DataMuseum.dk

Presents historical artifacts from the history of:

CR80 Wang WCS documentation floppies

This is an automatic "excavation" of a thematic subset of
artifacts from Datamuseum.dk's BitArchive.

See our Wiki for more about CR80 Wang WCS documentation floppies

Excavated with: AutoArchaeologist - Free & Open Source Software.


top - download

⟦68dbe49a1⟧ Wang Wps File

    Length: 9831 (0x2667)
    Types: Wang Wps File
    Notes: CPS/TCN/066     (Site 16) 
    Names: »3475A «

Derivation

└─⟦404706d13⟧ Bits:30006172 8" Wang WCS floppy, CR 0254A
    └─ ⟦this⟧ »3475A « 

WangText




    3475A/ktd…02…
 CPS/TCN/066

…02… NPP/830324…02……02…#
OPTO CABLE
 INSTALLATION
 INSTRUCTION
FOR SITE
 16…02…   
     …02… CAMPS












                 OPTO CABLE INSTALLATION INSTRUCTION
                 FOR SITE 16


                 CPS/TCN/066













                 Niels Peder Pedersen




                 Kurt Nybroe Nielsen








                 SHAPE (4), KM, NPP, HAU, CLA, Conf. Mgmt.,
                 PAB 
















                         …0e…Installation Mgr 830324…0f…

                                       

             1  


             830324
                                       




…0e…      3475A/ktd …02…CPS/TCN/066

…02…NPP/830324…02……02…2
OPTO CABLE INSTALLATION INSTRUCTION
FOR SITE 16…02…         …02…CAMPS…0f…













        830324                  All      Issue 1 of document









                    T̲A̲B̲L̲E̲ ̲O̲F̲ ̲C̲O̲N̲T̲E̲N̲T̲S̲





     1 GENERAL ......................................  
        4
       1.1 SCOPE ....................................  
            4
       1.2 DOCUMENT REFERENCE .......................  
            4
       1.3 REQUIREMENTS .............................  
            4

     2 RECEIVAL INSTRUCTIONS ........................  
        5

     3 PULLING INSTRUCTIONS .........................  
        6
       3.1 PULLING PRECAUTIONS ......................  
            6
       3.2 HOW TO PREPARE AND RUN OPTO-CABLE ........  
            8
         3.2.1 Preparation of Pull-Loop .............  
                8
         3.2.2 Running the Opto-Cable ...............  
               11
         3.2.3 Finish of Each Cable .................  
               11

     APPENDIX A


                        1  G̲E̲N̲E̲R̲A̲L̲



1.1      S̲C̲O̲P̲E̲

         The purpose of this instruction is to guide host nation
         in performing installation of opto-cables.



1.2      D̲O̲C̲U̲M̲E̲N̲T̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲

         Civil Works Requirements, Doc. No. PAB/CPS/CWR/0XX
           1)

         AS-To-Be-Built, Doc. No. PAB/CPS/ATB/0XX   1)

         1) XX: indicates applicable site.



1.3      R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲S̲

         The opto-cables will be provided by CR and shipped
         to site 6 months prior to start of installation in
         accordance with contract. The opto-cables will be terminated
         by CR with connectors provided by CR.

         Host nation will provide ducting for the opto-cables
         in accordance with ref 1 document. Host nation will
         run the cables from CAMPS equipment room to user terminals
         as specified in ref 1, section 3.

         When the opto-cables are installed they must be left
         with a free end of 5 m above rack D, and 2 m at user
         terminal positions (see ref 1 document). For splicing
         a 2 m overlap is required.

         The opto-cables shall be temporarily labelled by host
         nation at the main racks, at user terminal position,
         and at any splicing point required as specified in
         ref 1 and 2.

         The ducts must not be sealed until CR has completed
         the equipment installation.





                 2  R̲E̲C̲E̲I̲V̲A̲L̲ ̲I̲N̲S̲T̲R̲U̲C̲T̲I̲O̲N̲S̲



         The opto-cables are shipped to main site on rolls.
         On receipt, the rolls must be inspected for any damage.
         

         When the inspection is finished the receipt must be
         confirmed by telex or letter through SHAPE to CR.

         All rolls, including those intended for remote sites,
         will be shipped to the main site address.

         Each roll is marked with a number in accordance with
         a cabling plan which shows the rolls allocated to rooms
         (see Appendix A).

         Rolls allocated for remote sites are also specified
         in Appendix A.

         Host nation will be responsible for distribution to
         the applicable PHQ of those rolls intended for remote
         terminals. If the rolls have to be temporarily stored,
         they must be stored under the same conditions as required
         for the main CAMPS equipment.











                 3  P̲U̲L̲L̲I̲N̲G̲ ̲I̲N̲S̲T̲R̲U̲C̲T̲I̲O̲N̲S̲



         When pulling fiber optic cable, always remember that
         the subject is glass - a delicate subject.



3.1      P̲U̲L̲L̲I̲N̲G̲ ̲P̲R̲E̲C̲A̲U̲T̲I̲O̲N̲S̲

         a)  Before running the cable, a plan of the order in
             which the cables are to be run must be made (see
             Appendix A). This has to be done to avoid that
             short bits of cable have to be spliced together.
             Splicing of opto-cable is a delicate, expensive,
             and timeconsuming task, which can be avoided by
             following the cabling plan in Appendix A.

             Besides the extra work, a spliced cable is always
             more weak and less signal-efficient than an intact
             cable.

             If the cabling plan cannot be followed, please
             notify CR through SHAPE.

             The cable should not be placed directly from roll
             into duct. It should be allowed to remain off roll
             for 24 hours to prevent cable from buckling in
             cable tray.

         b)  When using the appropriate pull-boxes, a correct
             pull-loop and a moderate pulling force, the running
             of opto-cable should present no problems providing
             the following precautions are taken:

             1)  The opto-cable must never be bent to a radius
                 less than 13 mm during installation and a permanent
                 bending radius of less than 100 mm must be
                 avoided.

                 A sharper bending than this may cause micro
                 fissures in the glass to break up, which causes
                 degraded operation even if the fiber does not
                 break completely.



                 So -

             2)  Do not pull on kinks to undo them.

             3)  Do not wrap the cable round the hand when pulling
                 elsewhere than the pull-loop.

             4)  Do not pull the cable across sharp edges.

             5)  Do not use brute force. If the pulling is hard,
                 use liquid soap as a lubricant.



3.2      H̲O̲W̲ ̲T̲O̲ ̲P̲R̲E̲P̲A̲R̲E̲ ̲A̲N̲D̲ ̲R̲U̲N̲ ̲O̲P̲T̲O̲-̲C̲A̲B̲L̲E̲



3.2.1    P̲r̲e̲p̲a̲r̲a̲t̲i̲o̲n̲ ̲o̲f̲ ̲P̲u̲l̲l̲-̲L̲o̲o̲p̲

         To be able to connect the pulling wire to the opto-cable
         it is necessary to make a pull-loop (see figure 3.2-1).

         a)  Remove approx. 100 mm of the white cover jacket,
             using a cable knife (refer to table 3-1).

         b)  Remove all of the exposed black and white outer
             jackets with the jacket stripper.

         c)  Now the yellow woven KEVLAR is exposed. Tear up
             the weaving and thus expose the white inner jacket.

         d)  Snip off both inner jackets (and fibers) as far
             as possible, without hurting the KEVLAR which is
             the strength member of the opto-cable.

         e)  Now tie a reef knot with the ends of the KEVLAR,
             making a loop as big as wanted.

             This loop now should be sufficiently strong and
             protecting the fiber.



           R̲E̲C̲O̲M̲M̲E̲N̲D̲E̲D̲ ̲T̲O̲O̲L̲S̲ ̲A̲N̲D̲ ̲T̲E̲S̲T̲ ̲E̲Q̲U̲I̲P̲M̲E̲N̲T̲



         E̲q̲u̲i̲p̲m̲e̲n̲t̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲M̲a̲n̲u̲f̲a̲c̲t̲u̲r̲e̲r̲ ̲ ̲ ̲ ̲ ̲ ̲T̲y̲p̲e̲ ̲N̲u̲m̲b̲e̲r̲ ̲ ̲ ̲
         ̲ ̲ ̲ ̲ ̲ ̲

         Wire Cutter       XURON Corp        Micro-Shear 170
                                             C II

         Cable Knife       Weidmuller        AM-1

         Jacket Stripper   EREM              165

         Flashlight



















                        Table 3-1


















































  Figure 3.2-1 (sheet 1 of 2)…01…Opto-cable Cross Section 


















































   Figure 3.2-1 (sheet 2 of 2)…01…Preparation of Pull-loop



3.2.2    R̲u̲n̲n̲i̲n̲g̲ ̲t̲h̲e̲ ̲O̲p̲t̲o̲-̲C̲a̲b̲l̲e̲

         a)  To run an opto-cable two persons are required,
             since it will not tolerate being forced across
             an edge.

             One person feeds the cable from the reservoir into
             one pull-box while the other person pulls the other
             end.

         b)  In this way of pulling cables, with only one pull-box
             distance (max 20 m) at the time requires a technique
             to avoid kinks, knots, and twisting.

             1)  Start by pulling double the required amount
                 through the first pull-box distance. Then pull
                 the end further down to the next pull-box.

                 Subsequently, a new pull-box distance of cable
                 is run down from the first pull-box to the
                 second, then from the second to the third and
                 so on.

                 In this way the cable to be handled will never
                 exceed 40 m.

             2)  One way of handling piles of excess cable is
                 to make "figure 8s" with the cable coming out
                 of the pull-box. When it is all stacked, turn
                 the heap to get the free end on top.



3.2.3    F̲i̲n̲i̲s̲h̲ ̲o̲f̲ ̲E̲a̲c̲h̲ ̲C̲a̲b̲l̲e̲

         a)  After running a cable, be sure to allow the required
             lengths of additional cable to ease the connector
             terminations later on (see document reference 1).

         b)  After running a cable, the integrity of the fibers
             should be checked by means of flashlight.

             If the test is successful, the cable should be
             temporarily marked at both ends with the specified
             cable number (see Appendix A and document reference
             2). The final cable numbering will be done after
             terminations during site installation.










                        APPENDIX A





                   C̲A̲B̲L̲I̲N̲G̲ ̲P̲L̲A̲N̲



  M̲A̲I̲N̲ ̲S̲I̲T̲E̲:̲

  R̲O̲O̲M̲ ̲N̲O̲  U̲N̲I̲T̲ ̲N̲O̲/̲D̲E̲V̲I̲C̲E̲ ̲T̲Y̲P̲E̲  C̲A̲B̲L̲E̲ ̲N̲O̲  C̲A̲B̲L̲E̲ ̲L̲E̲N̲G̲T̲H̲
  ̲(̲m̲)̲  R̲O̲L̲L̲ ̲N̲O̲

    H318          19/VDU          W819          140          57
    I142-48       20/VDU          W820          160          57
    I142-48       21/VDU          W821          160          57
    I142-48       22/VDU          W822          160          57
    T1052         23/VDU          W823          150          60
    T1052         24/VDU          W824          150          60
    M216          25/VDU          W825           75          60
    M216          26/VDU          W826           75          60
    M229          27/VDU          W827           95          60
    M225          28/VDU          W828           80          63
    M201          29/VDU          W829           75          57
    M227          30/VDU          W830           85          63
    M202          31/VDU          W831           60          60
    M232          32/VDU          W832          120          63
    M201          33/VDU          W833           75          57
    M206          34/VDU          W834           70          29
    H318          */VDU                         140          29
    H206          35/VDU          W835           70          63
    H236          */VDU                         135          63
    I324-25       36/VDU          W836          225          29
    I351          37/VDU          W837          215          63
    H207          38/VDU          W838          175          29
    I142-48       49/MSP          W849          160          57
    T1052         50/MSP          W850          150          60
    M216          51/MSP          W851           75          60
    I324-25       52/MSP          W852          225          29
    I351          53/MSP          W853          215          63
    H207          54/MSP          W854          175          29


    *             Excess of contractual quantity (refer
                  to CAMPS Log No 1054, Para B, Subpara
                  (3)).