. The four models
         offer:

         -   a 50:1 range in instruction execution rate varying
             from 0.6 mips to 30 mips

         -   a 1000:1 range in memory capacity from 512 K bytes
             to 512 megabytes

         -   a 80:1 range in processing power by utilizing from
             one CPU up to 16 interconnected multiprocessors
             with a maximum of 5 CPU's each

         -   a 400:1 range in connectivity through peripheral
             controllers accomodating a variety of units with
             as many as 960 peripherals or up to 4096 communication
             lines.

         Flexible variation in the size and structure of the
         CR80 systems is permitted by the unusual degree of
         hardware and software modularity. The hardware includes
         fast transfer buses joined to each other by adapters
         which allow units on one bus to access those on the
         other. Dualization at the internal level and multiple
         redundancy at the system level provide a CR80 hardware
         architecture which, fully exploited by the DAMOS software
         operating system, provides survival following operational
         failure of individual components.

         Reliability, which is of major concern in real-time
         and distributed network applications, is achieved in
         the CR80 computer systems by treating all multiprocessors
         as equal elements not absolutely dedicated to a specific
         role. Fault tolerance and backup are achieved through
         an n+l redundance scheme without preassignment of system
         functions to specific processors. This is in marked
         contrast to the more common, rigid dualised configurations
         often encountered in dedicated applications with on-line
         master/slave arrangements, or off-line backup with
         switch-over facility.




2.2.3    S̲y̲s̲t̲e̲m̲s̲ ̲E̲x̲p̲e̲r̲i̲e̲n̲c̲e̲

         Systems are configured around the company's CR80 Computer
         which has proven itself particularly well suited to
         communication disciplines.  The following is a list
         of those communication disciplines in which the company
         has gained significant expertise:

         o   Packet Switching

             -   Routing Algorithms
             -   X25
             -   X21, X21 bis Interfaces
             -   X75

         o   Message Switching

             -   Preparation and Distribution
             -   Format Conversion (ACP126/127)
             -   Protocols (LITSYNC, CCITT X.25)
             -   Storage and Retrieval

         o   Line Switching

             -   Signaling and Supervision
             -   Routing Algorithms
             -   Synchronization and Timing
             -   Multiplexing and Trunking

         o   Dualized Systems

             -   Configuration Control
             -   Switchover and Recovery
             -   Reliability Performance
             -   V24/V28 Interfaces

         o   Security

             -   Multi-level
             -   Access Control
             -   SPECAT Handling
             -   Red/Black Interfaces
             -   Crypto Interface (DOLCE and others)
             -   Privileged User State
             -   Tempest

         System contracts awarded to the company on a Prime
         Contractor or Principal Sub-contractor basis are typically
         worth from several to tens of millions of US Dollars.
          Administratively distinct Project Offices are formed
         within the company to manage these large programs.

         A summary of the company's overall experience in data
         communication is presented in FIGURE 2.2.1-1.




















































              DATA COMMUNICATION EXPERIENCE
                      FIGURE 2.2.3-1



         Successful participation in these programs as prime
         or sub-contractor has broadened the company's resources.
          The high degree of reliability, security, efficiency
         and operational performance which these projects demand
         is met by applying up-to-date technology, specialized
         engineering expertise, and sophisticated data communications
         techniques.

         Christian Rovsing was principal sub-contractor to Litton
         Data Systems Inc. for the NICS-TARE program and is
         Prime Contractor for the FIKS, CAMPS and LME-NET programs.
          The FIKS network was installed at the customer's 8
         sites in 1982 under the direction of the Integrated
         Logistics Support Department of the System Division.

         The CAMPS program with a contract value of $ 30 Million,
         not counting options, is the largest, single computer
         systems contract ever to be awarded to a Danish electronics
         company.  The system is based on the latest version
         of the company's CR80 Computer product line.  The CAMPS
         project team has successfully completed the design
         and implementation phases.  The installation phase
         involves 16 separate sites located throughout Europe,
         and is underway. The CAMPS program has neccessitated
         the fulfilment of strict TEMPEST requirements.

         The LME-NET program is to be delivered in several phases.
          Phase 1 provides a network center with interfaces
         to IBM and UNIVAC mainframe computers and 10 switching
         nodes, forming a network covering western Europe. 
         This phase was completed in June 1982.  The network
         follows international standards for packet switching
         data networks, as defined by CCITT in recommendation
         X.25.  Later phases will provide facilities like multiple
         network control centers, satellite links to remote
         nodes, interfacing to other makes of mainframe computers,
         and support of facsimile and voice transmission.

         The ADA Compiler Development Project is part of a larger
         project which addresses the construction of an entire
         programming environment including an ADA computer.
         The programming environment will conform to the Stoneman
         specifications from the U.S. Department of 
         Defense.



         The total environment system is being financed by the
         Commission of the European Communities with a grant
         of US $ 3.2 million , which corresponds to 50% of the
         total development costs. The remaining development
         costs are covered by the participating companies and
         various public sources and funds.

         In the HAWK project Christian Rovsing has developed
         and now produces converters which make it possible
         to communicate between the HAWK BATTERIES by means
         of an extended message structure, while providing unchanged
         communication with the Battery Operation Control. 
         This provides a cost effective improvement to HAWK
         communication.

         The CR-Videotex system is a commercial information
         retrieval and display system which provides simple
         and efficient access to a wealth of information and
         services. Using low cost terminals based on TV technology,
         it can use either the public telephone network or a
         private telephone system. Data can be contained either
         in a control data base located on a single computer
         or a network of geographically distributed computers,
         each containing the local information of interest.
         

         To Air Canada Christian Rovsing A/S will deliver a
         new nation-wide communications system. This contract,
         recently signed, has an initial value of approximately
         15 million dollars.

         Another major airlines-communication system contract
         is with American Airlines for network transport services,
         which will interface to over 65,000 terminals throughout
         North America. This contract, recently awarded, is
         proof that Christian Rovsing A/S hardware systems are
         cost effective and can compete in the demanding commercial
         market.

         Much of the extensive management and technical experience
         which Christian Rovsing has acquired in message switching
         and data communication projects are directly applicable
         to the LKSAA project.

         The company's overall exposure to major computer system
         discipline reflects its ability to carry out a technically
         demanding project.


2.2.4    R̲e̲l̲e̲v̲a̲n̲t̲ ̲C̲o̲n̲t̲r̲a̲c̲t̲s̲



2.2.4.1  R̲e̲l̲e̲v̲a̲n̲t̲ ̲C̲o̲n̲t̲r̲a̲c̲t̲s̲ ̲a̲t̲ ̲C̲h̲r̲i̲s̲t̲i̲a̲n̲ ̲R̲o̲v̲s̲i̲n̲g̲ ̲A̲/̲S̲

         Eight major contracts are described below:

         a)  NICS-TARE for Litton Data Systems
         b)  FIKS for the Danish Ministry of Defence
         c)  CAMPS for NATO-SHAPE
         d)  LME-NET for L.M. Ericsson in Sweden
         e)  HAWK for NATO-HAWK
         f)  ADA Compiler for EEC
         g)  Protocol Converter for NATO-SHAPE
         h)  VIDEOTEX
         i)  Air Canada Data Network (ACDN)
         j)  Communication at Hill AFB/Edwards AFB
         k)  CROSS FOX for NATO/NODECA
         l)  Mobile War Headquarters for NATO/DMKL
         m)  American Airlines Data Network (AADN)

         Each of these projects uses the CR80 computer, designed
         and manufactured by Christian Rovsing A/S

         To provide further information about the capabilities
         of Christian Rovsing A/S as seen by our customers,
         contact with the respective company or organisation
         is invited.


         a)  N̲I̲C̲S̲-̲T̲A̲R̲E̲

         Description:     Communications Front-end Processors
                          for Message Switching Network

         Customer:        NATO Integrated Communications System
                          Management Agency, Brussels,Belgium

         Prime Con-       Litton Data Systems Inc.
         tractor:         Van Nuys,California.


         CRA Sub-
         contract
         value:           Approx. $6 Million

         Program
         Duration         36 months (1976-1979)



         A rigorous and competitive evaluation of various front-end
         communication processors was conducted by Litton's
         Data Systems Division to satisfy NICSMA's stringent
         operational and realiability requirements for TARE.
          A CR80-based configuration was chosen on the criteria
         of traffic handling, growth capability, reliability,
         and cost.

         The dualized configuration consists of two "CR COMPROCESSORS",
         two groups of line termination units, and dual data-channel
         interfaces to the TARE Message Processors.  The modularity
         and distributed processing aspects are apparent in
         the use of repetitive functional units around a multi-level
         data transfer bus structure (see FIGURE 2.2.5-1.

         Christian Rovsing has developed a customized configuration
         to NICSMA specifications and produced 20 dual-processors
         and associated line termination sub-systems, each of
         them capable of up to 163 line connections.  Several
         prototype systems have been delivered and successfully
         tested. In addition to supplying the complete front-end
         configuration, Christian Rovsing also assumed responsibility
         for the definition, system design, and implementation
         of the NICS-TARE line coordination protocols, buffering
         and other communication preprocessing functions.

         Our U.S. subsidiary, Christian Rovsing Corp., assumed
         a major coordination role in supporting Litton NICS-TARE
         effort.

         A brief description of the TARE COMPROCESSOR subsystem
         and its major functional role now follows.

         The TARE Communication Processor Subsystem is a fully-redundant
         front-end serving as concentrator and pre-processor
         for a maximum of 163 lines.  It interfaces the network
         to the Litton L3050 Message Processors.  A line-splitter
         assembly routes the lines to two CP's.  Both synchronous
         (2400 baud) and asynchronous (600 baud) channels are
         accomodated.  Synchronous lines are controlled through
         an EDC protocol (LITSYNC).
















































               NICS-TARE H/W CONFIGURATION
      SHOWING MODULARITY AND DISTRIBUTED PROCESSING
                      FIGURE 2.2.4-1





















































                 NICS-TARE H/W PACKAGING 
                      FIGURE 2.2.4-2








   b)    F̲I̲K̲S̲ ̲D̲e̲f̲e̲n̲c̲e̲ ̲I̲n̲t̲e̲g̲r̲a̲t̲e̲d̲ ̲C̲o̲m̲m̲u̲n̲i̲c̲a̲t̲i̲o̲n̲ ̲S̲y̲s̲t̲e̲m̲

         Description:     Defence Integrated Communications
                          System

         Customer:        Danish Ministry of Defence

         Prime Con-       Christian Rovsing
         tractor:    


         Contract
         Value:           Approx. $ 7 Million

         Program
         Duration:        48 months (1978-1982)


         FIKS is Denmark's tri-service defense communications
         network.  Its objective is to integrate, automate and
         upgrade teletype command networks and data communications
         systems previously operated individually by the Army,
         Navy, and the Air Force.

         Christian Rovsing and the Danish Air Material Command
         jointly developed the top-level system specification,
         and a contract was awarded early in 1978.  The specification
         covers design, development, installation and cut-over
         of a common nodal network for message and data traffic.
         FIKS provides higher survivability, improved security,
         greater efficiency, simpler operation and easier expansion
         through computerization.

         FIKS integrates and fully automates message switching
         and data transfer functions.  It consists of a multi-node
         network geographically distributed throughout Denmark.
          As initially structured, 8 nodes are arranged in a
         grid configuration and interconnected via 15 full-duplex
         trunks operating at 9.6 kilobaud per line.


         Message and data traffic under control of computerized
         nodal switching centers are interchanged between military
         users. Message users at remote terminals are served
         through COMCENTERs, some of which are co-located at
         the nodes.

         Message traffic rates range from low-speed (50 baud)
         to medium-speed (2400 baud). FIKS is sized to handle
         a throughput of 25,000 messages per busy hour including
         messages entering the network, multiple distribution
         of messages, retrievals, service messages and a 25%
         allowance for growth.

         Data users, continuously, exchange information through
         the FIKS network.  Typical data users are military
         data systems which relate to air defense, air traffic
         control, intelligence and command nets such as LINK-1,
         LOW-LEVEL RADAR, TVT EXTRACTORS, ACBA-CCIS, TOSCA,
         FLY-PEP, CHODDEN, and INTEL.

         The FIKS network interfaces to NICS-TARE through compatible
         circuits and protocols.  Also, access to the Nordic
         Public Data Network, NPDN, is provided using CCITT
         X.21 for circuit-switched calls and conversion to X.25
         for virtual calls; this interface is consistent with
         expansion to higher level X.25 packet switching.

         To accomodate the navy's unique requirements, ship-to-shore
         secure communications channels are provided through
         the appropriate ground-based comcenters.

         The generic elements of the Nodal Switching Center,
         one of several in the FIKS network, are depicted in
         FIGURE 2.2.6-3. Though physically separate, the Nodal
         Switch is shown co-located with the System Control
         Center and the Message Entry and Distribution Equipment.

         An abbreviated list of functions performed by the system
         includes:

         -   Message Preparation and Distribution
         -   Simplified ACP127 Format Handling
         -   Message Storage and Retrieval
         -   Network Supervision and Control
         -   Automatic Switchover and Recovery
         -   Alternative Routing
         -   Traffic and Operational Security.


















































                  FIKS GENERIC ELEMENTS
                      FIGURE 2.2.4-3


         c)  C̲A̲M̲P̲S̲


         Description:     Computer-aided Message Processing
                          System

         Customer         NATO-SHAPE, Brussels, Belgium

         Prime
         Contractor       Christian Rovsing

         Contract
         Value:           Approx. $ 30 Million

         Program
         Duration:        46 months (1980-1983)

         Christian Rovsing has contracted with NATO (SHAPE)
         to deliver CAMPS, the Computer Aided Message Processing
         System, on a turn-key basis to a number of NATO sites
         .

             CAMPS has two essential functions:

         1.  CAMPS assists the user in message handling, i.e.
             preparation, dispatch and receipt of messages.


         2.  CAMPS communicates with data networks, and other
             systems such as SCARS II (Strategic Command and
             Alert Reporting System) and ACE CCIS (Command Control
             Information System).

             There are, naturally, high demands for reliability
             and security in a system like CAMPS, and these
             demands are met by the hardware and software as
             an entity.

             The hardware system is based upon the company's
             CR80 computer.  In designing this computer, advanced,
             proven technology has been employed.  Reliability
             is further secured by using MIL quality components
             and by subjecting all electronic modules to a burn-in
             cycle, (See FIGURE 2.2.5-5).



















































        CAMPS SIMPLIFIED H/W-SYSTEM CONFIGURATION
                      FIGURE 2.2.4-5


             The CAMPS software consists of system programs
             and application programs.  The software engineering
             profits from the experience the company has obtained
             through the participation in other complex message
             processing and communication systems.

             CAMPS will exchange data with other computer- associated
             handling and communication systems. Interface systems,
             which exist or are being developed, include NATO-TARE
             and Tape Relay Centers plus SCARS II and ACE CCIS.

             The interface design is structured to permit the
             accomodation of new systems as they are introduced.

             The primary format for messages will conform to
             ACP-127 NATO SUPP-3 for all interfaces.

             CCIS and SCARS II will utilize the X-25 data communication
             protocol (CCITT) when interfacing with CAMPS.

             To interconnect CAMPS with older CCIS equipment,
             Christian Rovsing is implementing protocol converters.

             Extensive use of up-to-date technology is required
             to meet the stringent requirements set forth by
             SHAPE. The hardware configuration features distributed,
             autonomous processing-subsystems made economically
             feasible by LSI (RAM's, PROM's, CPU's, USART's,
             FIFO's, ALU's, etc.). The dualized configuration
             is partitioned into three Processors per Processing
             Unit with Main Memories, Terminal Data Exchanges,
             and pre-processor-controlled Line Termination Units.

             CAMPS also uses up-to-date technology like optical
             fibre-optic communication to connect terminals
             to the computer.



             CAMPS is characterized quantitively by:(a) a connectivity
             of 256 full-duplex lines or an equivalent 153,
             600 bytes/second (b) a 240-megabyte mass storage
             with 40-nano second access, providing virtually
             immediate retrieval of 24-hour traffic (c) a peak
             processing throughput of 30,000 messages/hour (d)
             a cross-office processing time of 400 msec (e)
             a system response time of less than 3 seconds (f)
             a predicted systems availability greater than 0.999996.

             CAMPS functional requirements deal with message
             handling, preparation, coordination, release, and
             distribution, format translation, storage and retrieval,
             supervision control, statistics and reports, protocols,
             and recovery and back-up-techniques. These aspects
             of CAMPS are depicted by the simplified software
             description shown in FIGURE 2.2.5-6.

             Of particular significance are: (1) the cost, weight,
             and size reduction achieved by CAMPS: the 6 rack,
             12 KW Hardware represents a drastic reduction compared
             to similar equipment (2) the unique security features
             to prevent unauthorized access such as privileged
             instructions, memory bounds, and separate SYSTEM
             USER states.

             A typical CAMPS installation consists of the following
             elements(see FIGURE 2.2.5-7).

             -   Processors and Mass Storage (3-bay Rack)

             -   Line Interface Equipment (4-bay Rack)

             -   Supervisory Console 

             -   Software Maintenance Equipment

             -   Spares/Tools Cabinet.

             The above equipment complement, which does not
             include the terminal option for remote locations,
             is installed in a secure area dedicated to CAMPS.

             The computer crates are installed in COMSEC approved
             TEMPTEST EMI-racks.






















































        CAMPS S/W SYSTEM CONFIGURATION - OVERVIEW
                      FIGURE 2.2.4-6

















































                CAMPS TYPICAL SITE LAY-OUT
                      FIGURE 2.2.4-7


   d)    L̲M̲E̲-̲N̲E̲T̲
         Customer:        L.M. Ericsson, Stockholm, Sweden

         Prime Con-
         tractor:         Christian Rovsing

         Contract
         Value:           Approx. $ 4.5 Million

         Program
         Duration:        48 months (1979-1983)

         The L.M.Ericsson Data Network is being developed as
         a private data communication network to cover the need
         within LME for communication between data centres and
         terminal users.

         LME-NET is based on the CR80 computer, and the first
         phase consists of (see FIGURE 2.2.5-8):

         o   a network center

         o   a host interface processor system for connection
             of IBM and UNIVAC computers

         o   10 switching nodes where traffic is collected and
             directed to the receiver

         o   a number of leased lines between the nodes, eight
             of which are in Sweden, one in Copenhagen and one
             in Madrid.

         In the later phases, the network will be enlarged with:

         o   additional network control centers, which will
             enable distributed control of the network

         o   additional geographically distributed host interface
             processors, perhaps with interfaces to the other
             machine types, e.g. ICL

         o   connection via satellite to new nodes, e.g. in
             Brazil.

         o   The LME-NET architecture is based on the following
             concept:



         1.  A general standardized transport facility is provided.
             The network will follow international standards
             for packet switch data networks as defined by CCITT
             in the recommendation X.25. This will enable later
             connection to public networks and ensure the adaptation
             of LMENET to future standards.

         2.  Existing makes of computers and terminals can be
             connected to the general network by means of mechanisms
             in the network which do not require modifications
             of the existing system.

             The above concept will enable a layered construction
             of LMENET following recognized principles of system
             construction in general, and network construction
             in particular (ISO's seven-layer model for network:
             Open Systems Interconnection Reference Model).

             LMENET provides the following functions:

             o   complete monitoring and control of the network,
                 independent of host computers connected

             o   emulation of a network complying with IBM's
                 Systems Network Architecture (SNA) in order
                 to establish communication between the IBM
                 user programs and the SNA terminals as well
                 as certain non-SNA terminals.

             o   emulation of network complying with UNIVAC's
                 Distributed Communication Architecture (DCA)
                 which enables communication between UNIVAC
                 user programs and terminals

             o   direct program to program communication

             o   various traffic types with different resource
                 requirements

                 - dialog traffic

                 - batch traffic

                 - transparent traffic

             The first phase of the LMENET went into operation
             in July 1982, with six connected host computers
             and approximately 2000 terminals.
























































              LME-NET PHASE 1 CONFIGURATION
                      FIGURE 2.2.4-8


   e)    H̲A̲W̲K̲ ̲A̲T̲D̲L̲/̲M̲B̲D̲L̲ ̲C̲o̲n̲v̲e̲r̲t̲e̲r̲

         Customer:        NATO HAWK Production and Logistic
                          Office

         Prime Con-
         tractor:         Christian Rovsing

         1.  D̲e̲v̲e̲l̲o̲p̲m̲e̲n̲t̲ ̲C̲o̲n̲t̲r̲a̲c̲t̲

             Contract
             Value:       Approx. $ 1.2 Million

             Program
             Duration:    April 1979 - Oct. 1981.

         2.  P̲r̲o̲d̲u̲c̲t̲i̲o̲n̲ ̲C̲o̲n̲t̲r̲a̲c̲t̲

             Contract
             Value:       Approx. $ 6 Million

             Program
             Duration:    Nov. 81 - Aug. 84.



         I̲n̲t̲r̲o̲d̲u̲c̲t̲i̲o̲n̲

         The ATDL/MBDL…0e…1)…0f… Converter (AMC) constitutes the means
         by which PIP modified IHAWK batteries, communicating
         in ATDL-1, and Battery Operation Control (BOC), communicating
         in MBDL, are able to exchange information.

         The MBDL was the message format used for communication
         between BOC and HAWK batteries in the earlier design.
         The PIP modification of the IHAWK batteries introduced
         a new message format, ATDL-1, which is much more powerful
         than the MBDL.

         The AMC is a CR80 computer that in most applications
         will be located inside the BOC shelter. In such configurations
         only the ATDL communication lines using the connectors
         normally used for the MBDL communication are visible
         from outside the BOC shelter 


         1)  ATDL:   Army Tactical Data Link
             MBDL:   Missile Battery Data Link







         I̲n̲t̲e̲r̲f̲a̲c̲e̲ ̲D̲e̲s̲c̲r̲i̲p̲t̲i̲o̲n̲

         Up to 8 PIP modified IHAWK batteries can be connected
         to the AMC via ATDL links. Similarly the AMC is connected
         to the 8 MBDL battery links of the BOC.

         In FIGURE 2.2.5-9 a schematic of the interconnection
         to BOC and Batteries is shown.


         The AMC will receive commands and reference track messages
         from the BOC in MBDL format. The commands will be transmitted
         to the relevant IHAWK battery in ATDL format.

         The ATDL status messages received from the batteries
         will be converted to MBDL and transmitted to the BOC
         for presentation on the display.

         As the ATDL message format enables an extensive exchange
         of track-information, a track file is established in
         the AMC to support the forwarding of this information
         to all other batteries.

         The software block diagram for the AMC is shown in
         FIGURE 2.2.5-10.



         E̲n̲v̲i̲r̲o̲n̲m̲e̲n̲t̲a̲l̲ ̲D̲e̲s̲c̲r̲i̲p̲t̲i̲o̲n̲

         As the AMC is installed in a shelter which is transported
         from site to site between operations, the CR80 modules
         have been environmentally tested to demonstrate that
         the equipment is capable to survive these conditions.


















































              AMC INTERCONNECTION SCHEMATIC
                      FIGURE 2.2.4-9
















































               AMC FUNCTIONAL BLOCK DIAGRAM
                     FIGURE 2.2.4-10


    f)   A̲D̲A̲ ̲C̲o̲m̲p̲i̲l̲e̲r

         Customer:        European Economic Community

         Contract
         value:           Approx. $ 3.2 Million

         Program
         Duration:        36 month (1981-1984)

         The ADA Compiler Development Project will produce an
         easily portable compiler and Run-time system for the
         full Ada language as standardized by the U.S. Department
         of Defense.

         DOD certification is planed for early 1984. An essestial
         aspect of the DA compiler is the facility for linking
         the SWELL S/W language - a structured low level language
         used with the CR80 computer - thus enabling reuse of
         existing S/W in context of new projects programmed
         in ADA.

         The compiler system will be tailored for mini/micro
         computer system applications. Particular attention
         will be given to minimize necessary address and/or
         physical memory space in such systems.

         The total system project encompasses the following
         subprojects:

         1)  Specification and implementation of a standard
             interface to the operating system and file system
             of the host computer.  The standard interface will
             conform to the Stoneman KAPSE requirements and
             will be specified as an ADA package. Particular
             attention will be paid to the design of the KAPSE
             database.

         2)  Minimum Toolset for ADA Program Development, conforming
             to the Stoneman MAPSE requirements. The toolset
             contains the following program development items:

             -   Text Editor
             -   ADA Compiler (see point 4)
             -   Linker
             -   Debugger


             -   Database Utility
             -   Command Interpreter
             -   Object Formatters (including Pretty Printer)
             -   Library File Utilities.

         3)  Distributed System Study addressing the impacts
             on the total system (KAPSE/MAPSE) caused by a distributed
             system architecture.

         4)  Ada Compiler, consisting of:

             -   Front End Compiler which converts ADA source
                 code into an intermediate language.

             -   Separate Compilation Handler

             -   Back End Compiler which generates A-code from
                 the intermediate language.

             The front end compiler produced in this project
             will be a test version primarily intended for generation
             of test input to the back end compiler and test
             of the compiler interfaces to KAPSE/MAPSE. The
             project also includes adaption and integration
             of an optimizing front end compiler produced by
             a French/German consortium (Alsys/CII Honeywell-
             Bull/Siemens).

             An important aspect of the compiler development
             project is the propagation of the formal and systematic
             software engineering methods used to produce the
             ADA compiler.

         5)  Run Time System including virtual machine:

             -   Design of portable run time system (A-code
                 machine, tasking kernel, i/o system).

             -   Implementation of run time system on the Christian
                 Rovsing CR80 and on the Olivetti S6000 computers.

         Points 1, 2 and 3 are being carried out by the Italian
         partner with Systems Designers Limited (England) as
         subcontractor, while points 4 and 5 are being carried
         out by the Danish partners.



         The complete system will be implemented on the Olivetti
         S6000 computer, which is a 16-bit minicomputer with
         virtual memory, and on the Christian Rovsing A/S CR80
         computer, which is a 16-bit minicomputer with multiprocessor
         capabilities, 32M byte memory space, 128K byte program
         addressing space, and 128K byte data space.

         The total system is financed by the Commission of the
         European Communities with a grant of 21 million Danish
         Kroner (approximately 2.7 million European Units of
         Account, or US $ 3.2. million ), which corresponds
         to 50% of the total development costs. The remaining
         development costs are covered by the participating
         companies and various public sources and funds.

         The total system project requires approximately 1000
         man months and will be completed in 1984.

         At present Christian Rovsing has implemented a subset
         of the ADA Compiler on the CR80 computer, translating
         ADA code to the system programming language SWELL.



























    g)   P̲R̲O̲T̲O̲C̲O̲L̲ ̲C̲O̲N̲V̲E̲R̲T̲E̲R̲

         Description:        CAMPS and SCARS II interface
                             adaptors to CCIS/Honeywell
                     6060

         Customer:           NATO-SHAPE, Belgium

         Prime Contractor:   Christian Rovsing A/S

         Contract Value:     Approx. US $ 1 million

         Program Duration: mid 1982 to mid 1984

         SHAPE has approved a concept for the improvement
         of command and control through the use of ADP.
          This concept includes a requirement for the linking
         of host computers supporting an ACE-wide data
         base which is updated from information primarily
         contained in original messages of the ACE reporting
         system.  The linking of CAMPS, SCARS and ACE-CCIS
         systems is a major step towards the realization
         of this concept (see FIGURE 2.2.5-11). Christian
         Rovsing will provide interface adapters to achieve
         CAMPS - SCARS II - CCIS System interoperability.

         PROTOCOL CONVERTER/CAMPS Hardware Commonality
         will enable SHAPE to intergrate CAMPS, SCARS II
         and CCIS  in a minimum of time, at a lower cost,
         and with a proven level of availability.

         The CAMPS (Computer Aided Message Processing System)
         was installed at SHAPE and in the Central Region
         (CR) in January 1983.  In Jan 1983, testing began
         and was completed in June 1983. SCARS II (Status
         Control Alerting and Reporting System) will be
         installed at SHAPE, and CAMPS and SCARS II are
         required to interface with the Honeywell 6060
         to permit an automated message flow between the
         networks supporting the systems. Final system
         acceptance is planned for mid 1984.



















































                     FIGURE 2.2.4-11
                    PROTOCOL CONVERTER
     showing CAMPS, SCARS, and CCIS Interoperability


    h)   V̲I̲D̲E̲O̲T̲E̲X̲

         Description :      Information retrieval and display
                            system

         Customer:          Danish Tele-administration

         Prime Contractor:  Christian Rovsing A/S

         Program Duration:  end 1980 - end 1981 (VIDEOTEX
                            is available as a CR commercial
                            product)

         I̲n̲t̲r̲o̲d̲u̲c̲t̲i̲o̲n̲

         VIDEOTEX is the name given to a low cost, easy to use,
         two way information service for homes, offices, libraries,
         schools, railway terminals, etc. The main objective
         of VIDEOTEX is to provide subscribers with information
         - text and graphics - at an ordinary TV console.

         Information provided to subscribers comes from a VIDEOTEX
         Computer Center (VCC) data base maintained by participaing
         suppliers of information. Information can be updated
         in several ways:

         o   on-line immediate edit - supplier determines when
             to update

         o   on-line bulk edit - supplier can transmit new data
             to VCC at any time; VCC updates at scheduled times

         o   off-line magnetic tape transfer - VCC updates at
             scheduled times 

         o   direct connection through VCC between subscribers
             and suppliers.

         A subscriber establishes a two-way information session
         via common carrier switched lines by dialing VCC. If
         an input port is available, VCC accepts the call request
         and gives access rights. If a call request cannot be
         accepted, the subscribed receives a busy tone - as
         with normal telephone usage.



         A subscriber can access information and can also transmit
         a message to other subscribers or suppliers of information.
         Finally, interactive services between a subscriber
         and the VCC can be provided.

         S̲y̲s̲t̲e̲m̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲s̲

         The principal functions offered by VIDEOTEX are:

         o   Information Retrieval
         o   Message Service
         o   On-line Applications
         o   Transaction Service
         o   Closed User Groups
         o   On-line Editing

         V̲I̲D̲E̲O̲ ̲D̲a̲t̲a̲b̲a̲s̲e̲ ̲U̲n̲i̲t̲

         The VIDEOTEX Data Base Unit (VDBU) is a self-contained
         computer system containing hardware/software to control
         and maintain an internal database. The VBU is dualized
         as it is a mandatory function of VIDEOTEX. Therefore,
         the VIDEOTEX configuration contains 2 VDBUs - one acting
         as a back-up for the other. Thus it is possible to
         reestablish the data base after a disc failure.

         E̲q̲u̲i̲p̲m̲e̲n̲t̲ ̲D̲e̲s̲i̲g̲n̲

         An overview of the hardware structure is given in FIGURE
         2.2.5-12, and the principal components are:

         o   VIDEOTEX Retrieval Unit

         o   VIDEOTEX Database Unit

         o   VIDEOTEX Input Unit

         o   VIDEOTEX External Database Unit

         Each unit is a self-contained, operational computer
         system and is dedicated to specific sub-tasks. Interchange
         of information between units is via the TDX-Bus, a
         time division multiplex path with high band-width.
















































                     FIGURE 2.2.4-12
         VIDEOTEX Computer System Configuration 
                  showing modular design


         S̲y̲s̲t̲e̲m̲ ̲G̲r̲o̲w̲t̲h̲ ̲

         The VIDEOTEX System Architecture (VSA) developed by
         Christian Rovsing A/S is based on a comprehensive and
         flexible approach; the system contains a number of
         operatinal capabilities performed by distributed processing
         elements which together provide the desired VIDEOTEX
         Service.

         Each processing element communicates with other operational
         elements through a transmission network (e.g. X.25
         package switching network, local area network, TDX-bus,
         etc.)

         System growth and expansion is, by virtue of the distributed
         architecture, very flexible, and in fact the growth
         potential is only a question of network capacity.


   i)    A̲i̲r̲ ̲C̲a̲n̲a̲d̲a̲ ̲D̲a̲t̲a̲ ̲N̲e̲t̲w̲o̲r̲k̲ ̲(̲A̲C̲D̲N̲)̲ ̲

         A contract to build an advanced data communication
         network for Air Canada has recently been received by
         Christian Rovsing A/S after an proposal effort in competition
         with major international computer companies. The network
         will be based on the CR80 computer, which has been
         developed by Christian Rovsing A/S and which will be
         built at the company's modern manufacturing plant in
         Ballerup, Denmark.

         The new data network will provide the backbone for
         Air Canada's overall data communication, covering ticket
         reservations, passenger aircraft and airfreight information,
         as well as administrative and financial tasks, thus
         necessitating a network that can meet strict requirements
         for reliability and security.

         The data network will consist of three nodes in respectively
         Toronto, Montreal, and Winnipeg. Each node will contain
         a powerfull CR80 computer to control network communication
         including 15,000 Air Canada terminals throughout North
         America.

         As Air Canada is recognized as a communications leader
         among the airlines, the order to Christian Rovsing
         A/S is another mark of international recognition for
         the company's data communication expertise.




   j)    D̲J̲O̲T̲/̲D̲R̲E̲S̲ ̲S̲y̲s̲t̲e̲m̲ ̲a̲t̲ ̲H̲i̲l̲l̲ ̲A̲F̲B̲ ̲(̲U̲t̲a̲h̲)̲ ̲E̲d̲w̲a̲r̲d̲s̲ ̲A̲F̲B̲
         ̲(̲C̲a̲l̲i̲f̲o̲r̲n̲i̲a̲)̲

         The Data Job Transmission (DJOT)/Data Review
         System (DRES) is being developed for the Utah
         Test and Training Range (UTTR) at Hill AFB, Utah
         by the Christian Rovsing Corporation, Thousand
         Oaks, California. DJOT/DRES became operational
         in October, 1983.

         The primary AF objective is to perform first
         generation data processing at Hill AFB, and all
         other processing at Edwards AFB. The DAPAC system
         is the primary first generation processor at
         Hill AFB. The Cyber computers provide processing
         resources at Edwards AFB.

         DJOT/DRES provides services to support this objective.
         The following is a general description of DJOT/DRES
         capabilities:

         a)  A communications capability linking the Data
             Oprations Center (DOC) at Hill AFB and the
             Flight Test Mission Control Center (FTMCC)
             at Edwards AFB by existing microwave equipment
             to provide:

             1)  High speed transfer of data between the
                 two facilities.

             2)  Remote job entry/remote job output (RJE/RJO)
                 for the Cyber at FTMCC to support UTTR
                 customers.

             3)  Remote interactive service on the Cyber
                 system for users at the DOC for Cyber
                 software development, data file access,
                 and the management of data processing
                 performed at FTMCC.

             4)  Transfer of ASCII files between facilities.

         b)  Creation, editing and storage of ASCII files
             at UTTR.

         c)  Online and offline storage sufficient to
             receive, store, list, display, and transmit
             flight test data generated at UTTR or FTMCC.



         d)  Online data review capability for:

             1)  Quality control of first generation data
                 processing.

             2)  "Quick-look" and graphics generation
                 for flight test data.


   DJOT comprises two physical subsystems, DJOT/E and
   DJOT/H, located at Edwards AFB and Hill AFB, respectively.
   Each of these subsystems is based on a CR80M (mapped)
   Computer System running the Distributed Advanced Multiprocessor
   Operating System (DAMOS). 

         The system block diagram is shown in FIGURE 2.2.4-13.





















































                  FIGURE 2.2.4-13 
           DJOT/DRES SYSTEM BLOCK DIAGRAM





         k)  C̲R̲O̲S̲S̲ ̲F̲O̲X̲ ̲M̲E̲S̲S̲A̲G̲E̲ ̲P̲R̲O̲C̲E̲S̲S̲I̲N̲G̲ ̲F̲A̲C̲I̲L̲I̲T̲Y̲


             PURCHASER:         NATO/Norwegian Defence
                                Communications Administration

             PRIME CONTRACTOR:  Harris Corporation, RF
                                Communications Group

             CONTRACT VALUE:    Approx. $4 million

             PROGRAM DURATION:  48 Months (1983-1987)


         Christian Rovsing A/S has been awarded a contract for
         the CROSSFOX Message Processing Facility (MPF); CROSSFOX
         is a NATO procurement to provide reliable communications
         between shore-based and ship-based commands.

         Highlights of the MPF are redundant Message Centres
         (MC's) for compilation of ship-to-shore HF message
         signals, message processing, and message switching.

         The Message Compilation Unit (MCU) will ensure ship-to-shore
         communications with a high level of confidence by processing
         multiple HF signals which individually can be of doubtful
         quality.

         Message processing provides analysis of formatted messages
         for automatic distribution, including direction of
         messages containing erros to message service operators
         and supervisory staff for correction. Facilities are
         provided for both short and long term storage. Additionally,
         the system includes multiple levels of security for
         handling messages, thus ensuring that only staff with
         acceptable security credentials can access classified
         messages. Automatic format conversion - conversion
         from ACP 126 to ACP 127 - is provided, and should yield
         a significant savings in manpower.

         Message switching facilities effect transmission of
         messages by broadcast (BC), Maritime Rear Link (MRL),
         and TRC/TARE lines. It should be noted that the two
         last means of communication can also serve for message
         reception by a Message Center. Finally, direct communication
         between MC's will ensure back-up facilities.

         An overview of the most essential communication aspects
         is given in Figure 2.2.4-14.



















































                     FIGURE 2.2.4-14
           MESSAGE SUBSYSTEM INTERFACE OVERVIEW


         The CROSSFOX MCU/MPF is implemented by the CR80 Computer.
         Essentially, the CR80 offers high:

         .   Availability
         .   Security
         .   Growth

         High availability is ensured by the redundant, self-monitoring
         design with automatic switchover.  On-line maintenance
         and module replacement reduces down-time and results
         in increased availability.

         Security is implemented by both hardware and software,
         with separation of data and programs for each user;
         only trusted users can access programs and change them.
         Additionally, user areas of data are protected from
         other users.

         Growth is facilitated by the modular design of the
         CR80, allowing:

         .     50: 1 range in instruction execution rate.
         .   1000: 1 range in memory capacity.
         .     80: 1 range in processing power.
         .    400: 1 range in connectivity.

         A cost-effective solution to CROSSFOX is achieved by
         virtue of in-house experience on related programs.
         The CR80 hardware implementation benefits from the
         CAMPS design, and a significant part of the CAMPS message
         processing software (applications software) can be
         re-used on the CROSSFOX Program.



         l)  A̲F̲C̲E̲N̲T̲ ̲M̲O̲B̲I̲L̲E̲ ̲W̲A̲R̲ ̲H̲E̲A̲D̲Q̲U̲A̲R̲T̲E̲R̲S̲ ̲-̲ ̲M̲E̲S̲S̲A̲G̲E̲ ̲E̲N̲T̲R̲Y̲
             ̲&̲ ̲D̲I̲S̲T̲R̲I̲B̲U̲T̲I̲O̲N̲ ̲S̲Y̲S̲T̲E̲M̲ ̲(̲M̲E̲D̲S̲)̲

             Purchaser:         NATO/DMKL (Dutch Material Procurement
                                Command)

             Prime Contractor:  Hollandse Signaalapparaten

             Contract Value:    Approx. $ 2.5 million

             Program Duration:  24 Months (1983-1985)

             Christian Rovsing A/S has been awarded the contract
             for the AFCENT MWHQ - Message Entry & Distribution
             System (MEDS).

             Implementation will be based on the CR Local Area
             Network TDX-Bus, which has been produced since
             1978 and implemented in various Military and Commercial
             Projects.

             Two MEDS are included, the Main Element and the
             Leapfrog Element. The Main Element is the one currently
             operational while the Leapfrog Element is being
             moved to a new site for installation. An artist
             concept of the MWHQ equipment layout and interconnection
             is shown in Figure 2.2.4-15.

             The MEDS will:

             -   Control preparation of outgoing messages originated
                 in the MWHQ Staff Element, i.e. message preparation
                 and co-ordination at VDUs.

             -   Process already prepared messages by storing
                 and subsequent presentation for supervisors
                 for conversion to transmission formats.

             -   Transmit all outgoing messages via MWHQ switching
                 system.

             -   Receive all incoming messages for the AFCENT
                 MWHQ.

             -   Process already received messages by storing
                 and subsequent presentation for supervisors
                 for distribution.

             -   Assist supervisory personnel in distribution
                 of incoming messages to users in the Staff
                 Element.
















































FIGURE 2.2.4-15…01…MWHQ EQUIPMENT LAYOUT AND INTERCONNECTION


             The TDX-net solution to the MEDS is a flexible
             and versatile approach, providing AFCENT with a
             truly distributed system. The number of different
             hardware modules used is limited in order to simplify
             spare parts handling. The processing power of the
             MEDS is distributed over various micro-computers,
             and inter- communication is via the TDX-bus, which
             is a twisted pair of two coasiial cables. The TDX-bus
             has been utilised in other military projects, e.g.
             CAMPS and FIKS.

             The MEDS will be equipped with word processing
             systems to enable the supervisory personnel to
             convert the message format from the internal format
             to the external format.

             In keeping with Christian Rovsing A/S' tradition
             for cost effective systems implementation, emphasis
             will be on using hardware, software, and procedures
             which have been developed in the course of other
             projects. Broad experience within NATO, for example,
             has resulted in a deep understanding of the needs
             for a user-friendly man-machine-interface (MMI),
             and design of the MWHQ-MEDS will benefit from many
             man-years of investment.




         m)  A̲M̲E̲R̲I̲C̲A̲N̲ ̲A̲I̲R̲L̲I̲N̲E̲S̲ ̲D̲A̲T̲A̲ ̲N̲E̲T̲W̲O̲R̲K̲ ̲(̲A̲A̲D̲N̲)̲

             Initially, the AADN will provide a connection and
             transport services between American Airline's widely
             distributed terminal population and its computer
             facility in Tulsa currently supported by 11 large
             host processors, 7 real-time and 4 commercial,
             all IBM 370 compatible.

             Four of the real-time host processors will execute
             the majority of the AADN enquiry/response traffic,
             a total of more than 1000 transactions per sec.

             AADN will provide connections with resources belonging
             to several external networks, including ARINC,
             as well as to other airlines computer facilities.
             A substantial number of terminals are located on
             the SITA network throughout the world. These terminals
             will enjoy nearly the same level of service as
             domestic terminals.

             An indirect service is provided to directly connected
             SABRE terminals, enabling agents to use AA transaction
             procedures even though being served by foreign
             airlines reservation systems. This service is provided
             by SMART systems which enables AMEX terminals direct
             access to the AA real-time host complex.

             The network topology of the baseline AADN is a
             star network with the hub located in Tulsa; 14
             network processor sites are connected with the
             hub via internodal trunk groups; generally, high
             speed, wideband connections; each network processor
             terminates a substantial local terminal population.

             The terminals are widely spread over the entire
             U.S., in Mexico, the Caribbean and Canada. Also,
             a substantial number of terminals are located on
             the SITA network throughout the world.

             The baseline AADN will be equipped to support more
             than 65,000 devices, this total is the projected
             end-1984 terminal population.



             The American Airlines terminals provide service
             to several different classes of users, and are
             consequently located in different environments,
             among others:

             o   Network Operations Center (NOC)
             o   SABRE Field Services
             o   Airport
             o   City Ticket Offices
             o   Consolidated Reservations Offices
             o   Travel Agencies
             o   Corporate Locations
             o   Freight Offices
             o   Administration.





                    3̲ ̲ ̲P̲R̲I̲C̲E̲ ̲P̲R̲O̲P̲O̲S̲A̲L̲



         I̲N̲T̲R̲O̲D̲U̲C̲T̲I̲O̲N̲

         This volume presents a fixed price proposal for the
         equipment and services specified in the Christian Rovsing
         A/S supplied:


                      LKSAA…01…Proposal


         Volume I:              Management and Cost Proposal

         Volume II:             Technical Proposal

         The price proposal consists of the following sections:

         Section 1              provides a description of the
                                principles of the price proposal
                                and a price summary

         Section 2              provides the bidding provisions.

         Section 3              provides a price breakdown in
                                "Work- Breakdown-Structure"
                                elements.

         Section 4              provides the hardware equipment
                                matrix.



3.1      P̲R̲I̲C̲I̲N̲G̲ ̲P̲R̲I̲N̲C̲I̲P̲L̲E̲S̲ ̲A̲N̲D̲ ̲S̲U̲M̲M̲A̲R̲Y̲



3.1.1    P̲r̲i̲n̲c̲i̲p̲l̲e̲s̲ ̲o̲f̲ ̲t̲h̲e̲ ̲P̲r̲i̲c̲e̲ ̲P̲r̲o̲p̲o̲s̲a̲l̲

         The Work Breakdown Structure is created by dividing
         all aspects of the project into major tasks. For each
         of the major tasks a further breakdown is generated
         detailing for instance hardware, software, and support
         tasks.

         The WBS consists, therefore, of a family tree of tasks
         organized to define and display the work to be accomplished
         for successful implementation of a project.



         The cost of the tasks at the lowest level has been
         estimated based on manpower-estimates and cost-estimates.
         By adding the costs of the tasks at a certain level
         in the WBS, the cost at a higher level in the WBS has
         been found.

         The price of a certain element in the WBS, therefore,
         reflects the cost to complete the task.



3.1.2    P̲r̲i̲c̲e̲ ̲S̲u̲m̲m̲a̲r̲y̲ ̲i̲n̲ ̲W̲B̲S̲ ̲F̲o̲r̲m̲a̲t̲

         The price is:


    DM  24,078,475.80 inclusive import customs duties
    =================================================


         The price is a firm fixed price. The price includes
         delivery at the Bonn site.

         The price exclusive import customs duties (net price)
         is DM 21.121.470,00.

         The import customs duties is DM 2.957.005,80 i.e. 14
         percent of the net price. The import customs duties
         is paid by Christian Rovsing A/S when import to Germany
         takes place. The receipt on the paid customs duties
         is delivered to Ausw…15…rtigen Amt no later than at delivery
         at the Bonn site.…86…1         …02…   …02…   …02…   …02…              
                                     
















































          Figure 3.1.2:  Cost Proposal Overview



3.2      B̲I̲D̲D̲I̲N̲G̲ ̲C̲O̲N̲D̲I̲T̲I̲O̲N̲S̲



3.2.1    V̲a̲l̲i̲d̲i̲t̲y̲

         The proposal including the options is valid until 1.
         July 1984.



3.2.2    T̲a̲x̲e̲s̲ ̲a̲n̲d̲ ̲D̲u̲t̲i̲e̲s̲

         The price is a firm fixed price. The import customs
         duties are included in the price and is also separately
         specified.



3.2.3    P̲a̲t̲e̲n̲t̲ ̲R̲i̲g̲h̲t̲s̲

         All patent and intellectual proprietary rights to equipment
         developed and built for the project remain the exclusive
         property of Christian Rovsing A/S or its suppliers.



3.2.4    G̲o̲v̲e̲r̲n̲m̲e̲n̲t̲ ̲R̲e̲s̲t̲r̲i̲c̲t̲i̲o̲n̲s̲

         The proposal is prepared taking into consideration
         only the legislation in force as of today. In case
         of legislation affecting this project or in case government
         restrictions are imposed in Christian Rovsing A/S after
         this date, the proposal shall be adjusted accordingly.





3.2.5    S̲p̲e̲c̲i̲f̲i̲c̲a̲t̲i̲o̲n̲s̲

         Christian Rovsing A/S assumes that the contract negotiated
         between AA and Christian Rovsing A/S will define the
         scope of work to be performed under the contract and
         refer to a statement of work to be appended to the
         contract and to form an integral part of the contract.

         Christian Rovsing A/S further assumes that the initial
         phase of the contractual work will be directed at drafting
         a System Requirements Specification, SRS, to exhaustively
         define all functional requirements of the system. Once
         completed, the SRS will be submitted to AA for approval
         - or otherwise - and signature. The agreed and signed
         SRS will at this stage replace the statement of work
         and supersede the RFP and this present proposal.

         One of the major areas to be detailed specified in
         the initial phase is the crypto system, where AA will
         deliver all crypto devices, while Christian Rovsing
         A/S will deliver the crypto controlling equipment.…86…1
                 …02…   …02…   …02…   …02…                                 
                  
3.3      D̲E̲T̲A̲I̲L̲E̲D̲ ̲P̲R̲I̲C̲E̲ ̲B̲R̲E̲A̲K̲D̲O̲W̲N̲


3.3.1    P̲r̲o̲g̲r̲a̲m̲ ̲M̲a̲n̲a̲g̲e̲m̲e̲n̲t̲










































3.3.2    S̲y̲s̲t̲e̲m̲ ̲E̲n̲g̲i̲n̲e̲e̲r̲i̲n̲g̲























3.3.3    H̲a̲r̲d̲w̲a̲r̲e̲













3.3.4    S̲o̲f̲t̲w̲a̲r̲e̲















3.3.5    S̲y̲s̲t̲e̲m̲ ̲I̲n̲t̲e̲g̲r̲a̲t̲i̲o̲n̲ ̲a̲n̲d̲ ̲T̲e̲s̲t̲























3.3.6    I̲n̲s̲t̲a̲l̲l̲a̲t̲i̲o̲n̲














3.3.7    M̲a̲i̲n̲t̲e̲n̲a̲n̲c̲e̲














3.3.8    T̲r̲a̲i̲n̲i̲n̲g̲


















3.3.9    D̲o̲c̲u̲m̲e̲n̲t̲a̲t̲i̲o̲n̲





















3.3.10   O̲p̲t̲i̲o̲n̲s̲













3.4      H̲A̲R̲D̲W̲A̲R̲E̲ ̲E̲Q̲U̲I̲P̲M̲E̲N̲T̲ ̲M̲A̲T̲R̲I̲X̲

         The hardware equipment matrix for the LKSAA is shown
         in the following. For each item an amount, a unit price,
         and a total price is given. All items are added to
         a total hardware configuration price, which is included
         in the WBS as WBS Line item 3.3.1. together with the
         procurement activity.

































                4̲ ̲ ̲C̲O̲N̲T̲R̲A̲C̲T̲U̲A̲L̲ ̲P̲R̲O̲V̲I̲S̲I̲O̲N̲S̲























                 INTENTIONALLY LEFT BLANK




























                 INTENTIONALLY LEFT BLANK
































                 INTENTIONALLY LEFT BLANK



















                        APPENDIX 1






         P̲r̲i̲c̲e̲ ̲I̲n̲p̲u̲t̲ ̲F̲o̲r̲m̲a̲t̲s̲

         All the prices provided in the Detailed Price Breakdown,
         section 3.3 has been used to fill out the various required
         formats found in the following:


















            RESTEN ER FRA SACLANT PROPOSAL OG 
          SKAL SLETTES HVIS DET IKKE BRUGES TIL 

                     LKSAA PROPOSAL 






                4̲ ̲ ̲C̲O̲N̲T̲R̲A̲C̲T̲U̲A̲L̲ ̲P̲R̲O̲V̲I̲S̲I̲O̲N̲S̲


         B̲i̲d̲d̲i̲n̲g̲ ̲P̲r̲o̲v̲i̲s̲i̲o̲n̲s̲

         The provisions listed below are suggested additions
         or modifications that Christian Rovsing A/S would like
         to discuss in connection with the requirements listed
         in the Special Provision of RFP-N00189-NATO-0001. Thus
         the Special Provisions of RFP-N00189-NATO-0001 and
         the below mentioned provisions would serve as the basis
         for contract negotiation, assuming award of contract
         by SACLANT to Christian Rovsing A/S.


         A̲r̲t̲i̲c̲l̲e̲ ̲V̲I̲I̲ ̲I̲d̲e̲n̲t̲i̲f̲i̲c̲a̲t̲i̲o̲n̲ ̲o̲f̲ ̲R̲e̲s̲t̲r̲i̲c̲e̲d̲ ̲R̲i̲g̲h̲t̲s̲ ̲C̲o̲m̲p̲u̲t̲e̲r̲
         ̲S̲o̲f̲t̲w̲a̲r̲e̲

         A.  We suggest that NAVELEX shall have restricted rights
             to all software, whether application or system
             software, not developed specifically for the project
             under NAVELEX funding.

         B.  We suggest that NAVELEX shall have unlimited rights
             to all application software developed under NAVELEX
             funding specifically for the project.


         A̲r̲t̲i̲c̲l̲e̲ ̲X̲X̲X̲ ̲T̲e̲r̲m̲i̲n̲a̲t̲i̲o̲n̲ ̲f̲o̲r̲ ̲D̲e̲f̲a̲u̲l̲t̲

         We should like to discuss this Article, as we find
         the time limits therein very short.


         A̲r̲t̲i̲c̲l̲e̲ ̲X̲L̲I̲I̲ ̲S̲i̲t̲e̲ ̲a̲n̲d̲ ̲N̲e̲t̲w̲o̲r̲k̲ ̲W̲a̲r̲r̲a̲n̲t̲y̲

         CR would like to replace the paragraph by a standard
         "no implied warranty" statement, e.g. text like the
         following:

         "The warranties, guarantees and representations set
         forth in this agreement, including this article XLII
         are exclusive. There are no implied warranties or guarantees
         of merchantability, or fitness for use or of suitability
         for purpose or any other warranty or guarantee beyond
         what is specifically stated herein. Except as otherwise
         provided herein, Contractors obligations under such
         warranties, guarantees and representations are to replace
         or repair to specifications level without cost to NAVELEX".



         A̲r̲t̲i̲c̲l̲e̲ ̲X̲L̲I̲I̲I̲ ̲O̲r̲d̲e̲r̲ ̲o̲f̲ ̲P̲r̲e̲c̲e̲d̲e̲n̲c̲e̲

         We find there is an inconsistence between A and C and,
         therefore, suggest an Order of Precedence as follows:

         1)  Special Provision

         2)  SRS once agreed between NAVELEX and Christian Rovsing
             A/S

         3)  Other applicable documents


         A̲r̲t̲i̲c̲l̲e̲ ̲L̲I̲I̲ ̲C̲o̲n̲t̲r̲a̲c̲t̲o̲r̲ ̲N̲o̲t̲i̲c̲e̲ ̲R̲e̲g̲a̲r̲d̲i̲n̲g̲ ̲L̲a̲t̲e̲ ̲D̲e̲l̲i̲v̲e̲r̲y̲

         This clause does not immediately seem acceptable to
         CR escpecially when compared with clause L. We suggest
         a maximum inserted.


         A̲r̲t̲i̲c̲l̲e̲ ̲L̲I̲I̲I̲ ̲P̲a̲y̲m̲e̲n̲t̲s̲

         Payment terms are to be negotiated. CR will wish to
         negotiate payment terms securing a balanced cash flow
         throughout the project execution.



            5̲ ̲ ̲L̲I̲F̲E̲ ̲C̲Y̲C̲L̲E̲ ̲C̲O̲S̲T̲S̲ ̲-̲ ̲M̲a̲i̲n̲t̲e̲n̲a̲n̲c̲e̲


5.1      I̲N̲T̲R̲O̲D̲U̲C̲T̲I̲O̲N̲

         This proposal for Life Cycle Cost (LCC) is covering
         system maintenance for the SACLANT CCIS as described
         in section 7 of the Technical Proposal.

         However, some assumptions have been made to give an
         exact picture of the coverage of the services offered
         to the prices stated in figure 3.6-1..

         All assumptions are subjects for negotiation.


5.2      C̲O̲V̲E̲R̲A̲G̲E̲

         All hardware and software classified as contractor
         deliverable in the Technical Proposal is covered under
         this LCC proposal.



5.2.1    O̲n̲-̲S̲i̲t̲e̲ ̲M̲a̲i̲n̲t̲e̲n̲a̲n̲c̲e̲

         Contractor will provide on-site hardware and software
         maintenance according to appendix A and described in
         detail in section 7 of the Technical Proposal. Software
         maintenance will consist of error correction only,
         on the software delivered under the main contract.
         The SW maintenance does not include design changes
         to the design requirements as they are stated in the
         request for proposal.



5.2.2    D̲e̲p̲o̲t̲ ̲M̲a̲i̲n̲t̲e̲n̲a̲n̲c̲e̲

         All repair of defective modules and sub-assemblies
         are included and performed by contractor and will continue
         after expiration of the hardware warranty period.



5.2.3    S̲p̲a̲r̲e̲ ̲P̲a̲r̲t̲s̲

         The amount of replaceable spare parts priced in this
         proposal is contractor's best estimate at the time
         of bidding.  The exact amount of spares will be negotiated
         between NATO and contractor at a provisioning conference
         during the Development Phase.


5.2.4    T̲o̲o̲l̲s̲ ̲a̲n̲d̲ ̲T̲e̲s̲t̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲

         The Tools and Test Equipment (T&TE) necessary to perform
         day to day maintenance will be supplied by contractor.
         Maintenance and Diagnostics (M&D) Software will be
         a part of T&TE. A list of T&TE is shown in appendix
         B.



5.2.5    C̲o̲n̲s̲u̲m̲e̲r̲a̲b̲l̲e̲s̲

         Consumerables are not included in the LCC.



5.3      F̲I̲E̲L̲D̲ ̲S̲U̲P̲P̲O̲R̲T̲

         The field support is estimated to 4 visits a year,
         5 working days per visit. This support will be performed
         by contractors field engineers.



5.4      C̲U̲S̲T̲O̲M̲E̲R̲ ̲S̲U̲P̲P̲O̲R̲T̲

         It is assumed that the customer provides reasonable
         working space within SACLANT organization, including
         all furniture necessary to perform the work. Additionally,
         an office for general repair and spare part stock shall
         be provided including workbenches, bookcases, chairs,
         and file cabinets.



5.5      S̲E̲C̲U̲R̲I̲T̲Y̲

         The personnel selected to perform the On Site System
         Maintenance will all be cleared to the security level
         required by NATO.



5.6      P̲R̲I̲C̲E̲

         Yearly Life Cycle Cost (LCC) for System Maintenance
         is shown in Figure 3.6.1. Prices given are based on
         a 7 years Maintenance contract.












 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

                       FY1     FY2     FY3     FY4   
                                                     
                                                     FY5     
                                                             
                                                             FY6     
                                                                     
                                                                     FY7
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Spare Parts
- T&TE       151,809 151,809 151,809 151,809 151,809 151,809 151,809

On Site
Maint.       373,234 373,234 373,234 373,234 373,234 373,234 373,234

Depot
Repair       Warr.    91,595  91,595  91,595  91,595 
                                                     91,595  
                                                             91,595

Field
Support CR    27,553  27,553  27,553  27,553  27,553 
                                                     27,553  
                                                             27,553

 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

US Dollars   552,596 616,638 616,638 616,638 616,638 616,638 616,638


Price level Oct. 1983. All items will be escalated
 in accordance with the indices published by the Danish
 Government Statistical Bureau for average monthly salary
 costs in manafacturing industries ISIC 385.


















             System Maintenance LCC
                  Figure 3.6.1


                        A̲P̲P̲E̲N̲D̲I̲X̲ ̲A̲




         1.  C̲O̲V̲E̲R̲A̲G̲E̲


             P̲E̲R̲I̲O̲D̲                           C̲O̲V̲E̲R̲A̲G̲E̲

             Normal working hours             On-site
             7.30 - 16.30, Monday 
             thru Friday, excluding
             holidays.


             Week-ends and holidays and       2 hours
             2nd and 3rd shift.               response
                                              time



         2.  M̲A̲N̲P̲O̲W̲E̲R̲

             3 HW/SW engineers will be assigned to perform on
             site manintenance.



         3.  R̲E̲C̲O̲G̲N̲I̲Z̲E̲D̲ ̲H̲O̲L̲I̲D̲A̲Y̲S̲

             New Year's Day

             President's Day

             Good Friday

             Memorial Day

             Independence Day

             Labor Day

             Thanksgiving Day

             Christmas Day



                        A̲P̲P̲E̲N̲D̲I̲X̲ ̲B̲




                 T̲O̲O̲L̲S̲ ̲A̲N̲D̲ ̲T̲E̲S̲T̲ ̲E̲Q̲U̲I̲P̲M̲E̲N̲T̲



1        I̲N̲T̲R̲O̲D̲U̲C̲T̲I̲O̲N̲

         This section contains a list of tools and test equipment
         necessary for maintenance.



2        S̲T̲A̲N̲D̲A̲R̲D̲ ̲T̲O̲O̲L̲S̲

         Table 2-1 lists one set of standard multipurpose tools
         with suitcase.



                      S̲T̲A̲N̲D̲A̲R̲D̲ ̲T̲O̲O̲L̲S̲

 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Line Nomenclature                    Manufacturer  Type
                                                   No.
No.
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

 1   Screwdriver, Plainhead          Weralit       435-0,4-50
 2   Screwdriver, Plainhead          Weralit       435-0,5-80
 3   Screwdriver, Plainhead          Weralit       435-0,6-120
 4   Screwdriver, Plainhead          Weralit       435-0,8-200
 5   Screwdriver, Plainhead          Weralit       434-1,0-125
 6   Screwdriver, Plainhead          Weralit       434-1,0-250
 7   Screwdriver, Plainhead          Weralit       434-1,2-175
 8   Screwdriver, Plainhead          Weralit       434-1,6-200
 9   Screwdriver, Stubby             Xcelite       S 141
10   Screwdriver, Watchmaker-set     Erem          TS-6N
11   Screwdriver, Philips            Weralit       350PR-0-60
12   Screwdriver, Philips            Weralit       1-80
13   Screwdriver, Philips            Weralit       2-100
14   Screwdriver, Philips            Weralit       2-300
15   Screwdriver, Philips            Weralit       2-150
16   Screwdriver, Philips            Weralit       4-200
17   Screwdriver, Stubby             Xcelite       SX 102
18   Screwdriver, Voltage Tester     Weralit       2253-3-40
19   Wrench, Metric                  Belzer        1953
                                                   M-5x10
20   Wrench, Metric                  Belzer        1953
                                                   M-6x7



 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Line Nomenclature                  Manufacturer  Type No.
No.
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

21   Wrench, Metric                Belzer        1953M-8x9
22   Wrench, Metric                Belzer        1953M-10x11
23   Wrench, Metric                Belzer        1953M-12x13
24   Wrench, Metric                Belzer        1953M-14x15
25   Wrench, Metric                Belzer        1931N-M-4,5x5,5
26   Wrench, Inches                Belzer        1953Z-1/4x5/16"
27   Wrench, Inches                Belzer        1953Z-3/8x7/16"
28   Wrench, Inches                Belzer        1/2 x 9/16"
29   Wrench, Adjustable            Bacho         4"
30   Wrench, Adjustable            Bacho         6"
31   Wrench, Adjustable            Bacho         8"
32   Wrench, Adjustable            Bacho         10"
33   Socket Wrench Set 4-14        Tecos         
34   Socket Wrench Set 3/16-9/16"  Tecos         
35   Side Cutter                   Erem          84E
36   Side Cutter                   Erem          196-6"
37   Side Cutter                   Belzer        2678
38   Pair of Pliers, Flat Nose     Erem          124
39   Pair of Pliers, Point Nose    Erem          41
40   Pair of Pliers, Bent Nose     Belzer        2477G
41   Pair of Pliers, "Polygrip"    Belzer        2615M
42   Pair of Pliers, "Polygrip"    Belzer        2624B
43   Pipe Wrench, 3", 45…0e…o…0f… Nose     Dowidat       176
44   Wire Stripper                 Belzer        3418B
45   Pair of Tweezers              Erop          24
46   Pair of Tweezers              Erop          21S/200
47   Steel Scissors                Erop          24
48   Unbraco Keys, Set 2-8 mm      Weralit       950/7-SM
49   Unbraco Keys, Set 2/64-1/4"   Weralit       950/7-SZ
50   Hammer, SUPERFLEX Head        Belzer        3625-27
51   Solderiron  with transformer  Weller        TCP-24V,7
52   Solderpoint                   Weller        PT-6
53   Solder                        Weller        60-40
54   Desoldering pump              Erem          PS 200
                                                 A
55   Electric Torch (Flashlight)                 Pencil
56   Wrapwire                      Metric        10-51
57   Suitcase f/hand tools         TC            TC100 MT
58   Double lid f/suitcase         TC            A 5-12
                                                 room
59   Double lid f/suitcase         TC            A - 18
                                                 room
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲


     One vacuumcleaner with a soft rubber mouthpiece is
     required at each main site for preventive maintenance.

                      Table 2-1




3        S̲T̲A̲N̲D̲A̲R̲D̲ ̲T̲E̲S̲T̲ ̲E̲Q̲U̲I̲P̲M̲E̲N̲T̲

         Table 3-1 lists the standard test equipment required
         during performing maintenance at    site.

         All measure and monitoring devices comply with the
         stability and accuracy demanded throughout the system.



 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Line Nomenclature               Manufacturer   Type No.      QTY
No.
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

1    Recording Thermometer/
               Hygrometer       Struers                      1
2    Data Communications Tester Tektronix      834           1
3    Multimeter                 Fluke          8020 A        2
4    Oscilloscope               Tektronix      465 B         1
5    Test Set 921-T             NU DATA        921-T         1
6    Optical Multimeter         PHONODYNE      Model 11
                                               XE            1
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲























                      Table 3-1



4…02…S̲P̲E̲C̲I̲A̲L̲ ̲T̲O̲O̲L̲S̲ ̲A̲N̲D̲ ̲T̲E̲S̲T̲ ̲E̲Q̲U̲I̲P̲M̲E̲N̲T̲

         Table 4-1 lists special tools and test equipment required
         during performing maintenance at   site.



 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Line Nomenclature             Manufacturer     Type No.      QTY
No.
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

 1   V24 Monitor Module       CR               CR8011/---/-- 
                                                             2
 2   Extender Board           CR               CR8059M/010/--
                                               1
 3   Extender Board           CR               CR8057M/010/--
                                               1
 4   Extender Board           CR               CR80107/010/--
                                               1
 5   V24 Loopback Adaptor     CR               CR82XXX/---/--
                                               1
 6   LTU Loopback Adaptor     CR               TBD
 7   LTUX-S Loopback Adaptor  CR               TBD
 8   LIA-N Loopback Adaptor   CR               CR82XXX/---/--
                                               1
 9   Tool Scale Spring        CDC              000 12210797  
                                                             1
10   SCR-DR TOPRQUE 2/35"     CDC              000 12218425  
                                                             1
11   Extender Card            CDC              000 54109701  
                                                             1
12   Alignm.Carr.Spindle      CDC              000 75018400  
                                                             1
13   Head Adjustment          CDC              000 75018803  
                                                             1
14   SCR-DR TRQ Hex Bit       CDC              000 87016701  
                                                             1
15   Adp. Speed Sensor        CDC              000 87052600  
                                                             1
16   Extractor Module         CDC              000 87399200  
                                                             1
17   Disk Pack, CE80 MB       CDC              000 70438700  
                                                             1
18   Disk Pack, Data 80       CDC              000 70438000  
                                                             1
19   Dust Remover, Spray      CDC              000 95047800  
                                                             1
20   Field Test Unit          CDC              9967          
                                                             1
21   OPTO Termination Kit     Versitron        9967          
                                                             1
22   OPTO Loopback Cable      CR               CR82XXX/---/--
                                               1













                      Table 4-1