DataMuseum.dk

Presents historical artifacts from the history of:

CR80 Wang WCS documentation floppies

This is an automatic "excavation" of a thematic subset of
artifacts from Datamuseum.dk's BitArchive.

See our Wiki for more about CR80 Wang WCS documentation floppies

Excavated with: AutoArchaeologist - Free & Open Source Software.


top - download

⟦6d4e78cc9⟧ Wang Wps File

    Length: 10907 (0x2a9b)
    Types: Wang Wps File
    Notes: CPS/AUX/061               
    Names: »3676A «

Derivation

└─⟦739d3b0df⟧ Bits:30006175 8" Wang WCS floppy, CR 0316A
    └─ ⟦this⟧ »3676A « 

WangText


…00……00……00……00……05……02……00……00……05…
…05… …05……06… …0a… …0f…  



…02…CPS/AUX/061

…02…SRA/830506…02……02…#
FAT PROCEDURE FOR THE RESYNC MODULE
…02……02…CAMPS










                    T̲A̲B̲L̲E̲ ̲O̲F̲ ̲C̲O̲N̲T̲E̲N̲T̲S̲


         1   INTRODUCTION............................   3 
         2   TESTSTEPS FOR TESTPROCEDURE 2...........   3 
         3   TESTSTEPS FOR TESTPROCEDURE 3...........  10 
         4   PRINTOUTS...............................  12 



                     1̲ ̲ ̲I̲N̲T̲R̲O̲D̲U̲C̲T̲I̲O̲N̲


         The purpose of this document is to present the teststeps
         which must be added to the Factory Acceptance Testprocedures
         (FATs) to qualify the RESYNC MODULE (CR80112).
         Teststep numbering and filter box jack numbering are
         chosen to match the site 14 FAT. In site 14 only 1
         of the 2 resync channels is used. If a site FAT involves
         more than one resync channel the teststeps must be
         performed for each channel used.
         Since the link through the RESYNC MODULE is independent
         of which PU (#1 or #2) that runs the test, the teststeps
         presented in this document are only performed as part
         of testprocedure 2 and 3 of the FAT.


                       2̲ ̲ ̲T̲E̲S̲T̲S̲T̲E̲P̲S̲


         The teststeps to be appended to testprocedure 2 are
         given on the following pages.



T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲                                                           T̲E̲S̲T̲
                                                                     ̲N̲O̲.̲:̲
                                                                     ̲2̲/̲2̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲2̲/̲C̲U̲/̲T̲D̲X̲#̲2̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲a̲l̲ ̲T̲e̲s̲t̲

S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲S̲e̲c̲s̲.̲ ̲3̲.̲4̲.̲5̲.̲1̲.̲o̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲4̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲7̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Case     Test
Step No. Station     Action                    Expected Results
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

7.18.1   OC          Boot the TDX3 test as
                     follows:
                     BA 1025(CR)
                     BM 140(CR)                Refer to Appendix
                                               B
                     BO 631(CR)                sec. 7.11

7.18.2   N/A         Power down the main and   N/A
                     remote site stat. mux.
                     Remove the testcable be-
                     tween the main site fil-
                     terbox J33 and the remo-
                     te site filterbox J40.
                     On the main site and the
                     remote site stat. mux.
                     set S1 and S2 on the ba-
                     se board switch group 2
                     to the CLOSED position
                     (extern clock). Power up
                     the main and remote site
                     stat. mux.

7.18.3   N/A         Connect the CRYPTO/MODEM  N/A
                     link between main site
                     filterbox J33 and remo-
                     te site filterbox J40.



  ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:





                                                ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
                                               ̲ ̲
                                               T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲

                                               TEST QA   QAR



T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲                                                           T̲E̲S̲T̲
                                                                     ̲N̲O̲.̲:̲
                                                                     ̲2̲/̲2̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲2̲/̲C̲U̲/̲T̲D̲X̲#̲2̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲a̲l̲ ̲T̲e̲s̲t̲

S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲S̲e̲c̲s̲.̲ ̲3̲.̲4̲.̲5̲.̲1̲.̲o̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲4̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲7̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Case     Test
Step No. Station     Action                    Expected Results
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

7.18.4   N/A         Power up both MODEMs and  N/A
                     CRYPTOs. If identical
                     keystores on both CRYPTOs
                     are on then proceed from
                     7.18.5 else load the
                     cryptokey into keystore 1
                     on both cryptos.

7.18.5   N/A         CRYPTO synchronization    CRYPTOs are
                     should be initiated. If   synchronized
                     not CH1.ERR on the
                     RESYNC MODULE is on.
                     Activate the RESET push-
                     button on the RESYNC MO-
                     DULE.

7.18.6   N/A         Set switch S1 on the      RTS on the main
                     MODEM link to OFF         site modem goes
                                               off
                     (MODEM link open circuit) for 1.5 secs
                                               and then on again
                                               for 3 secs.

                     When RTS on the main site CRYPTOS synchronize.
                     goes off the second time
                     set switch S1 to ON.




  ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:





                                                ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
                                               ̲ ̲
                                               T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲

                                               TEST QA   QAR



T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲                                                           T̲E̲S̲T̲
                                                                     ̲N̲O̲.̲:̲
                                                                     ̲2̲/̲2̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲2̲/̲C̲U̲/̲T̲D̲X̲#̲2̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲a̲l̲ ̲T̲e̲s̲t̲

S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲S̲e̲c̲s̲.̲ ̲3̲.̲4̲.̲5̲.̲1̲.̲o̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲4̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲7̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Case     Test
Step No. Station     Action                    Expected Results
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

7.18.7   N/A         Set switch S1 to OFF      After 13.5 secs.
                                               the CH1.ERR indicator
                                               goes on

                     Set switch S1 to ON       No synchronization
                                               is initiated

7.18.8   N/A         Activate the RESET push-  After 1.5secs
                                               the
                     button on the RESYNC      CRYPTOS synchronize.
                     MODULE

7.18.9   N/A         Set switch S2 on the      RTS on the main
                     MODEM link to OFF         site modem goes
                                               off
                     (MODEM link open circuit) for 1.5 secs
                                               and then on again
                                               for 3 secs.

                     When RTS on the main site CRYPTOS synchronize.
                     goes off the second time
                     set switch S2 to ON.

7.18.10  N/A         Set switch S2 to OFF      After 13.5 secs.
                                               the CH1.ERR indicator
                                               goes on

                     Set switch S2 to ON       No synchronization
                                               is initiated


 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:





                                                ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
                                               ̲ ̲
                                               T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲

                                               TEST QA   QAR



T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲                                                           T̲E̲S̲T̲
                                                                     ̲N̲O̲.̲:̲
                                                                     ̲2̲/̲2̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲2̲/̲C̲U̲/̲T̲D̲X̲#̲2̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲a̲l̲ ̲T̲e̲s̲t̲

S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲S̲e̲c̲s̲.̲ ̲3̲.̲4̲.̲5̲.̲1̲.̲o̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲4̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲7̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Case     Test
Step No. Station     Action                    Expected Results
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

7.18.11  N/A         Activate the RESET push-  After 1.5secs
                                               the
                     button on the RESYNC      CRYPTOS synchronize.
                     MODULE

7.19.1   N/A         Power down TU#11.         N/A
                     Conect 2 test VDUs
                     to J28 and J32 in
                     the CRT V24 filter
                     box. Power up TU#11.

7.19.2   OC          Activate the link 1BX
                     LTUX-S test as fol-
                     lows:

                     Enter from the OC:
                     DO OPEN1B(CR)
                     (Appendix A,sec. 4.24a)
                     DO VDU4(CR)
                     (Appendix A, sec.4.2)

                     When a couple of lines    Output stops.
                     have been transmitted to
                     the remote VDUs set switch
                     S1 to OFF.




 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:





                                                ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
                                               ̲ ̲
                                               T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲

                                               TEST QA   QAR



T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲                                                           T̲E̲S̲T̲
                                                                     ̲N̲O̲.̲:̲
                                                                     ̲2̲/̲2̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲2̲/̲C̲U̲/̲T̲D̲X̲#̲2̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲a̲l̲ ̲T̲e̲s̲t̲

S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲S̲e̲c̲s̲.̲ ̲3̲.̲4̲.̲5̲.̲1̲.̲o̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲4̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲7̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Case     Test
Step No. Station     Action                    Expected Results
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

7.19.3   N/A         When the CH1.ERR. indica- CRYPTOs synchronize
                     tor goes on set S1 to ON  and output is
                                               resumed.
                     and activate the RESET    OC print out
                                               as speci-
                     pushbutton on the RESYNC  fied in appendix
                                               B,
                     module. Let the testse-   sec. 7.18
                     quence finish normally

7.19.4   OC          Enter from the OC:
                     DO VDU4(CR)
                     (Appendix A, sec.4.2)

                     When a couple of lines    Output stops.
                     have been transmitted to
                     the remote VDUs set switch
                     S2 to OFF.

7.19.5   N/A         When the CH1.ERR. indica- CRYPTOs synchronize
                     tor goes on set S2 to ON  and output is
                                               resumed.
                     and activate the RESET    OC print out
                                               as speci-
                     pushbutton on the RESYNC  fied in appendix
                                               B,
                     module. Let the testse-   sec. 7.19
                     quence finish normally

                     Enter from the OC:
                     DO CLOSE1B (CR)
                     (Appendix A, sec.4.24b)


 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:





                                                ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
                                               ̲ ̲
                                               T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲

                                               TEST QA   QAR



T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲                                                           T̲E̲S̲T̲
                                                                     ̲N̲O̲.̲:̲
                                                                     ̲2̲/̲2̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲P̲U̲#̲2̲/̲C̲U̲/̲T̲D̲X̲#̲2̲ ̲F̲u̲n̲c̲t̲i̲o̲n̲a̲l̲ ̲T̲e̲s̲t̲

S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲S̲e̲c̲s̲.̲ ̲3̲.̲4̲.̲5̲.̲1̲.̲o̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲4̲,̲ ̲3̲.̲4̲.̲5̲.̲7̲.̲a̲.̲7̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Case     Test
Step No. Station     Action                    Expected Results
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

7.19.6   N/A         Power down the CRYPTOs,   N/A
                     the MODEMs and the main
                     and remote site stat.
                     mux. Remove the CRYPTO/
                     MODEM link. Connect the
                     testcable between J33 in
                     the main site filterbox
                     and J40 in the remote site
                     filterbox.
                     On the main site and the
                     remote site stat. mux.
                     set S1 on the ba-
                     se board switch group 2
                     to the OPEN position
                     (intern clock). Power up
                     the main and remote site
                     stat. mux.











 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:





                                                ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
                                               ̲ ̲
                                               T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲

                                               TEST QA   QAR


                       3̲ ̲ ̲T̲E̲S̲T̲S̲T̲E̲P̲S̲


         The teststeps to be appended to testprocedure 3 are
         given on the following pages.



T̲E̲S̲T̲ ̲S̲T̲E̲P̲S̲                                                           T̲E̲S̲T̲
                                                                     ̲N̲O̲.̲:̲
                                                                     ̲2̲/̲3̲

F̲U̲N̲C̲T̲I̲O̲N̲:̲ ̲ ̲W̲a̲t̲c̲h̲d̲o̲g̲ ̲P̲r̲o̲c̲e̲s̲s̲o̲r̲ ̲S̲y̲s̲t̲e̲m̲ ̲T̲e̲s̲t̲

S̲R̲S̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲:̲ ̲ ̲N̲/̲A̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

Case     Test
Step No. Station     Action                    Expected Results
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

12.18    N/A         If the CH1.ERR. indica-   N/A
                     tion is on activate the
                     RESET pushbutton on the
                     RESYNC MODULE.

12.19    OC          Enter from the OC:        Refer to appendix
                                               B
                     CCB(CR)                   sec. 19.9
                     94 1B FF FF(CR)

12.20    N/A         Power down the remote     After 13.5 secs.
                                               the
                     site stat. mux.           CH1.ERR indication
                                               goes on.

                     Power up the remote
                     site stat. mux.

12.21    OC          Enter from the OC:        Refer to appendix
                                               B
                     CCB(CR)                   sec. 19.10
                     94 1B FF FF(CR)

12.22    N/A         Activate the RESET push-  CH1.ERR.indication
                     button on the RESYNC      goes off.
                     MODULE

12.23    OC          Enter from the OC:        Refer to appendix
                                               B
                     CCB(CR)                   sec. 19.9
                     94 1B FF FF(CR)

 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
 ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
Comments:





                                                ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
                                               ̲ ̲
                                               T̲E̲S̲T̲ ̲W̲I̲T̲N̲E̲S̲S̲E̲S̲

                                               TEST QA   QAR


                       4̲ ̲ ̲P̲R̲I̲N̲T̲O̲U̲T̲S̲


         This chapter contains printouts as obtained during
         execution of the teststeps given in chapter 2 and 3.