WangText
1̲2̲.̲0̲ ̲ ̲ ̲ ̲E̲q̲u̲i̲p̲m̲e̲n̲t̲ ̲M̲a̲i̲n̲t̲e̲n̲a̲n̲c̲e̲
12.1 EMH
12.1.1 Maintenance
12.1.2 Spares
12.2 Toronto Node
12.1.1 Maintenance
12.1.2 Spares
12.3 Montreal Node
12.3.1 Maintenance
12..2 Spares
12.4 Winnipeg Node
12.4.1 Maintenance
12.4.2 Spares
12.5 Depot Spares
1̲3̲.̲0̲ ̲ ̲ ̲ ̲S̲/̲W̲ ̲M̲a̲i̲n̲t̲e̲n̲a̲n̲c̲e̲
13.1 S/W Maintenance, Phase 1
13.2 S/W Maintenance, Phase 2…86…1 …02… …02… …02…
…02…
10.4 D̲e̲l̲i̲v̲e̲r̲a̲b̲l̲e̲ ̲I̲t̲e̲m̲s̲ ̲a̲n̲d̲ ̲D̲o̲c̲u̲m̲e̲n̲t̲s̲ ̲L̲i̲s̲t̲
W̲P̲-̲i̲d̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲D̲o̲c̲-̲i̲d̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲D̲e̲s̲c̲r̲i̲p̲t̲i̲o̲n̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲
̲ ̲ ̲ ̲ ̲ ̲
8.1 Docmentation Plan
8.2 System Description Manual
8.3 System Operator Manual
8.4 Network Operator Manual
8.5.1 Installation Manual
8.5.2 Maintenance Manual
8.5.3 Assembly Breakdown
8.5.4 Inventory Manual
8.5.5 Spares Inventory (Site and
epot)
8.6 Programming and Development
Tools
8.7 S/W Description (As-Built)
9.1 Training Plan
11.1 Transportation Plan
11.2 Site Survey Report
11.3.1 EMH, Site Preparation Requirements
(SPR)
11.4.1 Toronto, SPR
11.5.1 Montreal, SP
11.6.1 Winnipeg, SPR
10.5 S̲c̲h̲e̲d̲u̲l̲e̲
Refer to the Master Schedule. A detailed schedule for
integrated logistics support will be worked out.
11. A̲P̲P̲L̲I̲C̲A̲B̲L̲E̲ ̲S̲T̲A̲N̲D̲A̲R̲D̲S̲
The following CD standards, procedures, and recommendations
apply to the ACDN project:
S̲y̲s̲t̲e̲m̲ ̲E̲n̲g̲i̲n̲e̲e̲r̲i̲n̲g̲:̲
ICD standard CD/STD/
S̲o̲f̲t̲w̲a̲r̲e̲ ̲E̲n̲g̲i̲n̲e̲e̲r̲i̲n̲:̲
Software subsystem documentation standard
Software terminology standard
Software design guidelines
Software verification standard
Product specification standard
Software test procedure standard
Pseudocode standard
UDF standard
SWELL proramming standard
PASCAL programming standard
Module heading standard
C̲o̲n̲f̲i̲g̲u̲r̲a̲t̲i̲o̲n̲ ̲M̲a̲n̲a̲g̲e̲m̲e̲n̲t̲:̲
Configuration item identification standard
Engineering change procedure
Configuration management plan
Version description Document standard
G̲e̲e̲r̲a̲l̲:̲
Design reviews
Problem handling standard
User's manual standard
12. D̲E̲P̲E̲N̲D̲E̲N̲C̲I̲E̲S̲
- Identification of OPNS/CGO to be known by CR before
November 15th 1982.
- SRS to be accepted no later than January 31 if
version 1-3 to be delivered on time.
- OPNS/CGO to be available Nov. - Dec. 1983 at least
2 hours during day time (0830-1200 - 13.00-17.00).
- ACNC machine available 99% of time July 83 - Dec
1984.
- ICC environment available at CR from June 83 until
Network Acceptance Test.
- AC 3xSE assistance (SK-HG-S) Oct. 82 - until Network
Acceptance Test part-time in Copenhagen.