⟦7e79b1907⟧ Wang Wps File

    Length: 21811 (0x5533)
    Types: Wang Wps File
    Notes: XFX/PLN/002               
    Names: »4093A «

Derivation

└─⟦7c6ce1fba⟧ Bits:30006155 8" Wang WCS floppy, CR 0035A
    └─ ⟦this⟧ »4093A « 

WangText



…1d……05……1d……07……1c……02……1c…    …1b……08……1b……09……1b……0d……1b……01……1b……05……1a……0a……1a……0e……86…1
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
    …02… 
     
     
     
     
     …02…
     
    …02… 
     
     
     
    

    4093A/aml…02…XFX/PLN/0002

…02…NPP/831206…02……02…#
CROSSFOX
 MPF TRANSPORTATION
 PLAN
…02……02…CROSSFOX
 MPF















                 CROSSFOX MPF TRANSPORTATION PLAN



                 XFX/PLN/0002














                 Niels Peder Pedersen




                 Knud Benkjer







                 HARRIS Oslo (7), HARRIS Rochester (1), KM,
                 OWE, KNB, PMS, GJ, BHB, KJK, LU















                          Install. Mgr.    831206          
                          


             1.1



             831206
         …86…1                                             …02…    
               …02…   …02…        

    4093A/aml…02…XFX/PLN/0002

…02…NPP/831206…02…   ii
CROSSFOX MPF TRANSPORTATION PLAN
…02……02…CROSSFOX MPF















    1   830927                  iii       First issue of document
        831128                2-3-4-6     Issue 1.1
                          7-10-22-28
                              33-34
                            Appendix A





        4093A/aml…02…XFX/PLN/0002

…02…NPP/831206…02…  iii
CROSSFOX MPF TRANSPORTATION PLAN
…02……02…CROSSFOX MPF


                    T̲A̲B̲L̲E̲ ̲O̲F̲ ̲C̲O̲N̲T̲E̲N̲T̲S̲



     1 INTRODUCTION  ................................ 1
         

     2 ORGANIZATION  ................................ 2
         
       2.1 GENERAL  ................................. 2
             
       2.2 TRANSPORTATION  .......................... 2
             

     3 TRANSPORTATION REQUIREMENTS  ................. 5
         
       3.1 PACKING AND MARKING  ..................... 5
             
       3.2 TRANSPORTATION  .......................... 5
             
       3.3 NOTICE OF SHIPMENT  ...................... 6
             
       3.4 INVOICING  ............................... 6
             
       3.5 INSURANCE  ............................... 6
             
       3.6 SHIPPING DOCUMENTS  ...................... 7
             
       3.7 RECEIPT OF EQUIPMENT AT SITES  ........... 7
             

     4 TRANSPORTATION ANALYSES  ..................... 8
         
       4.1 COORDINATION OF SHIPMENTS  ............... 8
             
       4.2 MATERIAL TO BE TRANSPORTED  .............. 8
             

     5 PACKING  ..................................... 9
         
       5.1 GENERAL PACKING DESCRIPTION  ............. 9
             
       5.2 PACKING MATERIAL AND METHODS  ............ 9
             
         5.2.1 General  ............................. 9
                 
       5.3 CR80M ITEMS  .............................10
             
         5.3.1 Identification of CR80M Modules
               to be packed  ........................10
                 
         5.3.2 Packing of CR80M Module  .............11
                 
         5.3.3 CR80M Crate  .........................18
                 
         5.3.4 CR80M Mini Crate  ....................21
                 
         5.3.5 Floppy Disk Station  .................21
                 
       5.4 CR80S ITEMS  .............................23
             
         5.4.1 CR80S Modules and Power Supply  ......23
                 
         5.4.2 CR80S Crate  .........................25
                 
       5.5 PERIPHERALS  .............................27
             
       5.6 RACKS  ...................................27
             

     6 MARKING  .....................................29
         
       6.1 GENERAL MARKING DESCRIPTION  .............29
             

     7 SHIPPING DOCUMENTATION  ......................34
         
       7.1 GENERAL  .................................34
             
       7.2 PACKING LISTS ............................34
             
       7.3 PROFORMA INVOICE .........................35
             
       7.4 NOTICE OF SHIPMENT AND AUTHORIZATION 
           TO SHIP  .................................35
             
       7.5 CUSTOMS DOCUMENT  ........................36
             
     APPENDIX A …86…1         …02…   …02…   …02…   …02…                    
                           
                   1  I̲N̲T̲R̲O̲D̲U̲C̲T̲I̲O̲N̲



     This plan outlines the planning and coordination to
     be performed concerning transportation. It describes
     how CR intends to manage and perform the task and outline
     the methods to be followed concerning packing, marking
     and documentation.











                     2  O̲R̲G̲A̲N̲I̲Z̲A̲T̲I̲O̲N̲



2.1      G̲E̲N̲E̲R̲A̲L̲

         Transportation to sites of the CROSSFOX MPF equipment
         will be planned, coordinated and controlled by a functional
         section within the integrated logistics department.
         (ILS).

         Figure 2.1 shows the organizationel set up for CROSSFOX
         MPF.



2.2      T̲R̲A̲N̲S̲P̲O̲R̲T̲A̲T̲I̲O̲N̲

         a)  The system division will contact a transportation
             company to perform the following tasks on the CROSSFOX
             MPF program:

             -   Preparation of shipments

             -   Transportation

             -   Forwarding of shipments through agencies in
                 each country as applicable

             -   customs clearance

             Under supervision by logistics department the transportation
             company will ensure a sufficient and timely delivery
             to each site.

















































     Figure 2.1…01…CROSSFOX Transportation Organization


         b)  Planning and coordination will be performed by
             ILS in cooperation with Harris-Rochester, who will
             also issue the procedures and instructions to be
             followed concerning packing, marking and documentation.
             Insurance and notice of shipment will also be performed
             by ILS transportation subsection.

             Recieval at sites will be performed by the installation
             teams under supervision of the ILS in cooperation
             with Harris-Rochester.

         c)  Invoicing will be the responsibility of the CROSSFOX
             MPF project office.

         d)  Packing, marking and documentation will be performed
             by ILS and controlled by the quality assurance
             department of the systems division, who also will
             approve the procedures per b) above.











              3  T̲R̲A̲N̲S̲P̲O̲R̲T̲A̲T̲I̲O̲N̲ ̲R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲S̲



         The following outlines the requirements concerning
         shipments to sites of the CROSSFOX MPF equipment.



3.1      P̲A̲C̲K̲I̲N̲G̲ ̲A̲N̲D̲ ̲M̲A̲R̲K̲I̲N̲G̲

         CR will pack the equipment and mark the containers
         in accordance with the requirements to transportation
         per this contract.



3.2      T̲R̲A̲N̲S̲P̲O̲R̲T̲A̲T̲I̲O̲N̲

         a)  CR will provide transportation of his equipment
             to the sites.  The delivery of equipment will follow
             the master schedule.  Actual shipping dates are
             selected to be in accordance with the readiness
             of site and time for transportation.

         b)  In case of classified equipment and/or material
             special shipping will be provided in accordance
             with the requirements of the contract.  Special
             security requirements concerning classified equipment
             are defined in NATO Security Manual C-M (55)15
             final volume 2 enclosure D, sect. V


3.3      N̲O̲T̲I̲C̲E̲ ̲O̲F̲ ̲S̲H̲I̲P̲M̲E̲N̲T̲

         a)  CR will notice Harris-Rochester and copy Harris-Oslo
             in advance of any shipment to site in accordance
             with the provisions of the contract.  Harris will
             inform any other authority within NATO involved
             in the shipment and will notify the responsible
             officer at the site in question.  HARRIS will issue
             an authorization to ship upon receipt of the notice.



3.4      I̲N̲V̲O̲I̲C̲I̲N̲G̲

         Invoices will be prepared and submitted in accordance
         with the provisions of the contract. Proforma invoices
         will follow each shipment for customs and insurance
         purposes.



3.5      I̲N̲S̲U̲R̲A̲N̲C̲E̲

         Each shipment will be insured.  The insurance sum will
         be the invoiced value of the shipment.





3.6      S̲H̲I̲P̲P̲I̲N̲G̲ ̲D̲O̲C̲U̲M̲E̲N̲T̲S̲

         The following shipping documents, issued in English,
         will accompany each shipment:

         a)  Packing lists, as specified per this contract.

         b)  Proforma invoice with value weight, cubage, quantity,
             insurance and other required data.

         c)  Customs document (Form. 302).

         The following shipping documents, when applicable,
         will accompany each shipment:

         d)  Copy of Bill of Lading

         e)  Certificates of conformity

         f)  Certificates of origin

         g)  Insurance Certificate

         The contractor shall provide to the purchaser a copy
         of all shipping documents used to effect a shipment.



3.7      R̲E̲C̲E̲I̲P̲T̲ ̲O̲F̲ ̲E̲Q̲U̲I̲P̲M̲E̲N̲T̲ ̲A̲T̲ ̲S̲I̲T̲E̲S̲

         a)  The installation team will be present for receipt
             of the equipment at sites as specified in 2.2.

         b)  Unloading and temporary storage area as well as
             handling support will be made available at each
             site as agreed to during the site surveys.

         c)  Further arrangements concerning a and b will have
             to be made at least at time of site verification.











                4̲ ̲ ̲T̲R̲A̲N̲S̲P̲O̲R̲T̲A̲T̲I̲O̲N̲ ̲A̲N̲A̲L̲Y̲S̲E̲S̲



4.1      C̲O̲O̲R̲D̲I̲N̲A̲T̲I̲O̲N̲ ̲O̲F̲ ̲S̲H̲I̲P̲M̲E̲N̲T̲S̲

         a)  All equipments are shipped from CR's plant in Copenhagen,
             Denmark. CR will contract a transportation company,
             who will provide for all transportations to sites.

         b)  The equipment will be shipped from Copenhagen to
             a mainsite by truck or by air.

         c)  CR intends to schedule the shipments so that the
             installation team will be present at site to receive
             the equipment.



4.2      M̲A̲T̲E̲R̲I̲A̲L̲ ̲T̲O̲ ̲B̲E̲ ̲T̲R̲A̲N̲S̲P̲O̲R̲T̲E̲D̲

         Table 4.2 lists the packed weight and cubages of the
         equipment for each site. 

             Site no.   Cubages   Weight
                        (m…0e…3…0f…)      (tons)

               101         11       1.9

               301         11       1.9




                          Table 4.2


















                        5̲ ̲ ̲P̲A̲C̲K̲I̲N̲G̲



5.1      G̲E̲N̲E̲R̲A̲L̲ ̲P̲A̲C̲K̲I̲N̲G̲ ̲D̲E̲S̲C̲R̲I̲P̲T̲I̲O̲N̲

         The equipment will arrive to site dissassembled and
         packed as follows:

         -   Computer Rack 1, 2, 3 Assembly are seperated into
             individual racks and shipped.

         -   Disk units, floppy disks, patch panels and modules
             are removed from the racks and shipped in their
             own containers.

         -   Cables between racks are generally shipped as part
             of one of the racks. Internal rack cables are not
             removed.

         -   Terminal equipment (VDU, MSP) are shipped in their
             own containers.



5.2      P̲A̲C̲K̲I̲N̲G̲ ̲M̲A̲T̲E̲R̲I̲A̲L̲ ̲A̲N̲D̲ ̲M̲E̲T̲H̲O̲D̲S̲



5.2.1    G̲e̲n̲e̲r̲a̲l̲

         The packing method to be used depends on whether the
         item is delivered for installation or as a spare item.

         For both groups the package must protect against the
         transportation environment. The items are to be shipped
         by air and truck and are to be packed accordingly.
         

         The items should be packed in accordance with their
         respective packing instruction found in the following
         sections.

         When the site equipment is delivered and unpacked,
         some of the packing material should be stored at the
         site and used to pack items which must be returned
         for repair. It is recommended that at least one package
         for each piece of equipment is stored for later reuse.
         



5.3      C̲R̲8̲0̲M̲ ̲I̲T̲E̲M̲S̲



5.3.1    I̲d̲e̲n̲t̲i̲f̲i̲c̲a̲t̲i̲o̲n̲ ̲o̲f̲ ̲C̲R̲8̲0̲M̲ ̲M̲o̲d̲u̲l̲e̲s̲ ̲t̲o̲ ̲b̲e̲ ̲p̲a̲c̲k̲e̲d̲

         The following list of CR80M modules is to be shipped
         to site as described in the following procedure:

         CR8020M     MAP
         CR8016M     128K RAM
         CR8003M     CPU/CACHE
         CR8055M     MBT
         CR8089M     CCA
         CR8091M     CCB
         CR8071M     MIA
         CR8076M     WCA
         CR8082M     LIA-N
         CR8087M     SFA
         CR8084M     DCA
         CR8081M     CIA A-B
         CR8066M     LTU SYNC 16K/Watchdog CPU
         CR8050M     POWER SUPPLY
         CR8044M     DISK CONTROLLER
         CR8047M     FD CONTROLLER





5.3.2    P̲a̲c̲k̲i̲n̲g̲ ̲o̲f̲ ̲C̲R̲8̲0̲M̲ ̲M̲o̲d̲u̲l̲e̲


         The CR80 Module (a) is placed in a wrapping of cardboard
         (b), see Figure 5.3.2-1. The module is fixed by this
         wrapping. An outer wrapping (c) is folded around the
         module and the wrapping (b).  The wrapping (c) is sealed
         by PVC tape.  The similar package for CR80M power supply
         is shown in Figure 5.3.2-2.

         Depending on the status of the module, either as a
         site installed or as a spare module, two ways of finishing
         packing exist.

         If the module is intended for site installation, it
         will be packed as follows:

         The adapter and 1M modules are stacked in quantities
         of maximum 11 and 9 modules, respectively, and the
         power supply in quantities of 2 (see Figure 5.3.2-3,
         5.3.2-4, and 5.3.2-5).

         The stacked modules are taped together. The modules
         are placed on four protective edges (b) in a cardboard
         container (c) (dimensions: 54x32x61 cm).

         The 1M module and the power supplies are placed upright
         on a piece of cardboard (d) nesting on four protective
         edges.  At the top protective edges will be used to
         fix the modules in the container.

         The spare 1M module is packed in the inner wrapping
         (b and c).  The module is placed in an outer container
         (e) (Figure 5.3.2-1).  The module is fixed by the two
         sets of upholstery (d) and (f).  The upholstery (f)
         is placed along the short side of the container.  The
         upholstery (d) is fixed on the longest edge of the
         module wrapping. The module is slid into the outer
         container which is sealed by 2" PVC tape.

         The package for the spare CR80M power supply is shown
         on Figure 5.3.2-2. The sealed cardboard box (d) is
         placed in an outer container of plywood (f). Inside
         the plywood container, the module is secured by the
         upholstery (e, g, and h). Finally the lid (i) is placed
         and fastened to the container with nails.




















































                      Figure 5.3.2-1
                   CR80M Module Package



















































                                           Figure 5.3.2-2
                                           CR80M Power Supply
                                           Package

















































           Figure 5.3.2-3…01…CR80M Module Package


















































           Figure 5.3.2-4…01…CR80M Module Package


















































        Figure 5.3.2-5…01…CR80M Power Supply Package



5.3.3    C̲R̲8̲0̲M̲ ̲C̲r̲a̲t̲e̲

         The packing of the CR80M crate (a) is given in the
         following step and is referring to Figure 5.3.3-1.

         Before the crate can be packed, the black rail mounted
         on the underside of the crate must be removed. The
         rail is wrapped in cushioning material and taped onto
         the upper side of the crate. The rail must be placed
         so that it does not exceed the height of the front
         edge of the crate.

         To avoid scratches, the handles must be equipped with
         reinforced tape. A strap placed around the back of
         the crate will be useful when lifting the crate in
         and out of the inner container (b…0f…2…0e…).

         The crate is placed in the inner container. The handles
         must face the short side where no fixing wood is placed.

         The plywood box (b…0f…1…0e…) is placed on the top of the crate.
         The four protective edges (d) are placed in each corner
         of the outer plywood container (c). The inside of the
         outer container is draped with a piece of strong polyethylene
         (1.5x2m). The inner box (b…0f…1…0e… + b…0f…2…0e… + a) is then placed
         inside the outer container and the polyethylene is
         wrapped around the inner box and sealed by tape. 

         Finally, the four protective edges (g) at the top and
         the lid (f) are placed. The lid must be nailed to the
         outer container. The outer container is equipped with
         handles to ease the lifting and transportating of the
         container.

         For the dimension of the container refer to Figure
         5.3.3.-2.



















































                                           Figure 5.3.3-1
                                           CR80M Crate Package


















































            Figure 5.3.3-2…01…CR80M Crate Package


5.3.4    C̲R̲8̲0̲M̲ ̲M̲i̲n̲i̲ ̲C̲r̲a̲t̲e̲

         As for CR80M Crate, yet some modifications have been
         made to the package, see Figure 5.3.4

         Being a small crate, the height of the package has
         been reduced and the inner container (b) is equipped
         with a lid (c). This makes out the inner box containing
         crate wrapped in strong polyethylene.



5.3.5    F̲l̲o̲p̲p̲y̲ ̲D̲i̲s̲k̲ ̲S̲t̲a̲t̲i̲o̲n̲

         As for CR80M crate see Figure 5.3.4.


















































          Figure 5.3.4…01…CR80M Mini Crate Package



5.4      C̲R̲8̲0̲S̲ ̲I̲T̲E̲M̲S̲



5.4.1    C̲R̲8̲0̲S̲ ̲M̲o̲d̲u̲l̲e̲s̲ ̲a̲n̲d̲ ̲P̲o̲w̲e̲r̲ ̲S̲u̲p̲p̲l̲y̲

         For the CR80S modules and power supply the existing
         package of molded foam will be used. (see Figure 5.4.1).

         The spare modules are shipped in a packaging similar
         to the outer package intended for CR80 M modules, (see
         Figure 5.4.1.).  The following modules are identified
         to be packed:

         CR10915     LTUX-M-CPU
         CR80108     OPTO TRANSMITTER/RECEIVER
         CR80109     L/L ADAPTOR



















































                          N̲O̲T̲E̲:̲

  Outer Package Used For Shipment of Single 1 M Modules.
                       Figure 5.4.1



5.4.2    C̲R̲8̲0̲S̲ ̲C̲r̲a̲t̲e̲

         The existing package will be maintained, see Figure
         5.4.2

         Two types of crates will be packed as shown:

         TDX-CRATE
         ADAPTOR-CRATE.





















































                       Figure 5.4.2



5.5      P̲E̲R̲I̲P̲H̲E̲R̲A̲L̲S̲

         Peripherals as:  VDU, printers, disk drivers and patch
         panels are shipped in their own containers as received
         from the manufacturers.



5.6      R̲A̲C̲K̲S̲

         Each rack is separately packed on a wooden pallet,
         protected with styrophor-corner and wrapped in PVC
         sheets.  An outer wrapping of plywood will protect
         the five free surfaces (see Figure 5.6).














































         1   =   CORRUGATED BOARD
         2   =   RACK
         3   =   FRONT AND REAR PIECES
         4   =   SKID
         5   =   HINGED WRAPPING OF PLYWOOD


                 Figure 5.6…01…Rack Package



                        6  M̲A̲R̲K̲I̲N̲G̲



6.1      G̲E̲N̲E̲R̲A̲L̲ ̲M̲A̲R̲K̲I̲N̲G̲ ̲D̲E̲S̲C̲R̲I̲P̲T̲I̲O̲N̲

         The packages and containers will be equipped with a
         label marked with the following data:

             -   CROSSFOX

             -   B-0209-H (K004/83)

             -   Purchase Control No/ Control Item No.

             -   CHRISTIAN ROVSING A/S, Lautrupvang 2, 2750
                  Ballerup, Denmark.

             -   Destination address

         The destination address and a group of box numbers
         will be furnished by Harris-Rochester.

         In addition each container will be clearly marked with
         a container number and precautionary markings applicable
         to handling (see Figure 6.1-1, 6.1-2. 6.1-3, and 6.1-4).





















































                       Figure 6.1-1





















































                       Figure 6.1-2





















































                       Figure 6.1-3





















































                       Figure 6.1-4



                7  S̲H̲I̲P̲P̲I̲N̲G̲ ̲D̲O̲C̲U̲M̲E̲N̲T̲A̲T̲I̲O̲N̲



7.1      G̲E̲N̲E̲R̲A̲L̲

         The composition of the shipping documentation will
         be as stated in para 3.6.



7.2      P̲A̲C̲K̲I̲N̲G̲ ̲L̲I̲S̲T̲S̲

         Packing lists shall accompany all shipments and two
         copied each shall be provided to the purchaser.  The
         complete set of packing lists will be signed by CHRISTIAN
         ROVSING A/S.

         Each packing list will contain the following information:

             -   Contract Number

             -   Shipping Address

             -   Container Number

             -   Contract Item Number

             -   Item Description

             -   Part Number

             -   Serial Number

             -   NATO Stock Number (if available)

             -   Partial or final shipment

             -   Quantity Shipped

             -   Shipment Number

             -   Date Shipped

         A complete set of packing lists giving the contents
         of the whole shipment will be enclosed in container
         with lowest box number. No copies or sets of packing
         lists should be attached to the outside of the containers.
         Assignment of box numbers will come at a later date
         from Harris-Rochester. See forms in app. A entitled
         Packing List and Master Packing List.





7.3      P̲R̲O̲F̲O̲R̲M̲A̲ ̲I̲N̲V̲O̲I̲C̲E̲

         A proforma invoice with the following information will
         follow each shipment:

             -   Purchaser identification (attention to contracting
                 officer)

             -   Contract reference (contract no., contract
                 item no. etc.)

             -   Contractor identification

             -   Configuration item description (part no., name,
                 quantity, item value)

             -   Total value of shipment

             -   Insurance reference

             -   Origin reference

             -   Total weight and cubage

             -   Container quantity

             -   Bill of lading no.

             -   Carrier reference

             -   Date of shipment



7.4      N̲O̲T̲I̲C̲E̲ ̲O̲F̲ ̲S̲H̲I̲P̲M̲E̲N̲T̲ ̲A̲N̲D̲ ̲A̲U̲T̲H̲O̲R̲I̲Z̲A̲T̲I̲O̲N̲ ̲T̲O̲ ̲S̲H̲I̲P̲

         CR proposes the following for notice of shipment:

         CR will send a "Notice of shipment" per telex to Harris-Rochester
         and copy Harris-Oslo in advance of each shipment. 
         HARRIS will issue an authorization to ship after approval
         by NODECA.  This return telex must be issued at least
         5 working days after such notice.

         At the same time HARRIS will submit to CR the customs
         documents (form. 302) required.



         The notice of shipment will contain:

             -   Contract Number

             -   Shipping Address (consigner and consignee)

             -   Number of containers

             -   Total Weight and Cubage of Shipment

             -   Name and Address of Carrier

             -   Scheduled Shipment

             -   Mode of Transport

         The information stated above should be sufficient to
         issue a form. 302.



7.5      C̲U̲S̲T̲O̲M̲S̲ ̲D̲O̲C̲U̲M̲E̲N̲T̲

         A form. 302 is required along with an authorization
         to ship before any equipment can be executed.  The
         information given in the notice of shipment will be
         used by NODECA for issue of the form. 302.














                        A̲P̲P̲E̲N̲D̲I̲X̲ ̲A̲