DataMuseum.dk

Presents historical artifacts from the history of:

CR80 Wang WCS documentation floppies

This is an automatic "excavation" of a thematic subset of
artifacts from Datamuseum.dk's BitArchive.

See our Wiki for more about CR80 Wang WCS documentation floppies

Excavated with: AutoArchaeologist - Free & Open Source Software.


top - download

⟦72d4de233⟧ Wang Wps File

    Length: 7537 (0x1d71)
    Types: Wang Wps File
    Notes: Inspection & Test Proc    
    Names: »1752A «

Derivation

└─⟦35f7ff388⟧ Bits:30006086 8" Wang WCS floppy, CR 0132A
    └─ ⟦this⟧ »1752A « 

WangText




…02…CPS/TPR/022

…02… EV/820225…02……02…#
INSPECTION AND TEST PROCEDURE FOR
CDC MMD 9730-80F…02……02…CAMPS








                    T̲A̲B̲L̲E̲ ̲O̲F̲ ̲C̲O̲N̲T̲E̲N̲T̲S̲


   1  SCOPE .........................................
      4

   2  APPLICABLE DOCUMENTS ..........................
      4

   3  INCOMING INSPECTION ...........................
      6
     3.1  GENERAL ...................................
        6
       3.1.1  Registration ..........................
          6
       3.1.2  Failure Reporting .....................
          6
       3.1.3  Documentation .........................
          6
         3.1.3.1  Invoice and COC's .................
            6
         3.1.3.2  Manuals ...........................
            6

     3.2  INCOMING INSPECTION AND TEST LOG ..........
        6

   4  VISUAL INSPECTION .............................
      8
     4.1  GENERAL ...................................
        8
     4.2  INSPECTION POINTS .........................
        8
     4.3  TRANSPORTATION ............................
        8

   5  TEST ..........................................
      9
     5.1  GENERAL ...................................
        9
     5.2  LOCKING PINS ..............................
        9
     5.3  MECHANICAL PARTS ..........................
        9
     5.4  OFF-LINE TEST UNIT ........................
        9
     5.5  MAIN POWER ................................
        9
     5.6  DISC PACKAGE ..............................
       10
       5.6.1  Ventilation ...........................
         10

     5.7  DRIVE START ...............................
       10
     5.8  SEQUENTIAL READ/WRITE TEST ................
       10
       5.8.1  Discrepancies .........................
         10

     5.9  MAXIMUM SEEK ..............................
       10
       5.9.1  Discrepancies .........................
         10

     5.10  RANDOM SEEK ..............................
       11
     5.11  LOCKING PINS .............................
       11
     5.12  TRANSPORTATION ...........................
       11

   6  PACKING .......................................
     12
     6.1  GENERAL ...................................
       12
     6.2  PACKING ...................................
       12
     6.3  PAPERWORK .................................
       12
     6.4  TRANSPORTATION ............................
       12


                         1̲ ̲ ̲S̲C̲O̲P̲E̲



         This document describes the procedures and guidelines
         for inspection and test of the CDC Disk Drive MMD 9730-80F
         and the flow showing events and responsibilities is
         shown in the flow-chart fig. 1.1.









                 2̲ ̲ ̲A̲P̲P̲L̲I̲C̲A̲B̲L̲E̲ ̲D̲O̲C̲U̲M̲E̲N̲T̲S̲



         SD/STD/017
         INCOMING INSPECTION STANDARD

         PAD/PRC/0002
         NON-CONFORMANCE HANDLING

         CDC 83323370
         TB216 FIELD TEST UNIT






















































                  3̲ ̲ ̲I̲N̲C̲O̲M̲I̲N̲G̲ ̲I̲N̲S̲P̲E̲C̲T̲I̲O̲N̲



3.1      G̲E̲N̲E̲R̲A̲L̲

         Unpacking, registration, inspection for shipping damage
         and visual inspection of the equipment shall be performed
         by the ILS Incoming Inspection personnel.



3.1.1    R̲e̲g̲i̲s̲t̲r̲a̲t̲i̲o̲n̲

         Registration shall be performed in agreement with the
         lines laid down in SD/STD/017, Incoming Inspection
         Standard.



3.1.2    F̲a̲i̲l̲u̲r̲e̲ ̲R̲e̲p̲o̲r̲t̲i̲n̲g̲

         All failures, discrepancies etc. shall be reported
         in agreement with the lines laid down in PAD/PRC/0002,
         Nonconformance Handling.



3.1.3    D̲o̲c̲u̲m̲e̲n̲t̲a̲t̲i̲o̲n̲


3.1.3.1  I̲n̲v̲o̲i̲c̲e̲ ̲a̲n̲d̲ ̲C̲O̲C̲'̲s̲

         Invoice and Certificates of Conformance shall in copies
         be distributed to the Project Office.


3.1.3.2  M̲a̲n̲u̲a̲l̲s̲

         Serial numbered manuals shall be filed in the ILS-archives
         until repacking.



3.2      I̲N̲C̲O̲M̲I̲N̲G̲ ̲I̲N̲S̲P̲E̲C̲T̲I̲O̲N̲ ̲A̲N̲D̲ ̲T̲E̲S̲T̲ ̲L̲O̲G̲

         The Incoming Inspection Log fig. 3.2-1 shall be filled
         in consistent and carefully during the whole inspection
         and test operation.  This log will be an appendix to
         the concerned Incoming Inspection Report (IKR).


































                   4̲ ̲ ̲V̲I̲S̲U̲A̲L̲ ̲I̲N̲S̲P̲E̲C̲T̲I̲O̲N̲



4.1      G̲E̲N̲E̲R̲A̲L̲

         The following visual inspection points shall be inspected
         by the ILS-inspection personnel.



4.2      I̲N̲S̲P̲E̲C̲T̲I̲O̲N̲ ̲P̲O̲I̲N̲T̲S̲

         a)  Verify that all ordered documentation, cables,
             terminators, address plugs, pins etc. are presented.

         b)  Inspect drive for possible shipping damage. 

         c)  Verify that all logic cards are firmly seated in
             logic chassis and power supply.

         d)  Verify that the control panel is firmly seated
             in shroud.

         e)  Verify that all connectors are firmly seated.

         f)  Ensure that carriage locking pin and ring assembly
             is moved from SHIPPING LOCK hole to PIN STORAGE
             hole.

         g)  Check entire drive for presence of foreign material
             which could cause an electrical short.

         h)  Check actuator and pack area for presence of material
             which could obstruct movement of carriage and heads.

         i)  Raise deck and verify that all cabling is intact
             and that there are no broken or damaged wires.



4.3      T̲R̲A̲N̲S̲P̲O̲R̲T̲A̲T̲I̲O̲N̲

         The transportation between ILS and EDB-TA will be carried
         out of ILS-personnel.


                         5̲ ̲ ̲T̲E̲S̲T̲



5.1      G̲E̲N̲E̲R̲A̲L̲

         The following test-points shall be performed by EDB-TA
         personnel according to CDC 83323370 TB 216 Field Test
         Unit Manual.



5.2      L̲O̲C̲K̲I̲N̲G̲ ̲P̲I̲N̲S̲

         Dismantle the carriage locking pins.


5.3      M̲E̲C̲H̲A̲N̲I̲C̲A̲L̲ ̲P̲A̲R̲T̲S̲

         Inspect all mechanical parts internal in the drive
         to ensure that there are no broken or damaged parts.



5.4      O̲F̲F̲-̲L̲I̲N̲E̲ ̲T̲E̲S̲T̲ ̲U̲N̲I̲T̲

         Connect the Off-Line Test Unit TB216 to the drive.



5.5      M̲A̲I̲N̲ ̲P̲O̲W̲E̲R̲

         Connect the main power and measure the presence of:

         +/-  5V DC
         +/- 20V DC
         +/- 46V DC





5.6      D̲I̲S̲C̲ ̲P̲A̲C̲K̲A̲G̲E̲

         Mount the pre-formatted disc package.



5.6.1    V̲e̲n̲t̲i̲l̲a̲t̲i̲o̲n̲

         Ventilate the pack area for minimum 10 minutes.



5.7      D̲R̲I̲V̲E̲ ̲S̲T̲A̲R̲T̲

         When the drive is started it shall be ensured that
         no abnormal noise is existing.



5.8      S̲E̲Q̲U̲E̲N̲T̲I̲A̲L̲ ̲R̲E̲A̲D̲/̲W̲R̲I̲T̲E̲ ̲T̲E̲S̲T̲

         Sequential read/write of random data from the preformatted
         disc package shall take place for minimum 15 minutes.



5.8.1    D̲i̲s̲c̲r̲e̲p̲a̲n̲c̲i̲e̲s̲

         In case failures or discrepancies occur, head alignment
         shall be controlled with the CE-package.



5.9      M̲A̲X̲I̲M̲U̲M̲ ̲S̲E̲E̲K̲

         Maximum seek shall be performed for minimum 15 minutes.



5.9.1    D̲i̲s̲c̲r̲e̲p̲a̲n̲c̲i̲e̲s̲

         In case failures or discrepancies occur, the servo
         system and the power system shall be controlled.





5.10     R̲A̲N̲D̲O̲M̲ ̲S̲E̲E̲K̲

         Perform random seek with read/write of random data
         for minimum 1 hour.



5.11     L̲O̲C̲K̲I̲N̲G̲ ̲P̲I̲N̲S̲

         Reassemble carriage locking pins.



5.12     T̲R̲A̲N̲S̲P̲O̲R̲T̲A̲T̲I̲O̲N̲

         When all tests have been performed and the paperwork
         is finished, contact ILS for transportation from EDB-TA
         testareas to ILS-testareas.


                        6̲ ̲ ̲P̲A̲C̲K̲I̲N̲G̲



6.1      G̲E̲N̲E̲R̲A̲L̲

         ILS-personnel has the responsibility for collecting
         all items according to para. 4.2 a and performance
         of the following points.



6.2      P̲A̲C̲K̲I̲N̲G̲

         All items shall be packed in plastic bags with humidity
         absorbing Silica Gel and repacked in the reuseable
         container.



6.3      P̲A̲P̲E̲R̲W̲O̲R̲K̲

         The paperwork in the shape of Incoming Inspection Log,
         Incoming Inspection Report and Stock List shall be
         finished.



6.4      T̲R̲A̲N̲S̲P̲O̲R̲T̲A̲T̲I̲O̲N̲

         ILS has the responsibility for transportation between
         CR A/S, Ballerup and the stock in Herlev.