top - download
⟦77efbde83⟧ Wang Wps File
Length: 19002 (0x4a3a)
Types: Wang Wps File
Notes: CAMPS arbejdskoder
Names: »0732A «
Derivation
└─⟦ecb9329a3⟧ Bits:30006006 8" Wang WCS floppy, CR 0041A
└─ ⟦this⟧ »0732A «
WangText
…02…
…02…KNN/840118…02……02…#
CAMPS PROJEKT NR. SAMT
ARBEJDSKODER FRA 1/1-84.…02… GJ/821013 …02…CAMPS
P̲R̲O̲G̲R̲A̲M̲ ̲M̲A̲N̲A̲G̲E̲M̲E̲N̲T̲ (100-199) L[NKLASSE, FORM
P̲R̲O̲J̲E̲K̲T̲N̲R̲.̲ ̲O̲G̲ ̲A̲R̲B̲E̲J̲D̲S̲K̲O̲D̲E̲ L̲I̲N̲E̲
̲I̲T̲E̲M̲
Projekt Adm., General 56P 014 111 1.1.1
PIP 56P 014 117 1.1.7
Subcontract Management Plan 56P 014 118 1.1.8
System Eng. Management, General 56P 014 121 1.2.1
System Development Plan 56P 014 122 1.2.2
Design and Div. Planning 56P 014 123 1.2.3
Design Standards 56P 014 124 1.2.4
Configuration Management 56P 014 125 1.2.5
Operation Management 56P 014 131 1.3.1
QA Plan 56P 014 142 1.4.2
Reliability Plan 56P 014 143 1.4.3
Logistics Support Management 56P 014 151 1.5.1
Logistics Support Plan 56P 014 152 1.5.2
Secretarial Assistance 56P 014 153
Temporary Secretary 56P 014 154
S̲Y̲S̲T̲E̲M̲ ̲E̲N̲G̲I̲N̲E̲E̲R̲I̲N̲G̲ (200-299)
System Requirements Specification 56P 014 211 2.1.1
Acceptance Test Plan 56P 014 212 2.1.2
Message Formats ICD 001 56P 014 221 2.2.1
ACP127 Interpretation ICD 003 56P 014 223 2.2.3
Supervisor procedures ICD 002 56P 014 224 2.2.4
SCARS II I/F ICD 005 56P 014 225 2.2.5
ACE CCIS I/F ICD 006 56P 014 226 2.2.6
NICS/TARE I/F ICD 004 56P 014 227 2.2.7
Crypto I/F 56P 014 229 2.2.9
Systems Design 56P 014 231 2.3.1
Performance report 56P 014 241 2.4.1
Performance report summary 56P 014 241 2.4.1.1
Damos performance test def. 56P 014 241 2.4.1.2
Damos performance test execution 56P 014 241 2.4.1.3
CAMPS prel. perform. test 56P 014 241 2.4.1.4
CAMPS final perform. test 56P 014 241 2.4.1.5
RMA Report 56P 014 244 2.4.4
EMC Report 56P 014 245 2.4.5
System Integration and Test Plan 56P 014 251 2.5.1
Acceptance Test Spec. (Overview) 56P 014 252 2.5.2
DSMT HW Test Spec. and Procedures 56P 014 252 2.5.2.3
Factory Acceptance Spec. 56P 014 252 2.5.2.4
COMSEC In-plant test Spec. 56P 014 252 2.5.2.5
DSMT SW Test Spec. 56P 014 252 2.5.2.6
In-plant SW Test Spec. 56P 014 252 2.5.2.7
Functional SW Test Spec. 56P 014 252 2.5.2.8
Operational SW Test Spec. 56P 014 252 2.5.2.9
Site 2-16 SW Test Spec. 56P 014 253 2.5.2.10
System Integration and Test
Specification and Procedures build 1 56P 014 253 2.5.2.11.1
System Integration and Test
Specification and Procedures build 2 56P 014 253 2.5.2.11.2
System Integration and Test
Specification and Procedures build 3 56P 014 253 2.5.2.11.3
Script for in-plant SW test 56P 014 253 2.5.2.11.4
DSMT test, (HW) follow-up 56P 014 531 5.3.1
DSMT test, (System) follow-up 56P 014 532 5.3.2
Major Review 56P 014 292 2.9.2
TDS Software Specification 56P 014 451 4.5.1
TDS Development 56P 014 453 4.5.3
DSMT Integration 56P 014 454 4.5.4
DAMOS test CAMPS HW 56P 014 465 4.6.5.1
DAMOS stabilization test def. 56P 014 465 4.6.5.2
DAMOS stabilization test 56P 014 465 4.6.5.3
CSF, MMS, THP stabilization 56P 014 465 4.6.5.4
I&T procedures for IOC 56P 014 465 4.6.5.5
IOC I&T 56P 014 465 4.6.5.6
DAMOS utility verification 56P 014 465 4.6.5.7
DAMOS sys. gen. users manual 56P 014 465 4.6.5.8
CAMPS database gen. users manual 56P 014 465 4.6.5.9
Package Test Review & monitoring 56P 014 466 4.6.6
System Integration and Test foll-up 56P 014 467 4.6.7
Build 1 I&T 56P 014 467 4.6.7.1
System I&T 56P 014 467 4.6.7.2
Definition of debugging tools 56P 014 467 4.6.7.3
Implementation of debugging tools 56P 014 467 4.6.7.4
System Generation 56P 014 467 4.6.7.5
H̲A̲R̲D̲W̲A̲R̲E̲ ̲D̲E̲V̲E̲L̲O̲P̲M̲E̲N̲T̲ (300-399)
H/W Management 56P 014 310 3.1
H/W Design (overall) 56P 014 320 3.2.0
TDX System 56P 014 360 3.6.0
COMSEC Test 56P 014 316 3.16
Production Planning 56P 014 510 5.1
DSMT HW Acceptance Test 56P 014 530 5.3
ED HW Acceptance Test 56P 014 535 5.3.5
Site Fabrication and Test 56P 014 540 5.4
Resync Module 56P 014 310 3.7.1
S̲O̲F̲T̲W̲A̲R̲E̲ ̲D̲E̲V̲E̲L̲O̲P̲M̲E̲N̲T̲ (400-499)
S/W Consultancy (DAMOS/CSF) 56P 014 411 4.1.1
S/W Management 56P 014 410 4.1.0
S/W Conf. Mgnt. 56P 014 412 4.1.2
DAMOS 56P 014 432 4.3.2
S/W Test Plan 56P 014 462 4.6.2
S/W Integration Plan 56P 014 463 4.6.3
MD Software 56P 014 485 4.8.5
S/W Eng. Management 56P 014 413 4.1.3
Package Specifications:
------------------------
I/O Control 56P 014 420 4.2.0
CAMPS System Functions 56P 014 420 4.2.1.1
Storage and File Management 56P 014 420 4.2.1.2
SSC System 56P 014 420 4.2.1.3
Traffic 56P 014 420 4.2.1.4
Distribution 56P 014 420 4.2.1.5
Terminal 56P 014 420 4.2.1.6
Table Management 56P 014 420 4.2.1.7
Storage and Retrieval 56P 014 420 4.2.1.8
Log 56P 014 420 4.2.1.9
Statistic 56P 014 421 4.2.1.10
Offline SW 56P 014 421 4.2.1.11
Support SW 56P 014 421 4.2.1.12
Database Def. Document 56P 014 422 4.2.2
Software I/F Control Doc. 56P 014 423 4.2.3
Package Specification - Detailed Design:
-----------------------------------------
I/O Control 56P 014 441 4.4.13
CAMPS System Functions 56P 014 449 4.4.9
Storage and File Management 56P 014 441 4.4.11
SSC System 56P 014 441 4.4.12
Traffic 56P 014 444 4.4.4
Distribution 56P 014 443 4.4.3
Terminal 56P 014 442 4.4.2
Table Management 56P 014 448 4.4.8
Storage and Retrieval 56P 014 446 4.4.6
Log 56P 014 445 4.4.5
Statistics 56P 014 447 4.4.7
Off-Line SW 56P 014 441 4.4.10
Firmware TDX Design 56P 014 441 4.4.14
Firmware WD Design 56P 014 441 4.4.15
Package Specification - Code and Test:
--------------------------------------
I/O Control 56P 014 441 4.4.13
CAMPS System Functions 56P 014 449 4.4.9
Storage and File Management 56P 014 441 4.4.11
SSC System 56P 014 441 4.4.12
Traffic 56P 014 444 4.4.4
Distribution 56P 014 443 4.4.3
T̲e̲r̲m̲i̲n̲a̲l̲ 56P 014 442 4.4.2
User VDU 56P 014 442 4.4.2.1
Printer 56P 014 442 4.4.2.2
Sup. VDU 56P 014 442 4.4.2.3
MDCO 56P 014 442 4.4.2.4
MSO 56P 014 442 4.4.2.5
Sup. Printer 56P 014 442 4.4.2.6
Table Management 56P 014 448 4.4.8
Storage and Retrieval 56P 014 446 4.4.6
Log 56P 014 445 4.4.5
Statistics 56P 014 447 4.4.7
Off-Line SW 56P 014 441 4.4.10
Package Integration
--------------------
VUP 56P 014 451 4.4.2.1
PRT 56P 014 451 4.4.2.2
SUP 56P 014 451 4.4.2.3
MDCO 56P 014 451 4.4.2.4
MSO 56P 014 451 4.4.2.5
SPR 56P 014 451 4.4.2.6
MDP 56P 014 451 4.4.3
THP 56P 014 451 4.4.4
LOG 56P 014 451 4.4.5
SAR 56P 014 452 4.4.6
STP 56P 014 452 4.4.7
TMP 56P 014 452 4.4.8
CSF 56P 014 452 4.4.9
SYS GEN 56P 014 452 4.4.10.1
FORM GEN VDU 56P 014 452 4.4.10.2.1
FORM GEN PRT 56P 014 452 4.4.10.2.2
DATA BASE GEN 56P 014 452 4.4.10.3
MMS 56P 014 452 4.4.11
SS&C 56P 014 452 4.4.12
IOC, FORMAT VDU 56P 014 452 4.4.13.1.1
IOC, FORMAT PRT 56P 014 452 4.4.13.1.2
IOC, LTUX HDL 56P 014 452 4.4.13.2
IOC, LTUX FW 56P 014 452 4.4.13.3
IOC, SS&C FW 56P 014 453 4.4.13.4
IOC, LTU HDL 56P 014 453 4.4.13.5
Q̲U̲A̲L̲I̲T̲Y̲ ̲A̲S̲S̲U̲R̲A̲N̲C̲E̲
CAMPS Overall 56Q 014 520 5.2
S̲I̲T̲E̲ ̲P̲R̲E̲P̲A̲R̲A̲T̲I̲O̲N̲ ̲A̲N̲D̲ ̲I̲N̲S̲T̲A̲L̲L̲A̲T̲I̲O̲N̲
Management and Planning 56P 014 A10 6.1
Installation Plan 56P 014 A10 6.1.1
Site Surveys 56P 014 A20 6.2
Civil Works Requirements (PAB only) 56P 014 A40 6.4
As-to-be-built Drawings 56P 014 A50 6.5
Coordination 56P 014 A51 6.5.1
Site Verification 56P 014 A60 6.6
Site Installation 56P 014 A70-71 6.7-6.22
Transportation 66D 014 980
Transportation Plan 66D 014 950 8.5
As-built drawings 66D 014 A40 9.4
Site Preparation and Design
(CR only) 56P 014 A30 6.5, 9.4
L̲O̲G̲I̲S̲T̲I̲C̲S̲ ̲S̲U̲P̲P̲O̲R̲T̲
Warranty (S/W) 56W 014 003 8.1
Maintenance 56W 014 003 8.1.1
Field Support 56W 014 002 8.3
Maintenance Mgmt. 56W 014 002 8.4
Maintenance Plan 56W 014 002 8.4.1
RSPL 56W 014 420 8.4.2
ASPL 56W 014 430 8.4.3
Spare Parts Delivery 56P 014 644 8.4.4
Codification 56P 014 645 8.4.5
Spare Parts Handler 56P 014 646 8.4.6
Tech. man. design, vol 1-6 56P 014 747 8.4.7
Tech. man. design, prev. maint. 56P 014 747 8.4.7.1
Tech. man. design., corr. maint. 56P 014 747 8.4.7.2
Tech. man. design., failure report. 56P 014 747 8.4.7.3
Incom. inspec., planning 56P 014 648 8.4.8
Incom. inspec., work 56P 014 649 8.4.9
Transportation Plan 56D 014 950 8.5
T̲R̲A̲I̲N̲I̲N̲G̲
Training Mgmt. 56P 014 820 8.2.2.0
Training Plan 56P 014 822 8.2.2
Training Methods 56P 014 823 8.2.3
Development of Courses - general 56P 014 824 8.2.4
Dev. of c: RST and Technical train. 56P 014 824 8.2.4.1
Dev. of c: User Training 56P 014 824 8.2.4.2
Dev. of c: On the Job Training 56P 014 824 8.2.4.3
Dev. of c: SW Maintenance Training 56P 014 824 8.2.4.4
Training-Overhead 76P 014 829 8.2.9
Training-Overhead: Secretary 76P 014 829 8.2.9.1
Training-Overhead: Drafting 76P 014 829 8.2.9.2
Training-Overhead: Printing 76P 014 829 8.2.9.3
Conduct of courses 56P 014 825 8.2.5
M̲A̲N̲U̲A̲L̲S̲ ̲A̲N̲D̲ ̲H̲A̲N̲D̲B̲O̲O̲K̲S̲
Manuals and Handbooks - General 56P 014 730 9.3.0
System Manuals 56P 014 730 9.3.0.1
OEM Manuals 56P 014 730 9.3.0.2
Tools and Test Equipment Manual 56P 014 730 9.3.0.3
Operator's Guide 56P 014 731 9.3.1.0
User's Guide 56P 014 731 9.3.1.1
Supervisor/Assistant's Guide 56P 014 731 9.3.1.2
CSSI Guide 56P 014 731 9.3.1.3
Manuals and Handbook overhead 76P 014 739 9.3.9
Secretary/Typing 76P 014 739 9.3.9.1
Drafting 76P 014 739 9.3.9.2
Printing and Materials and Delivery 76P 014 739 9.3.9.3
P̲R̲O̲G̲R̲A̲M̲ ̲M̲A̲N̲A̲G̲E̲M̲E̲N̲T̲ (100-199) L[NKLASSE, FORM
P̲R̲O̲J̲E̲K̲T̲N̲R̲.̲ ̲O̲G̲ ̲A̲R̲B̲E̲J̲D̲S̲K̲O̲D̲E̲ L̲I̲N̲E̲
̲I̲T̲E̲M̲
Projekt Adm., General 56P 014 100 1.1.1
PIP 56P 014 105 1.1.7
Subcontract Management Plan 56P 014 110 1.1.8
System Eng. Management, General 56P 014 115 1.2.1
System Development Plan 56P 014 120 1.2.2
Design and Div. Planning 56P 014 125 1.2.3
Design Standards 56P 014 130 1.2.4
Configuration Management 56P 014 135 1.2.5
Operation Management 56P 014 140 1.3.1
QA Plan 56P 014 145 1.4.2
Reliability Plan 56P 014 150 1.4.3
Logistics Support Management 56P 014 155 1.5.1
Logistics Support Plan 56P 014 160 1.5.2
Secretarial Assistance 56P 014 165
Temporary Secretary 56P 014 170
S̲Y̲S̲T̲E̲M̲ ̲E̲N̲G̲I̲N̲E̲E̲R̲I̲N̲G̲ (200-299)
System Requirements Specification 56P 014 200 2.1.1
Acceptance Test Plan 56P 014 201 2.1.2
Message Formats ICD 001 56P 014 202 2.2.1
ACP127 Interpretation ICD 003 56P 014 203 2.2.3
Supervisor procedures ICD 002 56P 014 204 2.2.4
SCARS II I/F ICD 005 56P 014 205 2.2.5
ACE CCIS I/F ICD 006 56P 014 206 2.2.6
NICS/TARE I/F ICD 004 56P 014 207 2.2.7
Crypto I/F 56P 014 208 2.2.9
Systems Design 56P 014 210 2.3.1
Performance report 56P 014 211 2.4.1
Performance report summary 56P 014 212 2.4.1.1
Damos performance test def. 56P 014 213 2.4.1.2
Damos performance test execution 56P 014 214 2.4.1.3
CAMPS prel. perform. test 56P 014 215 2.4.1.4
CAMPS final perform. test 56P 014 216 2.4.1.5
RMA Report 56P 014 217 2.4.4
EMC Report 56P 014 218 2.4.5
System Integration and Test Plan 56P 014 219 2.5.1
Acceptance Test Spec. (Overview) 56P 014 220 2.5.2
DSMT HW Test Spec. and Procedures 56P 014 221 2.5.2.3
Factory Acceptance Spec. 56P 014 222 2.5.2.4
COMSEC In-plant test Spec. 56P 014 223 2.5.2.5
DSMT SW Test Spec. 56P 014 224 2.5.2.6
In-plant SW Test Spec. 56P 014 225 2.5.2.7
Functional SW Test Spec. 56P 014 226 2.5.2.8
Operational SW Test Spec. 56P 014 227 2.5.2.9
Site 2-16 SW Test Spec. 56P 014 228 2.5.2.10
System Integration and Test
Specification and Procedures build 1 56P 014 229 2.5.2.11.1
System Integration and Test
Specification and Procedures build 2 56P 014 230 2.5.2.11.2
System Integration and Test
Specification and Procedures build 3 56P 014 231 2.5.2.11.3
Script for in-plant SW test 56P 014 232 2.5.2.11.4
DSMT test, (HW) follow-up 56P 014 233 5.3.1
DSMT test, (System) follow-up 56P 014 234 5.3.2
Major Review 56P 014 235 2.9.2
TDS Software Specification 56P 014 236 4.5.1
TDS Development 56P 014 237 4.5.3
DSMT Integration 56P 014 238 4.5.4
DAMOS test CAMPS HW 56P 014 239 4.6.5.1
DAMOS stabilization test def. 56P 014 240 4.6.5.2
DAMOS stabilization test 56P 014 241 4.6.5.3
CSF, MMS, THP stabilization 56P 014 242 4.6.5.4
I&T procedures for IOC 56P 014 243 4.6.5.5
IOC I&T 56P 014 244 4.6.5.6
DAMOS utility verification 56P 014 245 4.6.5.7
DAMOS sys. gen. users manual 56P 014 246 4.6.5.8
CAMPS database gen. users manual 56P 014 247 4.6.5.9
Package Test Review & monitoring 56P 014 248 4.6.6
System Integration and Test foll-up 56P 014 249 4.6.7
Build 1 I&T 56P 014 250 4.6.7.1
System I&T 56P 014 251 4.6.7.2
Definition of debugging tools 56P 014 252 4.6.7.3
Implementation of debugging tools 56P 014 253 4.6.7.4
System Generation 56P 014 254 4.6.7.5
240 Hours test 56P 014 255
Build 2 I&T 56P 014 256
Build 3 I&T 56P 014 257
H̲A̲R̲D̲W̲A̲R̲E̲ ̲D̲E̲V̲E̲L̲O̲P̲M̲E̲N̲T̲ (300-399)
H/W Management 56P 014 310 3.1
H/W Design (overall) 56P 014 320 3.2.0
HW Inventory Handling 56P 014 330 3.6.0
Production Planning 56P 014 340 5.1
Site Fabrication and Test 56P 014 350 5.4
Resync Module 56P 014 360 3.7.1
S̲O̲F̲T̲W̲A̲R̲E̲ ̲D̲E̲V̲E̲L̲O̲P̲M̲E̲N̲T̲ (400-499)
S/W Consultancy (DAMOS/CSF) 56P 014 400 4.1.1
S/W Management 56P 014 401 4.1.0
S/W Conf. Mgnt. 56P 014 402 4.1.2
DAMOS 56P 014 403 4.3.2
S/W Test Plan 56P 014 404 4.6.2
S/W Integration Plan 56P 014 405 4.6.3
MD Software 56P 014 406 4.8.5
S/W Eng. Management 56P 014 407 4.1.3
HP Development 56P 014 408
Package Specifications:
------------------------
I/O Control 56P 014 410 4.2.0
CAMPS System Functions 56P 014 411 4.2.1.1
Storage and File Management 56P 014 412 4.2.1.2
SSC System 56P 014 413 4.2.1.3
Traffic 56P 014 414 4.2.1.4
Distribution 56P 014 415 4.2.1.5
Terminal 56P 014 416 4.2.1.6
Table Management 56P 014 417 4.2.1.7
Storage and Retrieval 56P 014 418 4.2.1.8
Log 56P 014 419 4.2.1.9
Statistic 56P 014 420 4.2.1.10
Offline SW 56P 014 421 4.2.1.11
Support SW 56P 014 422 4.2.1.12
Database Def. Document 56P 014 423 4.2.2
Software I/F Control Doc. 56P 014 424 4.2.3
Package Specification - Detailed Design:
-----------------------------------------
I/O Control 56P 014 430 4.4.13
CAMPS System Functions 56P 014 431 4.4.9
Storage and File Management 56P 014 432 4.4.11
SSC System 56P 014 433 4.4.12
Traffic 56P 014 434 4.4.4
Distribution 56P 014 435 4.4.3
Terminal 56P 014 436 4.4.2
Table Management 56P 014 437 4.4.8
Storage and Retrieval 56P 014 438 4.4.6
Log 56P 014 439 4.4.5
Statistics 56P 014 440 4.4.7
Off-Line SW 56P 014 441 4.4.10
Firmware TDX Design 56P 014 442 4.4.14
Firmware WD Design 56P 014 443 4.4.15
Package Specification - Code and Test:
--------------------------------------
I/O Control 56P 014 450 4.4.13
CAMPS System Functions 56P 014 451 4.4.9
Storage and File Management 56P 014 452 4.4.11
SSC System 56P 014 453 4.4.12
Traffic 56P 014 454 4.4.4
Distribution 56P 014 455 4.4.3
T̲e̲r̲m̲i̲n̲a̲l̲ 56P 014 456 4.4.2
User VDU 56P 014 457 4.4.2.1
Printer 56P 014 458 4.4.2.2
Sup. VDU 56P 014 459 4.4.2.3
MDCO 56P 014 460 4.4.2.4
MSO 56P 014 461 4.4.2.5
Sup. Printer 56P 014 462 4.4.2.6
Table Management 56P 014 463 4.4.8
Storage and Retrieval 56P 014 464 4.4.6
Log 56P 014 465 4.4.5
Statistics 56P 014 466 4.4.7
Off-Line SW 56P 014 467 4.4.10
Package Integration
--------------------
VUP 56P 014 470 4.4.2.1
PRT 56P 014 471 4.4.2.2
SUP 56P 014 472 4.4.2.3
MDCO 56P 014 473 4.4.2.4
MSO 56P 014 474 4.4.2.5
SPR 56P 014 475 4.4.2.6
MDP 56P 014 476 4.4.3
THP 56P 014 477 4.4.4
LOG 56P 014 478 4.4.5
SAR 56P 014 479 4.4.6
STP 56P 014 480 4.4.7
TMP 56P 014 481 4.4.8
CSF 56P 014 482 4.4.9
SYS GEN 56P 014 483 4.4.10.1
FORM GEN VDU 56P 014 484 4.4.10.2.1
FORM GEN PRT 56P 014 485 4.4.10.2.2
DATA BASE GEN 56P 014 486 4.4.10.3
MMS 56P 014 487 4.4.11
SS&C 56P 014 488 4.4.12
IOC, FORMAT VDU 56P 014 489 4.4.13.1.1
IOC, FORMAT PRT 56P 014 490 4.4.13.1.2
IOC, LTUX HDL 56P 014 491 4.4.13.2
IOC, LTUX FW 56P 014 492 4.4.13.3
IOC, SS&C FW 56P 014 493 4.4.13.4
IOC, LTU HDL 56P 014 494 4.4.13.5
…0c…ILS er ikke rettet op…0c…
S̲I̲T̲E̲ ̲P̲R̲E̲P̲A̲R̲A̲T̲I̲O̲N̲ ̲A̲N̲D̲ ̲I̲N̲S̲T̲A̲L̲L̲A̲T̲I̲O̲N̲
Management and Planning 56P 014 B10 6.1
Installation Plan 56P 014 B15 6.1.1
Site Surveys 56P 014 B20 6.2
Civil Works Requirements (PAB only) 56P 014 B25 6.4
As-to-be-built Drawings 56P 014 B30 6.5
Coordination 56P 014 B35 6.5.1
Site Verification 56P 014 B40 6.6
Site Installation 56P 014 B45-50 6.7-6.22
Transportation 66D 014 B60
Transportation Plan 66D 014 B65 8.5
As-built drawings 66D 014 B70 9.4
Site Preparation and Design
(CR only) 56P 014 B75 6.5, 9.4
L̲O̲G̲I̲S̲T̲I̲C̲S̲ ̲S̲U̲P̲P̲O̲R̲T̲
Warranty (S/W) 56W 014 003 8.1
Maintenance 56W 014 003 8.1.1
Field Support 56W 014 002 8.3
Maintenance Mgmt. 56W 014 002 8.4
Maintenance Plan 56W 014 002 8.4.1
RSPL 56W 014 420 8.4.2
ASPL 56W 014 430 8.4.3
Spare Parts Delivery 56P 014 644 8.4.4
Codification 56P 014 645 8.4.5
Spare Parts Handler 56P 014 646 8.4.6
Tech. man. design, vol 1-6 56P 014 747 8.4.7
Tech. man. design, prev. maint. 56P 014 747 8.4.7.1
Tech. man. design., corr. maint. 56P 014 747 8.4.7.2
Tech. man. design., failure report. 56P 014 747 8.4.7.3
Incom. inspec., planning 56P 014 648 8.4.8
Incom. inspec., work 56P 014 649 8.4.9
Transportation Plan 56D 014 950 8.5
T̲R̲A̲I̲N̲I̲N̲G̲
Training Mgmt. 56P 014 820 8.2.2.0
Training Plan 56P 014 822 8.2.2
Training Methods 56P 014 823 8.2.3
Development of Courses - general 56P 014 824 8.2.4
Dev. of c: RST and Technical train. 56P 014 824 8.2.4.1
Dev. of c: User Training 56P 014 824 8.2.4.2
Dev. of c: On the Job Training 56P 014 824 8.2.4.3
Dev. of c: SW Maintenance Training 56P 014 824 8.2.4.4
Training-Overhead 76P 014 829 8.2.9
Training-Overhead: Secretary 76P 014 829 8.2.9.1
Training-Overhead: Drafting 76P 014 829 8.2.9.2
Training-Overhead: Printing 76P 014 829 8.2.9.3
Conduct of courses 56P 014 825 8.2.5
M̲A̲N̲U̲A̲L̲S̲ ̲A̲N̲D̲ ̲H̲A̲N̲D̲B̲O̲O̲K̲S̲
Manuals and Handbooks - General 56P 014 730 9.3.0
System Manuals 56P 014 730 9.3.0.1
OEM Manuals 56P 014 730 9.3.0.2
Tools and Test Equipment Manual 56P 014 730 9.3.0.3
Operator's Guide 56P 014 731 9.3.1.0
User's Guide 56P 014 731 9.3.1.1
Supervisor/Assistant's Guide 56P 014 731 9.3.1.2
CSSI Guide 56P 014 731 9.3.1.3
Manuals and Handbook overhead 76P 014 739 9.3.9
Secretary/Typing 76P 014 739 9.3.9.1
Drafting 76P 014 739 9.3.9.2
Printing and Materials and Delivery 76P 014 739 9.3.9.3