…02…PC/PLN/001
…02…851210…02……02…#
CCIS MACHINE ACCESS PLAN
CONTRACT SHNMO 85-9532/INF, LINE ITEM 1B…02……02… PC
T̲A̲B̲L̲E̲ ̲O̲F̲ ̲C̲O̲N̲T̲E̲N̲T̲S̲
1 GENERAL .....................................
1
1.1 PURPOSE ..................................
1
1.2 APPLICABLE DOCUMENTS .....................
1
2 TIME TABLE ..................................
2
2.1 TIME TABLE DATES .........................
2
2.2 DURATION OF TEST PERIODS .................
3
2.3 TIME OF TEST PERIODS .....................
3
2.4 END-SYSTEM STATE .........................
3
3 ASSUMPTIONS .................................
4
1̲ ̲ ̲G̲E̲N̲E̲R̲A̲L̲
This CCIS Machine Access Plan describes the duration
of the various test periods needed to perform the validation
activities for the CCIS-PC Interface Link as stated
in PC/TPR/007.
1.1 P̲U̲R̲P̲O̲S̲E̲
The purpose of the document is:
a. To define dates for the various test periods.
b. To define the state of the end-systems in each
test period.
c. To define the configuration of the CAMPS end-system
in the test periods.
1.2 A̲P̲P̲L̲I̲C̲A̲B̲L̲E̲ ̲D̲O̲C̲U̲M̲E̲N̲T̲S̲
1. PC INTERFACE STUDY,
Contract SHNMO 85-9532/Inf.
2. PC VALIDATION PROCEDURE
PC/TPR/007, preliminary issue
2̲ ̲ ̲T̲I̲M̲E̲ ̲T̲A̲B̲L̲E̲
CR84 will suggest the following time table as shown
below:
2.1 T̲I̲M̲E̲ ̲T̲A̲B̲L̲E̲ ̲D̲A̲T̲E̲S̲
Time Table for CCIS-PC Interface Validation Activities:
T̲e̲s̲t̲ ̲P̲e̲r̲i̲o̲d̲ ̲1̲:
Monday, 27 January, 86 - Friday 31 January, 86
T̲e̲s̲t̲ ̲P̲e̲r̲i̲o̲d̲ ̲2̲:
Saturday 1 February, 86 - Sunday 2 February, 86
T̲e̲s̲t̲ ̲P̲e̲r̲i̲o̲d̲ ̲3̲:
Monday 3 February, 86 - Friday 7 February, 86
T̲e̲s̲t̲ ̲P̲e̲r̲i̲o̲d̲ ̲4̲:
Saturday 8 February, 86 - Sunday 9 February, 86
T̲e̲s̲t̲ ̲P̲e̲r̲i̲o̲d̲ ̲5̲:
Monday 3 March, 86 - Friday 7 March, 86
T̲e̲s̲t̲ ̲P̲e̲r̲i̲o̲d̲ ̲6̲:
Saturday 8 March, 86 - Sunday 10 March, 86
2.2 D̲U̲R̲A̲T̲I̲O̲N̲ ̲O̲F̲ ̲T̲E̲S̲T̲ ̲P̲E̲R̲I̲O̲D̲S̲
The duration of access to the CCIS Machine per day
in each test period.
Test period 1 1x3 hours/day
Test period 2 2x3 hours/day
Test period 3 1x3 hours/day
Test period 4 2x3 hours/day
Test period 5 1x3 hours/day
Test period 6 2x3 hours/day
2.3 T̲I̲M̲E̲ ̲O̲F̲ ̲T̲E̲S̲T̲ ̲P̲E̲R̲I̲O̲D̲S̲
The time suggested for the tests is placed outside
normal working hours. CR84 defines normal working hours
as 8.00 a.m. until 5.00 p.m.
CR84 suggests the following timetable
T̲e̲s̲t̲ ̲P̲e̲r̲i̲o̲d̲ T̲i̲m̲e̲ ̲o̲f̲ ̲D̲a̲y̲
Test period 1: 6.00 p.m. until 9.00 p.m.
Test period 2: 9.00 a.m. until 12.00 noon
& 3.00 p.m. until 6.00
p.m
Test period 3: 6.00 p.m. until 9.00 p.m.
Test period 4: 9.00 a.m. until 12.00 noon
& 3.00 p.m. until 6.00
p.m
Test period 5: 6.00 p.m. until 9.00 p.m.
Test period 6: 9.00 a.m. until 12.00 noon
& 3.00 p.m. until 6.00
p.m
2.4 E̲N̲D̲-̲S̲Y̲S̲T̲E̲M̲ ̲S̲T̲A̲T̲E̲
Configuration
CCIS CAMPS
Test period 1: test operational
Test period 2: test operational
Test period 3: test operational
Test period 4: test test
Test period 5: test operational
Test period 6: test test
3̲ ̲ ̲A̲S̲S̲U̲M̲P̲T̲I̲O̲N̲S̲
CR84 makes the following assumptions to the time table:
a. CR84 may change the dates for the test periods.
b. CR84 may define new test periods.
c. CR84 may delete unnecessary test periods.
d. The CAMPS System shall be available for CR84 engineers
in the whole test period for reconfiguration etc.
e. The CAMPS System shall be under configuration control
during the test periods. It will be SHAPE's responsibility
to maintain the configuration control.
f. The CCIS Machine Room where the PC Test Computer
will be placed and shall be accessable for the
engineers from CR84 during normal working hours.
g. SHAPE shall supply an office for CR84's disposal
during the test periods.
h. CR84 engineers shall be able to work from 8.00