top - download
⟦6ff4389e4⟧ Wang Wps File
Length: 2928 (0xb70)
Types: Wang Wps File
Notes: intern Meddelelse Nr. 299
Names: »1902A «
Derivation
└─⟦780c36067⟧ Bits:30006094 8" Wang WCS floppy, CR 0146A
└─ ⟦this⟧ »1902A «
WangText
…02…
…02…KNN/820324…02……02…#
INTERN MEDDELELSE NR. 299
…02……02…CAMPS
TO: SW Team, System Engineering Team, QA, GQAR, GJ,
BHB
FM: KNN
S̲u̲b̲j̲e̲c̲t̲:̲ ̲ ̲D̲e̲t̲a̲i̲l̲e̲d̲ ̲D̲e̲s̲i̲g̲n̲ ̲R̲e̲v̲i̲e̲w̲ ̲(̲3̲1̲/̲3̲-̲7̲/̲4̲ ̲a̲n̲d̲ ̲
1̲9̲/̲4̲-̲3̲0̲/̲4̲)̲
The following organizations are invited to participate
in all of the reviews by one representative each:
- SHAPE
- QA
- System Engineering
Review members from the software team are nominated
below.
All reviewers are requested to follow the guidelines
laid down in CPS/AUX/018; Detailed Design Review Plan.
It is i̲m̲p̲o̲r̲t̲a̲n̲t̲ that the reviewers formulate their
problem statement(s) in a clear unambigous language.
If m̲o̲r̲e̲ ̲t̲h̲a̲n̲ ̲o̲n̲e̲ problem statement is contained on
a DN, they shall be numbered such that the book captain
can produce answers which refer to the problem being
answered.
The book captains shall establish a correction master.
After correction in the CAMPS secretariate, the correction
master shall be filed in SW conf. mngt. (KNN).
A presentation of the packages is scheduled to the
29/3 and 5/4 1982 at 14.00 in CAMPS meeting room.
R̲e̲v̲i̲e̲w̲ ̲1̲
Document: System Status and Control
DNs due date 29/3
Date, Time: 31/3 1982, 10.00 hrs.
Reviewers: BHJ, SJU, HJP, OKH
Review Secretary: FH
Review Chairman: KNN
R̲e̲v̲i̲e̲w̲ ̲2̲
Document MDCO VDU
DNs due date 31/3
Date, Time: 2/4 1982, 10.00 hrs.
Reviewers: JBS, KNB
Review Secretary: CGN
Review Chairman: KNN
R̲e̲v̲i̲e̲w̲ ̲3̲
Document: MSO VDU
DNs due date: 2/4
Date, Time: 7/4 1982, 10.00 hrs.
Reviewers: BBC, NJ
Review Secretary: CGN
Review Chairman: KNN
R̲e̲v̲i̲e̲w̲ ̲4̲
Document: Traffic
DNs due date: 17/4
Date, Time: 19/4 1982, 10.00 hrs.
Reviewers: JJS, BLP, NJ
Review Secretary: KNB
Review Chairman: KNN
R̲e̲v̲i̲e̲w̲ ̲5̲
Document: SW Interface Control Document
DNs due date: 19/4
Date, Time: 21/4
Reviewers: All (One representative per group)
Review secretary: NJ
Review chairman: KNN
R̲e̲v̲i̲e̲w̲ ̲6̲
Document: Data Base Design Document
Dns due date: 20/4
Date, Time: 22/4 1982, 10.00 hrs.
Reviewers: All (One representative per group)
Review Secretary: NJ
Review Chairman: KNN
R̲e̲v̲i̲e̲w̲ ̲7̲
Document: I/O Control
DNs due date: 22/4
Date, Time: 26/4 1982, 10.00 hrs.
Reviewers: HUH, KNB, BBC
Review Secretary: HKI
Review Chairman: KNN
R̲e̲v̲i̲e̲w̲ ̲8̲
Document: Print (TBDs)
Date, Time: 30/4 1982, 10.00 hrs.
Reviewers: BBC, JJS
Review Secretary: KS
Review Chairman: KNN
R̲e̲v̲i̲e̲w̲ ̲9̲
Document: Supervisor VDU
DNs due date 23/4
Date, Time: 28/4 1982, 10.00 hrs.
Reviewers: BBC, JJS, NJ
Review Secretary: MSN
Review Chairman: KNN