⟦812863b8e⟧ Wang Wps File

    Length: 9758 (0x261e)
    Types: Wang Wps File
    Notes: CPS/TCN/052     (Site 06) 
    Names: »2717A «

Derivation

└─⟦404706d13⟧ Bits:30006172 8" Wang WCS floppy, CR 0254A
    └─ ⟦this⟧ »2717A « 

WangText




…0e…     2717A/ktd/
    …02… CPS/TCN/052

…02… NPP/821201…02……02…#
OPTO CABLE
 INSTALLATION
 INSTRUCTION
 
FOR SITE
 06…02… Issue
 1.1 …02… CAMPS…0f…












                 OPTO CABLE INSTALLATION INSTRUCTION
                 FOR SITE 06


                 CPS/TCN/052













                 Niels Peder Pedersen




                 Kurt Nybroe-Nielsen








                 SHAPE (4), KM, NPP, HAU, DL, Conf. Mgmt.  
                    
















                         Installation Mgr  821201

                                       

             2  


             821201
                                       




      2717A/ktd/…02…CPS/TCN/052

…02…NPP/821201…02……02…2
OPTO CABLE INSTALLATION INSTRUCTION
FOR SITE 06…02…Issue 1.1…02…CAMPS













        820906                 All        Issue 1 of document


        821104               5, 8, 9,   Issue 1.1 of document
                             12, 14

        821201               All        Issue 2 of document








                    T̲A̲B̲L̲E̲ ̲O̲F̲ ̲C̲O̲N̲T̲E̲N̲T̲S̲





     1 GENERAL ......................................  
        4
       1.1 SCOPE ....................................  
            4
       1.2 REQUIREMENTS .............................  
            4
       1.3 DOCUMENT REFERENCE .......................  
            4

     2 RECEIVAL INSTRUCTIONS ........................  
        5

     3 PULLING INSTRUCTIONS .........................  
        6
       3.1 PULLING PRECAUTIONS ......................  
            6
       3.2 HOW TO PREPARE AND RUN OPTO-CABLE ........  
            8
         3.2.1 Preparation of Pull-Loop .............  
                8
         3.2.2 Running the Opto-Cable ...............  
               11
         3.2.3 Finish of Each Cable .................  
               11

     APPENDIX A


                        1  G̲E̲N̲E̲R̲A̲L̲



1.1      S̲C̲O̲P̲E̲

         The purpose of this instruction is to guide host nation
         in performing installation of opto-cables.



1.2      D̲O̲C̲U̲M̲E̲N̲T̲ ̲R̲E̲F̲E̲R̲E̲N̲C̲E̲

         Civil Works Requirements, Doc. No. PAB/CPS/CWR/0XX
           1)

         AS-To-Be-Built, Doc. No. PAB/CPS/ATB/0XX   1)

         1) XX: indicates applicable site.



1.3      R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲S̲

         The opto-cables will be provided by CR and shipped
         to site 6 months prior to start of installation in
         accordance with contract. The opto-cables will be terminated
         by CR with connectors provided by CR.

         Host nation will provide ducting for the opto-cables
         in accordance with ref 1 document. Host nation will
         run the cables from CAMPS equipment room to user terminals
         as specified in ref 1, section 3.

         When the opto-cables are installed they must be left
         with a free end of 5 m above rack D, and 2 m at user
         terminal positions (see ref 1 document). For splicing
         a 2 m overlap is required.

         The opto-cables shall be temporarily labelled by host
         nation at the main racks, at user terminal position,
         and at any splicing point required as specified in
         ref 1 and 2.

         The ducts must not be sealed until CR has completed
         the equipment installation.





                 2  R̲E̲C̲E̲I̲V̲A̲L̲ ̲I̲N̲S̲T̲R̲U̲C̲T̲I̲O̲N̲S̲



         The opto-cables are shipped to main site on rolls.
         On receipt, the rolls must be inspected for any damage.
         

         When the inspection is finished the receipt must be
         confirmed by telex or letter through SHAPE to CR.

         All rolls, including those intended for remote sites,
         will be shipped to the main site address.

         Each roll is marked with a number in accordance with
         a cabling plan which shows the rolls allocated to rooms
         (see Appendix A).

         Rolls allocated for remote sites are also specified
         in Appendix A.

         Host nation will be responsible for distribution to
         the applicable PHQ of those rolls intended for remote
         terminals. If the rolls have to be temporarily stored,
         they must be stored under the same conditions as required
         for the main CAMPS equipment.











                 3  P̲U̲L̲L̲I̲N̲G̲ ̲I̲N̲S̲T̲R̲U̲C̲T̲I̲O̲N̲S̲



         When pulling fiber optic cable, always remember that
         the subject is glass - a delicate subject.



3.1      P̲U̲L̲L̲I̲N̲G̲ ̲P̲R̲E̲C̲A̲U̲T̲I̲O̲N̲S̲

         a)  Before running the cable, a plan of the order in
             which the cables are to be run must be made (see
             Appendix A). This has to be done to avoid that
             short bits of cable have to be spliced together.
             Splicing of opto-cable is a delicate, expensive,
             and timeconsuming task, which can be avoided by
             following the cabling plan in Appendix A.

             Besides the extra work, a spliced cable is always
             more weak and less signal-efficient than an intact
             cable.

             If the cabling plan cannot be followed, please
             notify CR through SHAPE.

             The cable should not be placed directly from roll
             into duct. It should be allowed to remain off roll
             for 24 hours to prevent cable from buckling in
             cable tray.

         b)  When using the appropriate pull-boxes, a correct
             pull-loop and a moderate pulling force, the running
             of opto-cable should present no problems providing
             the following precautions are taken:

             1)  The opto-cable must never be bent to a radius
                 less than 13 mm during installation and a permanent
                 bending radius of less than 100 mm must be
                 avoided.

                 A sharper bending than this may cause micro
                 fissures in the glass to break up, which causes
                 degraded operation even if the fiber does not
                 break completely.



                 So -

             2)  Do not pull on kinks to undo them.

             3)  Do not wrap the cable round the hand when pulling
                 elsewhere than the pull-loop.

             4)  Do not pull the cable across sharp edges.

             5)  Do not use brute force. If the pulling is hard,
                 use liquid soap as a lubricant.



3.2      H̲O̲W̲ ̲T̲O̲ ̲P̲R̲E̲P̲A̲R̲E̲ ̲A̲N̲D̲ ̲R̲U̲N̲ ̲O̲P̲T̲O̲-̲C̲A̲B̲L̲E̲



3.2.1    P̲r̲e̲p̲a̲r̲a̲t̲i̲o̲n̲ ̲o̲f̲ ̲P̲u̲l̲l̲-̲L̲o̲o̲p̲

         To be able to connect the pulling wire to the opto-cable
         it is necessary to make a pull-loop (see figure 3.2-1).

         a)  Remove approx. 100 mm of the white cover jacket,
             using a cable knife (refer to table 3-1).

         b)  Remove all of the exposed black and white outer
             jackets with the jacket stripper.

         c)  Now the yellow woven KEVLAR is exposed. Tear up
             the weaving and thus expose the white inner jacket.

         d)  Snip off both inner jackets (and fibers) as far
             as possible, without hurting the KEVLAR which is
             the strength member of the opto-cable.

         e)  Now tie a reef knot with the ends of the KEVLAR,
             making a loop as big as wanted.

             This loop now should be sufficiently strong and
             protecting the fiber.



           R̲E̲C̲O̲M̲M̲E̲N̲D̲E̲D̲ ̲T̲O̲O̲L̲S̲ ̲A̲N̲D̲ ̲T̲E̲S̲T̲ ̲E̲Q̲U̲I̲P̲M̲E̲N̲T̲



         E̲q̲u̲i̲p̲m̲e̲n̲t̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲M̲a̲n̲u̲f̲a̲c̲t̲u̲r̲e̲r̲ ̲ ̲ ̲ ̲ ̲ ̲T̲y̲p̲e̲ ̲N̲u̲m̲b̲e̲r̲ ̲ ̲ ̲
         ̲ ̲ ̲ ̲ ̲ ̲

         Wire Cutter       XURON Corp        Micro-Shear 170
                                             C II

         Cable Knife       Weidmuller        AM-1

         Jacket Stripper   EREM              165

         Flashlight




















                        Table 3-1


















































   Figure 3.2-1 (sheet 1 of 2)…01…Opto-cable Cross Section


















































   Figure 3.2-1 (sheet 2 of 2)…01…Preparation of Pull-loop



3.2.2    R̲u̲n̲n̲i̲n̲g̲ ̲t̲h̲e̲ ̲O̲p̲t̲o̲-̲C̲a̲b̲l̲e̲

         a)  To run an opto-cable two persons are required,
             since it will not tolerate being forced across
             an edge.

             One person feeds the cable from the reservoir into
             one pull-box while the other person pulls the other
             end.

         b)  In this way of pulling cables, with only one pull-box
             distance (max 20 m) at the time requires a technique
             to avoid kinks, knots, and twisting.

             1)  Start by pulling double the required amount
                 through the first pull-box distance. Then pull
                 the end further down to the next pull-box.

                 Subsequently, a new pull-box distance of cable
                 is run down from the first pull-box to the
                 second, then from the second to the third and
                 so on.

                 In this way the cable to be handled will never
                 exceed 40 m.

             2)  One way of handling piles of excess cable is
                 to make "figure 8s" with the cable coming out
                 of the pull-box. When it is all stacked, turn
                 the heap to get the free end on top.



3.2.3    F̲i̲n̲i̲s̲h̲ ̲o̲f̲ ̲E̲a̲c̲h̲ ̲C̲a̲b̲l̲e̲

         a)  After running a cable, be sure to allow the required
             lengths of additional cable to ease the connector
             terminations later on (see document reference 1).

         b)  After running a cable, the integrity of the fibers
             should be checked by means of flashlight.

             If the test is successful, the cable should be
             temporarily marked at both ends with the specified
             cable number (see Appendix A and document reference
             2). The final cable numbering will be done after
             terminations during site installation.










                        APPENDIX A





                       C̲A̲B̲L̲I̲N̲G̲ ̲P̲L̲A̲N̲



         M̲A̲I̲N̲ ̲S̲I̲T̲E̲

         R̲O̲O̲M̲ ̲N̲O̲    U̲N̲I̲T̲ ̲N̲O̲/̲D̲E̲V̲I̲C̲E̲ ̲T̲Y̲P̲E̲    C̲A̲B̲L̲E̲ ̲N̲O̲    R̲O̲L̲L̲
         ̲N̲O̲

          RA-46          19/VDU              W819        37
          RA-50          20/VDU              W820        37
          RA-57          21/VDU              W821         7
          RA-17          22/VDU              W822         7
          RA-33          23/VDU              W823         7
          A-5            24/VDU              W824         7
          E-8/9          25/VDU              W825         7
          M-42           26/VDU              W826        17
          E-6/1          27/VDU              W827        37
          RA-29          28/VDU              W828         8
          RA-15          29/VDU              W829        17
          D-10/11        30/VDU              W830         8
          B-4            31/VDU              W831         7
          G-4            32/VDU              W832        37
          RA-33          51/MSP              W851         8
          G-4            52/MSP              W852         8
          G-4            53/MSP              W853         8
          RA-29          54/MSP              W854         8
          

           R̲E̲M̲O̲T̲E̲ ̲S̲I̲T̲E̲ ̲6̲A̲:̲

          2365            2/VDU              W22         17
          2365           10/MSP              W30         17
          2365            3/VDU              W23         17
          2365           11/MSP              W31         17

           R̲E̲M̲O̲T̲E̲ ̲S̲I̲T̲E̲ ̲6̲B̲:̲

          2545            2/VDU              W22         37
          2545           10/MSP              W30         37