DataMuseum.dk

Presents historical artifacts from the history of:

CR80 Wang WCS documentation floppies

This is an automatic "excavation" of a thematic subset of
artifacts from Datamuseum.dk's BitArchive.

See our Wiki for more about CR80 Wang WCS documentation floppies

Excavated with: AutoArchaeologist - Free & Open Source Software.


top - download

⟦77efbde83⟧ Wang Wps File

    Length: 19002 (0x4a3a)
    Types: Wang Wps File
    Notes: CAMPS arbejdskoder        
    Names: »0732A «

Derivation

└─⟦ecb9329a3⟧ Bits:30006006 8" Wang WCS floppy, CR 0041A
    └─ ⟦this⟧ »0732A « 

WangText




…02…           

…02…KNN/840118…02……02…#
CAMPS PROJEKT NR. SAMT
ARBEJDSKODER FRA 1/1-84.…02… GJ/821013     …02…CAMPS










P̲R̲O̲G̲R̲A̲M̲ ̲M̲A̲N̲A̲G̲E̲M̲E̲N̲T̲ (100-199)               L[NKLASSE, FORM                              P̲R̲O̲J̲E̲K̲T̲N̲R̲.̲ ̲O̲G̲ ̲A̲R̲B̲E̲J̲D̲S̲K̲O̲D̲E̲   L̲I̲N̲E̲
                                                         ̲I̲T̲E̲M̲

Projekt Adm., General                56P 014 111         1.1.1
PIP                                  56P 014 117         1.1.7
Subcontract Management Plan          56P 014 118         1.1.8
System Eng. Management, General      56P 014 121         1.2.1
System Development Plan              56P 014 122         1.2.2
Design and Div. Planning             56P 014 123         1.2.3
Design Standards                     56P 014 124         1.2.4
Configuration Management             56P 014 125         1.2.5
Operation Management                 56P 014 131         1.3.1
QA Plan                              56P 014 142         1.4.2
Reliability Plan                     56P 014 143         1.4.3
Logistics Support Management         56P 014 151         1.5.1
Logistics Support Plan               56P 014 152         1.5.2
Secretarial Assistance               56P 014 153
Temporary Secretary                  56P 014 154


S̲Y̲S̲T̲E̲M̲ ̲E̲N̲G̲I̲N̲E̲E̲R̲I̲N̲G̲ (200-299)

System Requirements Specification    56P 014 211         2.1.1
Acceptance Test Plan                 56P 014 212         2.1.2
Message Formats        ICD 001       56P 014 221         2.2.1
ACP127 Interpretation  ICD 003       56P 014 223         2.2.3
Supervisor procedures  ICD 002       56P 014 224         2.2.4
SCARS II I/F           ICD 005       56P 014 225         2.2.5
ACE CCIS I/F           ICD 006       56P 014 226         2.2.6
NICS/TARE I/F          ICD 004       56P 014 227         2.2.7
Crypto I/F                           56P 014 229         2.2.9
Systems Design                       56P 014 231         2.3.1
Performance report                   56P 014 241         2.4.1
Performance report summary           56P 014 241         2.4.1.1
Damos performance test def.          56P 014 241         2.4.1.2
Damos performance test execution     56P 014 241         2.4.1.3
CAMPS prel. perform. test            56P 014 241         2.4.1.4
CAMPS final perform. test            56P 014 241         2.4.1.5
RMA Report                           56P 014 244         2.4.4
EMC Report                           56P 014 245         2.4.5
System Integration and Test Plan     56P 014 251         2.5.1
Acceptance Test Spec. (Overview)     56P 014 252         2.5.2
DSMT HW Test Spec. and Procedures    56P 014 252         2.5.2.3
Factory Acceptance Spec.             56P 014 252         2.5.2.4
COMSEC In-plant test Spec.           56P 014 252         2.5.2.5
DSMT SW Test Spec.                   56P 014 252         2.5.2.6




In-plant SW Test Spec.               56P 014 252         2.5.2.7
Functional SW Test Spec.             56P 014 252         2.5.2.8
Operational SW Test Spec.            56P 014 252         2.5.2.9
Site 2-16 SW Test Spec.              56P 014 253         2.5.2.10
System Integration and Test
Specification and Procedures build 1 56P 014 253         2.5.2.11.1
System Integration and Test
Specification and Procedures build 2 56P 014 253         2.5.2.11.2
System Integration and Test
Specification and Procedures build 3 56P 014 253         2.5.2.11.3
Script for in-plant SW test          56P 014 253         2.5.2.11.4
DSMT test, (HW) follow-up            56P 014 531         5.3.1
DSMT test, (System) follow-up        56P 014 532         5.3.2
Major Review                         56P 014 292         2.9.2
TDS Software Specification           56P 014 451         4.5.1
TDS Development                      56P 014 453         4.5.3
DSMT Integration                     56P 014 454         4.5.4
DAMOS test CAMPS HW                  56P 014 465         4.6.5.1
DAMOS stabilization test def.        56P 014 465         4.6.5.2
DAMOS stabilization test             56P 014 465         4.6.5.3
CSF, MMS, THP stabilization          56P 014 465         4.6.5.4
I&T procedures for IOC               56P 014 465         4.6.5.5
IOC I&T                              56P 014 465         4.6.5.6
DAMOS utility verification           56P 014 465         4.6.5.7
DAMOS sys. gen. users manual         56P 014 465         4.6.5.8
CAMPS database gen. users manual     56P 014 465         4.6.5.9
Package Test Review & monitoring     56P 014 466         4.6.6
System Integration and Test foll-up  56P 014 467         4.6.7
Build 1 I&T                          56P 014 467         4.6.7.1
System I&T                           56P 014 467         4.6.7.2
Definition of debugging tools        56P 014 467         4.6.7.3
Implementation of debugging tools    56P 014 467         4.6.7.4
System Generation                    56P 014 467         4.6.7.5


H̲A̲R̲D̲W̲A̲R̲E̲ ̲D̲E̲V̲E̲L̲O̲P̲M̲E̲N̲T̲ (300-399)

H/W Management                       56P 014 310         3.1
H/W Design (overall)                 56P 014 320         3.2.0
TDX System                           56P 014 360         3.6.0
COMSEC Test                          56P 014 316         3.16
Production Planning                  56P 014 510         5.1
DSMT HW Acceptance Test              56P 014 530         5.3
ED HW Acceptance Test                56P 014 535         5.3.5
Site Fabrication and Test            56P 014 540         5.4
Resync Module                        56P 014 310         3.7.1




S̲O̲F̲T̲W̲A̲R̲E̲ ̲D̲E̲V̲E̲L̲O̲P̲M̲E̲N̲T̲ (400-499)

S/W Consultancy (DAMOS/CSF)          56P 014 411         4.1.1
S/W Management                       56P 014 410         4.1.0
S/W Conf. Mgnt.                      56P 014 412         4.1.2
DAMOS                                56P 014 432         4.3.2
S/W Test Plan                        56P 014 462         4.6.2
S/W Integration Plan                 56P 014 463         4.6.3
MD Software                          56P 014 485         4.8.5
S/W Eng. Management                  56P 014 413         4.1.3


Package Specifications:
------------------------

I/O Control                          56P 014 420         4.2.0
CAMPS System Functions               56P 014 420         4.2.1.1
Storage and File Management          56P 014 420         4.2.1.2
SSC System                           56P 014 420         4.2.1.3
Traffic                              56P 014 420         4.2.1.4
Distribution                         56P 014 420         4.2.1.5
Terminal                             56P 014 420         4.2.1.6
Table Management                     56P 014 420         4.2.1.7
Storage and Retrieval                56P 014 420         4.2.1.8
Log                                  56P 014 420         4.2.1.9
Statistic                            56P 014 421         4.2.1.10
Offline SW                           56P 014 421         4.2.1.11
Support SW                           56P 014 421         4.2.1.12
Database Def. Document               56P 014 422         4.2.2
Software I/F Control Doc.            56P 014 423         4.2.3


Package Specification - Detailed Design:
-----------------------------------------

I/O Control                          56P 014 441         4.4.13
CAMPS System Functions               56P 014 449         4.4.9
Storage and File Management          56P 014 441         4.4.11
SSC System                           56P 014 441         4.4.12
Traffic                              56P 014 444         4.4.4
Distribution                         56P 014 443         4.4.3
Terminal                             56P 014 442         4.4.2
Table Management                     56P 014 448         4.4.8
Storage and Retrieval                56P 014 446         4.4.6
Log                                  56P 014 445         4.4.5
Statistics                           56P 014 447         4.4.7
Off-Line SW                          56P 014 441         4.4.10
Firmware TDX Design                  56P 014 441         4.4.14
Firmware WD  Design                  56P 014 441         4.4.15


Package Specification - Code and Test:
--------------------------------------

I/O Control                          56P 014 441         4.4.13
CAMPS System Functions               56P 014 449         4.4.9
Storage and File Management          56P 014 441         4.4.11
SSC System                           56P 014 441         4.4.12
Traffic                              56P 014 444         4.4.4
Distribution                         56P 014 443         4.4.3
T̲e̲r̲m̲i̲n̲a̲l̲                             56P 014 442         4.4.2
User VDU                             56P 014 442         4.4.2.1
Printer                              56P 014 442         4.4.2.2
Sup. VDU                             56P 014 442         4.4.2.3
MDCO                                 56P 014 442         4.4.2.4
MSO                                  56P 014 442         4.4.2.5
Sup. Printer                         56P 014 442         4.4.2.6
Table Management                     56P 014 448         4.4.8
Storage and Retrieval                56P 014 446         4.4.6
Log                                  56P 014 445         4.4.5
Statistics                           56P 014 447         4.4.7
Off-Line SW                          56P 014 441         4.4.10


Package Integration
--------------------

VUP                                  56P 014 451         4.4.2.1
PRT                                  56P 014 451         4.4.2.2
SUP                                  56P 014 451         4.4.2.3
MDCO                                 56P 014 451         4.4.2.4
MSO                                  56P 014 451         4.4.2.5
SPR                                  56P 014 451         4.4.2.6
MDP                                  56P 014 451         4.4.3
THP                                  56P 014 451         4.4.4
LOG                                  56P 014 451         4.4.5
SAR                                  56P 014 452         4.4.6
STP                                  56P 014 452         4.4.7
TMP                                  56P 014 452         4.4.8
CSF                                  56P 014 452         4.4.9
SYS GEN                              56P 014 452         4.4.10.1
FORM GEN VDU                         56P 014 452         4.4.10.2.1
FORM GEN PRT                         56P 014 452         4.4.10.2.2
DATA BASE GEN                        56P 014 452         4.4.10.3
MMS                                  56P 014 452         4.4.11
SS&C                                 56P 014 452         4.4.12
IOC, FORMAT VDU                      56P 014 452         4.4.13.1.1
IOC, FORMAT PRT                      56P 014 452         4.4.13.1.2
IOC, LTUX HDL                        56P 014 452         4.4.13.2
IOC, LTUX FW                         56P 014 452         4.4.13.3
IOC, SS&C FW                         56P 014 453         4.4.13.4
IOC, LTU HDL                         56P 014 453         4.4.13.5


Q̲U̲A̲L̲I̲T̲Y̲ ̲A̲S̲S̲U̲R̲A̲N̲C̲E̲

CAMPS Overall                        56Q 014 520         5.2


S̲I̲T̲E̲ ̲P̲R̲E̲P̲A̲R̲A̲T̲I̲O̲N̲ ̲A̲N̲D̲ ̲I̲N̲S̲T̲A̲L̲L̲A̲T̲I̲O̲N̲

Management and Planning              56P 014 A10         6.1
Installation Plan                    56P 014 A10         6.1.1
Site Surveys                         56P 014 A20         6.2
Civil Works Requirements (PAB only)  56P 014 A40         6.4
As-to-be-built Drawings              56P 014 A50         6.5
Coordination                         56P 014 A51         6.5.1
Site Verification                    56P 014 A60         6.6
Site Installation                    56P 014 A70-71      6.7-6.22
Transportation                       66D 014 980
Transportation Plan                  66D 014 950         8.5
As-built drawings                    66D 014 A40         9.4
Site Preparation and Design
(CR only)                            56P 014 A30         6.5, 9.4


L̲O̲G̲I̲S̲T̲I̲C̲S̲ ̲S̲U̲P̲P̲O̲R̲T̲

Warranty (S/W)                       56W 014 003         8.1
Maintenance                          56W 014 003         8.1.1
Field Support                        56W 014 002         8.3
Maintenance Mgmt.                    56W 014 002         8.4
Maintenance Plan                     56W 014 002         8.4.1
RSPL                                 56W 014 420         8.4.2
ASPL                                 56W 014 430         8.4.3
Spare Parts Delivery                 56P 014 644         8.4.4
Codification                         56P 014 645         8.4.5
Spare Parts Handler                  56P 014 646         8.4.6
Tech. man. design, vol 1-6           56P 014 747         8.4.7
Tech. man. design, prev. maint.      56P 014 747         8.4.7.1
Tech. man. design., corr. maint.     56P 014 747         8.4.7.2
Tech. man. design., failure report.  56P 014 747         8.4.7.3
Incom. inspec., planning             56P 014 648         8.4.8
Incom. inspec., work                 56P 014 649         8.4.9
Transportation Plan                  56D 014 950         8.5




T̲R̲A̲I̲N̲I̲N̲G̲

Training Mgmt.                       56P 014 820         8.2.2.0
Training Plan                        56P 014 822         8.2.2
Training Methods                     56P 014 823         8.2.3
Development of Courses - general     56P 014 824         8.2.4
Dev. of c: RST and Technical train.  56P 014 824         8.2.4.1
Dev. of c: User Training             56P 014 824         8.2.4.2
Dev. of c: On the Job Training       56P 014 824         8.2.4.3
Dev. of c: SW Maintenance Training   56P 014 824         8.2.4.4
Training-Overhead                    76P 014 829         8.2.9
Training-Overhead: Secretary         76P 014 829         8.2.9.1
Training-Overhead: Drafting          76P 014 829         8.2.9.2
Training-Overhead: Printing          76P 014 829         8.2.9.3
Conduct of courses                   56P 014 825         8.2.5


M̲A̲N̲U̲A̲L̲S̲ ̲A̲N̲D̲ ̲H̲A̲N̲D̲B̲O̲O̲K̲S̲

Manuals and Handbooks - General      56P 014 730         9.3.0
System Manuals                       56P 014 730         9.3.0.1
OEM Manuals                          56P 014 730         9.3.0.2
Tools and Test Equipment Manual      56P 014 730         9.3.0.3
Operator's Guide                     56P 014 731         9.3.1.0
User's Guide                         56P 014 731         9.3.1.1
Supervisor/Assistant's Guide         56P 014 731         9.3.1.2
CSSI Guide                           56P 014 731         9.3.1.3
Manuals and Handbook overhead        76P 014 739         9.3.9
Secretary/Typing                     76P 014 739         9.3.9.1
Drafting                             76P 014 739         9.3.9.2
Printing and Materials and Delivery  76P 014 739         9.3.9.3



P̲R̲O̲G̲R̲A̲M̲ ̲M̲A̲N̲A̲G̲E̲M̲E̲N̲T̲ (100-199)               L[NKLASSE, FORM                              P̲R̲O̲J̲E̲K̲T̲N̲R̲.̲ ̲O̲G̲ ̲A̲R̲B̲E̲J̲D̲S̲K̲O̲D̲E̲   L̲I̲N̲E̲
                                                         ̲I̲T̲E̲M̲

Projekt Adm., General                56P 014 100         1.1.1
PIP                                  56P 014 105         1.1.7
Subcontract Management Plan          56P 014 110         1.1.8
System Eng. Management, General      56P 014 115         1.2.1
System Development Plan              56P 014 120         1.2.2
Design and Div. Planning             56P 014 125         1.2.3
Design Standards                     56P 014 130         1.2.4
Configuration Management             56P 014 135         1.2.5
Operation Management                 56P 014 140         1.3.1
QA Plan                              56P 014 145         1.4.2
Reliability Plan                     56P 014 150         1.4.3
Logistics Support Management         56P 014 155         1.5.1
Logistics Support Plan               56P 014 160         1.5.2
Secretarial Assistance               56P 014 165
Temporary Secretary                  56P 014 170


S̲Y̲S̲T̲E̲M̲ ̲E̲N̲G̲I̲N̲E̲E̲R̲I̲N̲G̲ (200-299)

System Requirements Specification    56P 014 200         2.1.1
Acceptance Test Plan                 56P 014 201         2.1.2
Message Formats        ICD 001       56P 014 202         2.2.1
ACP127 Interpretation  ICD 003       56P 014 203         2.2.3
Supervisor procedures  ICD 002       56P 014 204         2.2.4
SCARS II I/F           ICD 005       56P 014 205         2.2.5
ACE CCIS I/F           ICD 006       56P 014 206         2.2.6
NICS/TARE I/F          ICD 004       56P 014 207         2.2.7
Crypto I/F                           56P 014 208         2.2.9
Systems Design                       56P 014 210         2.3.1
Performance report                   56P 014 211         2.4.1
Performance report summary           56P 014 212         2.4.1.1
Damos performance test def.          56P 014 213         2.4.1.2
Damos performance test execution     56P 014 214         2.4.1.3
CAMPS prel. perform. test            56P 014 215         2.4.1.4
CAMPS final perform. test            56P 014 216         2.4.1.5
RMA Report                           56P 014 217         2.4.4
EMC Report                           56P 014 218         2.4.5
System Integration and Test Plan     56P 014 219         2.5.1
Acceptance Test Spec. (Overview)     56P 014 220         2.5.2
DSMT HW Test Spec. and Procedures    56P 014 221         2.5.2.3
Factory Acceptance Spec.             56P 014 222         2.5.2.4
COMSEC In-plant test Spec.           56P 014 223         2.5.2.5


DSMT SW Test Spec.                   56P 014 224         2.5.2.6
In-plant SW Test Spec.               56P 014 225         2.5.2.7
Functional SW Test Spec.             56P 014 226         2.5.2.8
Operational SW Test Spec.            56P 014 227         2.5.2.9
Site 2-16 SW Test Spec.              56P 014 228         2.5.2.10
System Integration and Test
Specification and Procedures build 1 56P 014 229         2.5.2.11.1
System Integration and Test
Specification and Procedures build 2 56P 014 230         2.5.2.11.2
System Integration and Test
Specification and Procedures build 3 56P 014 231         2.5.2.11.3
Script for in-plant SW test          56P 014 232         2.5.2.11.4
DSMT test, (HW) follow-up            56P 014 233         5.3.1
DSMT test, (System) follow-up        56P 014 234         5.3.2
Major Review                         56P 014 235         2.9.2
TDS Software Specification           56P 014 236         4.5.1
TDS Development                      56P 014 237         4.5.3
DSMT Integration                     56P 014 238         4.5.4
DAMOS test CAMPS HW                  56P 014 239         4.6.5.1
DAMOS stabilization test def.        56P 014 240         4.6.5.2
DAMOS stabilization test             56P 014 241         4.6.5.3
CSF, MMS, THP stabilization          56P 014 242         4.6.5.4
I&T procedures for IOC               56P 014 243         4.6.5.5
IOC I&T                              56P 014 244         4.6.5.6
DAMOS utility verification           56P 014 245         4.6.5.7
DAMOS sys. gen. users manual         56P 014 246         4.6.5.8
CAMPS database gen. users manual     56P 014 247         4.6.5.9
Package Test Review & monitoring     56P 014 248         4.6.6
System Integration and Test foll-up  56P 014 249         4.6.7
Build 1 I&T                          56P 014 250         4.6.7.1
System I&T                           56P 014 251         4.6.7.2
Definition of debugging tools        56P 014 252         4.6.7.3
Implementation of debugging tools    56P 014 253         4.6.7.4
System Generation                    56P 014 254         4.6.7.5
240 Hours test                       56P 014 255
Build 2 I&T                          56P 014 256
Build 3 I&T                          56P 014 257


H̲A̲R̲D̲W̲A̲R̲E̲ ̲D̲E̲V̲E̲L̲O̲P̲M̲E̲N̲T̲ (300-399)

H/W Management                       56P 014 310         3.1
H/W Design (overall)                 56P 014 320         3.2.0
HW Inventory Handling                56P 014 330         3.6.0
Production Planning                  56P 014 340         5.1
Site Fabrication and Test            56P 014 350         5.4
Resync Module                        56P 014 360         3.7.1






S̲O̲F̲T̲W̲A̲R̲E̲ ̲D̲E̲V̲E̲L̲O̲P̲M̲E̲N̲T̲ (400-499)

S/W Consultancy (DAMOS/CSF)          56P 014 400         4.1.1
S/W Management                       56P 014 401         4.1.0
S/W Conf. Mgnt.                      56P 014 402         4.1.2
DAMOS                                56P 014 403         4.3.2
S/W Test Plan                        56P 014 404         4.6.2
S/W Integration Plan                 56P 014 405         4.6.3
MD Software                          56P 014 406         4.8.5
S/W Eng. Management                  56P 014 407         4.1.3
HP Development                       56P 014 408


Package Specifications:
------------------------

I/O Control                          56P 014 410         4.2.0
CAMPS System Functions               56P 014 411         4.2.1.1
Storage and File Management          56P 014 412         4.2.1.2
SSC System                           56P 014 413         4.2.1.3
Traffic                              56P 014 414         4.2.1.4
Distribution                         56P 014 415         4.2.1.5
Terminal                             56P 014 416         4.2.1.6
Table Management                     56P 014 417         4.2.1.7
Storage and Retrieval                56P 014 418         4.2.1.8
Log                                  56P 014 419         4.2.1.9
Statistic                            56P 014 420         4.2.1.10
Offline SW                           56P 014 421         4.2.1.11
Support SW                           56P 014 422         4.2.1.12
Database Def. Document               56P 014 423         4.2.2
Software I/F Control Doc.            56P 014 424         4.2.3


Package Specification - Detailed Design:
-----------------------------------------

I/O Control                          56P 014 430         4.4.13
CAMPS System Functions               56P 014 431         4.4.9
Storage and File Management          56P 014 432         4.4.11
SSC System                           56P 014 433         4.4.12
Traffic                              56P 014 434         4.4.4
Distribution                         56P 014 435         4.4.3
Terminal                             56P 014 436         4.4.2
Table Management                     56P 014 437         4.4.8
Storage and Retrieval                56P 014 438         4.4.6
Log                                  56P 014 439         4.4.5
Statistics                           56P 014 440         4.4.7
Off-Line SW                          56P 014 441         4.4.10
Firmware TDX Design                  56P 014 442         4.4.14
Firmware WD  Design                  56P 014 443         4.4.15




Package Specification - Code and Test:
--------------------------------------

I/O Control                          56P 014 450         4.4.13
CAMPS System Functions               56P 014 451         4.4.9
Storage and File Management          56P 014 452         4.4.11
SSC System                           56P 014 453         4.4.12
Traffic                              56P 014 454         4.4.4
Distribution                         56P 014 455         4.4.3
T̲e̲r̲m̲i̲n̲a̲l̲                             56P 014 456         4.4.2
User VDU                             56P 014 457         4.4.2.1
Printer                              56P 014 458         4.4.2.2
Sup. VDU                             56P 014 459         4.4.2.3
MDCO                                 56P 014 460         4.4.2.4
MSO                                  56P 014 461         4.4.2.5
Sup. Printer                         56P 014 462         4.4.2.6
Table Management                     56P 014 463         4.4.8
Storage and Retrieval                56P 014 464         4.4.6
Log                                  56P 014 465         4.4.5
Statistics                           56P 014 466         4.4.7
Off-Line SW                          56P 014 467         4.4.10


Package Integration
--------------------

VUP                                  56P 014 470         4.4.2.1
PRT                                  56P 014 471         4.4.2.2
SUP                                  56P 014 472         4.4.2.3
MDCO                                 56P 014 473         4.4.2.4
MSO                                  56P 014 474         4.4.2.5
SPR                                  56P 014 475         4.4.2.6
MDP                                  56P 014 476         4.4.3
THP                                  56P 014 477         4.4.4
LOG                                  56P 014 478         4.4.5
SAR                                  56P 014 479         4.4.6
STP                                  56P 014 480         4.4.7
TMP                                  56P 014 481         4.4.8
CSF                                  56P 014 482         4.4.9
SYS GEN                              56P 014 483         4.4.10.1
FORM GEN VDU                         56P 014 484         4.4.10.2.1
FORM GEN PRT                         56P 014 485         4.4.10.2.2
DATA BASE GEN                        56P 014 486         4.4.10.3
MMS                                  56P 014 487         4.4.11
SS&C                                 56P 014 488         4.4.12
IOC, FORMAT VDU                      56P 014 489         4.4.13.1.1
IOC, FORMAT PRT                      56P 014 490         4.4.13.1.2
IOC, LTUX HDL                        56P 014 491         4.4.13.2
IOC, LTUX FW                         56P 014 492         4.4.13.3
IOC, SS&C FW                         56P 014 493         4.4.13.4
IOC, LTU HDL                         56P 014 494         4.4.13.5



                               …0c…ILS er ikke rettet op…0c…

S̲I̲T̲E̲ ̲P̲R̲E̲P̲A̲R̲A̲T̲I̲O̲N̲ ̲A̲N̲D̲ ̲I̲N̲S̲T̲A̲L̲L̲A̲T̲I̲O̲N̲

Management and Planning              56P 014 B10         6.1
Installation Plan                    56P 014 B15         6.1.1
Site Surveys                         56P 014 B20         6.2
Civil Works Requirements (PAB only)  56P 014 B25         6.4
As-to-be-built Drawings              56P 014 B30         6.5
Coordination                         56P 014 B35         6.5.1
Site Verification                    56P 014 B40         6.6
Site Installation                    56P 014 B45-50      6.7-6.22
Transportation                       66D 014 B60
Transportation Plan                  66D 014 B65         8.5
As-built drawings                    66D 014 B70         9.4
Site Preparation and Design
(CR only)                            56P 014 B75         6.5, 9.4


L̲O̲G̲I̲S̲T̲I̲C̲S̲ ̲S̲U̲P̲P̲O̲R̲T̲

Warranty (S/W)                       56W 014 003         8.1
Maintenance                          56W 014 003         8.1.1
Field Support                        56W 014 002         8.3
Maintenance Mgmt.                    56W 014 002         8.4
Maintenance Plan                     56W 014 002         8.4.1
RSPL                                 56W 014 420         8.4.2
ASPL                                 56W 014 430         8.4.3
Spare Parts Delivery                 56P 014 644         8.4.4
Codification                         56P 014 645         8.4.5
Spare Parts Handler                  56P 014 646         8.4.6
Tech. man. design, vol 1-6           56P 014 747         8.4.7
Tech. man. design, prev. maint.      56P 014 747         8.4.7.1
Tech. man. design., corr. maint.     56P 014 747         8.4.7.2
Tech. man. design., failure report.  56P 014 747         8.4.7.3
Incom. inspec., planning             56P 014 648         8.4.8
Incom. inspec., work                 56P 014 649         8.4.9
Transportation Plan                  56D 014 950         8.5




T̲R̲A̲I̲N̲I̲N̲G̲

Training Mgmt.                       56P 014 820         8.2.2.0
Training Plan                        56P 014 822         8.2.2
Training Methods                     56P 014 823         8.2.3
Development of Courses - general     56P 014 824         8.2.4
Dev. of c: RST and Technical train.  56P 014 824         8.2.4.1
Dev. of c: User Training             56P 014 824         8.2.4.2
Dev. of c: On the Job Training       56P 014 824         8.2.4.3
Dev. of c: SW Maintenance Training   56P 014 824         8.2.4.4
Training-Overhead                    76P 014 829         8.2.9
Training-Overhead: Secretary         76P 014 829         8.2.9.1
Training-Overhead: Drafting          76P 014 829         8.2.9.2
Training-Overhead: Printing          76P 014 829         8.2.9.3
Conduct of courses                   56P 014 825         8.2.5


M̲A̲N̲U̲A̲L̲S̲ ̲A̲N̲D̲ ̲H̲A̲N̲D̲B̲O̲O̲K̲S̲

Manuals and Handbooks - General      56P 014 730         9.3.0
System Manuals                       56P 014 730         9.3.0.1
OEM Manuals                          56P 014 730         9.3.0.2
Tools and Test Equipment Manual      56P 014 730         9.3.0.3
Operator's Guide                     56P 014 731         9.3.1.0
User's Guide                         56P 014 731         9.3.1.1
Supervisor/Assistant's Guide         56P 014 731         9.3.1.2
CSSI Guide                           56P 014 731         9.3.1.3
Manuals and Handbook overhead        76P 014 739         9.3.9
Secretary/Typing                     76P 014 739         9.3.9.1
Drafting                             76P 014 739         9.3.9.2
Printing and Materials and Delivery  76P 014 739         9.3.9.3