⟦789a46005⟧ Wang Wps File

    Length: 5810 (0x16b2)
    Types: Wang Wps File
    Notes: CPS/TPR/017               
    Names: »1671A «

Derivation

└─⟦0c861a53d⟧ Bits:30006079 8" Wang WCS floppy, CR 0122A
    └─ ⟦this⟧ »1671A « 

WangText




…02…CPS/TPR/017

…02…EV/811111…02……02…#
INSPECTION AND TEST PROCEDURE FOR
ABACUS FREQUENCY STABILIZER 1152-3                          CAMPS








                    T̲A̲B̲L̲E̲ ̲O̲F̲ ̲C̲O̲N̲T̲E̲N̲T̲S̲



   1  SCOPE ........................................ 
     4
   2  APPLICABLE DOCUMENTS ......................... 
     4
   3  INCOMING INSPECTION .......................... 
     5
     3.1  GENERAL .................................. 
       5
       3.1.1  Registration ......................... 
         5
       3.1.2  Failure Reporting .................... 
         5
       3.1.3  Documentation ........................ 
         5
         3.1.3.1 Invoice and COC's ................. 
           5

     3.2 INCOMING INSPECTION AND TEST LOG .......... 
           5

   4  VISUAL INSPECTION ............................ 
     6
     4.1  GENERAL .................................. 
       6
     4.2  INSPECTION POINTS ........................ 
       6

   5  TEST EQUIPMENT ............................... 
     7
   6  TEST CONFIGURATION ........................... 
     8
   7  FUNCTIONAL TEST .............................. 
     9
     7.1  AMBIENT .................................. 
       9
     7.2  HIGH TEMPERATURE ......................... 
       9

   8  PACKING ...................................... 
     10
     8.1  GENERAL .................................. 
       10
     8.2  PACKING .................................. 
       10
     8.3  PAPERWORK ................................ 
       10

   APPENDIX A:  INCOMING INSPECTION LOG ............ 
     
   APPENDIX B:  TEST SET-UP ........................ 
     


                         1̲ ̲ ̲S̲C̲O̲P̲E̲



         This document describes the procedures and guidelines
         for inspection and test of the frequency stabilizer
         model 1152-3 delivered from Abacus Controls Inc. to
         CRA.



                 2̲ ̲ ̲A̲P̲P̲L̲I̲C̲A̲B̲L̲E̲ ̲D̲O̲C̲U̲M̲E̲N̲T̲S̲



         SD/STD/017
         Incoming Inspection Standard

         PAD/STD/002
         Nonconformance Standard

         Technical Manual
         Model 1152-3

         CPS/AUX/009
         Quality Requirements for Equipment
         Purchased for the CAMPS Project.


                  3̲ ̲ ̲I̲N̲C̲O̲M̲I̲N̲G̲ ̲I̲N̲S̲P̲E̲C̲T̲I̲O̲N̲



3.1      G̲E̲N̲E̲R̲A̲L̲

         Unpacking, registration, inspection for shipping damage
         and visual inspection shall be performed by the ILS-Incoming
         Inspection Personnel.



3.1.1    R̲e̲g̲i̲s̲t̲r̲a̲t̲i̲o̲n̲

         Registration shall be performed in agreement with the
         lines laid down in SD/STD/017, Incoming Inspection
         Standard.



3.1.2    F̲a̲i̲l̲u̲r̲e̲ ̲R̲e̲p̲o̲r̲t̲i̲n̲g̲

         All failures, discrepancies etc. shall be reported
         in agreement with the lines laid down in PAD/STD/002,
         Nonconformance Standard.



3.1.3    D̲o̲c̲u̲m̲e̲n̲t̲a̲t̲i̲o̲n̲



3.1.3.1  I̲n̲v̲o̲i̲c̲e̲ ̲a̲n̲d̲ ̲C̲O̲C̲'̲s̲

         Invoice and Certificates of Conformance shall in copies
         be distributed to the Project Office.



3.2      I̲N̲C̲O̲M̲I̲N̲G̲ ̲I̲N̲S̲P̲E̲C̲T̲I̲O̲N̲ ̲A̲N̲D̲ ̲T̲E̲S̲T̲ ̲L̲O̲G̲

         The Incoming Inspection Log, Appendix A, shall be filled
         in consistently and carefully during the whole inspection
         and test operation. This log will be an appendix to
         the concerned Incoming Inspection Report (IKR).


                   4̲ ̲ ̲V̲I̲S̲U̲A̲L̲ ̲I̲N̲S̲P̲E̲C̲T̲I̲O̲N̲



4.1      G̲E̲N̲E̲R̲A̲L̲

         The following visual inspection points shall be inspected
         by the ILS-inspection personnel.



4.2      I̲N̲S̲P̲E̲C̲T̲I̲O̲N̲ ̲P̲O̲I̲N̲T̲S̲

         a)  Verify that all ordered items are presented.

         b)  Inspect the units for possible shipping damage.

         c)  Verify that the workmanship is in accordance with
             CPS/AUX/009.


                    5̲ ̲ ̲T̲E̲S̲T̲ ̲E̲Q̲U̲I̲P̲M̲E̲N̲T̲



         a)  2 AC Voltmeters 125/250V

         b)  2 AC Amperemeters 20/5/2 A

         c)  1 Multimeter Fluke 8020 A

         d)  1 ABACUS Frequency Stabilizer with option board
             type 41095-5.

         e)  2 Potentiometers with knobs mounted in a control
             box.

         f)  1 Frequency counter

         g)  3 Switches mounted on a panel or on the load

         h)  1 Load consisting of three 1KW heater units.


                  6̲ ̲ ̲T̲E̲S̲T̲ ̲C̲O̲N̲F̲I̲G̲U̲R̲A̲T̲I̲O̲N̲



         One ABACUS frequency stabilizer with option board connected
         to two potentiometers are used to control the input
         voltage and frequency of the unit under test.

         The input is connected to a voltmeter and through an
         amperemeter to the input of the unit under test.

         The output of the unit under test is connected to a
         frequency meter and a voltmeter through an amperemeter
         to the three switches for the load.

         The test set-up is shown in APPENDIX B.


                    7̲ ̲ ̲F̲U̲N̲C̲T̲I̲O̲N̲A̲L̲ ̲T̲E̲S̲T̲



7.1      A̲M̲B̲I̲E̲N̲T̲

         Ambient temperature: +20 - 25…0e…o…0f…C.

         The out-put frequencies and voltages in idle conditions
         are measured for 45 Hz and 60 Hz input.

         The input voltage is varied and HIGH and LOW CUT OFF
         are measured.

         With the load set to approx. 1/2 KW, 1 KW and 2 KW
         the input voltage and current and the output voltage,
         current and power are measured.

         With a peak-load of 3 KW for a short duration and with
         the input voltage 220V/50Hz the input current and the
         output current, voltage and frequency are measured.



7.2      H̲I̲G̲H̲ ̲T̲E̲M̲P̲E̲R̲A̲T̲U̲R̲E̲

         High temperature: +40…0e…o…0f…C.

         The input is set to 220V/50Hz.

         With approx. load 1 KW, the input current and the output
         voltage, frequency and current are measured after 24
         hours run, and the results are filled in the log.


                        8̲ ̲ ̲P̲A̲C̲K̲I̲N̲G̲



8.1      G̲E̲N̲E̲R̲A̲L̲

         ILS-personnel has the responsibility for collecting
         all items according to para 4.2 a and performance of
         the following points.



8.2      P̲A̲C̲K̲I̲N̲G̲

         All items shall be packed in plastic bags with humidity
         absorbing Silica Qel and repacked.



8.3      P̲A̲P̲E̲R̲W̲O̲R̲K̲

         The paperwork in the shape of Incoming Inspection Log,
         Incoming Inspection Report and Stock List shall be
         finished.