DataMuseum.dk

Presents historical artifacts from the history of:

CR80 Wang WCS documentation floppies

This is an automatic "excavation" of a thematic subset of
artifacts from Datamuseum.dk's BitArchive.

See our Wiki for more about CR80 Wang WCS documentation floppies

Excavated with: AutoArchaeologist - Free & Open Source Software.


top - download

⟦6130da9ea⟧ Wang Wps File

    Length: 3258 (0xcba)
    Types: Wang Wps File
    Notes: INTERN MEDDELELSE         
    Names: »1150A «

Derivation

└─⟦71faab506⟧ Bits:30006051 8" Wang WCS floppy, CR 0079A
    └─ ⟦this⟧ »1150A « 

WangText




…02…           

…02…JHO/810915…02……02…#
INTERN MEDDELELSE NR. 193
…02……02…CAMPS






         Til: BHB, FE, KNN, GJ, KFL

         Fra: JHO

         cc:  JPR, VHN, AM[, RT, SDV, AF, KRO

         V̲e̲d̲r̲.̲ ̲b̲e̲l̲a̲s̲t̲n̲i̲n̲g̲ ̲a̲f̲ ̲C̲A̲M̲P̲S̲-̲s̲e̲k̲r̲e̲t̲a̲r̲i̲a̲t̲ ̲o̲g̲ ̲t̲e̲g̲n̲e̲s̲t̲u̲e̲
         ̲i̲ ̲s̲e̲p̲t̲e̲m̲b̲e̲r̲ ̲o̲g̲ ̲o̲k̲t̲o̲b̲e̲r̲ 

         Vedlagt findes en oversigt over de st]rre skriftlige
         v`rker, der skal laves i CAMPS-afdelingen i l]bet af
         september og oktober. Planen er lavet for at kunne
         dimensionere sekretariat og tegnestue s>ledes at lange
         turn-around tider ikke virker forsinkende p> projektet.

         Planen giver f]lgende belastning p> ugebasis.

         M                                                   AT SKRIVE/RETTE
          ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
         ̲ ̲ ̲ ̲ ̲ ̲

         September    36/37         1               10
                      38/39         6              500
         Oktober      40/41        18             1435
                      42/43         1              250
                      44            4              630
                      --------------------------------
                      Middeluge    33              310
                      ================================

         I middel skulle denne belastning ikke give problemer
         for sekretariatet. P> grund af den ulige belasting
         opfordres forfatterne til at aflevere s> tidligt som
         muligt i den f]rste del af perioden.

         Uden for planen ligger de mindre ting som telexer,
         breve, interne meddelelser og referater. Det er hidtil
         forudsat at tage en sekret`rs tid. Der vil blive fulgt
         op p> om det idag ikke er mere omfattende.

         Tegnestuen bedes give besked, hvis de ikke kan holde
         tidsfristerne for de n`vnte opgaver.


         Jan Holm



DOKUMENT…02…f`rdig…02…antal…02…antal…02…andre…02…oplag         ansv.
…02…dato…02…sider…02…A4…02…tegn.          ca.
                                  ialt/    tegn.
                                  at
                                  skrive
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Documentation plan        810910    20/10                 20      JHO
Acceptance Test Procedure 810915      /400                15      FE
Area Utilization Plan     810915    10                    10      JHO
Own Equipment Plan        810915    20                    20      JHO
Progress Report, sep.     810917    75/50  0              12      GJ
Back Panel, Type 8        810920    10/     5              5      CSV
Spec.af resourceopf. syst.        810920     40/10                      10 JHO
Ass. B/down Comp. Racks   811001    55/30  20             10      CSV
Ass. B/down Freq. Stab Rack       811001       /20        10            10 CSV
Ass. B/down Line Term Racks       811001     75/35        20            10 CSV
Ass. B/down Tare Racks    811001      /20  10             10      CSV
CPS/SDS/001 (opdateret)   811001  1200/600 50             24      FE
CRT FAT Spec. Proc.       811001    50                    15      GT
CRT SDS                   811001   150/50                 20      GT
Database Design DBD/001   811001        3                 24      KNN
DSMT HW Req. Spec.        811001   100                    15      BHB
ECP/? (SRS)               811001      /20                  5      FE
EMC-Report                811001   100                    15      BHB
Existing Documentation    811001      /20  0              20      JHO
ICD/0001/ECP - updates    811001      /20                 30      FE
Kabler og Mekanik         811001        0         50       5      CSV
Main Switch               811001      /30  10              5      CSV
OCR SDS/028               811001   115                    24      KNN
Performance Report        811001   100/70  5              10      FE
SW ICD CPS/ICD/009        811001        3                 24      KNN
User Print SDS/029        811001   170                    24      KNN
Supervisor SDS/023        811015   250                    24      KNN
DSMT HW-Test Procedure    811101   500                    15      BHB
MSO SDS/026               811101   245                    24      KNN
Operational Test Procedure        811101     50                   15    FE
Sub. Print SDS/024        811101   170                    24      KNN
MDCO SDS/025              811115   215                    24      KNN