⟦81f067ed0⟧ Wang Wps File

    Length: 8994 (0x2322)
    Types: Wang Wps File
    Notes: CPS/VCD/001  TEKST        
    Names: »0893A «

Derivation

└─⟦3eaaffc64⟧ Bits:30006034 8" Wang WCS floppy, CR 0057A
    └─ ⟦this⟧ »0893A « 

WangText




…02…CPS/VCD/001

…02…810821…02……02…
VERIFICATION CONTROL DOCUMENT
…02…Issue 1…02…CAMPS









                 T̲A̲B̲L̲E̲ ̲O̲F̲ ̲C̲O̲N̲T̲E̲N̲T̲S̲



   1  GENERAL ...................................... 
     4 to  6

     1.1  PURPOSE .................................. 
       4
     1.2  REFERENCED DOCUMENTS ..................... 
       4
     1.3  TERMS AND ACRONYMS ....................... 
       6

   2  INTRODUCTION ................................. 
     7 to  9

     2.1  ENTRIES IN MATRIX ........................ 
       7
       2.1.1  Requirements Reference ............... 
         7
       2.1.2  System Design ........................ 
         7
       2.1.3  Detailed Design ...................... 
         9
       2.1.4  Verification ......................... 
         9

   3  REQUIREMENTS-DESIGN MATRIX FOR 
      CPS/210/SYS/0001 ............................. 
      10  

   4  REQUIREMENTS-DESIGN MATRIX FOR 
      CPS/230/ICD/0001 ............................. 
     107

   5  REQUIREMENTS-DESIGN MATRIX FOR
      CPS/230/ICD/0002 ............................. 
     120

   6  REQUIREMENTS-DESIGN MATRIX FOR 
      CPS/230/ICD/0003 ............................. 
     144

   7  REQUIREMENTS-DESIGN MATRIX FOR
      CPS/ICD/004 .................................. 
     159

   8  REQUIREMENTS-DESIGN MATRIX FOR
      CPS/ICD/005 .................................. 
     166

   9  REQUIREMENTS-DESIGN MATRIX FOR
      CPS/ICD/006 .................................. 
     167

   10 REQUIREMENTS-DESIGN MATRIX FOR
      CPS/ICD/007 .................................. 
     168


                        1̲ ̲ ̲G̲E̲N̲E̲R̲A̲L̲



         This document is the Verification Control Document
         for the CAMPS system.

         It is an internal CR document, but a copy is presented
         to SHAPE to enhance system visibility.

         The document will be expanded, when detailed information
         is available, from S/W package and H/W module specification.



1.1      P̲U̲R̲P̲O̲S̲E̲

         This document maps requirements to the system design
         with the objective to make it possible to verify that
         all requirements are covered by the design. The document
         will also serve as a reference document which for each
         requirement gives the reference to the design specification
         and to the verification procedures.



1.2      R̲E̲F̲E̲R̲E̲N̲C̲E̲D̲ ̲D̲O̲C̲U̲M̲E̲N̲T̲S̲

         The following documents are referenced in the Verification
         Control Document:

         a)  System Requirements Specification,
             CPS/210/SYS/0001, Issue 3.4

         b)  User Procedures and Associated Formats
             CPS/230/ICD/0001, Issue 3.3

         c)  Supervisor Commands and Procedures
             CPS/230/ICD/0002, Issue 3

         d)  ACP127 NATO Supp. 3 procedures 
             CPS/230/ICD/0003, Issue 3.2

         e)  NICS TARE Interface
             CPS/ICD/004, Issue 2

         f)  TRC, Point-to-Point Interface
             CPS/ICD/007, Issue 2



         g)  CAMPS System Design Specification
             CPS/SDS/001, Issue 1

         h)  CAMPS System Function
             CPS/SDS/002, Issue 1

         i)  Message Management
             CPS/SDS/003, Issue 1

         j)  System Status & Control
             CPS/SDS/004, Issue 1

         k)  Table Management
             CPS/SDS/005, Issue 1

         l)  I/O Control
             CRS/SDS/006, Issue 1

         m)  Storage and Retrieval
             CPS/SDS/007, Issue 1

         n)  STP Design Specification
             CPS/SDS/008, Issue 1

         o)  Logging
             CPS/SDS/009, Issue 1

         p)  Traffic Handling
             CPS/SDS/010, Issue 1

         q)  Message Distribution
             CPS/SDS/011, Issue 1

         r)  Terminal Package
             CPS/SDS/012, Issue 1

         s)  TEP Supervisor VDU Package
             CPS/SDS/023, Issue 1

         t)  TEP User VDU Package
             CPS/SDS/027, Issue 1

         u)  Software Interface Control Document
             CPS/ICD/009, Issue 1

         v)  Data Base Document
             CPS/DBD/001, Issue 1

         w)  R&M Program Plan
             CPS/PLN/004, Issue 2


         x)  CAMPS Installation Plan
             CPS/PLN/005, Issue 1

         y)  CAMPS Maintenance Plan
             CPS/PLN/006, Issue 1

         z)  Quality Requirements for Equipment Purchased for
             the CAMPS Project
             CPS/AUX/009, Issue 1



1.3      T̲E̲R̲M̲S̲ ̲A̲N̲D̲ ̲A̲C̲R̲O̲N̲Y̲M̲S̲

         In the Verification Control Document the following
         terms and acronyms are used:

         APSW        Application Software
         CPS/xxx/ddd CAMPS Document
         CR80        CR80D Computer
         CSF         CAMPS System Function
         HW          Hardware
         IOC         I/O Control
         KER         Kernel
         LOG         Log & Accountability
         MDP         Distribution
         MMS         Message Management system
         N/A         Not Applicable
         OEM         Qriginal Equipment Manufacturer
         OLP         Off-Line Package
         RACK        Rack
         SAR         Storage & Retrieval
         SPSW        Support Software
         SSC         System Status & Control
         SSP         Support Software
         STP         Statistics
         SYS         System
         SYSW        System Software
         TBS         To be Supplied
         TDM         Test/Distribution & Monitor
         TDX         Telecommunication Data Exchange
         TEP         Terminal Package
         THP         Traffic Handling
         TMP         Table Management
         VCD         Verification Control Document
         WDP         Watchdog Package


                     2̲ ̲ ̲I̲N̲T̲R̲O̲D̲U̲C̲T̲I̲O̲N̲



         All software and hardware requirements in the CAMPS
         Requirements Specification from section 3.2 to section
         3.5.2.16 plus all requirements listed in the Interface
         Control Documents no. 1 through 7 have been mapped
         onto the CAMPS System Design Specification and the
         CAMPS Package Design Specification.

         Each requirement referenced in the VCD has been filled
         in with one or more reference(s) to design specification.
         In the cases where more than one reference to the design
         has been specified, the first listed reference points
         to the description where the main part of the requirement
         is described.



2.1      E̲N̲T̲R̲I̲E̲S̲ ̲I̲N̲ ̲M̲A̲T̲R̲I̲X̲

         The VCD matrix is described as a matrix consisting
         of four columns. The columns are named:

         -           Requirements

         -           System design

         -           Package design

         -           Verification



2.1.1    R̲e̲q̲u̲i̲r̲e̲m̲e̲n̲t̲s̲

         All reference numbers of the sections and the subsections
         in the CAMPS Requirements Specification and the ICDs
         are listed as the first column in the matrix.



2.1.2    S̲y̲s̲t̲e̲m̲ ̲D̲e̲s̲i̲g̲n̲

         In this column the requirements are mapped onto the
         system or package level. Where it has been possible,
         the requirements have been mapped down to the package
         level. The used acronyms are correlated as follows:




         ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

         SYSTEM LEVEL             PACKAGE LEVEL
         ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

                                  KER
                         SYSW     IOC
                                  CSF
                                  MMS
                     ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

                                  SSC
                 SW               TMP
                                  THP
                         APSW     MDP
         SYS                      TEP
                                  SAR
                                  LOG
                                  STP
                     ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

                         SPSW     SSP
                                  OLP
             ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

                                  CR80
                                  TDX
                 HW               TDM
                                  WDP
                                  RACK
         ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲ ̲

         The system- and package specification is related to
         the CAMPS System Design Specification, CPS/SDS/001.

         Where the acronym OEM is used, it means that the equipment
         is selected with specifications compliant with requirements
         to be delivered by an original equipment manufacturer.

         Some requirements are not mapped onto the system or
         a package but onto a document. The document fulfils
         or describes how the requirement is verified.



2.1.3    P̲a̲c̲k̲a̲g̲e̲ ̲D̲e̲s̲i̲g̲n̲

         In this column the requirements are mapped onto the
         package design specification. Each requirement has
         a reference, which points to a specific document, and
         section, where the required function is described.



2.1.4    V̲e̲r̲i̲f̲i̲c̲a̲t̲i̲o̲n̲

         This column contains for each requirement a reference
         to the verification procedures, where the verification
         of the requirement is described. This column will be
         filled in when the verification procedures is available.











    3̲ ̲ ̲R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲S̲-̲D̲E̲S̲I̲G̲N̲ ̲M̲A̲T̲R̲I̲X̲ ̲F̲O̲R̲ ̲C̲P̲S̲/̲2̲1̲0̲/̲S̲Y̲S̲/̲0̲0̲0̲1̲


























    4̲ ̲ ̲R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲S̲ ̲D̲E̲S̲I̲G̲N̲ ̲M̲A̲T̲R̲I̲X̲ ̲F̲O̲R̲ ̲C̲P̲S̲/̲2̲3̲0̲/̲I̲C̲D̲/̲0̲0̲0̲1̲


























    5̲ ̲ ̲R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲S̲ ̲D̲E̲S̲I̲G̲N̲ ̲M̲A̲T̲R̲I̲X̲ ̲F̲O̲R̲ ̲C̲P̲S̲/̲2̲3̲0̲/̲I̲C̲D̲/̲0̲0̲0̲2̲


























    6̲ ̲ ̲R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲S̲ ̲D̲E̲S̲I̲G̲N̲ ̲M̲A̲T̲R̲I̲X̲ ̲F̲O̲R̲ ̲C̲P̲S̲/̲2̲3̲0̲/̲I̲C̲D̲/̲0̲0̲0̲3̲



























      7̲ ̲ ̲R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲S̲ ̲D̲E̲S̲I̲G̲N̲ ̲M̲A̲T̲R̲I̲X̲ ̲F̲O̲R̲ ̲C̲P̲S̲/̲I̲C̲D̲/̲0̲0̲4̲
















      8̲.̲ ̲ ̲R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲S̲-̲D̲E̲S̲I̲G̲N̲ ̲M̲A̲T̲R̲I̲X̲ ̲F̲O̲R̲ ̲C̲P̲S̲/̲I̲C̲D̲/̲0̲0̲5̲


             This section will be completed when the CAMPS-SCARS
             interface is base-lined.

















 9̲.̲ ̲ ̲R̲E̲Q̲U̲I̲R̲E̲M̲E̲N̲T̲S̲-̲D̲E̲S̲I̲G̲N̲ ̲M̲A̲T̲R̲I̲X̲ ̲F̲O̲R̲ ̲C̲P̲S̲/̲I̲C̲D̲/̲0̲0̲6̲


             This section will be filled in when the
             CAMPS-CCIS interface is base-lined.