⟦662c9692d⟧ Wang Wps File

    Length: 3327 (0xcff)
    Types: Wang Wps File
    Notes: Site Preparation          
    Names: »0048A «

Derivation

└─⟦83a4a04d1⟧ Bits:30005815 8" Wang WCS floppy, CR 0002A
    └─ ⟦this⟧ »0048A « 

WangText













3.7.1.2.7

         d)  S̲i̲t̲e̲ ̲P̲r̲e̲p̲a̲r̲a̲t̲i̲o̲n̲

             The parties to this contract recognize that at
             some NATO installations the facilities, as they
             exist on the site survey date, may not be accurately
             depicted in any available as-built drawings.  In
             recognition of these facts, the joint efforts described
             below, (i.e. contractor's site surveys and drawing/specification
             preparations ((Civil Works Requirements, As-To-Be-Built
             Drawings, and As-Built Drawings)), and SHAPE's
             submittal of additional information) are intended
             to ensure that current and accurate documentation
             is delivered to SHAPE at or before the time of
             final acceptance.This objective is best served
             through an intensive effort, by both parties, to
             work carefully together. To that end, the parties
             undertake as follows:













         SHAPE will:

         1)  Prior to and during contractor site surveys, determine
             the full extent of available documentation/specifications
             and will insure that such documentation, when it
             exists, is furnished to the Contractor. Data not
             available at time of site survey will be supplied
             by SHAPE after Site Survey if agreed upon in the
             Minutes of Meetings of Site Surveys. When such
             Minutes provide for SHAPE's subsequent provision
             of documentation to CR, the Minutes will indicate
             the nature and extent of the documentation to be
             provided. The level of detail of the documentation
             to be provided will be at least that NATO type
             B cost estimate documentation.


         2)  When, as a result of facilities modifications made
             during or after a Contractor Site Survey, the contractor's
             Site Survey baseline is rendered inaccurate, SHAPE
             will without being requested by contractor furnish
             drawings/specifications of the facilities changes
             to the Contractor. Such post Site-Survey facility
             changes will be communicated to the Contractor
             no later than 3 months before submission of As-TO-BE-BUILT
             Drawings and will be provided in a level of detail
             at least square to that of NATO type B cost estimate
             documentation.












         Contractor will:

             1)  Undertake to produce the required documentation
                 (Civil Works Requirements, As-To-Be-Built Drawings,
                 and As-Built Drawings) based upon the information
                 supplied (per (1)+(2) above and upon his own
                 survey.

         The parties recognize,that the accuracy and completeness
         of the contractor's Civil Works Requirements, As-To-Be-Built
         Drawing and As-Built Drawings will be a function of
         the following factors:

             (a) The contractor's access to the appropriate
                 facility areas during his Site Survey, and

             (b) The diligence with which the contractor uses
                 his facility access to record information,
                 and

             (c) The accuracy and completeness of such data
                 as is provided by SHAPE in accordance with
                 subparagraphs (1) and (2) above..




         (2)     Contractor agrees that when post-survey facilities
                 changes are communicated to him at any time
                 prior to 3 months before submission of A-T-B-B-D
                 these modifications will be reflected in the
                 As-To-Be-Build Drawings, and the As-Built Drawings.